5.5 EMRUSR 08-13-2024��i Elk River , Municipal Utilities UTILITIES COMMISSION MEETING TO: FROM: ERMU Commission Mike Tietz —Technical Services Superintendent MEETING DATE: AGENDA ITEM NUMBER: August 13, 2024 5.5 SUBJECT: East Substation Power Transformer Bid ACTION REQUESTED: Accept WEG Transformers USA, LLC bid for transformer and award contract contingent upon final review by legal counsel. BACKGROUND: Approved with the 2024 budget was the addition of a new electric substation. This new substation named East substation will be located on Lot 1, Block 1 within Natures Edge Business Center Third Addition. The official address is 16740 Gateway Road. Staff worked with DGR Engineering to assemble the transformer specifications for the project. Notice for formal bids were sent out to bidders on June 26, 2024, with bids opened on August 1,2024. DISCUSSION: One of the larger components of the substation addition is the transformer. This transformer steps down the 69kV transmission system to ERMU's distribution voltage of 12.47kV. The cost of this transformer exceeds the statutory threshold amount and is subject to competitive bidding law. The quotes and equipment specifications were reviewed by our substation engineering contractor, DGR Engineering. Specifications in the bid solicitation included a minimum requirement of delivery date by September 1, 2026, with possible preference given to units manufactured and assembled in the United States. In the bid specifications, ERMU reserved the right to consider the minimum requirements, give preference to units manufactured and assembled in the United States, and to award the bid as deemed to be in ERMU's best interest. Two bids were received: 1 Niagara Power Transformer Corporation $1,369,945 2 WEG Transformers USA, LLC $1,535,200 Despite having a lower bid, Bidder 1 could not meet the delivery date requirement. Bidder 2 could meet the delivery date requirement, possibly with a unit manufactured and assembled outside of the United States. Page 1 of 2 93 Upon bid opening, DGR conducted due diligence with both Bidders. Such due diligence confirmed the delivery date for Bidder 1 later than September 1, 2026. Therefore, Bidder 1 was rejected for failure to meet the minimum bid requirements. DGR's due diligence affirmed that Bidder 2 could deliver a unit manufactured and assembled in the United States, before the required delivery date, and at the price in the bid. Because of this difference in delivery time and the indirect costs and system load considerations associated with extending the construction schedule, based on the bid requirements as solicited, it is in the best interest of ERMU and the project to award the bid to WEG Transformers USA, LLC for $1,535,200. The recommendation letter from DGR Engineering is attached. FINANCIAL IMPACT: Previous project estimates included $1,500,000 for the transformer. Staff are working with DGR and WEG to agree to payment terms that would be within the 2024 budget, with the remainder of the transformer costs paid in 2026 and will be reflected in the 2026 budget. ATTACHMENT: • DGR Recommendation of Award of Contract - WEG Page 2 of 2