Loading...
5.1.-5.4. HERITAGE MAPLES 1-10-2006 . . Item # 5 . 1. - 5.4. MEMORANDUM TO: Planning Commission Scott Harlicker, Senior Planner ~ FROM: DATE: January I 0, 2006 SUBJECT: Case No. LUOs-Os, ZCOS-03, CUOS-172 and P 05-16, Request for a Land Use Amendment, Zone Change, Conditional Use Permit and Preliminary Plat (Heritage Maples) Request The applicant has requested the following: . Land Use Plan amendment from CC (Community Commercial) to UR (Urban Residential) . Zone Change from C3 (Highway Commercial) and R3 (Townhouse District) to PUD (planned Unit Development) . Conditional Use Permit for the PUD . Preliminary Plat for a 52 unit townhouse development 60 Day Rule and 120 day Rule At the November 2151 City Council meeting, the applicant agreed to an extension of the 60 - Day Requirement for the Land Use Plan amendment, zone change, conditional use permit and preliminary plat to January 17,2006. Location The project is located between the West Oaks subdivision and Highway 10, East of Big Lake Township and west of Waco Street. Zonin&/Land Use . R3(Townhouse District) & C3 (Highway Commercial) / CC (Community Commercial) . . . Heritage Maples January 10,2006 Page 2 Attachments Location Map Development Plans Townhouse Elevations Air photo of area Memo from the City Engineer, dated 10/13/05 Memo from the Environmental Technician, dated 9/29/09 Letter from the applicant Minutes from October 17th and November 21 st City Council meetings Overview At their November 21 st meeting, the City Council postponed action on these items and referred them back to the Commission for further review. The plans presented to the Council had been revised since the Commission had reviewed them. The revisions were in response to concerns the Commission had raised. This project will be presented to the Council for their consideration on January 17th. The applicant is proposing to develop 13.82 actes into a 52 lot townhouse planned unit development. The topography of the site is rolling with medium tree coverage and a large wetland complex. Most of the tree coverage is in the southwest and central portions of the site. There is a power line easement and transmission line that crosses east to west across the middle of the site. The site is bounded by Highway lOon the north, a 5 acre single family parcel of the east, West Oaks development to the east and south and Big Lake Township to the west. The southern part of the site, south of the power line easement, was included in the West Oaks plat as an outlot. Land Use Amendment A land use amendment is required as part of this project. The northern portion of the property is currently guided as CC (Community Commercial). The applicant is requesting to change the land use to UR (Urban Residential). Given the surrounding residential land uses and access, urban residential could be an acceptable land use. Zone Change A zone change is required as part of this project. Most of the property is currently zoned C3 (Highway Commercial). The southern portion, the area included as an outlot in the West Oaks plat, is currently zoned R3 (Townhouse District). The applicant is requesting that the zoning be changed to PUD (planned Unit Development). The applicant has provided a narrative explaining why a zone change to PUD should be approved. The applicant could develop the property as a townhouse development with an R3 zoning. Conditional Use Permit Townhouse Elevations S:\PLANNING\Case Files\2005\P 05-16 Heritage Maples\P05-016PC1-10.doc Heritage Maples January 10,2006 Page 3 . A conditional use permit is required for the proposed PUD. As part of the CUP process a review of the townhouse elevations is required. The exterior of the units are a mix of brick, stucco, vinyl lap and shake siding. The elevations are approved as part of the CUP. For comparison, it appears that the units comply with the R3 design standards. Lots All of the units have a minimum 20 foot setback from the wetland. All but three of the units are setback 30 from the public right-of-ways. Along the service road, one unit is setback 14.6 feet and two are setback 24 feet. The units are setback 22 feet from the edge of the private feet street. For comparison, 30 feet is the minimum setback requirement from private streets and public right-of-ways in the R3 district. The units in the center of the project are very close together. Along the front of the units there is about 10 feet between units. The net density of the project, lot area minus wetland, is 4.32 units/acre. Streets/ Parking A service road is proposed along Highway 10 from Raven Lane in Big Lake Township to the east boundary of this plat. The right of way for the service road is 60 feet. Yankton Street is proposed to be extended as a public street from the north boundary of West Oaks to intersect with the proposed service road. There is a private loop street through the center of the site; 48 units will have access from this road, four units will have access from Yankton . Street. Sidewalks are provided along all of the streets. Four off street parking spaces are proposed for each unit, two in the garage and two in the driveway. The private street is 28 feet wide; this is wide enough to allow on street parking on one side of the street. No additional off street spaces are proposed. Yankton Street will be 32 feet wide, which will allow parking on both sides of the street. Landscaping The trees in the southwest corner of the site will be removed as a result of this plan. These trees are the only trees on the site. The area was listed on the NRI with a qualitative rank of C. This area is a remnant piece of the original wooded area that is now the West Oaks development. The proposed landscape plan includes 70 overstory trees and 87 evergreen trees. The landscaping requirement for subdivisions is two trees per lot, one boulevard tree and one front yard tree. The landscape plan includes 70 front boulevard/ front yard trees; based on the subdivision ordinance 104 boulevard/front yard trees are required. Thirty (30) additional streets trees should be planted along the service road. Eighty-seven evergreen trees are proposed to provide screening within the site, along the service road and along the west boundary of the plat, between the townhouses and the existing single family homes. Fifty- seven ornamental trees are proposed as well as landscaping around the townhouses. . S:\PLANNING\Case Files\2005\P 05-16 Heritage Maples\P05-016PC1-1O.doc . . . Heritage Maples January 10, 2006 Page 4 Preliminary Plat A preliminary plat for 52 townhouse lots is being proposed. The plat includes platting Yankton Street from the north boundary of West Oaks to intersect with the proposed service road. The plat is consistent with the current site plan. Grading, Drainage and Utilities Grading, drainage and utility issues are addressed in the City Engineer's memo. Park and Recreation The Park and Recreation Commission recommended cash to meet the park dedication requirements. Recommendation Staff recommends that the Commission recommend approval the applicant's request for a Land Use Plan amendment from CC to UR based on the following findings: 1. The proposed amendment is appropriate for this site because the proposed land use is compatible with the adjacent residential land uses. 2. The proposed amendment is appropriate for this site because it is accessed from local streets that service residential neighborhoods. Staff recommends that the Commission recommend approval the applicant's request rezoning from C3 to PUD based on the following findings: 1. The proposed PUD zoning is consistent with the proposed land use of Urban Residential. 2. The proposed PUD zoning is compatible with the adjacent single family residential and townhouse zoning. Staff recommends that the Commission recommend approval the conditional use permit for the PUD with the following conditions: 1. ALL COMMENTS OF THE CITY ENGINEER SHALL BE ADDRESSED. 2. THE LANDSCAPE PLAN BE REVISED TO INCLUDE EVERGREEN TREES PLANTED 25 FEET ON CENTER ALONG THE WEST BOUNDARY OF THE PROJECT AND OVERSTORY TREES BE PLANTED 30 FEET ON CENTER ALONG THE SERVICE ROAD. 3. THE WETLAND ENHANCEMENT PLAN BE APPROVED BY THE TEP PRIOR TO ANY GRADING ON SITE. S:\pLANNING\Case Files\2005\P 05-16 Heritage Maples\P05-016PC1-1O.doc Heritage Maples January 10, 2006 Page 5 . Staff recommends that the Commission recommend approval of the preliminary plat with the following conditions: 2. 3. 4. 5. 6. 7. 8. . 9. . 1. A DEVELOPERS AGREEMENT BE PREPARED AND EXECUTED OUTLINING THE TERMS AND CONDITIONS OF THE PLAT APPROVAL PRIOR TO RELEASING THE PLAT FOR RECORDING. SURFACE WATER MANAGEMENT FEE BE PAID IN THE AMOUNT REQUIRED BY THE CITY AT THE TIME OF FINAL PLAT PRIOR TO RELEASING THE PLAT FOR RECORDING. THE LETTER OF CREDIT SHALL COVER WETLAND MITIGATION. DRAINAGE EASEMENTS SHALL BE IN PLACE OVER THE WETLAND AND THE WETLAND MITIGATION AREAS. RESTRICTIVE COVENANTS SHALL BE RECORDED ON THE WETLAND AND THE WETLAND MITIGATION AREAS. A THREE YEAR MONITORING REPORT ON THE WETLAND MITIGATION IS REQUIRED. THE CITY ENGINEER'S COMMENTS BE INCORPORATED INTO THE PLANS. STREET LIGHTS BE INSTALLED AS REQUIRED BY ELK RIVER UTILITIES A LETTER OF CREDIT BE PROVIDED TO THE CITY IN THE AMOUNT OF 100% OF THE COSTS OF THE PUBLIC IMPROVEMENTS. UPON COMPLETING ALL OF THE IMPROVEMENTS AND HAVING THEM ACCEPTED BY THE CITY, A WARRANTY BOND IN THE AMOUNT OF 25% OF THE IMPROVEMENT COSTS SHALL BE SUBMITTED TO THE CITY FOR THE PERIOD OF ONE YEAR. 10. A SEALCOAT FEE IN THE AMOUNT TO BE DETERMINED BY THE CITY ENGINEER BE PAID PRIOR TO RELEASING THE PLAT FOR RECORDING. 11. A GRADING AND EROSION CONTROL PLAN BE APPROVED BY THE CITY ENGINEER PRIOR TO THE ISSUANCE OF BUILDING PERMITS. 12. A DEVELOPMENT PLAN BE APPROVED BY THE CITY ENGINEER PRIOR TO THE ISSUANCE OF BUILDING PERMITS. 13. ALL GRADING BE CERTIFIED PRIOR TO THE ISSUANCE OF BUILDING PERMITS. 14. ALL MAILBOXES BE CLUSTERED. 15. A TREE PRESERVATION PLAN BE APPROVED PRIOR TO RELEASING THE PLAT FOR RECORDING. 18. ANY TREES OFF SITE OR ON SITE, NEAR THE LIMIT OF GRADING THAT ARE TO BE PRESERVED, SHALL BE FENCED WITH A SNOW FENCE AT THE DRIP LINE TO PREVENT GRADING, COMPACTION, OR STORAGE OF EQUIPMENT, DEBRIS OR MATERIALS. STAFF SHALL INSPECT FENCING PRIOR TO GRADING COMMENCING. 19. WATER ACCESSIBILTY FEES IN THE AMOUNT DETERMINED BY THE CITY BE PAID PRIOR TO RELEASING THE PLAT FOR RECORDING. S,\PLANNING\Case Files\2005\P 05-16 Heritage Maples\P05-016PC1-10.doc . . . Heritage Maples January 10, 2006 Page 6 20. ANY ITEM OR CONDITION FOUND THAT INDICATES THE SITE IS LIKELY TO YIELD INFORMATION IMPORTANT TO PRE-HISTORY OR HISTORY SHALL BE REPORTED TO THE CITY IMMEDIATELY. FURTHER, THE CITY RESERVES THE RIGHT TO STOP WORK AUTHORIZED IN ITS APPROVAL UNTIL THE SITE IS APPROPRIATELY INVESTIGATED AND WORK IS AUTHORIZED. 22. THE DEVELOPER SHALL WORK WITH THE CITY ON AN OAK WILT SUPPREESION PROGRAM. THIS PROGRAM SHALL BE APPROVED AND IN PLACE PRIOR TO ANY TREE REMOVAL. 24. ALL COMMENTS CONTAINED IN REBECCA HAUG'S MEMOS DATED 9/13/05 AND 9/29/05 SHALL BE ADDRESSED. 25. PARK DEDICATION FEE IN THE AMOUNT APPLICABLE AT THE TIME OF FINAL PLAT APPROVAL SHALL BE PAID FOR THE 52 UNITS. S:\PLANNING\Case Files\2005\P 05-16 Heritage Maples\p05-016PC1-1O.doc I 4111'" T4 li, ~ W r II ~ ~ l- f-- J~ <l: > ~ - Ct: ~ t. ~ ~t. Ii.. I '~ ~~ ~ ~ r ~~ c-- I R~T" II "~r \:,i ..-.. NW w - ::J ); I- m <l: - C~ w > 186 TH AV ~ U N (f) cr. 10' ::----. :-l 0- ~ ~r- '-" ~ 18 ~~ - ~ ~ c-- I- ~ I- --.......7'i-f.."'::"I--~ W ~ W f--- ~ - E Ct: > I- ~ is f--- (f) Wa- f--- >- ~ -' ~::- =--=- 0 ~ f--- ~, Ct: ~ ..;;;: ~ ( I- <l: f--- ~ 0- ~; ~~ r ' , ~ ~~~ ~~ BUSINESS CENTER DRIVE COUNTY ~fj 0 ~~~ ~ COURT ELK PAJPN'fER - C) - rnorno %\ ~ t- Bl1SINESS H OU SE ~ ~-\ I \ I I I 11 12 h J) - f- f--- '1-f- ~ ~3 V:J f- ?J..- \ I ~ r" z ~ is'..>- Q, h- A ENUE \J~ D::-t;j~ o NW ~[~j ~ ~ ~ ~ PINEWOOD ~--v ~ ~ 182Nb A w - GOLF COURSE ~ / b 0 ~ V ,~~o I- ?V ioJ R V R IE~ 1E G T$ ~ I- ~ W ~ ~~W~~ j ~(')- w Ct: t I- ~ ocit=~ (f) ~~ lADD~ ~~ .:~ ~ Ct: ~J~ qr .G~Of ~ Location Map El --- N River ' Case Number: P 05-16 HERITAGE MAPLES ~ - -l :r: f'T1 ~ ::0 :r: 1m ~ .:il """ "1"I 2! III l/) :::o~ ij ;u o Z -f fTl r fTl < )> -f o Z - -l :r: I: I-!- f'T1 .:;-1 r- "'" ~ III z !: - -l :r: f'T1 co f'T1 ~ 1m o .:j't Z "'" !: "I - ~ f'T1 1m ~ .:il ::0 "',1 ~ 1'1 ~ z tI) ::q ~O'j pi ~, ~~~ ~ ~ ~ ~ .. /lJ ~ o I 0 z 1 ~ ~ l I r ) Z . ~~ II ~Ul ~~ 1] ;U o u Z ~ ~ \ -I . ~ ~ ~.i. .ppi IrU .1'1 '< I}> t~ o z ~~ ~ ~ ! ~ ~ ! ~ B a q ~ ~ o o I 1] I -. j-- I I I I I I I I I '------ 1 1 r } Z . r---- I I I I I I I I L__________ - ::c '" aJ=i)o- !:l1g, GI"11"1J: -OVlITl ~~~ ."VlEITl ~o~~ .,,~ ITl ~~~x ~"z '" <: '" '" . -, I I I I I I I I I I I r _____..J . . . 1J ;0 o Z m -i Bi fIJ lAB r f~ fIJ < > _. -i ~ . J B . j IA~ S ij ii . 13065 Orono Parkway Elk River, MN 55330 October 13, 2005 File: 226-082P Mr. Scott Harlicker Senior Planner City of Elk River 13065 Orono Parkway Elk River 11N 55330 RE: HERITAGE MAPLES ADDITION Dear Mr. Harlicker: . As requested we have reviewed the revised submittal package for the Heritage Maples Addition as prepared by Schoell & Madson, Inc. The revised set of plans had a revision date of October 11, 2005. These plans were submitted after a meeting with the developer's representative and their engineer. Our comments will keep in mind our previous letters regarding this proposed project dated August 15, 2005 and September 26, 2005. A. Existing Conditions Plan Our questions relative to the existing conditions plan were answered via a recent phone call from the developer's representative. · The Existing Conditions plan shows a 50-foot roadway easement adjacent to TH 10 that runs from the northwest comer to the southeast comer and through the comer of the Beck property. The developer's representative indicated this easement does not exist. · There is also an area labeled "Existing Easement" adjacent to TH 10 that is approximately centrally located in the property and appears to be 66 feet wide by 220 feetlong. The developer's representative indicated this easement is for access to the two parcels. As such, it may need to be vacated as part of the platting process. . Phone: 763.635.1000 Fax: 763.635.1090 www.cLelk-river.ffill.us Heritage Maples October 13, 2005 Page 2 . B. Service Road . The preliminary plat has been revised to show a 60-foot right-of-way for the service road adjacent to TH 10. I have had a conversation with Terry Humbert, the MnDOT Project Manager for TH 10 Inter Regional Corridor and he concurs that a 60-foot right-of-way should be sufficient for the future when improvements are made to TH 10. At that time, the service road will act as a frontage road leading traffic to various intersections along TH 10. . There is an existing access to TH 10 that is noted to be removed in the Existing. Conditions Plan. The final plat will need to provide access control along the entire TH 10 frontage. . The preliminary plat should acquire the necessary property from the Beck parcel to continue the service road from the southeast corner of Heritage Maples over to the old Waco Street alignment, ultimately coming out to the intersection of new Waco Street and Business Center Drive. This will provide a direct connection for this development to the signalized intersection at Waco Street and lli 10. C. Preliminary Grading Plan/Preliminary Utility Plan . . This project in its current form has been presented to the Technical Evaluation Panel (rEP). The TEP has approved the minor wetland filling. . The project should provide a minimum 20-foot setback from the wetland boundary. This 20-foot area should be a "no grading" and "no cutting" of any native vegetation. On the most recent revision the developer has revised the plan to provide the wetland buffer in all areas with the exception of near Building 42, the service road, and the pond near Yankton Street. It should be noted that the ponding area near Yankton Street has been discussed with the developer's representative and determined that it is more important to provide adequate quality control for the runoff than to provide the entire wetland buffer with a less than adequately sized pond. . Sanitary sewer alignment from the West Oaks Addition to Private Street A was revised with the previous revision to provide all manholes in paved areas, however, there is still a manhole in the driveway of Units 35 and 37. The City Sewer Department will need to get its jet truck to this manhole at least once a year. The truck fully loaded is in excess of 80,000 lbs. This driveway will need to be constructed to support this weight. . . There is a similar water connection that has been moved to the same alignment as the sanitary sewer. According to City policy, this water connection must be of HDPE pipe with a valve at both ends and no service connections in between. S:\PLANNING\Case Files\2005\P 05-16 Heritage Maples\10 13 05 engr's memo.doc Heritage Maples October 13, 2005 Page 3 . . It appears that an attempt has been made to provide the 40-foot wide drainage and utility easement needed for these utility routings on Building Sites 37 and 40. . Hydrant locations will be reviewed with the Fire Chief during the final plat review process. . Sidewalks are shown along the west side of Yankton Street, along the south side of the service road, and around the internal portion of Street A. All sidewalk pedestrian ramps must be constructed in accordance with MnDOT Detail7036F. The precast panel should be red in color. Panels are to be submitted for approval prior to installation. . The area west of Lots 46 and 47 still appears to be too flat. . . The storm sewer system has been revised slightly based on previous comments. The concept of the storm sewer system is approvable. The detail of the storm sewer calculations still needs to be reviewed. . It appears that the pond contours have been revised to meet the City standard for grading of pond areas. . . A MnDOT permit will be needed for ditch grading and culvert installation in the ill 10 right-of-way. Will MnDOT accept an increase in the lOO-year discharge from 1.79 CFS to 5.07 CFS? . The Grading Plan shows filling under the power line. This will need to be reviewed and approved by the power company. D. Miscellaneous Items . MnDOT has previously contacted the City of Elk River regarding the potential for a Local Initiative Project to build the service road adjacent to ill 10. With Local Initiative Projects, MnDOT participates in the funding. If the developers and MnDOT are willing to proceed this way, the City could pursue a Local Initiative Project for the construction of this service road. The City would need to be involved, since MnDOT policies do not allow for these types of agreements with individuals. It is unclear whether or not MnDOT would allow the project to proceed and simply reimburse the City for the construction, if a Local Initiative Project were approved. . . A portion of this project which is in Outlot A of West Oaks has previously been assessed for trunk sewer and water. The remaining portion of the project has not. It should be a requirement of the development that the portion not previously assessed be assessed for trunk sewer and water at the current rate. The 2005 assessment rate for trunk sewer and water is $7,163.87 per gross acre minus any delineated wetland area that is not proposed to be filled. S:\PLANNING\Case Files\2005\P 05-16 Heritage Maples\10 13 05 engr's memo.doc Heritage Maples October 13, 2005 Page 4 . · This project will require an NPDES permit and a Storm Water Pollution Prevention Plan (SWPPP). The submittal package should include a written text for SWPPP and an exhibit showing where silt fence and other erosion methods would be utilized. City policy requires that the SWPPP be signed by the owner, the engineer, and the contractor. If you have any questions regarding any of these comments, please call. Sincerely, ~~ Terry J. ~~er, PE City Engineer . . S:\PLANNING\Case Files\2005\P 05-16 Heritage Maples\10 13 05 engr's memo.doc . "" . . MEMORANDUM TO: Scott Harlicker, Senior Planner Rebecca Haug, Environmental Technician f 7f' FROM: DATE: September 29, 2005 SUBJECT: Heritage Maples Plat - Environmental Issues . On Sept~mber 2;8, 2005, Victor Pacheco, Mara Anderson and I met to discuss the environmental issues in th~Heritage Maples Plat. [mp~cts in the buffer area were discouraged since the City is proposing a wetland buffer ordinance with the purpose of the buffer having an area that is not impacted. The use of rain gardens to minimize the size of the drainage ponds was discussed to avoid impacts in the wetland buffer area. Mara and [ gave Victor some names of communities that have incorporated rain gardens and a few websites for installation, specifications, ecological benefits and cost effectiveness. Moving the proposed sidewalk along the Service Road to the West would avoid or minimize wetland impacts, which is the purpose of the Wetland Conservation Act. Also, since the project is serviced by a private drive, the idea "of making the drive a one- way was brought up to allow for space to move the structures farther away from the wetland. . Finally, since .the greatest impact is caused by two four-unit build.ings, Victor acknowledged that by moving them to another lot, and/or replacing them with a different style of building, impacts could be" minimized even further. . I understand that this plat is going in front of the City Council for approval on October .17, 2005. If you need any additional information from me prior to that meeting, please feel free to contact me. Thank you. . 6.6. 6.7. 6.8. 6.9. . . City Council Minutes October 17, 2005 Page 9 Consider Resolution for Land Use Map Amendment to Change the Land Use from CC (Community Commercial) to UR (Urban Residential) as Requested by New Century Land Development. Public Hearing. Case No. LV 05-05 Consider Ordinance for Zone Change from C3 (Highway Commercial) to PUD (planned Unit Development) as Requested by New Century Land Development. Public Hearing. Case No. ZC 05-03 Request by New Century Land Development for Preliminary Plat (Heritage Maples), Public Hearing. Case No. P 05-16 Request by New Century Land Development for Conditional Use Permit for Residential Planned Unit Development. Public Hearing. Case No. CV 05-17 Staff report submitted by Senior Planner Scott Harlicker. Mr. Harlicker stated the applicant is requesting a land use amendment, a zone change, a conditional use permit, and a preliminary plat for a 52 unit townhouse development. He provided an overview of the project. Mr. Harlicker stated the Planning Commission denied all the requests of the applicant. Some members of the Commission felt the land use should remain commercial. He stated the Commission wanted to continue these items so that many staff and Commission issues could be addressed. Acting Mayor Dietz stated he was in favor of this development if it was to be for senior housing. He would like a condition added that the townhomes could only be for residents 55 and older. Mr. Harlicker stated it could also be added to the PUD agreement. Acting Mayor Dietz opened the public hearing on all four requests. Victor Pacheco, applicant, representing New Century Land Development-Stated he didn't want to bring the requests back to the Planning Commission because he believed they wanted the zoning to remain commercial and it wouldn't matter how many changes he tried to make. He stated there has been a lack of commercial interest in this parcel due to its location, shape and wetlands. Acting Mayor Dietz closed the public hearing on all four requests. Councilmember Farber expressed concerns over the private drives in the plat. He stated there are other senior housing developments in Elk River where the private drives cannot handle vehicles such as garbage trucks and the residents must haul their garbage to the end of drives. Brad Stevens, Planning Commissioner-Stated the Commission was concerned about losing the commercial aspect for this parcel but was willing to work with the applicant for the townhome development. He stated the Commission had many concerns about the plat including: the loss of a community center, high density, setbacks between buildings and near wetlands, architectural improvements, and green space. Mr. Pacheco stated there may have been a misunderstanding between himself and the Planning Commission regarding the zone change. He stated the setbacks were garages that were close together and not living spaces. Councilmember Farber questioned why the Planning Commission felt the density of this project was too high when the applicant appears to be under the city's requirements by half. City Council Minutes October 17, 2005 Page 10 . Mr. Stevens stated that because the townhomes were so close together and didn't meet the setbacks to each other and the wetlands, the Commission felt the density was too high. Discussion was held regarding the difference between city streets and private drives. Acting Mayor Dietz questioned how the city could get the rest of the service road to Waco Street. Mr. Maurer stated there is one parcel of property (Beck property) that the service road needs to cross to connect to Waco Street. He stated the city could have the developer make contact with the Beck property owners to try and acquire enough property for the service road. If they can't the city would need to use the power of eminent domain. Acting Mayor Dietz questioned where the funds would come from to pay for the property acquisition and the service road. . Mr. Maurer stated he believed the expense may be too much for the developer but noted that they are the reason the road is needed. He stated if the developer is successful with the property acquisition and installs the road, then the city could agree with some type of cost participation. He stated another option is to have the developer pay $750 per townhome unit to use toward the construction of the service road but they would still have to negotiate with the Beck property owners for purchase and acquisition of land for the service road. He stated MnjDOT may by willing to participate in construction through the Local Initiative process. Acting Mayor Dietz questioned if a community center had been in the plat at one time. Mr. Pacheco stated that sometimes the builder will convert one of the units into a community center for residents but felt for this development was too small to support it. Councilmember Motin stated he was concerned about rezoning this parcel prematurely. He stated there is not a lot of commercial property on the west side of town and felt tllere was a need for it. He stated he didn't think the wetlands would make it difficult to develop commercially. He stated he would like more information on the impact to adjacent commercial properties. He stated that with all the residential development going on in the area, the commercial property is needed. He stated the Council may want to continue these requests. Councilmember Motin stated he would like to see revised drawings with the comments of staff and the Planning Commission addressed. Councilmember Gumphrey stated he would like to see the city take ownership of the private streets due to the issues with other townhomes in Elk River. He stated the frontage road should be connected to Waco Street. MOVED BY COUNCILMEMBE FARBER AND SECONDED BY COUNCILMEMBER MOTIN TO CONTINUE THE LAND USE AMENDMENT, ZONE CHANGE, CONDITIONAL USE PERMIT, AND PRELIMINARY PLAT FOR HERITAGE MAPLES TO NOVEMBER 21,2005. MOTION CARRIED 4-0. . City Council :Minutes November 21, 2005 Page 8 . 4. FIRE ACCESS LANE(S) SHALL BE APPROVED BY THE FIRE CHIEF. 5. THE BUILDING SHALL MEET ALL BUILDING CODES. 6. THE BUILDING SHALL MEET ALL FIRE CODES. MOTION CARRIED 5-0. Councilmember Farber stated the developer did a good job with making this development not look like a typical strip mall. Mayor Klinzing stated the developer has stuck to what they said they would do for this project. 6.8. Request by Riverside Development for Preliminat;y Plat Extension-Hillside Estates 8th Addition Mr. Harlicker stated Riverside Development is requesting an extension of the preliminary plat for Hillside Estates 8th Addition. He stated this will allow the developer to final plat the remaining lots into the Eleventh and Twelfth Additions. Councilmember Motin questioned how this would affect the current flooding issues in Hillside. . Mr. Maurer stated he is working with the developer in resolving the flooding issues. He stated the developer has been very cooperative and wants to remedy this situation:. Discussion was held on how long to extend the timeframe. MOVED BY COUNCILMEMBER FARBER AND SECONDED BY COUNCILMEMBERGUMPHREY TO EXTEND THE PRELIMINARY PLAT FOR HILLSIDE ESTATES 8th ADDITION FOR ONE YEAR. MOTION CARRIED 5-0. 6.9. Resolution for Land Use Map Amendments to Change the Land Use from CC (Community Commercial) to UR (Urban Residential). Requested by New Century Land Development. Public Hearing-Case No. LU 05-05 Mr. Harlicker stated this item was continued from the October 17, 2005 City Council meeting. He provided a brief review of the land use amendment requested by the applicant. Mayor Klinzing opened the public hearing. Daniel Leistico, 18627 144th Street, Big Lake-Stated he was in favor of the development if it is still for the 55 and older community and is limited to one level housing. He is opposed to extending the frontage road from his house over to Waco Street. He is also concerned for approximately 30 trees he planted near the road in front of his house. . Victor Pacheco, applicant-Stated the property is not viable as a commercial lot due to its site constraints and the market conditions. City Council :Minutes November 21, 2005 Page 9 . Mayor Klinzing closed the public hearing. Councilmember Dietz stated he would like to see this plat go back to the Planning Commission for further review. Planning Commissioner Leo Offerman stated there were some unresolved issues regarding wedands, city engineer's comments not addressed, and nonconforming lots. Mr. Clark stated a four-fifths vote was needed for the land use amendment and a Councilmember suggested this item be continued to tonight until there was a full Council. Councilmember Motin stated this item was also postponed so that issues mentioned in the October 17, 2005 minutes could be addressed (commercial viability, impact to east property owners, revised drawings that take into account staff/Commission/Council comments). Mr. Pacheco handed out revised drawings and stated the site is difficult to develop commercially as there are electrical easements through the property and the city would be taking additional right-of-way for a frontage road. Councilmember Farber questioned the amount of land use available for any commercial or residential development. . Mr. Maurer stated he has reviewed the revised drawings and Mr. Pacheco has addressed many of the issues raised by the Planning Commission. He stated many commercial projects have power line and wedand issues that have been worked around. Councilmember Dietz stated he would be voting against this project as the Planning Commission did not get a full chance to review the plat. He stated he is not opposed to the project. Councilmember Gumphrey concurred. Councilmember Farber concurred and stated the Planning Commission should be allowed to have their concerns resolved. Mr. Beck stated this item needs to be voted on by the City Council by November 24, 2005. He stated the applicant would need to agree to an extension. Mr. Pacheco questioned the issues. He stated he thought they were addressed with Planning Commission and staff. Mayor Klinzing explained to the applicant that the city needs his written approval to extend the time frame on the land use amendment, the zone change, preliminary plat, and conditional use permit. She stated the Council is not completely opposed to the change from commercial to residential but would like to see some issues resolved. Mr. Pacheco requested the Council change the land use at this meeting. . Councilmember Dietz stated that all the items are tied together. He stated that if the issues on this plat are not addressed satisfactorily, then the Council may want to leave the land use designation as commercial. City Council Minutes November 21, 2005 Page 10 . :Mr. Beck stated the applicant would need to provide a written letter agreeing to extend the timeframe deadline by 60 days on all four items prior to the Council acting on them. He stated if the Council wished to deny the items tonight they would need to provide findings for the denial. :Mr. Pacheco stated he would like to continue to work with the city and agreed to submit a letter extending the timeframe deadline. Councilmember Motin stated he was concerned about changing the zoning from commercial to residential. He stated this will make the other commercial lots in the area less desirable for commercial development. :Mr. Pacheco stated the revised drawings include the frontage road requested by the city and meet MnjDOT specifications. He stated concerns regarding the cost to him for the frontage road. :Mr. Maurer recommended the frontage road be connected to a signalized intersection and that MnjDOT Local Initiative funds may be available in 2007 for this project. Items 6.9.-6.12. were acted upon after Item 6.14. on this agenda in order to give:Mr. Pacheco time to draft and submit his letter requesting the timeframe extension. 6.13. Dodge Avenue Improvement-Resolution Accepting Feasibility Report and Ordering Public Hearing . :Mr. Maurer presented the feasibility report for the reconstruction of Dodge Avenue. He stated he held an informational meeting with the affected property owners and they feel the improvement will help their businesses. He stated approximately 40% would be assessed to property owners and 60% would be paid from street reserves. MOVED BY COUNCILMEMBER MOTIN AND SECONDED BY COUNCILMEMBER DIETZ TO ADOPT RESOLUTION 05-124 RECEIVING THE FEASIBILITY REPORT AND ORDERING A PUBLIC HEARING ON THE IMPROVEMENT IN THE MATTER OF THE DODGE AVENUE IMPROVEMENT OF 2005. MOTION CARRIED 5-0. 6.14. Highland Road Improvement Resolution Ordering Preliminary Feasibility Report for the Highland Road Reconstruction :Mr. Maurer stated he held an informational meeting with property owners in Ridgewood East and Ridgewood East 3rd Addition regarding four options for an improvement in the Highland Road area. He stated the owners had interest in either adding a sidewalk along Highland Road or reconstructing the road and adding sidewalks. Councilmember Dietz questioned if city sewer could be added under the road for future services. He questioned how the cost to hookup would be determined. . :Mr. Maurer stated as many services as possible would be stubbed in under the road in order to protect it from future open-cutting. He stated the stub in of sewer could be funded with the sewer fund and if property owners hook up at a later date, there would be some reimbursement to the city of the costs via assessments. . . . DArE Fie _ . --- ?r/; ~Z:!VEfJ ~ PROJECT NARRATIVE HERITAGE MAPLES ELK RIVER, MINNESOTA FILE COpy Project Description: New Century Land Development is proposing the Heritage Maples multi-family residential development on the 13. 82-acre triangle parcel located adj acent to Highway lOon the South Service Road between Raven Lane and Waco Street NW. Heritage Maples will be a Planned Unit Development (PUD) consisting of 48 units on the west parcel and 4 units on east parcel with a combined total of 52 lmits. Because of the properties' location and current market demand it was envisioned that the site should be developed as a senior living age 55 plus development with mix of housing types take advantage of the natural topography and ecological features within and surrounding the site. The site will provide an attractive residential enclave surrounded by natural and recreational enjoyment with spacious and scenic VIews. As a POO the development incorporates the following design: 1. 3 types of residential housing units utilizing a slab on grade design. 2. Clustering of units to preserve existing wetlands and wildlife areas 3. Clustering the residential units minimizes the amount of road that is needed and lessens impacts to the surrounding area. 4. Providing enhanced mitigation areas for stormwater management. 5. A plaza area is provided for a central gathering area and passive recreation. . 6. Enhanced landscaping with a mix of overstory, understory and coniferous trees along with building foundation plantings. 7. Landscaped bermed areas along the South Service Road to provide screening from traffic. 8. Proposed Monument sign at the entrance of the development Existing Conditions The 13.82-acre site consists of a rolling topography with medium tree coverage and wetlands. The South Service Road and Waco Street N.W. border the north and east side of the property while an existing multifamily development is located directly to the south and southeast along yankton St. N.W. The western edge is bordered by the Elk Dale single-:family addition. Although the topography is rolling, water generally drains from west to east and southeast into a large wetland basin located along yankton Street and the south end of the site. The site consists of a medium canopy coverage primarily located on the south portion of the property along the existing wetland basin. A overhead electric power line running east to west is located in the central portion of the property. . Proposed Rezoning The proposed POO development will consist of 52-slab on grade multi-family units catering to the senior 55 plus age living. This development will require a rezoning from an existing commercial district to a POO development and a guide plan change from commercial to urban residential. As a residential POO, we feel this development will complement the surrounding residential properties instead of a proposed commercial use the property is guided and zoned for. The majority of the units will be clustered along the north and central portion of the west parcel, four residential units will also be located along yankton Street as an extension of the existing multifamily development. This will allow the large wetland basin to be located along the east and southeast of the property to be preserved. Enhanced landscaping is provided with a mix of overstory, understory and coniferous trees along with foundation plantings. A plaza area is proposed in the large open area located at the south end of the private drive. The plaza will complement the development by providing a focal point for a central gathering area and passive recreation. The entrance into the site will be enhanced with landscaped berms and an entrance monument sign that will reflect the high quality and character of the development. Access to the 48 units located on the west parcel is from a private drive while access to the 4 units located on the east parcel is from yankton Street and a private drive from the South Service Road. The road will have curb and gutter to provide an urban feel and enhanced stormwater controL . Grading throughout the property will be quite extensive to accommodate slab on grade housing units. The grading impacts will affect the tree portion located on the southern end of the site, however the existing wetland basin was preserved. Three stormwater ponds are proposed for this development to provide an enhanced mitigation area for stormwater management. The storm water retention ponds will treat and provide rate control for the stormwater generated on the public road and proposed development. Sewer and water is proposing to use existing city services. Purpose for POO Rezoning: New Century Land Development is requesting the proposed Heritage Maples development to be rezoned from an existing commercial district to a POO Development. The POO is requested to allow flexibility in the required building setbacks for the front yard setback and building separation. We are proposing a 15- foot front yard setback for the residential building instead of the required front yard setback of 20- feet from the back of the curb. The design of the unit has the garage tucked back into the unit and will have the 20-foot setback enabling a useable driveway. Also, the required separation between units is 25-feet, we are requesting 10-feet for garages and 20-feet for the residential units. The reduced setbacks and building separations are needed due to the larger footprints required for single level living. We feel that the outcome of the Heritage Maple Development will enhance and benefit the City of Elk River for the following reasons: A. B. C. . D. E. A unique housing product consisting of three types of housing units. A four unit building is being provided instead of an 8 unit building, which is aloud per city code. This will greatly enhance the character and the overall look of the development. The overall design consists of 4 units per acre. Single level living Senior housing for in town lite cycle housing. Enhanced landscaping is proposed throughout the development. An enhanced front entranced sign is also being proposed for additional visual character. A 30,000 square-foot wetland enhancement is proposed for the existing lower quality/degraded wetland basin located on the eastern portion of the site. . . . F. A plaza area is provided for a central gathering area and passive recreation. This area is intended . to be a shared amenity for the entire development. . .~ The construction and expansion of the Highway 10 Service Road has been requested by the City of Elk River and is being proposed as part of this development. This will provide a key access route for the proposed site and surrounding areas along the service road for further development. ~ An extension of utility services as requested by the City of Elk River is also being proposed as part of this development. This will greatly enhance future growth to the west side of the City. The overall design/development of Heritage Maples had many constraints as well. However, New Century Land Development feels the overall design best fits the existing site due to the current conditions while providing an attractive residential enclave. Some of the existing site constraints are as follows: A. The site is currently odd shaped in a triangular fashion and is bisected by an overhead electric power line. The current design reflects clustering of residential units lessened site impacts to the surrounding area. B. The service road also proposes difficulty on the proposed development. Additional right-of-way taking has been requested for the advancement of the existing service road. The site is aJready small in nature and proposes many environmental difficulties, such as the existing wetlanclllow area located on the east and southeast portion of the site. Altering the current design to meet current setback requirement for the proposed right-of-way taking will greatly impact overall function of the proposed development. Conclusion As mentioned earlier, New Century Land Development is requesting the site be rezoned to a PUD Development for the flexibility in the required setbacks. We feel the Heritage Maples development will provide added character and enhanced residential living in the City of Elk River. We are excited and look forward to working with city staff on this development in efforts to provide a high quality development. .....,^<. .) '1... I; ;~\ 0- ~4/-"-1" ,~t ~., ./1' ,f'" I ' I- " I: r', I I'. '~~I\ )~ kj1 _-I-~~_~L ,;~ /'(~'f~~ " :;, -\ ) ~/ / / f.J>. T'i=i::- ~ 1--" >-' .~ \~:: /-- ~ST LINE /' / or sw " ; , .i ,) I ! I I I I I I i I ""'~~a~ ~ " ~ , HEREBY CERTIFY THAT THIS PLAN. SPECIFICATION. OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION ANQ THAT I AM ^ DULY LICENSED PROfESSIONAL ENGINEER UNDER THE LAWS IOF THE STATE Of MINNESOTA. r7;?_~ J.?iR:Hin Dnte: 7 /22/05 Reg. No. 21552 '"'' '.. Revisions Designed By: Dale: Description: B : JRH B/II/D5 REVISED PER CITY CO!IMEN JRII Drown By: 9/20/05 REVISED PER CITY COMME JRII ws 10/11/05 REVISED PER CITY CmlMENTS JRH Checked Bf 11/10/05 REVISED PER CITY COMMEN .IRH JRH I ~ Schoell & Madson, Inc. _~_ engineering. Surveying. Planning - I,' ~:' . NEW CENTURY LAND DEVELOPMENT 18140 Zene Street. Suite 171 Elk River, MN 55330 783-232-9088 CUen\: www.schoelrnadeon.com 554 Th..d street NW, Suite 100 81< Rver, ~.ote 55330-1409 . (763) 241-0108 - IllX' (952) 546-9065 ~ c~ 128 (:)~ 2 S r- >-. ( n -.), / '/~d/: ( ^ / ,^0/ ( / / 1/4 1/4 >-, ()', '1 , /~ OF NW 611.00 "$ f'l Z --< ;U l> --<z on f'l to f'll1" /p' f I I f ! ~ , f i /~ ~ , I I I / I / / , i ~s--...--... / 7 I I '. " ., '/ ! ! I ! I ! I I ! I I I / , , .' I ! I I I l I , , ,I I ! i '" n J> r f'1 5::--< GJo :z ~. o~ ::l --<n IJ.... ~;+ :cCO " roO fTl~ ~ Ul <b AJ~ <b ;- ~<b I 0 (f)CT COOl -i~ 0", )>~ a- t I -io. "'.... "'''' fTl -. <0 ;:s "'.... <0 I I O"g' :::0 010 Z mO '" fTl 0 )> r r ~ ~ z ~ !jj 0;) " f'1 f'1 --< l!j Project Nsme/Locellol1' HERITAGE MAPLES ELK RIVER, MINNESOTA Sl1eetlllle' EXISTING CONDITIONS PLAN f I /,"', g II ~ > > ~ -fj-\~-;-j. "" 'lt~ ~ ~~~~] @ <0 ~ ~. "''vi] . ~ ( ~ ~\ ~\ ,~ \~ ~, \,~~? ~ ~ \~ ~s "'< ~jS~i_Ss';'- J>><> _ ~. ~"-- . I I iI ""tlos::::ozn ::OZl>f'TlfTlO OfT1Z$OZ < cn(Tl-f 6rr1:>rrlUl::O r>1,rt/JU})> O~""Tl)>:?O~ >:rTlaz-<o -fZ::OO(f):::tI ~g~5~~ -l-f""tl~t;F ~~~tj~z VJ~~~~~ ~~F):F ~:a2~Z :i()~P~ ~8~g~ ~~~~~ z??OVi~ ~~:t)>~ ozfT1FZ :I:fTI5: >- 2S;~~~ ~dci~::o ~~Po~ gYlzn~ Ul~~~: ~~~~~ r~c> ~~:!l <oM ~b [ I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION. OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROfESSIONAL ENGINEER UNDER THE LAWS OF THE STATE Of MINNESOTA. I I r"i:? 2::.--'-- J<5'R. llill 0,1.e: 7122/05 Reg, No, 21552 Revisions Dale: 0/11/05 9/20/05 10/11/05 11/IB/05 Description: REVISED PER CITY COMMEN REVISED PER CITY COMMENT REVISED PER CITY COMMENTS REVISED PER CITY COMMENT Designed By: JRH Ore,," By: ws Checked By: JRH > > t:; ,.cO 01-< 00 ~;g -<" ,,; g~ illUl o C 01 z~ ~ ~ ~ R>~ Z ':( 0 Ul I o '" d ~ ~ ;;0 ^ -f ~ f'Tl C Z r ~ ~ ~ ~ Z (5 ~ ~ ~ P?~Z~01 )> ~ ?E Ul 6 ~ z ~ 0;;0 Z ~ f'Tl M g Yl ;0 - M Z '" fl ~ R> ~ Ul Ul }> ~ ~ ~ ): fi ~ Z 0 o M < ~ UJ ~ }> Ul 'ii ~ Vi -< ~~ OL 00 ~2 '" UlO 'r z~ f';;o ~ -l' tn r II '~.-I h, '--.{ I I .J I I /.- ,-b -l' '" -l'< -l'< :!: B~ "':::: NW.....(\.)N ~w 00000 f'Tloo M~riMM:08N f'Tlf'Tlf'Tlf'Tlf'Tl~l>J> -f-l-l-f-ll;:1rr> =;;0 }>M ZM 0;;0 M =z -0 OM "'-< -<0 I M'" Z N, 00 00 0-< UlUl "" MM 00 =Ti=r; E12 56 Zz UlUl "1Ul OI ""/?- or 0", ~~ c 00 :::!< ~~ -0 Z Ul ~iJ)b~ ~b~S M - M01Ul ~;~~ ;~-u~ Z' ~z -< l"Tl~ o-ls::r Vi~~5 ~().:-Io ~~~~ Z;;tICZ g5~~ UlO;oO O;;oM ::!JU). p ~~~~ ~Frr:l::j }> 00 ~3::AJZ ~S:::O:E UJ~J!~ ;J~~~ g~U))> -lZ~() IO 0 l"Tl-l"TlZ ,,~8~ ~~~g VJl"TllT\~ '\ .,-:u- }>}> ~z M~ zpJ ;;0 -I~p. ~ tn ~ ko_ 1\ c;:;. )f ~~~r ~ ~ ~ Jt' -4~~~Ri.~1 L, 'b~ \J,.~ L...- V ~.~ ~ · >"~W\li II I ;;\ I ~ 'j': ~~ '" "',~ I !~ " ~ -----ti~ : r _~ "~ ~ ~~I1- - ----.~ ~ , .~t~~~L-:/"--iJt~~ g ~Ib '" ~ --, ~ I / . .'1'"'''' .1 Y '''~ ' i,'~ r ,,- ~.~-: .~ "'"TQ~ ::w,./~--,~~~ ~1"~ " 1 p c- 'f '[71' r \~, ~~ d ~f ,Y. - - - ----' I ",n -.!1 I I , r I tn N30MV~ ,.j I \.. i M31VMNIVM e> ~ -g~_p ~' -01 ~h tn 0> F"," C;; ~ .-J lOr I- ~;J-p ~ r M, ~ ~)- M ~ N 1:"'- '" ~ 7 H h Cl b "'1O'r:'- ~ h'" "-- t'1 C 1:t.6', DU- 71A 1 j f------H ~~, ----;..~i 1/1t~ ( ~ :J..6:J lJ I f!l~ <0 r - - o '" [Xl " yv ~^- .' ,.- ~ o 01 '" Z o I '" )> ;;0 ^ !" ,"-L -r 1 I -L..- rll ,..,. I I ~ ::'1, IA_ '00 ~ IV ---<--4 ,- '" <0 ----sg ,i A il ,I:' IVA'I~ I .-I '" <0 '" o ~ '" '" '" '" '" -l' '" tn " o Z o @/ I " . . O~96 ~o_ '-1, t: :1 ,Iffl : I Viij!7 : v /; ,'IJ , /~ o~j II I II; I , ,f I .' I I '" J ,'1 I t I I !' / I // / " : .' ./ .' I II I' / / /; J I . / 1/ /; j III!I I'll III !//I If II 1// II ' ;/ ' ,I ;I i I If If. ~u o o o o o 8 o o o o o o ~ t l~ ~ 1 1 r ~ 'J I 11 G> m z m :lJ )> r- en ::j m ::E o :lJ A Z o -i m en I Y ;' / .- .,' ~ / o o Z o ;;0 '" -< M " }> ;ij '" M Z -< 01 C ;= o Z " " M ;;0 o M Z -< o "1 " ;;0 }> o M -< o " o " ;;0 }> 1) I o }> r o o Z -< o c ;;0 r Z '" Z r M -< " ;;0 o iT! o oJ o Z ;;0 o o ^ o o Z ~ C o -< 6 Z M Z -< ;;0 }> Z o M Ul o ;= 01 o ;;0 Z " ;a }> "1 ." o o o Z --i ;;0 o r Ul i;) Z Ul ;= --i "1 M Z o f'l I }> "1 iT! ;;0 Ul 0 r= ;0 -< M "1 ':l ~ 0 o Z M I 0 W "1 M 0 "1 ;;0 ~ ~ }> " f'l , Ul r o " M ---... I I '~-'. Schoell & Madson, Inc. _~_ Engineering. Surveying. Planning ~ I Clent: NEW CENTURY LAND DEVELOPMENT 18140 Zane Street, Suit. 177 Elk RI..r, MN 55330 783-232-9088 WWW.schoellmBdsoncom 554 TNrd street NW, Suite 100 Bk River, Mlnne.ot. 55330-1409 (763) 24HJI08 - IllX' (952) 546-9065 If-/;' 'lOA rJ f-~+I-!lS_ 1 1 I I ,0 t 'II "r :~,. II /~ 'l )'l ~II 1 ) ~~ / ... 20' '" '-- -r I - .[ I: '" 0> / j7~ ~ f&' / I / / I I I / / I I / / I I / I I I I I I -+- I r I I r I I 1 ~ 1....- ;'g "^<;. o ;;0 }> z oJ r M j!l }> ;;0 M o '" Z o o }> -< o I 01 }> Ul Z , Ul --i o ;;0 '" Ul ~ ;;0 '" }> Z I 0", ~~ r M " }> iTI ~ o oJ o Z "" , ;;0 'ii ;;0 }> " :!J ;;0 M ~ ;;0 }> Z -< "" , }> c ?< < }> ~ M ~ --i M ;;0 '" }> z < }> ~ ~ z I:'>- ~ ", M M -< ~ Project Name/Location: HERITAGE MAPLES ELK RIVER, MINNESOTA ~ I III i I 00 i g I III i I i I g I Ul 0 }> C Z ';;0 :::; 01 ?U c -< Z M Ul f'l ili ;;0 ~ }> Z I o r M :E=:E:tj~~;g~~ ;;J~gUlalOCI )>)0. ~)>~6r ;;:~rz:~~~ 'Tl"'?ZMZ~~ ~~~~ ~fT1-< o ~ M "" , Ul i;) Z ~ ~ W' 7'\' 0J Sheet Tille' SHEET INDEX PLAN 8MI , I !l> '" 8 '" V> 2 ~ R, ~ '" gJ .'>: '" f' , '-.. -....... -....... 'U ;0 o 'U o UJ fT1 o r m (j) m Z o fT1 X u; -< z G) ;;:3 ;::-< z" . S' (in =~ '~ ~. i: ~ ~'" I a en", 001 o~ I I "'-l' 0101 "'-l' I I :::8 0>0 "'", U}CT ---I~ )>~ -to. fTl .0' '" O~' Z fTl o )> I I GJO Og, -U-l' :Len fTli,f :::0<; '" J ~ 2et' ~ 16\ Project Number: 80027-001 / ^' /\1/: ^ ( ,^0 / 0 / I ( -1 ~ >-, , ,~ / Ij", m I / 0 co sw 0 1/4 OF NW 1/4. 611.00 \ \ \ ---". -r I I -\ ) ----I / / >-, ( n ,J, ~ 1--" o I ~ m I o ---J (J1 o o I ~ m I o ~ --.J o /- ~ST / I I OF >-> .::. ; ~rr :;' ~" ~:~ t:~ .~ LINE I I I I I '" I I I 149.00 492.00 49.00 49.00 33.00 33.00 N1"S8'04"E N 01'58'04" E 49.00 4- . .00 w- w w ",- '" 0 '" <0 ex> ~--l w m w 0 g is '" '" <.n .... ~'" w 0 g g g '" '" w g g !-' 8 33.00 33.00 49.00 49.00 N 01'58'04" E 33.00 33.00 33.00 33.00 49.00 49.00 492.00 PRIVA 52.50 52.50 N 01'58'04" E 420.00 52.50 52.50 52.50 52.5 U> U> 52.50 ... ... ~ U> U> t:J to to ... ... '" '" '" " ,,- t:J ~o; ... ... 52.50 .... <.n m --l t:J 52.50 52.50 52.50 <0 52.50 52.50 52.50 '" ex> '" '" '" ~--l '" m ~~ ... '" .... '" '" to to ... ~'" '" ~ " " t:J t:J t:J ... '" ~ 52.50 52.50 52.50 t:J t:J 52.50 52.50 52.50 N 01'SS'04" E 52.50 420.00 PRIVATE-S~ 49.00 33.00 N 01'58'04" E 328.00 33.00 49.00 4-9.00 33.00 33.00 9.00 w w '" '" '" w w wg: g '" '" w w g g '" '" '" g g '" !-'d '" ~ '" 0 " 0- <0 0 '" '" '" 0 '" 0 '" O~ '" .... <.n m 49.00 33.00 33.00 49,00 N 01'58'04" E 49.00 33.00 33.00 49.00 328.00 %:J: @ / . ~~ ..., " , 0 mm z -.. 0 00. .....~ " ~ I I I I I II I "'~'I ~D~ . "-. I '~~ ~ .~........_;~~ ! I I ! I ! I ! I I ! I I ! I I I ! I I ! ! I I / ! , , ., ~I Z, Z' fTl' UlI O. -11 ~ it 1 i o c ? o .... J> ---J (J1 I ~ J c=:: I IN N o g~ Zc' ~~ "", ~~ ~ "''-., ~ ,.'" "- ,,<, ----------- "- ,"'1.0 "''''J> VI n J>" J> VlO' , ",n '" 3;"0 '" " ZIU ,... , ~o l!i VI.... "'<.n Al. J> ~'" Z l'>- z, J>o Gln f'1" !ji ..~ c" .... -, '0 -=t.,... -<.... ~ ~ .... :g lO1.0 '!,> f;, ,'~'~";.'~ '': '. -'. f HEREBY CERHFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREP.6,RED BY ME OR 'JNDER MY DIRECT SUPERVISION AND THAT I 6.M A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MiNNESOTA. ~~f~ D.le: 7/22/05 Reg. Ne. 2(552 ReVisions Oesi9~ed By: D.le: Description: B : JRH 8/11/05 REVISED PER CITY COMMENT IRII Druwrt 8y: 9/20/05 REVISED PER CITY COMMENTS JRII ws 10/11/05 REVISED PER CITY COMMENTS JRII Checked By: 11/18/05 REVISED PER CITY COIIMENT IRII JRH I '-. Schoell & Madson, Inc. _ _ - EngIneering . Surveying. Planning ~ I Project Name/Lac.IIOIl' HERITAGE MAPLES ELK RIYER, MINNESOTA CHent' NEW CENTURY LAND DEVELOPMENT 18140 Z.ne Street, Suite 177 Elk RI..r. MN 55330 763-232-9088 www.schoelmsdson.com 554 Third stree' NW, Suito 100 Elk River. Minne.ot. 55330-1409 no' (763) 241"0108 - tlU'(952) 546-9065 ~ SI1..tlltlo' PRELIMINARY PLAT . ----.......... <:J VI .~ ~ f) 49.00 '" '" '" g lI[ 49.00 I I / ! f- i "-... i ! i !... ',f "- i f "/ { "- I I '" , -0 n ^ , Ul.,..Wro...... CJ -< ! / , , ro~~~~ ~~~~~ ~ '" tIlVJtIltllVll> ~71~~71 1 ;os'- ./ ''/ ! '" { , ./ N g I ^ i-t\U;~WN:::O\OOO-..j(J'\Ul.fl>.Wru...... ~ I / "/ { I I I i I ! ./ I ! ruNNN""WW.fl>.~WW.fl>.""WW"" oooorooo~oo~~ob~~obw ~~~.fl>.~(J'\(J'\~~$$~~(J'\(J'\~~ \O\O\O\O~\O\O-..j-..j\o\o-..j-..j\o\o-..j~ VlVJVlVJVJVlVJVlVlVlVltllVlVlVlVll> ~~~~7171~~71~71~~~~~ '" , IUD n " WWWWWWWNNNNNNNNNN..................r (J'\~~wN......o~m~~~~WN......O~ro-..j~ ~ww~~wW~ruNNNNNNNNNruN ~bb~~bb~oororooommmrooooomm ~(J'\~~~~(J'\~~.fl>..fl>.~~~~~.fl>.~~~~ -..j\o~-..j-..j~~~\o~~\o~~~\o~~~~~ ~~~~~~~~~~Vl~~tIl~~~~~~~ ~~~~~~~~71~~~~~~~~~~~ o C Al.... 0' -=':l J> '" , IUD n ^ ~~!:i8; tntti;tt:::';~ ~~ ~ gpl ln~ g;... VI!" ~~ IU \lJWWWWWwwWNNruN ~rn~~rnh:~~~~~~~ ~ \D(J'\ Ul~(J'\(7\~(Jl(J'\\D\O\O\D ;u - f'1 ~(l'JVl(I'J~~tIlVl~f.IlVlf.ll J> ~~~~~71~71~~~~~ ~ ~ ~~~ g-~~ ~L~~ .. - n~6 0",0 50+0 ITO ~p ^ "' J> "- "- ;+ i;- ? ."g~iii5gE J;; ;~;::: G) '-<':.<.g:<-g~ ~ -1')--- -'w ~'3-~~C+1 C 10" ON m ~~~~:8 (I) ;!;~.6 ~ ii .. ~ ~Jft)~",,--.s :; ~ ~~g-~~ -10- ~w o~~~~~ ~ QOft) ~ o.fl>. (Jl22g- -1')::'; ~~j .. <::-< z'" 5' g:g '1 co" , '" ~ ~ ~(l) I 0 com 0", 0_ I I N.... "'''' N.... I t ~O 0;0 mO N 8~ IJ.... :cCO fTlif ;o~ '" ~ (/)0' -I~ )>~ -10. fTl .0' .0 O~. Z fTl o )> r r ;:S (';) 8MI Project Number; ~0027-001 ~ / NfYO'2~1 "w 511.90 /" " "~- frJ~,\!~,,_}_:))t If iJ:t.~,,=-::tJ11" ~~~' \ I I r- '//, Z ~ / 'iit\ to " \ ; $ G: l ~~ ~" Aq'(; \!,) ""in! ir \ ~o'" ~ rw ~/r J- ;tJ v ;:! '-....1 ~'" 03,0, FFE- 055 , ,>,,"~ " ~ '"""7 N <D ), ~ L w . D L' " '" ~~~ 129 .i'~~ CBm. 130 \ '.v~J ji. ~~': A'~~FO~lrI2r\~""' "'''' ~OIV,,~ " \~ " t :"~ ~ ,. 'r. ~- 1'ii >- ! J-;:"'f ,:::L >-0: \\\ ~ ~ ~1~' CJ\lr \r-~F~~:4;"r : \ ~ ~ ~ '~&, V ~~ m~~E w-;~~ \ ,,'\ ,~, 'v~ ~ ~' . 'E-S~~~ ~<,," \ ,,~ '" ....< ~.) , , ~\, O'O~ ~~~' co 1~~~~ ~~!':.~;;:';'l~_3dlr:i:s, :}~ '\.'" "0" . 1', ON 33 OM tk 0\ CO \ ~:- y :\1 ", tel ~' ..~ 'I k;: ,~"" .{~., "7 'J'Y\: ~ 9 -311 OJ, 9,311 . o. ." ': ~ ~ "'" ;'f\J';'\\.. . S' , "I \.' . '," ,J--../ "" ;~,t~4);5)'?-~,:,'.""",;"""",,'" ~;}1"",; 'L.~,~", 'i~'-" FES~.'/ : .".J",. " .~' ~' "I ii ~i ;i I:> / 0, " [ii~\J f:-:~'~ II 8 ~ UJ ~ () m ";\,:r"-- I: I 4190 ~'~ :::f'" o/" ?;::::~ ~ Ii. I ...s.......,; :;;\,',"'~ . -. ~ / Z r := VJ ~ . '''r ".~ ~ I:, ~,ee~.'\.. ',~ "l.v~ .......... ~g;: ffi ~~ ~ ; ~":' ::-'---: x-<:4=:":';~~1tg.._~ c~~ ~~ ~ ~~ (J) ,12 4.95 lKlllI.@-~~"'h :~ ! ~Ui ~~ ,1'.' __ ..." ~.~ }Qz () ~~ ~ I On n 80 ~ ", n ", 00 " CZ =0 f: g f1l ; i =~~_~J=JL___':,;~ I ~J:~::#J, I~ $' i 0 , · ~r.i rJf//:W/ , i lig II I IlAi7,,/ : I 0 'I 'II i I I 'ii · j // I V ;''' ill; ! \ f (' Ii. I / ! / :/1:1/// fIll ylJ l Ai // /; 1~f' ~ II 7;!"~ ~7 { /!~/ I ' 0f ;" It I .L, II i 6.//,'/" ;t1;fl"~!. J' "I G." "'" ' II ,/ i/i 1/ I ,j ,e;; w'G."" il! ! ,,' ~, co, , "/ r c: ~~i;l/"i! I ,/ I ! ,/ / ,I .6>.,9 .::. ~~ ~,~. "'''',:~~~, " ~~.'i ~i!b ,~i<: I ~, ~; 1-,;.." )>()Vl"":i::crlVlO(JlVJ ~~~~~~~~~~ ~~8-r~o~~'S:: lJ1~-l~fT1""'o ~~ ;dOOVJO()Z~ ::E c:::Oof11;OC ~fT1 ~~f11AJO~~~~;;U I cr~~~. ~~fTl~ ~:g~Q:tVJoo~ UlOO~ f'TIa""'dz zt:....,o~ofTlo:::uG1 ~~S;fTl~~~~6~ F:r!~~U1~~.rn~z 8rT1*:'S~~~~g~ . f:~Yl?5~~:iz() ~;~~~~~~~ ~f)f1lrrlF~M:tm ~^~Gl5~~f"Tl~ ~0G1 of"TlZOO O'1~~~~g~G) -riOrr1Of"Tl -Ie ~~~~-l~ g~ -lrnUl~~rr1 o:;U ~l~~ " ", -lilOalO :C::O cfTl 0 :~~~~ ~~G)~~ -uO:trnO =Uzf"Tl-<Bi :~~gcj z -lCn ;0 o ::1f"TlfTI ~f;;~~~ \J b~f;E* S; "'ozz z S::z:CG):::: Z J:!. ~~~ P f'TlG) :r a z~~~~ rrt ri1~:r!::E(/) ~zf1l ~ )> r= )> -l -f II J=iTi ~J! ~~ lUr ~-{;O~ z~ ~~ (/):u (/) Ul ",,,, ", ofTl 00 ~Ul ::!z 0-10 ~~ :z~ '" ", <:E ", '" " 'ii ", 6 z iil :>.'; I~ I I ~ ~~ o W Qg ."oocn ~~~~ ~~~~ ~ ~~ ~" 'Ow o ~o ro ~~ :~ 0000 OOOM <.oI<l>OO> 0000 ~~ ~~ 0000 ~Q:~(t 00 ;;{~ 00 ~~ 0,0, 0.0. I I [ I j I I 000.... ~MO...... WIDO<.ol o~ w~ 00 ~e <.01(,><.01-" ""....tg.... 0000 <,.l........tg GIlD....'" 1f!.>!t1fl#- NO o.l:n ~~ *fl "''' m I o ~ o ~ ~ ~ (,) r,,) N W **~~ ~~ mm I'" ~~ 00 ~~ 00 ~g ~~ 00 ~~ ~ ~ ~:: ON :g~ ~ '" ~ o ~ g 1; ~ ~ g5:~~ - - <:~ OIOlGlW t1l....U1d> ~~ mm :;~!Hl ;"'-../-0 ~~ 00 0>0><>>0> 0>0>"'0> -lCl> 01 <0 '.0:"" w 0 mm WW -... 0>0>0>0> 010>0>0> ",,0>0><D o.ONO mm u.0 wm ow o W ~~~ ~~~ ;;{~;;{ ~~~ "''''''' 000 g~* ~WO ~~Sl ~~<: 'i'-#-# ~OP> ~~g WNO ~~~ SS~ ~g:~ www 8~i' m.....o. ~:::1l mOlt... mww :"u,u. ..." ",- o S G <D ~ I 01 ~.c )>)>s: "')> S:-1z ~~~ c"'''' s:"'" "" o. ~ :~~ ",r >::!w Zz", OC) )>Ul}1 ;::5~ )>r)> xr", ~CD-{ c",,,, s: ", ~~~ zO .;.,..)>;0 In )> ", 0",0 2:;10 ",-0 -1"Z s:"'n fTl~;o ~ <::1 s:'" 2Q>- zZZ "I ~~l) ",n "'0 '" "'0 I)> )>z rn r", ~~ "'I ~x <:E =; I N1'S8'04"E @ 611.00 ~ 08_ ".J co ~ U> '" ... '" '" S G ~ FE= s. ! / I r-1 '", lid.. S,:Q t;:;" .,..,..f>. ~3il I J / I.' I 1-/ " ,;;.., // ~! <( f'l -l r " z tj~ ~UI " n -l !~z '-.. I ;,/ ! II '. f'TlG1fTlO gJ ~~~~ ~ ~~~f) Z ;0' -l (i) ~:t~~ RO )>fTl=fU'l m ~8~~ ~ 02)>r en .~ ~~~~ (5 Cl :z"~~~ g is OUlG1~ Z ~ Ci~~='< ;j M ~~~:r! ~ s: ", d ;;~~5 z ;;0 ;00-10 0 )> ~~~~ rri F= ~~~~ (JJ ~ ~z~~ '~ g~6 z ~-IfT! 7i. -for A~~ -u>::::r ~'~~ "'0'" ~""'O -1Vl", =; ", ! / I ~~d~~dg d~ 5~1~ J;!F~~(J}~~;O~ ~~fTl=l r~o~ooiJ;;oz ::1;0(,1)6] ~~r ;08(=1; ~C) ~C~M - ~e;Qadd ~~ (/)~:=EG) C-~ :;0 ". o-l=i~ )>-~ ~~U) ~z ;56;::I:6 ~~~lI)~~ ~~ gM~~ ;::0 .:::efTIor-:::::t::o fTls::n ;gd~~:~ fTl~ ~~~~ <-l}>P ~ ~ -<~5~ ~~6rrl~.'lJ 2! gf:zj;: }>~"U~~~ ~ ~~~: ag~~~g Ul $!gejr; -oogz:t~ ~ ~~~F ffi"TllTI~oM r ;ur=Qn c:eD m2 Q). fTlrg ()~mOfTl~ rrl -lo~ cUJt)c(J}o (,I) ~fT1(f) id"T1^~fJ);:o ~ UJ~-I ~g~~~~ ~ ~0~ cn;ooo~~ ~ ~o~ ~~ii?u~~ M o~, ~\JQ)~oo 0 G1~UJ ~~. (,I)~fT1 ~ ~n~ cQUlcoC2:$ 0 ~S::f'Tl ~~d~~~ ~ ~~~ cnz~fTIt:l~ g ;::o~g )> _fTl)> ^ "Tl)>z ;;o-;,Z:;oO ""'{] p'-f fTl~ITI~~T ~ r~g fTIUJ~ (] ~08 cj;;1 0 :z )> Z o < ", '" o:J n /" no 00 ZZ ;:j-1 o~ rn " -1 o '" '" :r: )> r r I I ! I I I , I ! I / / / f II I If! I 1//1 1/1,/' / I Ii / I II f / Ij ! ! 1.'/ : / ! ! I i/ ! / ;.Ill If f i ;I I 1/ ! II / Il II II I '.'/ , 14/ I; l! / ,_! ! ! i': / ii I !/'Jf ! /-1 !, 11'': / l/~ ./ '/ ./ " o ~o ~~ ~N 00 ~w ~~ o wo ~~ i1~ ~ ~~~jj~ ~~~~g w-'>> rn o~ w=,o !~~ ~~cn o woo ;oww ~~; ~=: ~-'>>.... ~ o W o W o W &l~ ~~ "'''' ~o <!~ "'''' g~f,ig ~~~~ OOUi ~~~ ",,,,,,, ~ ;:rig~ iI ~~~d~ ""~.t: ~ .~~ i:i WWW WWN ~o =,WO "~m =::~ ~~o o ~ ~ 00 ~w ~~ o W ~ o~ ~~~ ::~N ~~.... ~N mw ago 80r,j 0" ~~ 000 ~2~ 00 ~~ ~~ " ~ ~~~ iDr:i~~ 0000 00 ~~ 00 ~~ 00 ~~ 00 ~~ 000 Ul~~ 000 i:rl;,:~ 0000 U1(1'1/.n/.n :;: ., ~n' ., ~ ~ 0,0. ~~~ mmOl ~ m ~~~ 0.0.0, mm I_ '" ~~~ 000.0. ~ ~ mm m -0 wm ~ ~ -N NN mo 00 m* z t;;~;~~ ....<>>8(1)0 000 ~8~ ~ ~~~ ~~~~ g~g '" NO ~ m -~ 000 wwo o;N ~~ ~=c;:!'J ~iR~~ iDm:O::o8 ~~8~~ o '" '" wwo m~!:!l NN- ~ig~ ;; ;; ~~O;~~ 00 ~~ "''' 0- m~ NN "" o :-":"!'J~-c ~~g:O'ii ~~i'~f'Tl I m '" il iil ~ ~ en 1.' f-+- -r.. OO~ ~~s #-t!i! ~OO mOlell ### ~~~ "''''' ~~~~ ;!!?/!'11-#- o ~ ~# " ~N o -l m~N ~~8: :g;l'- ~~ ~~:D~ cn/.nO >< ~;::w~ ~2~g WWN ~~m i'J ~~ 'l! ~~m WN~ l ,., ",F ,/ PI " ,1.., /",~, l! II; ,fl'.... 1: / / }/ /!.... j ./1 f f 'i1 ,/ / , II - I , If.. I'll ! I ,}! ! / , 10- ! j:'~ ..... n.. /! / ' ! ,1 ~ I 11/;// II / :f'l/f f 1f ! " I I ,fHl.\/I/ I it/ ~'I"J -0 g~ .....O>Ol"" ~~g~ NNO ~g:;j !"~-../.,,< "'.....iD-cm 01 ow U1..... g~ i'J N-- giJ:t ww m ~ ~~ ~~~ g; g~ ~;;kl ii~ m ~ld~~~ ~~B ""::::W WwN l8~ ~~~~ mw ~w g~ g~g~ MN.... :!! "'''''00'0 OlOl/.n f'Tl :.: :.: m~w ~~m w w 00 -0. www .s~.s ~oo ~mss ..........l,JIVI ~!! m r'" ~~ ~ o ~~! ~~ ~~ ~ w w 00 ww 00 00 :...,. ~::::::1l w o " www 000 moUl z ggg:~~ ""wt.lf'TlXl "i..l:to.:"":<~ ww 00 {oo.. w o www 000 i-.>i:uo www ....0.0 w m ww N~ mm 88 ou. ~~ mii~g o;,,:to. '''' ! NNW :.........0 www 000 --~ .....lol,Jl i:liH wt.r.O o o 8S ~ ~ I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPM~EO BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I p.M A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA r'7.2 2:-:- f.j('[ Hill 0,(.. 1/22105 Reg, No. Re\'i~ious Dale: Description: Bv: 8/11/05 REVISED PER CITY COMMENT~ JRH 9/20/05 REVISED PER CITY COMMENTS IR\! 10/11/05 REVISED PER CITY COMIIENTI. .IRlI f-It7iii705-REViSililpER'CITy"CollMENT JRIl 24552 ........ I ,';' Designed By- JRH Clent' Schoell & Madson, Inc. Engln....rlng . Surveying. Planning -~- .......... I ~~ ~5 616 c;:;g~ g;g~f::!J ~~!Gg ~g ~~z~~g ~~ ~~ o~ zbUi ~~~r ~ ~t3 ~~ o~ ~ocn~~vl ~G)"TlU'l ~tI) ::E~ -ff'TlO~ ::uf11~;o [0;0 ~(/)ilz~6 g:rrl 5 -I Z -IO"Tl(] ~~~() ~ l;(I) we; ~F> ~ITI G1:zfTl --,~::E~o~"Tl5G)~ ~~~f'Tl~f'TldZb~o~....rc;)O O~fT!f'Tl~gfTIo;o6o UlZf'TlO~::UO:;o::r:~(D~O" N~ f:2~ j!::;o ~;og z....,~~ G) ~~::U(Jl ~IJ) ~fJ)g"Tlg~ ~~ >C):eJ> mF!J~ UJ~S~ -l >J> ~~ ,t. G)OMn~~ )> ::!........~OfTI~ =irrl'-(S3O::!;oG')ror)>o<o::OfTl (]~ ~o -15; -< ~> fTlo j; M ~m zr c' zJ>~;$ic--; p1 _gS3~~::!6 o~r-~_-:!J~~~;gO~(];og~ ~p1::Ur~a~(J} ~~CD~M~g~V'O~~)>1:;~~ ~oo~ ......0 ~.!":::;fTI:J>o:(/)(I)< :S;[D ;O"'_---l )>~::O~do(/)o ~)>~Ul~~.~ ~MBi~~::ob ~""""~oil~5~ ~6z~~o : J><~. oG1"'" ;i; ~;o~~~':2 )>ogf11;o~:;u s::_~~~~~ o ~CI;o ~ Z~Ul H- 6i3 ~ ~ (,I)::::r~~~:!< ~ ~og ~~~ :~~ E;o{A ~ ~ g~E;~O.Vl o :-' ~ ;OCJ> ::r:c;:g 'T1 ~- fT1 s:: ;::o~~b~ '1 0 ~~ cj6E F~~ a -<~ ~ ~ ~'l~~~~ o ~)>s;: >J> -lz -f fTI -lG)Vl Q ~ ~Q)z""\J~~ ~fij9od~ ti N~Gl~i])rQ CD )> ~~ ~~~ oMo"TJ;:u~ I ;0' - (/)o~Ui rnfTl - 0""'0(/)0 I;: 0 -l-;oo.::! ~ ~ ~~ ~~d ~~~ ~~;o d ~ ~g~::oti ~ f'Tl~~ ~s::~ ~~~Cl jI;~ ~ ~~~~cj <: ~:e::U [;Iwp OJ;f'Tl ~ ~~ d ~~fTl~\l ,~ ~~~. ~~ o[fl=i~'; 6 .~. f110~>Q ""' ~~l.oI ~G) ~(,I)~Vt 0 :E _ f'TlO ~r Z ~b G)U) -f~U'l C""\J 0 f;lf l.fjll o :r::r: ,- G1;o '1 0 U) ::r: ~ -< ~ J>~ fT1'~ ~ ~ ;(j~ \J~ r~ ~~ ~-< ;;0 ~ .O~-l i:fll g t; rrl I 0 ~~ ~ : (] -1 0 :r: I'l I. f 1/ ~ /,f ~ f! f! /,1 ~ II ;/ I 1 o ", :::OVJ )>""0>< Z -lQ)>--'C 8~ :;u~;o~ ~ O"Tl~8a ~'" I"g~~~ ~~<D"~ ~~ ~ti=i~' N~~~-u ~~ >~go~ ~~~~~ 0): 5~~~~ ~tT1~~~ Z;OOZ-UfTI ~ ~ ~ d~;oQ~~ og~~(I) ;0 : ~ ~ =<! ~ -;g ~ -u g g ~,ln~;1!'6 g~~d~ ~ pl:e-<o: cjD~;of) o ~>;oUl ::u-rtg~--i ~ ~~~~ ~~o~~ ~ :S~~fT1 ~~~=<c ;tJ ~rE~ ::t~~~~ o [IJ(/)OZ -1 fT1 r fTl55D~ )>aJ~;O R> ::::0"-0;0 ;o~-I---i ~ ~g~~ ~~~~ ;;0 z: '-t-f 0-fS::rt1 ." fTIPJ5fT1 OI~"TJ fTI (]~Z~ ~fTIQfTI ~ z~~;o >~~~ r ~~>!; ~~~~ ~ ~:;~~ ~:o~ ~ o-lz 0 ~:J:OW Z Z:!;O-l z::o~" -t 9ZzO ^~ITl~ Z-;C)-f ~ ~a C):c :I: ~~ fT1 f'Tl fT1 ~~ b (fJ0' -I~ )>~ -In fTI .0' '" O~. Z fTI o )> r r , .f ,J , 8~ 'lJ... Irn fTIif AJ~ i::.... Z" . ::f ~Q =~ '1 m' ~ III ~ ~ ~ro 1 c rnm 0t}1 o~ I I "'-" t}1t}1 "'''' 1 1 :::0 mO mO '" o )> r ~ g; z l)o ~ ~ 0;) gj Project Nsme/Loc.UOI1' HERITAGE MAPLES ELK RIVER, MINNESOTA www.schoeNmad8oncom 554 ThIrd Slreet NW. SuR. 100 , .. . "./ nhnn.~~:~~=~t~.;:)~'9065 NEW CENTURY LAND DEVELOPMENT 18140 2aft. Street, Suite 177 Elk River, MN 55330 783-232-9088 Or(lwn By: WS Checked By: JRH q' .. Sheet ToI1o' PRELIMINARY GRADING PLAN \~ \d \ \, i',,"!1 I 111\) \ J i!! \'\ ;~6 : i~1 / I! "<)~';f~" .tJ ~~6 / r - - - - - - / ~.. ;/ I ~ ~ -f,i L. (/"1,) \ / .J-. \..~~ ,,~'-=r-l : ~f~ /~1" f I: ./ 'li;/.-;--!7-r\ If, ~,/ -~-/-\, ~ ~ ~~~ f/~~ ~ I'. ~" 0 :'t.~' "'1, <. .L__. -1~!'\.J~ ~,! ~'b .;c.il\; '. , / / f, r ~\ l' ~ r; tt. -:1\ J/ff~' /, ~ ~l " '--, it''.. li Ir;KP'l:(\! ~~" r If ,0 r' ,; ~ =~-;u>5'cl; ''fY/,.." j //1 ~ o \1 ~(---__/ \ 'II z~ ,,;' 7\,' "'011 : ,,'1 f f; ~ · 'J~/ " .), ~ . > . . 1~/!J j I,., i I ", \"P~~ I, ' . dJ 'LI I I ,\ biN I;~ ~_l! ~~ '" '" h- fti1l!... f,".~ " _..~. ' _" I \""'1 I'l'~a \ ::;IlL., r I ~~ Ji. /iIE <IE W'; 'f ':~J/ !i "~'","':':'-':::~-----':-::ih~i/ 'I , t. \furl~ . \ I H, i ':r \ _1'-;- :"'LtI'~ r 2i r] ~~ I /:i II~ "',,_Y~/~'@ h HI. &'JT \lltff~ ~~ II /:; if '~o 'C " f~r'J...,...:.. 1 1', ' . ~.' 1; :-- "., ,~!ll ~ ----i'i: ~,;QJlDJf1' / · ./ IA I ~ n. ", : " I - - .-::t.._:~~~, ~~~6 !:' i V ~:;_" i !l~{~ < ^ >{ ~;.~'!r{J;~:\~~ll "~~I!i'''~ t, ~r. .~ t' ~(:~,'/Jr. ~~ "_, i' ~'~, ?>::~~) ~ '"' ~ }I ~ !;}}!!\: I":V;' ~ " " J'.,' ;/' 'f i.ll! '~.~~~~:~, ~~;~.~: "', ,~j r1 ,>- ~/ j /1// '# /,~:,;;,;~ i~~~ _ ~ ~ __~~ __, , V. , -, ," --, ,,~,JI-fr"~~', . t~ l:%/;;/f " ,'t,'t, ~ \ ~"'~"\': .~--J^- ~/f ,.l~~.1i5'ij'~".,~~\.~..~ ,~".~:L,~,:,~r-J__r-/l}:1 ,wI/ 90' h7/Zi/ !///~ ,.'\ 0:< ,. '. //(.\ ~ ~~l "'. ........ "":".. h..". ~: ii' ,~/ ' 7/' f , ~~J I ' '~ / <~\ ...:.; : ;{/ v: ,.\ {:,h., t<l .~. ~.,,~ ". =:. ,,,,tj-::' =~,,-. "o~ ~ ~~ '" ". l /// (I/ . /'/ \~~~.'~ ..~:,.;. ..........,,/ ft::/: l<;~- ','J '."~ l-'_~'-_"> "'" "" "y. I '-"'~'" '" It '/~ f / i J I' i r:-" ~) "i; ." ~, .. , ,..': ,cl" "~-- - " ~n' t f :,L -<' l' >;'''~ //~.:'::::>>~.<." ii~.8:~:<"1:: ~\.~i">\ '.~~l.. I 'i;J. (~o.. 1 '\&"~l-~'" ~.' gO"" - , -....\II}; '. vi i /f /11 Itl (.-~'~.11cf ~ V; >,,</~~;:J~ :tl~~~~~:' k.~{},W 1J~}f,i~~1./ ,\ ~X~~' "#. ;~<~~J'\~~i1~~;~~<_ -~~~J#?~ffi/ ~~-~\~ ~0~i l'/', ,'! ~I~ jla~.,ft~~,ii:::::8.~::~~~;.~; . C:;A7/,: / \\w _, \, ~... ""ltlM 'l(illljlll"rlllrlri<ililrlr',lr'llrl-j.1j'r(I'r'tl,IT1[1, li~I'lf,!,l,ill,l;r,l(llr,IA<-:V~' f '~-)'~ I i I f/I/ -... ~~ ...", I f!J t/ll.t'll1!11_1'11111![!I'llr~.,,~,I~Jil.l,[,I,I/lltr!lr ~ ~tlllrl]'\!I!}ll,I,l,f.:l,::~_':itl '1~i!tJ,f1l/J/!1 if I; Ifl..... _ ....7..~- I ! ~ j I I ' I 1 I ' - 1 1 oJ ~.~ii).'~! r 11 -, . .- : 'f '," . . 'I':~" 'p' 5. "f'r' I';'! ...." '" I'," 'I' , I , I , " ,', . J :;1.. 00... ," '.' , i , · '.' 1 , ,...,..1." L'.''7f ." . /.' , ! If . 1 .,.,..... 1,'-" - ,. g Cl::l z~ ,'_.!,!11111.I,llllllrl/"/i - I _.<7,R1/ ! t Ii - Ij -/...,.... r:l~'(<.I:):,'>:!:<':J:l>"'i6g: a'<. c~ll:r:r:,II~j_lrf['r!,rlllrr\!/II/l);.:/ - ~ Ill, /1/'" I //1 ! "-IL Ih',1~~I~.i.11111~ ~e a r'I(lll'~lll!,lr'/IIIIII"II,!-.t::>K'" /,//\ // /1 II II ~. r'~JI~."~d-'-"-"';"~-;~~'. ..,,!'-, '.' , '.' . . . '.' .... . 'i. '0., i.,'.,' ."" ., , ".'..iI.'j"'" "/1 'f.' I I h. . o ,,:r.I-....:1-....~~J..,.U_f-lLrl.JI!IIIIIClll~,.:lr!f'rl-ll/.-..' , t f };:::; )> --l to " 0 I Itll1 .'-' (7)..>J...,1 1 tit I. I rr'''rT,,1-t'12+1-~.L-l.L!_lJ-l ,t-,,):. pi f I ~Of ~ ~ ~ ~ -u 0 -U ::E J: ~ ~ G') ,.. 0 I III (1''''--- ,,.:,,,,'\rllll'lrrlrr!illllllll,llllljl!tI~!r:~~i,II'I(lfll!I7;J~';:' ,'- /',1 " I! l o I (j) ..., (j) (j) s::: rn fTl :it I' I f ~~I['~C?4:rl,IJIQ-talljll!lr'llf,l.,'II(Jll@rl/rlll,ll(rl/:':",t ,/1 h // If' I!, / ~ u. ~ ~ <:: "" ~ ~ ~ :;;: ~ ::: ::3 ~ 3 ~~~._~i ~ii!..'1~~T?' ~:;~:~~'~~:>::iR:::~:~!:~:::/W~/ ('t.~~;~.i/II;~?I/;/'l r~-1 JI\9'I;,,';~"-8t:1,8 _~' Illll!I"'I.llll11\1"1~1~1,~ 1/'1/ 11/011/flf J> ',:.do.:-"";;-"'" ",,' "",.,.,..' , , , , " /! I I I I, . III I Zi~- - - ". -"-- - - ~ :,:~~(D/llrllrll,'!I, . i / 'i! II -l -~~~ -~";';'~n.. 1 .' I If!!1 i I Ul .. J.A~I)Jg!:l_ eJ:~~ 0- ~ ~ i x / f?//lI/ ~ .",.J..J~.("", f .. -. ': ! f " {I I' l . c::- ITl '~fr~"""';' ~-.......-..~ i I, ./1, I .0 ~~- . ..' '1.:; .Ii -i~{J~...., '~':'~.'. .~.."'."".':~i ""'. i~/Z-/f Ii' / ITl ~ll -0-" t: - . . ~"" i~;~ // / 1.1 '6 . ~ ! L ,!' I' !.' [!J / f / lV" f / ~ . 1'3' ~ ",g ~ II d. V .f I. 1 I ! II~ i I ~, ~K / / i / ! 1, 1 :z: ~J'll:~ \ ~ ,,~! ~. .~ I /IJ // /f? II {j ~~~.I "fri_./ !~l j !J,# /~/ I,' 'Z "'\1 ~: I !"""t.. . '-1/ i'roI /II v , I/!I , ~ A ~~;r (.J'A.,.. 'li...~.' ~.'T~~."'.'.',;r~..~// / r (j /. /// 1/ .A / I ~~s~. teEtl i\i~6{ / ,1/1 r '\ , I ~~~,. i-----' --~."~ ,~- . ~~~~ IJ! ,,, / / l/) : -:--1' I ~ ! /- ~ fj" //,j/; I I !, ,I,' /1 I I _ -/--/1 Ilfl/' I 'ftrii~. ~~6'A I.' &t if I ! /1 I : /:,/ ~ ~8~~; 1~~~ /' 1 7'1 it / /1......... II I I .." / I )> ~ ~ d I tJ i %;/ I It;' a .J.//I : /fr.: : r:']; vi' I ;' /1 / /f 1/1/ I I I'; j I, !" ;0.. I,' ) ~ I',: .., I /( II!",'.) ;/111 II ,", .. !. 1 , f' , / . 11 I I I 'q I , /1 i ; /1 ! /r. /;! / I ;;; I / !. i I ';/1' I'.' It^ '-:7 J / f;f I " Ii/I "'/1 I, \.J I; , : [~I' IJ // l.~t 1// ;//1 I I ~. 1/!!.'/f/ 1"1; I ,~? f I ;J... " ;"1 II / I ~r;' '" I if I A /.' f' i". / / l .J! ! j 1// // 1~' 1/./ / / . lilt\ /1 / ! I ! /f II ,;' /, 1/ I f Iii I !:' // I w. f!; ./ / ; ! iI; I !j / i I ,~I,I I' 7../ / l/f 1.>'1/ ,I !/ I. I / ) : 1.J;;1 I /' o' / /ll/ / " ji ill /, f (,il!;,!/ il/lll '" h I I / I l /1' I 1/ ,l' I .' -t.. I lJ > N )> o II " )> Vl OJ :< Vl o o )> 0 OJ '" " ;:: o '" ~ I ~ Ul -l lJ > Z -l Ul o :J: ITl o c r ITl -orn,..G1,..)>- O'~~~~~g ^ tn )( 3 ~ _~g~_:J~ ~~[~[z ~~5'~:~~ ~~Z fb-~ ~ rrl ~ ~ ~ IJl ~ ;:: ~ ~[~ z ~(ft~ ~ 0- 3' ~~~~~~~~~~Q~~~~~~~~6~~)>-~~~ ii' g ~,~ ~ ~ [j :r:; ~ s. Q c ~ ii' =4 ~ ~ ~ ..... 0' ~ ~ g ~ 2- 8 n: 3' ci':= (l) 0 ~ a. ~ :!.. III OJ (T1 0 ^ a ~ 0 -. .., :l .., 3 :s::: go g:] ~6 0 Zo 0 ~ ~ -o~ g ~'9.I-g g-3 g ~ ~ X:J ~ tngg.>ozx~~Otntn~~:]~gF:]~~:]gg~oo~ ~~f~~,~g~~~~~:rn~ g~~~[~[:]~[z [~. [ ~, beg iTl 0' g tn ~ 2: g -, a. Vl UI 2 g ~ 2 a 0 I1l ,.. o~~i ~~~~a.~~~~ ~~~~ 3~~.:s:::~ ~ ~~ '" -< 00- "'~r.-@.-;::-' " )>(f) ~=I CfTl~ ~Q~::~ i g ~~ ;~~ ~ :l;::U1 Z o 0 ~> 3:fQ ..... ~[~ ~ ~ ~ r--~o ~o Iii = ~ ~ Vl <n~N:~N:~ OJ iii' OJ OJ iii' OJ lD iii' lD '" lD 0 iii' 0 lD -< lD iii' OJ OJ iii' lD UJ}>Ul)>Vl ~~~~~~ ~~~~~ ~ --IF-lF-i~ MC'lMOMUl ~~~~E:; SJ~SJHJ 00 oc: Z)> ;;j~ ~~ d~ "'Vl d6 ~~ ~z " -<-< oili c: )>" ~~ ;:!=l ~~ ~~ 0:< ~t: ~~ ~~ "'''' "" ro )>'" z'" '" o o Z -< '" )> o -< o '" vi o o Z < '" Z iTi Z f;1 '" )> Vl -< " )> '" o '" r. oc:o oz< ZO'" ~~~ ",Vl-< 0-<0 c:o'" Ul::O~ .. ~ p VlOC:O ~~g~ ~~~~ .. ~d~ ~~~ ~~~~~N~N~~~~~~~~~rn~m~~~~~~~ o o Z c< o o Z c< o o Z c< ~ c: ur..p. ~o z o c ~ 'U Vl '" " '" '" '" -".....uo CDCOUlC '" '" " o o Z c< lD iii' OJ lD '" OJ OJ '" lD lD '" OJ lD '" OJ " '" '" -< o '" OJ..p. 0 ~ fTl ~ 0 '" -"...-..(T1 (j) 0. N: 0 00 )>)> .c[, " '" o ~~~gjei ~~'" ~~9 00 )>)> rr lD '" OJ OJ '" lD OJ '" OJ ~~Ul~Ul~(f)~)>(f))>Vl)>(f))>Vl (f) (/))>Vl,..Ul)>(f) ")>,,)>,,)>,,)>~;;j~~~~z~~;;j~~~~~~~~,,, ~~~~~3~~~~~~ ~o~o~o~ ~ ~ ~~ fTlUT(T1UTfTl..p.fTluF~C~~~~~~~~~2~2~2~~ fT1 I. (Tl \. /Tl I' fTl I"' -; l= -; F= -; r-= -; , -I r -; F -; F -I F -I ~ ~q~q~q~q~~~~gM~M:M~MnMnMoM~ r r 'r r o"'o"'ol>O~o}>Ol>:::O",::o,..;o". ~9~9~9~9~O~0~O;oo~o;oooooooa o 0 0 0z~z~z~~~~~~~~~~~~~ '" '" 1I1 -< " )> '" o '" r. 'i~1 :<'" -'" ~Ul;o "''''1Tl ~80 "'cC Vi~5J G) ~ fT1 ~ :s::: )> ITl M Z '" -l - Ul p p ~ en tAN""" 0 . . . Z NNU1(T1 ~~~:ij ~~~~ OOO-U ~~~SJ ;o;U;Oc l>>):>-z l=Fl=:::j ~~~~ fTllTlrTlO lI)~(J)OJ (J}(J}(J)O IIIC F~F~ )> rowCD;O fTlfTlfTlO enD......... ~~;$i"; (Tl-::O() ;o~Ul". ~~dS Oc:'" ~(I)~ c: z ::; Vl '" :g ~ '" '" Vl r I HEREBY CE.RTlFY THAT THIS PLAN, SPEClflCAflON, GR REPQRT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I lAM A DULY UCENSED PRorES.SIONAl ENGINEER UNDER THE Lft.wS or~jfE ~. M'NNESOTA scoilT\t, Dllle: 7/22/05 Reg, No. Re\'isions Dale: 6/11/05 9(20(05 10(11/05 11(16(05 Description: REVISED PER CITY COMME~TS REVISED PER CITY COllME~TS REVISED PER CITY COllME~T REVISED PER CITY COMME~TS 44107 B : SAY SAY SAY SAY Designed By: SAH Drown BY' WS Checked By: SAH o '00 0- o > ~ Z o 0 c Ul o 0 ~ )> o lJ ~ ITl ~ Ul -< -< ~ :s::: -< 1Il ~ ~ '" Ul Vl o o 00", 0"'< z 0 '" :;:; 5 :.u '" c '" '" 0 '" o c: '" c: Vl '" 1I1 Z Vl ~ ~ :< '" '" '" c: '" C lD OJ 1I1 Vl o '" o o c: o c: Vl o '" z )> ;:: '" z -< )> r ~ :u -< '" '" '" I ~~~~;g~o; ~~g~~~' G)~s::a:::::"O c( ~Ul:' ~ 5~~~t5F~ ~~~r"O :;! G)g~~~~~ ZZ~=E~~~ ~~~~~~~ r~o;:!!{I)fT1~ ~ ~r(f)~d?O;$i 8 ?1~~52.;O~):>- ~ ,..~F~~Vl~ Ul ~~;g~~d~ ~ 0001 nw::! F ~~~O~fTln J: r);!(TI3m::o~ ~ ~:~l>?u~~ o,..;o:l~~~ ~ ~~2';}~~~ ~ 111~""{J-tO c ;:O~~A~ot5 ofTl~~~~ Zd~:;O~~ "Ur-;~)>G1 ~~ ~~~ (/)z ;oz ~G'> d o ",,- <;~'" ~)>g "''''Z 80~ ~CJ5 ~~~ ~C-l -t~O ~~~ -<'" " '" '" '" Vl" o -IfTl-U ~ fii3!S;: r'1 ~~~ )> I ;:: ~ ~d~ ? ~E~ ~ ~~"" )> 000 ~)> t5~~ ",,,,z ~ ~~G'> ~ r~z =< G)-t~ ~O~ ~~~ , ~~ "')> z o lD- <;'" z 51;; X' ;::- )>... -<. '" ~o )>0 rz )>-< z'" a/) <;6 OJ'" OVl "'I "" r Vl 5 " '" V1 o '" '" '" o Vl o z o z " <; z -< o o z -< '" o r ! / I , f / / I f I 1 j f f' t 1/ 1 {I f (I " , Ii 'I f // ! /;1 ! i I ! / .I / ,I I ~/ '" OJ 0 '" 0 OJ -< ?I ?f f I I II !j f' fl f! {" f! if 1/ f t Ii ;/ / ~I ;,:1 Q;;; C' ~<; Oz ~~ ~~ ",'" ,,0 <;0 z~ =l?;' zo <:>-< o 0'" " "'Vl "':< ~F Z'" )>'" -<" )> z;u 0)> or or "10 )> -<;:: 0)> '" -<'" ~d 0-< "'I z'" '" "'Vl .::; '" IVl,..Vl...... ;t>::r:;o:cO ~F ~8~ )>:r; _OZ ~~ ~8~ G) ~:r-; -i)> M?u~ OU~O~fTl ~gdg~ Pl". 00 ;::'" ~~~~8 \)~~(;~ C;:ofTI::r:.~ ~~~3!~ . OZ !<",<:>~ ~~~2 ~hg.~ "':<z fTI. 0 Vl z :< "O~F)> r ",0 )>OI ~g~~ ~OUlf'T1 ~ Vi,rl,.. Sj -U fTI-", :;; <; ~ ' r ZITI 0 ~-I~~ F~~~ SJ~ :;; r -<'" I' '" ~2 "'r ;::0 I o ,,0 '" -<" I-i ",:< -<Vl I:< "')> ;;jF "'OJ ['1'" '" '" " -< !; r '" Iii -< -I "0 rtHTl-.J ~~~~' :::e:-tZZ ~ =izG)~F :<"-< ~~~(j~ o~fT1~3 ~~~:~ g~~o~ Z raJO G'>)>fTIfT1Ul ",rO ~~d~d ~~;g~~ s;:~t]8 ~o G1 zfTI-foofTI .0 ~:~~ :;;?u01 ~::!!~o "'-<0 fTI;oI ~ o ;:: ~~~SJ S:::E.J:o-Q fTlfTIr~ Z'" r -1.z~G) d~~~ ~~~g :EJ> ::; Z Z 00 -< Z r ~rnrn..J>. J> fTl fTI' -< 0 g ~~Ul~ Z z~gr ~ 6~z~ ~ -I~g~ :u ~~g~ "'zmfTI b )>-100 ;u~-;): ;ij ~Qoz '" ",0 ~ ~~~ -u ~~~ ~ ~~t'J v1 ln~~ !"t'J~ ,,' Vl "')> - ~~~ 0-<-< "0_ z ~~~ Z{l)~ ~g8 ~~~ ~Vl~ ",Oz 00-< Vl_z Vl" 6 I > )> Z F ~ ~ ~ j; ITl " '" Z ~ ~ ~ Ul 0 ;:: )> '" r z -< V1 ~ 0'" 0' z ~~ z;:: ~~ ",'" "'0 00 "'z ~:;.;! Z '" '" Vl "',.. o '" "'< .", '" ~ ~ Vl'" 0' '" Vl", 0\2 "0 ~~ "'", "''" Q~ ~:i! Fz ~ ~fTl ~ g~ S ~~ ~ 8{;J o r )>)> Z: zz '" 00 '" OJOJ o c:c: o "'''' -< <;<; Vl "" '" 0" '" ,,0 <;;:: ~:i! !"", [g d~?l :2~ ~ "'z r gj~); =1 '" '" oOZ ;:: Vl )> ~~~ _Vl -<z ~~~ :;u;c ~ o r ~~:r '$!-~ rN '" r . : )> -< Os:: ~z 0;<: Pc: . s:: -<0 "''' '" "'~ Vl . -<-< 00 " :<Vl )>0 ~r= d~ ,,0 Vl o P 1I1"''''' ~g' r"'" "';::<; -<cz ~~~ -'" ~;a~ Z"'O -<"'Vl zO{fl fh'lj; _)>r ZF' <;oj; "''''~ ~~)> ~B~ ?nc~ . Vl;:: c ;::;:: )> -<", '" - '" . :;;0 r'" " )>-< ZI o OJ rc: 0" 0" )> -<r 8~ _Vl z-< o f':Z r'" 0- ,,- ,,' '0 !!!o -<z "'-< .'" ~ o '" 6 o iJi " o Vl '" o " F '" '" ;:: o ~ V1 o '" M x o '" Vl 1I1 ;:: !; '" '" ~ '" '" o c: '" '" o )> Vl '" ::j :< '" '" ;:: o ~ {;j )> z o Vl ::j '" ~ ,g o Z o :< '" Vl ~ '< " '" o ;:: z l>- '" '" " r '" o -< '" o 'ii " <; z -< Vl )> '" '" o z -< o " )> z o 0;) " " <; z ~ CIienl. Project Name/location: HERIT AGE MAPLES ELK RIVER, MINNESOTA , , Schoell & Madson, Inc. _~_ Engineering. Surveying. PlannIng _ www.schoellmadeon.com I',,' 554 Third Streel NW, Suite 100 \U'.""-' Sic. River, Minneeota 5533Q-t409 e' (763) 241.0108 . ,.. (952) 546-9065 NEW CENTURY LAND DEVELOPMENT 18140 Zane Street, Suite 177 Elk Rive" MN 55330 763-232-9088 ----ij Sheet Trt\e' LANDSCAPE PLAN . I ./ Jf i i I j /' ! I I / /. f/ /' /<- ; If Ii ;,/ 1/ if '1 If ! // : /;1 / ;s::--< z'" . S' dQ =~ ~~. '" '" ~ ~'" I 0 ce", g~ I I "'''' '-"'-" ;:s 'I t ~8 "'~ 8~ -0'" Ice fTlif :::O!:i rn (f)<T --1~ )>~ --10. fTl .0' .0 O~. Z fTl o )> r r SMI Project