5.5a EMRUSR 08-13-2024August 8, 2024 M4 Elk River Municipal Utilities Attn: Mike Tietz 13069 Orono Parkway, PO Box 430 ENGINEERING Elk River, MN 55330 RE: Award Recommendation Furnishing an Electric Power Transformer — East Substation DGR Project No. 429902 Dear Mike: We have reviewed the bids received on August 1, 2024 for the above -referenced project. A bid summary form of the bid results is enclosed. We have checked the bids for mathematical accuracy and compliance with the bid specifications. We are hereby prepared to offer the following recommendation. There was one (1) responsive bid received with a total purchase price of $1,535,200.00. This bid was submitted by WEG Transformers USA, LLC (WEG). WEG has successfully completed similar projects for us in the past, and we know of no reasons why they would not perform well on this project. WEG's price was comparable to low bidder pricing on recent DGR projects for similar sized transformers. We are therefore recommending that WEG be awarded the contract for Furnishing an Electric Power Transformer for a total purchase price of $1,535,200.00, contingent on the successful negotiation of proposal clarifications, payment terms, and terms and conditions. There was one (1) non -responsive bid received by Niagara Power Transformer Corporation (Niagara). The specifications require that the power transformer be delivered by September 1, 2026, and Niagara quoted a delivery date in February 2027. Niagara failed to meet the required delivery date listed in the specifications and thus their bid was determined to be non -responsive. Please review our recommendation and feel free to contact us with any questions you or the Board may have. Please let us know when an award has been made. We will be sending a copy of the bid summary to all bidders and plan holders. Best Regards, DGR Engineering Brenton Thompson, P.E. Enclosure: Bid Summary DGR Engineering — 1302 South Union Street — P.O. Box 511— Rock Rapids, IA 51246 phone: 712.472.2531 — fax: 712.472.2710 — dgr.com q',, H7W ;M a up\ 1vx71nan, Y I" ws\l h Rcconii Con Imand Vo Ovvn m 4 °T`02.6x'x 7iWaW Vy ', 95 BID SUMMARY FURNISHING AN ELECTRIC POWER TRANSFORMER - EAST SUBSTATION ELK RIVER MUNICIPAL UTILITIES ELK RIVER, MINNESOTA (1)-15/20/25 MVA, ONAN/ONAF/ONAF @ 55" C 16.8/22.4/28 MVA, ONAN/ONAF/ONAF (a 65" C DELTA - GRDY, 69-13.2/7.62 kV, w/LTC ENGINEERING 1302 South Union Street Rock Rapids, Iowa 51246 DGR Project No. 429902 Bid Letting: August 1, 2024 - 2:00 PM Page 1 of 1 BASE BID Bidder and Address Bid Security Acknowledge Delivery Manufacturer / Comments o ( /o) Addendum #1 Total Purchase Price (7C) Total Eval. Price (8G) Location WEG Transformers USA, LLC 6350 WEG Drive 5% Bid Bond Yes $1,535,200.00 $1,708,967.00 July, 2026 Washington, MO Washington, MO 63090 Niagara Power Transformer Corp 1755 Dale Road 5% Bid Bond Yes $1,369,945.00 $1,549,174.00 February, 2027 Buffalo, NY Non -responsive bid: Failed meet the delivery date required per the specifications. Buffalo, NY 14225 *Specifications required delivery by Sept 1, 2026 Corrected Amount P:\04\299\02\Doc\Spec\Xfmr\BidSum-XFMR ERMU 429902 Page 1 of 1 96