05-08-2024 Parks and Recreation Commission Packet (4)
Parks and Recreation Commission
Regular Meeting
&
Work Session
Agenda
Wednesday, May 8, 2024
6:30 PM
Elk River City Hall
▪ Regular meeting in Council Chambers
▪ Work Session meeting in Upper Town Conference Room immediately following regular meeting
1. CALL MEETING TO ORDER
2. PLEDGE OF ALLEGIANCE
3. CONSIDER AGENDA
4. CONSIDER MINUTES
4.1 April 10, 2024 Minutes
5. OPEN FORUM
An opportunity to provide comments and feedback regarding items not on the agenda. Information provided in Open Forum
will not be discussed at this meeting; rather, the information will be referred to staff and/or scheduled for discussion at a
future meeting.
6. PRESENTATIONS, AWARDS, AND RECOGNITION
7. ACTION ITEMS
7.1 Healing is Possible 5K
8. DISCUSSION ITEMS
8.1 Hillside Beginner's Area Proposal
8.2 Sherburne County Collaboration: Great Northern Regional Trail
8.3 Scout Island - Scout Service Project
9. DIVISION MANAGER UPDATES
9.1 Assistant City Administrator Update - May 8, 2024
10. ANNOUNCEMENTS
11. MOTION TO ADJOURN REGULAR MEETING
12. WORK SESSION – UPPER TOWN CONFERENCE ROOM
Work Sessions are less formal meetings to encourage dialog. Official action or votes are not typically taken. At the
conclusion of a discussion, a simple consensus provides staff direction for execution of the item. This portion of the agenda
is audio recorded but not video recorded or broadcast. Work Sessions are open to the public; however, visitors who wish
Page 1 of 125
The Elk River Vision
A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and community
engagement that encourages and inspires prosperity
to provide input must be invited by the presiding officer, assume a seat at the discussion table and provide their full name
and address for the official record.
12.1 Athletic Facilities Master Plan
13. MOTION TO ADJOURN
Page 2 of 125
Meeting of the Elk River
Parks and Recreation Commission
Held at the Elk River City Hall
April 10, 2024
Members Present: Chair Dave Anderson, Commissioners Joy Goodwin, Greg Loidolt, Mike Niziolek,
Hal Stewart, and Jill Varty
Members Absent: Ryan Holmgren
Council Liaison: Councilmember Mike Beyer
Staff Present: Assistant City Administrator/Business Services Director Joe Stremcha, Farmers
Market/Special Events Coordinator Karen Wingard, Senior Planner Chris Leeseberg,
Recreation Assistant Ali Wallace
1. Call Meeting to Order
Pursuant to due call and notice thereof, the meeting of the Elk River Parks and Recreation
Commission was called to order at 6:30 p.m. by Chair Anderson.
2. Pledge of Allegiance
3. Consider Agenda
Moved by Commissioner Goodwin and seconded by Commissioner Varty to approve the
April 10, 2024, agenda. Motion carried 6-0.
4. Consider Minutes
Moved by Commissioner Stewart and seconded by Commissioner Goodwin to approve the
March 13, 2024, Parks and Recreation Commission Minutes. Motion carried 6-0.
5. Open Forum
6.1 Plat Review Process – Park Dedication
Mr. Leeseberg went over the land use application process. The Parks and Recreation Commission and
Planning Commission are recommending bodies and share their recommendations with the City
Council and the Council will make the final decision. Applications are due the last Monday of the
month. The following Monday, typically the first Monday of the month, there is a city-wide review
meeting which includes all city departments and Elk River Municipal Utilities, to go over the
proposed plat applications received for the month and staff can share their comments, concerns, and
recommendations. The county and state also receive the information so they can have their input as
well.
The next step is presenting it to the Parks and Recreation Commission on the second Wednesday of
the month. The Commission then makes a recommendation of land or cash and if applicable a trail
and/or easement is required. Land dedication outside the urban service district, non-city sewer and
water lots, requires a one-and-a-half-mile service radius, or a thirty-minute walk to a neighborhood
Page 3 of 125
Parks and Recreation Commission Minutes Page 2
April 10, 2024
recreation component according to the Master Plan. It would be a natural resource based linked to
recreational trail systems and would provide minimal facilities, not looking for a full neighborhood
park. Park dedication in the cash form is based on the number of new lots, not existing lots. The Trail
Master Plan is used to determine if a development needs a trail connection. In some cases, the
location is specific or is a guide. This information is provided to the developer early in the process to
help them create a design/layout based on the Trail Master Plan. The Planning Commission reviews
the plans on the fourth Tuesday of the month, staff provides a recommendation for plat approval
based on the comprehensive plan, ordinances, and site plan review meeting. The Planning
Commission provides a formal recommendation to the council for plat approval. The Planning
Commission does not evaluate park dedication needs. The Park & Recreation Commission meeting
can occur before or after the Planning Commission meeting since they operate independently of each
other, but both meetings need to occur before the City Council can review it. The planning and
platting items are typically brought to the City Council on the 3rd Monday of the month. Staff
provides the Council with the recommendations from the Parks & Recreation Commission, Planning
Commission, and staff. The Council considers the recommendations and approves or denies the plat
application.
Mr. Leeseberg presented slides showing the Preliminary Plat Process and Simple Plat Process. If the
Parks and Recreation Commission (PRC) disagrees with a proposed location of a park or trail they
should act on the request and recommend that the item be moved to location “A”. Staff will then
work with the applicant to adjust the plans as needed before the City Council meeting or include a
condition that the park shall be relocated as recommended by the PRC. The Planning Commission
often makes similar recommendations, for instance, the location of a street or cul-de-sac.
As a recap the Parks and Recreation Commission reviews Park Dedication and Trails/Easements, the
Planning Commission reviews the zoning regulations, and the City Council reviews all
recommendations and acts on the application.
7.1 Park Dedication – Natures Edge Business Park Fifth Addition
Mr. Stremcha shared the staff report and let the commissioners know there is an existing paved
bituminous trail that was constructed when the roadway was constructed so the second motion is not
relevant.
Moved by Commissioner Loidolt and seconded by Commissioner Niziolek to accept park
dedication for Natures Edge Business Park Fifth Addition to be paid in cash, at the
applicable rate for the final platted acres, at the time of recording. Motion carried 6-0.
7.2 Farmers Market Coloring Contest
Mrs. Wingard presented the three options on a ballot for the Farmers Market coloring contest. There
were 52 entries this year. The ballots were collected, and this was the first time there was a tie so
Council Member Beyer submitted his vote as the tiebreaker. The winner is option C which was
submitted by Savannah.
Page 4 of 125
Parks and Recreation Commission Minutes Page 3
April 10, 2024
Moved by Commissioner Stewart and seconded by Commissioner Varty to approve option C
as the winner of the 2024 Farmers Market Coloring Contest. Motion carried 6-0.
7.3 Parks and Recreation Commission Ordinance Review
Mr. Stremcha shared that staff would like to reclarify and confirm how each of the powers and duties
will be acted on or implemented to ensure the successful fulfillment of the following recommended
changes.
▪Assist with the promotion of city parks, trails, and recreational facilities.
▪Collaborate with external organizations to ensure the offering of an appropriate array of
recreation opportunities for the youth and adults of the city.
▪Collaborate with city staff to ensure the proper maintenance and development of city parks,
trails, and recreation facilities.
Mr. Stremcha explained that for the first bullet point “Assist with the promotion of parks, trails, and
recreational facilities” it would be helpful to discuss as a Commission how those will be acted on and
if it’s necessary to keep or would you want to remove it.
Commissioner Loidolt said the intent is to not get in the way of but to promote events. The
commission is not going out to sell the trails, parks, and recreational facilities.
Mr. Stremcha said in the last revision vandalism was incorporated, is that something that’s inherent
based on the person wanting to make sure we promote things or not vandalize, or is that specific to
this Commission that we’re making it an initiative to address? If it’s inherent in a civilian perspective
versus a commission perspective, we should make note of that. Either include it because of x, y, z or
remove it.
Chair Anderson stated community connection is one of the key roles and thinks it should be a natural
part of this role and thinks it should be left in.
Commissioner Niziolek thinks all commissioners promote the parks and wouldn’t be on the
Commission if we didn’t do this.
Mr. Stremcha asked how that is different as a civilian versus a commissioner. What would be the
different actions taken to fulfill the duty, beyond what a volunteer and the community would do? If
the commission wants it in there, let's have a rationale behind it. How is it going to be executed?
Council Member Beyer shared that assist with the promotion is a strong statement which means being
an assistant and suggested changing it to support the promotion.
Commissioner Loidolt said assist means you are required to be at the events to help with the
promotion, but we are not required.
Mr. Stremcha shared the next bullet point “Collaborate with external organizations to ensure the
offering of an appropriate array of recreation opportunities for the youth and adults of the city.” We
need to define that specific role and responsibility for the duties.
Page 5 of 125
Parks and Recreation Commission Minutes Page 4
April 10, 2024
Commissioner Loidolt shared that this is asking them to do things outside of the commission and
thinks it can be reworded. It is important that we do boast what we have but don’t think it’s a
requirement.
Chair Anderson asked what the wording was before it was changed. Mr. Stremcha thinks it was work
with versus collaborate with.
Commissioner Goodwin shared that the way she reads the statement is as if she’s helping to make
sure the city understands what other cities are doing and bringing to them to the Council. She doesn’t
feel it’s the responsibility of the commissioner. It is helpful to brainstorm those ideas in a work
session but it’s not up to the commission to do the leg work and come up with the plans.
Commissioner Hal asked if enable would be a better word to allow user groups, or clubs to come to
the Commission to make a recommendation or state their wishes.
Mr. Stremcha said from his perspective it would be the absence of the commission's roles and
responsibilities would thus enable others to fill the void. It wouldn’t necessarily be the power to
enable others it would be a void that was left vacant by not having the commission fill that
responsibility. It’s not the power and duty to enable someone else, it’s the power and duty for the
commission to take action.
Commissioner Niziolek thinks it’s stated the way it is because if an external organization comes to the
commission and wants something, we should collaborate and work with them to provide that
recreational opportunity.
Commissioner’s discussed changing ensure to consider, and all agreed to change it to consider.
The third bullet point “Collaborate with city staff to ensure the proper maintenance and development
of city parks, trails, and recreational facilities” need to define. Commissioner Loidolt said that we have
staff that are in charge of maintenance, and we should not tell them how to do their job. He thinks it
can be reworded and be made softer than ensure. Chair Anderson shared this is the essence of what
we do and thinks the word ensure should be replaced. Commissioner Varty suggested changing it to
support. Mr. Stremcha shared that park maintenance falls under the Council's purview under Public
Works versus a regular presence.
Commissioner Loidolt suggests removing proper maintenance, because the way it reads with the word
ensure in it, we are telling the staff how to do their job. If ensure is changed to something softer then
it is okay. Commissioners agree to change ensure to support.
Mr. Stremcha asked if support would be through budget recommendations or suggestions. When we
successfully fulfill the duties and responsibilities, what are you doing to ensure or support the proper
maintenance and development of said parks. If this is your duty and responsibility, how are you going
to fulfill that and what types of scenarios would that entail? What is the commission doing to make it
actionable?
Council Member Beyer shared that when it says to collaborate with city staff to ensure the proper
maintenance and development of city parks, trails, and recreational facilities it means the commission
is supporting the park plans, field plans, and assisting staff. Ensure is a very strong word and means
you’re in charge and support means you’re part of a team to make a decision.
Page 6 of 125
Parks and Recreation Commission Minutes Page 5
April 10, 2024
Commissioner Niziolek thinks some verbiage is needed to collaborate with Sherburne County and
adjacent townships and cities on potential park related issues such as trail connections, recreational
facilities, and the Great Northern Trail.
Mr. Stremcha suggested adding parks, trails, and recreational opportunities as part of the external
organizations to bullet point two. External organizations apply to any kind of entity.
Commissioners discussed the removing array from the second bullet point, and all agreed.
The changes are as follows:
▪Support with the promotion of city parks, trails, and recreational facilities.
▪Collaborate with external organizations to consider the offering of appropriate parks, trails,
and recreation opportunities for the youth and adults of the city.
▪Collaborate with city staff to support the proper maintenance and development of city parks,
trails, and recreation facilities.
Moved by Commissioner Loidolt and seconded by Commissioner Goodwin to recommend to
the City Council to approve the revision to the reworded Parks and Recreation Ordinance.
Motion carried 6-0.
7.4 Camp Cozy Park Natural Resources Management Plan
Stremcha shared that at the last meeting it was discussed adding in some features. Those features are
identified in the attached map. The plan was approved by the Commission in December 2023 with
the revision based on the commission's recommendation.
Moved by Commissioner Niziolek and seconded by Commissioner Stewart to approve the
Camp Cozy Park Natural Resources Management Plan with the recreational amenities
located on the map. Motion carried 6-0.
8.1 Recreation Amenities Length of Season
Mr. Stremcha shared staff would like to get feedback from the Commission on when is an appropriate
time for seasonal amenities to be added or subtracted from the community. Historically, on April 1 or
May 1, depending on the spring season, things start to roll out, such as pickleball nets, archery ranges,
etc. From a budget perspective is the Commission okay with having one pickleball net up year-round
to provide those opportunities? Is this something we want to consider for future budgets to
incorporate those types of amenities with longer seasons or have the flexibility with staff making the
judgment calls? What are the Commission's feedback and thoughts on the length of season for
amenities?
Commissioner Niziolek suggests taking the staff’s recommendation. If the staff feels confident, they
can put up pickleball nets early without damage then they should do that. Staff needs to be in charge
and should listen to what the community has to say.
Page 7 of 125
Parks and Recreation Commission Minutes Page 6
April 10, 2024
Mr. Stremcha shared that in the past, if there was a request to put the pickleball nets up in January, the
staff would respond that we’re going to wait until April 1. The direction we’re looking for is if the
Commission is comfortable with staff deviating away from the set policy of April 1. By extending the
season we’re going to inflate our budget slightly because there will be more scenarios where the
weather will cause more wear and tear on the equipment which may require replacing the nets sooner.
The staff hasn’t felt comfortable enough to make the decision.
Commissioner Goodwin said this year was a unique season and asked if staff received calls from the
community to have things put out earlier, such as pickleball nets. Mr. Stremcha said we did.
Chair Anderson shared people drove everywhere to play pickleball for a few months and he thinks
that giving staff the recommendation of flexibility and knowing that there is a cost that comes with it,
is a good plan. The community should not have to call.
Commissioner Loidolt agreed to give staff the flexibility and suggested staggering the nets and only
putting up a couple so we’re not replacing them all at the same time.
Commissioner Goodwin asked if there are other amenities such as the splash pad that need to be
considered for this. Mr. Stremcha said those are seasonally scheduled because of winterization with
water freezing and the uncertainty. With pickleball nets, you can get by with a little more flexibility.
Commissioner Goodwin asked if the staff needs a recommendation on the amount of time or if we
can allow the staff to make that determination. Mr. Stremcha stated there is not a formal policy that
states the spring season starts on April 1, so that is a staff-level determination. If the Commission
doesn’t feel like it needs to be a policy and wants to give staff the flexibility to make that
determination within the confines of the budget they can. But if the budget were to be inflated for the
2025 season due to wear and tear increase that might need to be part of the recommendation this
summer.
Chair Anderson shared that if people want to play, they should be playing.
9. Parks and Recreation Manager Update
Mr. Stremcha shared that the Recreation Manager position will be posted soon and will start the
recruitment process over the next month or two.
Chair Anderson shared that this past month Mr. Stremcha cleared up the status of the city park, Burr
Oak. It was important for the Commission to see that the life estate of Carrol Bloomdahl was park
dedication.
Chair Anderson shared the Scout Island access is identified in public records and signage for the park
boundaries will be installed.
Commissioner Niziolek asked if an outside agency can review the natural resource inventory of Burr
Oak to find out what is there. Chair Anderson suggested adding that as a discussion item to a future
meeting.
Page 8 of 125
Parks and Recreation Commission Minutes Page 7
April 10, 2024
10. Announcements
11. Adjourn Regular Meeting
Moved by Commissioner Loidolt and seconded by Commissioner Niziolek to adjourn the
regular meeting of the Parks and Recreation Commission at 7:52 p.m. Motion carried 6-0.
12. Work Session
The work session meeting of the Elk River Parks and Recreation Commission was called to order at
8:01 by Chair Anderson.
12.1 Athletic Facilities Master Plan
Mr. Stremcha shared he wanted to reiterate some of the key points from the presentation at the last
meeting. These are concepts and features that we want to include in the future. When we talk about
tilting a field 10 degrees to the east, that is something that will come up with the construction of the
complex and not something conceptually we’re going to decide on today. The number and type of
fields are the features that will help guide where the needs are. Conceptually as we look 10 years from
now what do we want to see in these park improvements? We still need to look at how we’re going to
raise the funds.
Commissioner Loidolt likes all the plans and has shown them to people and wants to start building
them now. The baseball fields haven’t been redone and need to be upgraded. Since the baseball field
is in a big plan, he would like to see a smaller scale to get it done sooner because there is a need for a
premiere baseball field. He asked if these plans have been shared with Elk River Youth Baseball. Mr.
Stremcha said we based the number of fields from a study done last year. The overall thing to keep in
mind with this plan is sequencing. We cannot do the construction at Oak Knoll until PT Complex has
a soccer/lacrosse field. The improvements need to be sequentially done.
Commissioner Niziolek shared that one of the things he struggles with is the amount of money spent
on parking when looking at the recreation percentage. Mr. Stremcha said that stems from the concept
of being okay with gravel, grass, or paved lots, the vision is that they are paved. Commissioner
Niziolek is concerned that the big price tag on paving a parking lot versus providing a recreational
activity. Mr. Stremcha shared the number of off-street parking spaces required for tournaments and
utilization is no different than the FT Center. A significant portion of the property is going to be
parking but the size of the budget for parking will be contingent on the level of service that’s
provided. The parking lots could start as gravel lots in phase one and then be paved in phase ten.
Commissioner Niziolek is concerned about DAAC and moving it away from a 4-field complex. He
feels that DAAC and Oak Knoll draw people into town and there is great value in that for our
community.
Mr. Stremcha shared that the future of the fairgrounds is unknown, and that parcel of land goes hand
in hand with DAAC. There is hesitation in planning DAAC based on what could happen with the
neighboring lot. The softball needs that were discussed with that user group were to consolidate their
Page 9 of 125
Parks and Recreation Commission Minutes Page 8
April 10, 2024
fields to have more organized tournaments in a specific location. When they looked at the fields and
user groups, a lot of ballfields and lacrosse/soccer fields were in their home or niche, more
compacted geographically. The current DAAC location could be used more as an interim recreational
complex that’s more youth-driven based on the nature of those fields in being in such proximity that
user groups don’t prefer to use the west face field because of the sunset and other safety concerns.
There are a lot of things that need to be improved at DAAC so rather than do that in a tight, confined
space the feeling was to relocate and repurpose and combine the fields at PT Complex.
Commissioner Niziolek asked if we’re looking at the long term should the city make good statements
about the fairground being of value to the city maintaining DAAC and expanding the complex.
Commissioner Loidolt said that will incur extra costs and the city already owns the parcels, except the
high school baseball field.
Chair Anderson stated it’s hard to see into the future, but he likes the idea of having baseball/softball
on the PT Complex campus. Since there are three new Commissioners, he would like to see the
utilization study findings on page one and then the implementation sequencing and strategy.
Commissioner Stewart would like a sequence summary. They are interlocking puzzle pieces where one
needs to occur before the next can occur, but he’s concerned that if we fail on the front, we’ll fail on
the back. We need to ramp up the PT Complex first. Would like to build off of the phasing plan. In a
perfect world these are the steps we want to follow but we need to look at off ramps if that sequence
doesn’t hold.
Chair Anderson asked what the ultimate action item is down the road. Mr. Stremcha said we would
want a mutually agreed upon concept that will be the pedestal for which the fundraising begins. When
we talk about the next 10-15 years or whatever the Council deems as the appropriate timetable to
move forward with the project, this is the vision for the complex to look like as a finished project.
Conceptually this will be the number of fields, where lacrosse, baseball, and softball have a home,
those are the concepts, not necessarily the finalized design that will go out for bidding. The plan will
be tweaked and be refined over the next decade but it’s not necessarily what will be built tomorrow.
This will need to be clarified in the communication piece because once this ends up in the paper
people will be asking how their tax dollars will be used, and that’s not the narrative we want to
communicate. This is what we want to see in the future.
Council Member Beyer shared he’s a big-picture guy and sees that we’re trying to draw people into
Elk River and we’re growing at a pace that we need additional fields, but does Elk River want to
grow? What happened to where the city meets the country? Do want to grow to the size of St. Cloud
and Maple Grove or do we want to be Elk River? He wanted to throw that out because that’s the
question he’s had when there have been great big proposals and want to build big residential areas
where they want the city to buy them a water tower and sewer, which is fine if it’s cost neutral, but we
don’t want put the burden on the taxpayers. It’s great to have long-term goals but it has to fit into
everything else in the city. He appreciates the time the Commission is taking to decipher this.
Mr. Stremcha said this will go to the Council as an awareness piece, there is going to be a consistent
conversation around what the long-term plan needs to be identified, from the standpoint of rebuilding
what we have existing or expanding and what is the philosophical approach to both.
Page 10 of 125
Parks and Recreation Commission Minutes Page 9
April 10, 2024
12.2 Disc Golf Open House Discussion Recap and Next Steps
Mr. Stremcha shared we received a lot of feedback and had good conversations regarding current
concerns at Lions Park and we want to address them long-term. Other needs and wants were
discussed such as the size and scope of the facility, the need for variety, more secluded, and 18
independent holes. He will put the information together and share it with the attendees. There were 9
community members present, with three of them being Commission members.
Chair Anderson shared they brought what we needed to the table. Commissioner Stewart agreed and
said they did a good job articulating what’s important to them, things that he never thought about
since he hasn’t played the game.
Chair Anderson clarified that Mr. Stremcha will summarize the discussion and it can be discussed at a
future work session and mentioned that the future space can be discussed at that time. Mr. Stremcha
confirmed five different spaces came up in conversation. As an awareness, these are the features that
are desired and long term what are the things we want to incorporate, so during the budget process
we can state that we need X dollars to facilitate this improvement project and where it falls within the
next five years based on the capital outlay planning that we do.
11. Adjournment
There being no further business, moved by Commissioner Loidolt and seconded by
Commissioner Goodwin to adjourn the Parks and Recreation Commission work session at
8:37 p.m. Motion carried 6-0.
Minutes prepared by Ali Wallace.
___________________
Dave Anderson, Chair
___________________
Tina Allard, City Clerk
Page 11 of 125
The Elk River Vision
A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and community
engagement that encourages and inspires prosperity
Request for Action
To
Parks and Recreation Commission
Item Number
7.1
Meeting Date
May 8, 2024
Prepared By
Karen Wingard, Farmer's Market/Event Coordinator
Item Description
Healing is Possible 5K
Reviewed by:
Joe Stremcha
Cal Portner
Action Requested
Approve, by motion, the Healing is Possible 5K event at Orono Park on Saturday, October 26, 2024.
Background/Discussion
Jonna Phillips, with the Veteran Resilience Project, will present her proposal to hold the Healing is Possible 5K
event at Orono Park on Saturday, October 26, 2024.
Financial Impact
None
Mission/Policy/Goal
Help, not hinder citizen quality of life
Attachments
None
Page 12 of 125
The Elk River Vision
A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and community
engagement that encourages and inspires prosperity
Request for Action
To
Parks and Recreation Commission
Item Number
8.1
Meeting Date
May 8, 2024
Prepared By
Karen Wingard, Farmer's Market/Event Coordinator
Item Description
Hillside Beginner's Area Proposal
Reviewed by:
Joe Stremcha
Cal Portner
Action Requested
Discuss the promised amenity location and funding needs.
Background/Discussion
Park Stewards for Hillside Park will present a proposal to add a beginner's trail and skill area to Hillside Park.
Financial Impact
Unknown.
Mission/Policy/Goal
Work with citizens to achieve goals.
Attachments
1. Hillside Beginner's Area Proposal 4-12-24
2. Existing Trail Map
Page 13 of 125
April 12, 2024
To: City of Elk River Parks and Recreation
From: Derek Burchill
Volunteer Trail Steward/Dirt Boss – Hillside Mountain Bike Park
Minnesota Off Road Cyclists
Subject: Permission request to add a “beginner’s trail and skills area” to Hillside Mountain Bike Park
To Whom it May Concern:
I would like to propose and get permission to add a short beginner’s trail and skills area to Hillside
Mountain Bike Park. This trail network would be in the grassy area next to the main trailhead to section 1, right
off the parking lot. It would be a great addition to the park, giving younger/less experienced riders a place to
hone their skills and confidence to tackle the main trail. Please see the attached map and pictures for
reference.
We have designed the trail network to have an outer loop with very easy features, like berms and pump
track rollers. Branching off the outer loop would be four skills trails, getting progressively harder starting with
very easy #1 to the more difficult #4. These tentative plans may change slightly during construction:
#1 – A short, fairly straight section with a few basic features, possibly a skinny or low bridge.
#2 – A longer section with two small tabletop jumps that are easily rollable for those who don’t want to leave
the ground. It may start with a higher bridge to aid in building speed for jumping.
#3 – A slightly twisty section with several features made of rocks or wood. Possibly a rock garden, roller
coaster, or curved bridge.
#4 – A twisty section with harder features like a rock roll, chunkier rock garden or small drop.
We would like to add some non-bike related items to make it more appealing for families to come and
enjoy as they practice their skills. Some ideas included larger rocks or boulders for kids to climb on, picnic
tables/benches for parents to sit at while their kids ride and possibly a flower garden/tree in the middle. These
items can be added once the trail has taken shape.
Page 14 of 125
For resources from the city, we will need materials such as the mini skid and fuel, black dirt, green
treated lumber and screws, rocks, picnic tables and benches, possibly small trees and flowers (I’ll be looking
for volunteers to do the gardening if you know of any), possibly gravel; ball diamond aggregate or other durable
trail covering to make the trail more maintenance free. We will need access to the specialized tools necessary
for relocating the bike stand to make it more accessible. We may also need assistance in creating additional
signage and setting the bigger rocks. All other obstacles should be able to remain where they are. The vast
majority of the labor will be volunteer with the exception of the assistance from the city for the above items.
Please reach out to me with any questions or concerns. We are hoping to start this project this spring
with a summer opening. Thank you for your time!
Derek Burchill
763-807-1000
Burchill.derek@gmail.com
Page 15 of 125
Page 16 of 125
Rock Garden Skinny
Rock Roll to the riders right, Small Drop to his left
Roller Coaster
Page 17 of 125
Small Tabletop Jump (ours would be constructed of dirt)
Rollers and Berms
Page 18 of 125
Bridges of various shapes and sizes
Page 19 of 125
Page 20 of 125
The Elk River Vision
A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and community
engagement that encourages and inspires prosperity
Request for Action
To
Parks and Recreation Commission
Item Number
8.2
Meeting Date
May 8, 2024
Prepared By
Karen Wingard, Farmer's Market/Event Coordinator
Item Description
Sherburne County Collaboration: Great Northern
Regional Trail
Reviewed by:
Joe Stremcha
Cal Portner
Action Requested
Provide input on the Legacy Grant application and discuss funding options.
Background/Discussion
Sherburne County Parks Director Gina Hugo will present background information on the Great Northern
Regional Trail and the status of the 2024 GMRPTC Legacy Grant application.
Financial Impact
To be determined.
Mission/Policy/Goal
Help, not hinder citizen quality of life
Attachments
1. 20230414 GNT Partners MOU Fully Executed
2. 2024 GNRT project_budget
3. Great Northern Regional Trail PPT ER P_R Commission
4. 2024 Great Northern Regional Trail Legacy Proposal Content
Page 21 of 125
Great Northern Trail Partners MOU
Sherburne and Mille Lacs Counties, Cities of Elk River, Zimmerman, and Princeton (collectively known as “Parties”) hereby enter into this Memorandum of Understanding:
The Parties agree to work together on the development and management of the Great
Northern Trail (GNT), consistent with the Great Northern Trail Master Plan in order to enhance recreational opportunities for residents of the eastern Sherburne County and
Mille Lacs County region. The Parties will continue the GNT Committee previously established consisting of staff representatives from each of the Parties.
Through the Committee and the implementation of the MOU; the Parties will seek to
denote the roles and responsibilities of each governing entity in grant solicitation, refining trail corridor to improve local connections, defining allowable trail uses and suggesting
best practice in managing operations and maintenance. The Parties understand that decision-making lies with each respective Board or Council (collectively referred to as
“Boards”) of the respective parties that have ownership of the trail corridor.
The Committee will:
1. Include key staff from the Parties to provide recommendations to be considered by their respective Boards;
2. Include townships and cities that are bisected by the trail corridor in discussions
and seek feedback on decisions impacting their respective jurisdictions;
3. Schedule meetings as needed with regular communication through emails;
4. Work together to assist Parties in maximizing grant opportunities for construction
and maintenance of the trail segments and trail heads as prioritized in the master plan;
5. Support the development prioritization strategy set forth in the master plan. It is the intent that Sherburne County apply for funding to complete the south half of
corridor first;
6. Recommend to the Parties’ respective Boards a cost sharing model per project or a cost allocation of professional services that benefit the entire trail that can be
codified in writing;
Page 22 of 125
2
7. Develop a GNT event permitting recommendations to promote regulatory consistency along the entire regional corridor;
8. Recommend to each Party, based on Party-specific circumstances, guidelines for Trail Closure(s) (such as hunting season, etc.);
9. Establish minimum base trail conditions and maintenance schedule
recommendations to assist Parties in coordinating such activities for maximum cost effectiveness; and
10. Make recommendations on the acquisition of easements and fee title interest in
real property for each Party’s Board consideration.
Party Responsibilities:
1. Each Party is responsible for maintaining the portion of the trail corridor in their ownership;
2. Each Party shall assume leadership for grant and construction administration for work on portions of trail corridor in their ownership; and
3. Each Party shall be responsible for their acts and those individuals who are under their direction and control.
Each Party agrees to designate a person(s) to work with the committee.
This Memorandum of Understanding will automatically renew annually, unless affirmative
action is taken by a Party wishing to opt out. A Party desiring to opt out must do so in writing with six (6) months’ notice.
Sherburne County Mille Lacs County
By: ______________________________ By: _______________________________
Name: ___________________________ Name: ____________________________
Title: ____________________________ Title: ______________________________
Date: ____________________________ Date: ______________________________
Lisa A Fobbe (May 10, 2023 12:43 CDT)
Lisa A Fobbe
Lisa A Fobbe
County Commissioner
05/10/2023
Page 23 of 125
Page 24 of 125
Page 25 of 125
Page 26 of 125
Page 27 of 125
Great Northern Regional Trail 24-006F
Sherburne County
Reference Eligible Item Details Quantity Unit Cost/Item Total Cost
A Mobilization 1 35,000.00 35,000.00
B Initial Grading/removal (SY)3500 25.00 87,500.00
C Retaining Wall (SF)200 80.00 16,000.00
D Paving (SY)3500 45.00 157,500.00
E Grading, seeding (acre units)1 500.00 500.00
F Branded Trailhead Kiosks 5 35,000.00 175,000.00
G Shade Structure/Rain Shelter 4 35,000.00 140,000.00
H Portable Toilet Screen Fence(LF)60 250.00 15,000.00
I EV-Charging 1 19,000.00 19,000.00
J E-Bike Charging 4 2,500.00 10,000.00
K Water Filling Station 1 10,000.00 10,000.00
L Picnic Tables 5 2,500.00 12,500.00
M LED Solar Lighting 3 15,000.00 45,000.00
N Tree Planting 10 500.00 5,000.00
O Native Planting (1-gallon pots)500 25.00 12,500.00
P Interpretive Panels 5 2,500.00 12,500.00
Q Waste Receptacle 4 500.00 2,000.00
R ADA Width Limiter Gate 9 750.00 6,750.00
Subtotal 761,750.00
0
Construction Total 761,750.00
Design/Engineering/Const. Admin.152350
Soft Cost Total 152350
GMRPTC Local Match
Total Project 914100 731280 182820
Total Percentage 0.8 0.2
Non Eligible Expenses Item Details
0
Page 28 of 125
0
Non-Eligible Total 0
Grand Total 914100
Page 29 of 125
4/12/2024
Page 30 of 125
This scenario proposes that the match be spilt equally between participating partners three ways
Partner Agency Local Match Desing/Eng/Const. Admin
178,020.00 148350
Elk River 59,340.00 49450
Sherburne County 59,340.00 49450
Zimmerman 59,340.00 49450
Page 31 of 125
10% of the project cost is eligilbe for cost share for engineering and design. The "soft costs" are not.
Soft Costs - eligible grant expense Total Out of Pocket
148,350.00
0 108,790.00
0 108,790.00
0 108,790.00
This scenario proposes that the match be spilt equally between participating partners three ways
Page 32 of 125
10% of the project cost is eligilbe for cost share for engineering and design. The "soft costs" are not.
Page 33 of 125
This scenario proposes splitting the local match equitably between partipicating partners according to the percent project cost in each jurisdiction
Total Project Cost $914,100
Design/Engineering Cost $152,350
Soft Costs (eligible grant expense)$152,350
Local Match Total $182,820
Grant Request $731,280
Elk River Project Components Quantity Cost/Unit Total Cost
1/3 Mobilization 0.3333 35,000 $11,666.67
Trailhead Sign 2 35,000 $70,000.00
Shade Structure 1 35,000 $35,000.00
Picnic Tables 1 2,500 $2,500.00
Interpretive Panels (ER History, Landfill)2 2,500 $5,000.00
Woodland Trails Panel 1 2,500 $2,500.00
Portable Toilet Screen Fence (LF)20 250 $5,000.00
ADA Width Limiter Gate 3 750 $2,250.00
$133,916.67
Sherburne County Project Components Quantity Cost/Unit Total Cost
1/3 Mobilization 0.3333 35,000 $11,666.67
Trailhead Sign 2 35,000 $70,000.00
Shade Structure 2 35,000 $70,000.00
Picnic Tables 2 2,500 $5,000.00
Waste Receptacle 2 500 $1,000.00
Portable Toilet Screen Fence (LF)20 250 $5,000.00
Interpretive Panels (Tamarack, GNRR)2 2,500 $5,000.00
ADA Width Limiter Gate 6 750 $4,500.00
$172,166.67
Zimmerman Project Components Quantity Cost/Unit Total Cost
1/3 Mobilization 0.3333 35,000 $11,666.67
Initial Grading/removal (SY)3500 25 $87,500.00
Retaining Wall (SF)200 80 $16,000.00
Paving (SY)3500 45 $157,500.00
Grading, seeding (acre units)1 500 $500.00
Trailhead Sign 1 35000 $35,000.00
Portable Toilet Screen Fence (LF)20 250 $5,000.00
Shade Structure 1 35,000 $35,000.00
EV-Charging 1 19,000.00 $19,000.00
E-Bike Charging 4 2,500.00 $10,000.00
Water Filling Station 1 10,000.00 $10,000.00
Picnic Tables 2 2,500.00 $5,000.00
Waste Receptacles 2 500.00 $1,000.00
LED Solar Lighting 3 15,000.00 $45,000.00
Tree Planting 10 500.00 $5,000.00
Page 34 of 125
Native Planting (1-gallon pots)500 25.00 $12,500.00
$455,666.67
Total Construction Expense $761,750.00
Page 35 of 125
Percent Construction Cost Match Amount Eng./Design/Const.Admin.Soft Costs
0.175801335 $32,140.00 Grant funded $26,783.33
Percent Construction Cost Match Amount Eng./Design/Const.Admin.Soft Costs
0.226014659 $41,320.00 Grant funded $34,433.33
Percent Construction Cost Match Amount Eng./Design/Const.Admin.Soft Costs
This scenario proposes splitting the local match equitably between partipicating partners according to the percent project cost in each jurisdiction
Page 36 of 125
0.598184006 $109,360.00 Grant funded $91,133.33
Page 37 of 125
10% of the project cost is eligilbe for cost share for engineering and design. The "soft costs" are not.
Total Out of Pocket
$58,923.33
Total Out of Pocket
$75,753.33
Total Out of Pocket
Page 38 of 125
$200,493.33
Page 39 of 125
10% of the project cost is eligilbe for cost share for engineering and design. The "soft costs" are not.
Page 40 of 125
Great Northern Regional Trail
Partnership Overview & Legacy Grant Proposal
Page 41 of 125
Great Northern
Regional Trail Partnership
•Shared Amenity
•5 Agencies
•Multiple Stakeholders
Page 42 of 125
•Established in 2020
•Master Plan
•Pursue Regional Designation
•Updated in 2023
•Grant funding
•Support implementation of Master
Plan
•Recommendations
•Regulatory consistency
•Maintenance standards
•Guidelines for trail closures
•Equitable cost participation
•Easements/Fee title
Great Northern
Regional Trail
Partnership MOU
Page 43 of 125
2024
Legacy Grant Proposal
•11 Features
•Refine Branding
•Trailhead Features
•Interpretive Opportunities
•Trailside Amenities
•2025-26 Design
•2027 Construction
Page 44 of 125
Feature 1 – South End at Proctor
Design & Construct:
•GNRT Trailhead Sign
•Map
•Information
Page 45 of 125
Feature 2 – Woodland Trails Regional Park
Incorporate:
•GNRT Brand
•Map
•Information
Page 46 of 125
Feature 3 – CR 33
Design & Construct
•Shade Structure
•ADA Width Limiter
•Picnic Table
•Interpretive Panel
•Portable Screen
Page 47 of 125
Feature 4 – 221st Ave Parking Lot
Design & Construct:
•GNRT Trailhead Sign
•Map
•ADA Width Limiter
•Information
Page 48 of 125
Feature 5 – North of 221st
Design & Construct:
•GNRT Trailhead Sign
•Map
•Information
Page 49 of 125
Feature 6 – 4 ¾ Mile Marker
Design & Construct:
•GNRT Trailhead Sign
•Map
•Information
Page 50 of 125
Feature 7 – North of the Overlook
Design & Construct
•Shade Structure
•Picnic Table
•Trash Receptacle
Page 51 of 125
Feature 8 – 239th Avenue
Design & Construct:
•GNRT Trailhead Sign
•Map
•ADA Width Limiter
•Information
Page 52 of 125
Feature 9 – CSAH 25 Parking Lot
Design & Construct:
•GNRT Trailhead Sign
•ADA Width Limiters
•Portable Screen
•Benches
Page 53 of 125
Feature 10 – South of Zimmerman
Design & Construct
•Shade Structure
•Picnic Table
•Interpretive Feature
•Trash Receptacle
Page 54 of 125
Feature 11 – South of Compost Site
Design & Install
•Living 515’ Screen
•ADA Width Limiter
Page 55 of 125
Feature 12 – Zimmerman Park & Ride
Page 56 of 125
Project Budget
GMRPTC Local Match
Construction Total $761,750
Design/Eng/Const. Admin $152,350
Soft Cost Total $152,350
Total Project Cost $914,100 $731,280 $182, 820
Reference Eligible Item Details Quantity Unit Cost/Item Total Cost
A Mobilization 1 35,000.00 35,000.00
B Initial Grading/removal (SY)3500 25.00 87,500.00
C Retaining Wall (SF)200 80.00 16,000.00
D Paving (SY)3500 45.00 157,500.00
E Grading, seeding (acre units)1 500.00 500.00
F Branded Trailhead Kiosks 5 35,000.00 175,000.00
G Shade Structure/Rain Shelter 4 35,000.00 140,000.00
H Portable Toilet Screen Fence(LF)60 250.00 15,000.00
I EV-Charging 1 19,000.00 19,000.00
J E-Bike Charging 4 2,500.00 10,000.00
K Water Filling Station 1 10,000.00 10,000.00
L Picnic Tables 5 2,500.00 12,500.00
M LED Solar Lighting 3 15,000.00 45,000.00
N Tree Planting 10 500.00 5,000.00
O Native Planting (1-gallon pots)500 25.00 12,500.00
P Interpretive Panels 5 2,500.00 12,500.00
Q Waste Receptacle 4 500.00 2,000.00
R ADA Width Limiter Gate 9 750.00 6,750.00
Subtotal 761,750.00
0
Construction Total 761,750.00
Page 57 of 125
Elk River Project Components Quantity Cost/Unit Total Cost Percent Construction Cost Match Amount Eng./Design/Const.Admin.Soft Costs Total Out of Pocket
1/3 Mobilization 0.3333 35,000 $11,666.67
Trailhead Sign 2 35,000 $70,000.00
Shade Structure 1 35,000 $35,000.00
Picnic Tables 1 2,500 $2,500.00
Interpretive Panels (ER History, Landfill)2 2,500 $5,000.00
Woodland Trails Panel 1 2,500 $2,500.00
Portable Toilet Screen Fence (LF)20 250 $5,000.00
ADA Width Limiter Gate 3 750 $2,250.00
$133,916.67 0.175801335 $32,140.00 Grant funded $26,783.33 $58,923.33
Cost Participation, Features 1-5
Page 58 of 125
Cost Participation, Features 6-11
Sherburne County Project Components Quantity Cost/Unit Total Cost Percent Construction Cost Match Amount Eng./Design/Const.Admin.Soft Costs Total Out of Pocket
1/3 Mobilization 0.3333 35,000 $11,666.67
Trailhead Sign 2 35,000 $70,000.00
Shade Structure 2 35,000 $70,000.00
Picnic Tables 2 2,500 $5,000.00
Waste Receptacle 2 500 $1,000.00
Portable Toilet Screen Fence (LF)20 250 $5,000.00
Interpretive Panels (Tamarack, GNRR)2 2,500 $5,000.00
ADA Width Limiter Gate 6 750 $4,500.00
$172,166.6
7 0.226014659 $41,320.00 Grant funded $34,433.33 $75,753.33
Page 59 of 125
Cost Participation, Feature 12
Zimmerman Project Components Quantity Cost/Unit Total Cost Percent Construction Cost Match Amount Eng./Design/Const.Admin.Soft Costs Total Out of Pocket
1/3 Mobilization 0.3333 35,000 $11,666.67
Initial Grading/removal (SY)3500 25 $87,500.00
Retaining Wall (SF)200 80 $16,000.00
Paving (SY)3500 45
$157,500.0
0
Grading, seeding (acre units)1 500 $500.00
Trailhead Sign 1 35000 $35,000.00
Portable Toilet Screen Fence (LF)20 250 $5,000.00
Shade Structure 1 35,000 $35,000.00
EV-Charging 1 19,000.00 $19,000.00
E-Bike Charging 4 2,500.00 $10,000.00
Water Filling Station 1 10,000.00 $10,000.00
Picnic Tables 2 2,500.00 $5,000.00
Waste Receptacles 2 500.00 $1,000.00
LED Solar Lighting 3 15,000.00 $45,000.00
Tree Planting 10 500.00 $5,000.00
Native Planting (1-gallon pots)500 25.00 $12,500.00
$455,666.6
7 0.598184006 $109,360.00 Grant funded $91,133.33 $200,493.33
Page 60 of 125
Great Northern Regional Trail – GMRPTC Legacy Grant 2024
Project Name: Trailhead Development and Improvements – Elk River to Zimmerman
Project Overview: This project proposes to reflne the marketing brand of the Great Northern
Regional Trail (GNRT) throughout the entire scope, which includes design and construction of a
Trailhead Facility in Zimmerman as rendered in the Master Plan; design and construction of a
trailhead sign at the south end of the GNRT in Elk River, and design and construct ion of comfort and
interpretive features along the trail between the trailheads.
Project Description: Upon achieving Regional Designation, the Great Northern Regional Trail
Partnership began drafting a logo inspired by the historic Great Northern Railroad. Through several
iterations a flnal version has been selected to initiate establishment of a brand fo r this Regional
Facility. The Partnership is eager to begin intentional design that incorporates and builds on the
logo with precedent trailhead signs, benches, shade structures, and interpretive opportunities.
Project Timeline: Funding Available in Contract fall 2025
Summer 2025 – RFP for Design
Fall 2025 – Begin Design – public engagement
2027 - Construction
Page 61 of 125
FEATURE 1 Starting on the south end of the GNRT, in Elk River, a branded trailhead sign will anchor
the south start of the trail and be visible and recognizable to users to enter the trail on bike from the
trail system along Procter Road. The trailhead sign will include acknowledgement of funding, the
GNRT Partnership, information about parking locations, trail distances, comfort features and
locations, and trail etiquette tips. Locate sign on west side of trail outside CR ROW.
Page 62 of 125
Page 63 of 125
FEATURE 2 Moving north and into Woodland Trails Regional Park, which now serves as a parking
facility for many GNRT users, a branded map panel will be added to the City of Elk River’s 4 -sided
trailhead kiosk and incorporate a clear route to the GNRT via the trails within the Regional Park,
acknowledgement of funding and the GNRT Partnership, other parking locations, trail distances,
comfort features and locations, and trail etiquette tips.
Page 64 of 125
Feature 3: At the northern boundary of Woodland Trails Regional Park, trail users approach a grade
separated crossing under County Road 33, where the City of Elk River maintains a trash receptacle,
portable toilet and connector trail to a residential neighborhood. This project proposes adding a
ADA accessible width limiter gate, consistent with the construction and design standard set forth
by the U.S. Forest Service in “Vehicle Barriers: Their Use and Planning Considerations”. The
maintained turf within the GNRT ROW, on the edge of Woodland Trails Regional Park, provides the
setting for a shade structure and seating for a trailside snack or rest. A screen fence will be added
for the portable toilet to enhance the setting. Here we envision an interpretive panel that BLANK
(City of Elk River – ideas?)
Page 65 of 125
Page 66 of 125
Feature 4 - Continuing north 1.7 miles, trail users cross 221st Avenue where there is a GNRT Parking
Facility. Here we propose a branded trailhead Kiosk, consistent with the southmost trailhead
proposed at Proctor Road – which would be constructed and positioned to be visible from
approaching vehicles. ADA accessible width limiter gates, consistent with the construction and
design standard set forth by the U.S. Forest Service in “Vehicle Barriers: Their Use and Planning
Considerations” will be installed on both the north and south intersections of trail and road. This
feature is proposed inset from the road at each intersection from here north, to serve two purposes:
1. exclude motorized vehicles and 2. slow trail users at before road crossing.
Page 67 of 125
Page 68 of 125
Feature 5 - Just north of the 221st Ave. Parking Facility the trail runs along the west edge of the Elk
River Landflll and presents the perfect opportunity to place an interpretive panel that highlights all
the positive aspects of the Elk River Landflll, their innovative methane capture to produce
electricity, their diligent ground water monitoring, and devotion to stewardship through their prompt
thorough retrieval of trash after high winds.
Page 69 of 125
Feature 6 - The next component of this project is proposed at the 4 ¾ mile marker on the City of Elk
River and Sherburne County border. This location boasts spectacular views of a tamarack wetland,
from an overlook that was constructed through an Eagle Scout Project. Features will be added here
that invite a stop at this awe-inspiring forested wetland community. An interpretive sign will be
designed to highlight the uniqueness of tamaracks and the ecosystem services provided by the
plants, animals, and invertebrates that they have an interdependent relationship with. This sign will
be placed off the trail with an invitation to climb the stairs to the overlook , which will maintain
accessibility to this interpretive feature for all. This location is fully shaded and a nice location for a
bench, which will utilize historic limestone slabs that were salvaged from the railroad bed during
construction of the GNRT in 2019.
Page 70 of 125
Page 71 of 125
Feature 7 - North of the overlook trail users approach an inviting grassy opening where we propose
to add a shade structure/shelter, picnic table, and trash receptacle.
Page 72 of 125
Feature 8 - The next road crossing to the north at 239th Avenue, provides another opportunity for
promoting the trail with a branded trailhead kiosk in the southeast corner of the trail and road
intersection. Siting the sign here will also mitigate an issue we have with vehicles parking in this
undesignated location. ADA accessible width limiter gates, consistent with the construction and
design standard set forth by the U.S. Forest Service in “Vehicle Barriers: Their Use and Planning
Considerations” will be installed on both the north and south intersections of trail and road.
Page 73 of 125
Feature 9 - Trail users next encounter the CSAH 25 GNRT parking facility. This 6 stall location
provides quick access from U.S. Hwy 169 and for Livonia Township residents. This location
provides parking and a portable restroom. Here we propose adding a branded trailhead kiosk and a
portable restroom screen. This location would be enhanced with seating created from historic
limestone blocks that were salvaged from the railroad bed during construction of the trail in 2019.
ADA accessible width limiter gates, consistent with the construction and design standard set forth
by the U.S. Forest Service in “Vehicle Barriers: Their Use and Planning Considerations” will be
installed on both the north and south intersections of trail/road and parking lot trail connection.
Page 74 of 125
Page 75 of 125
Feature 10 - Before reaching Zimmerman, this project capitalizes on an opportunity provided by a
trailside opening that offers expansive views of a large wetland complex, by constructing an
additional shade structure/rain shelter to provide respite on exceptionally hot days and seeking
shelter from an unexpected rain event on a longer trail experience. A picnic table and waste
receptacle is planned to make this an ideal picnic spot. This location would also be home to an
interpretive panel that highlights the fascinating history of the Great Northern Regional Railroad,
ties to pages 6-7 of the GNRT Master Plan.
Page 76 of 125
Feature 11 – 515 linear feet of tree planting parallel to the trail to provide visual enhancement is
proposed along the segment that approaches the City of Zimmerman. An ADA accessible width
limiter gates, consistent with the construction and design standard set forth by the U.S. Forest
Service in “Vehicle Barriers: Their Use and Planning Considerations” will be installed at this location
where the trail is adjacent to the road leading to the Zimmerman Compost Site. This location will
also beneflt from a motorized vehicle barrier.
Page 77 of 125
Feature 12 - Culminating the project on its north end, is a trailhead facility as rendered in the GNRT
Master Plan. The facility replaces an existing park-and-ride lot on the east edge of Zimmerman’s
Lions Park. The design accommodates trail users and additional parking stalls for the park-and-
ride. Overfiow parking will easily be handled in the large Lions Park main lot immediately northwest
of the trailhead. This project is meant to promote the GNRT and provide convenient, comfortable
access to the trail, while providing comfort features speciflc for trail users.
Zimmerman is a rapidly growing community with many multi-family housing facilities recently built
and planned for the near future. The once small, rural community is quickly taking on an urban
character. To support demographic shift, this trailhead includes Electric Vehicle (EV) and Electric
Bike (E-bike) charging stations, LED lighting, a picnic/shade shelter, water fllling station with pet
watering vessel https://www.prodrinkingfountains.com/outdoor-drinking-fountains/, branded
trailhead kiosk, screening for two portable restrooms and landscaping to capture stormwater and
provide shade with native trees, shrubs, and plants.
To provide charging to all EVs, this project proposes a level 2 charger, which charges at a rate of 12 –
80 miles per hour, fllling most EVs from empty to full in 4.5 hours. More rapid charging provided
through a level 3 charger would not beneflt all EV drivers, as not all EVs can be charged on a level 3.
Page 78 of 125
The Elk River Vision
A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and community
engagement that encourages and inspires prosperity
Request for Action
To
Parks and Recreation Commission
Item Number
8.3
Meeting Date
May 8, 2024
Prepared By
Joe Stremcha, Business Services Director/Assistant
City Administrator
Item Description
Scout Island - Scout Service Project
Reviewed by:
Joe Stremcha
Cal Portner
Action Requested
Discuss the service project and address any comments, questions, or concerns.
Background/Discussion
The service project will be reviewed by staff during the Site Plan Review meeting on Monday, May 6. This
project will include the following:
▪ Construction of a new access path (shown in red on the attachment).
▪ Clean up the historical trail (shown in blue) by removing debris.
▪ Install boundary signs along the common boundary with parcel 75-00934-0125.
▪ Installing a rustic sign “Scout Island” (near the south of the blue line).
▪ Building a rustic picnic table to be placed near the northern end of the peninsula (near the north end
of the blue line).
The new access trail will be a rustic path involving the removal of buckthorn. No dirt work or seeding will be
needed. The trail is necessary because of the adjacent land redevelopment and acquiring a new access
easement for access.
Financial Impact
Minimal boundary signage.
Mission/Policy/Goal
Work with citizens to achieve goals
Attachments
1. Scout Island service project
Page 79 of 125
Page 80 of 125
The Elk River Vision
A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and community
engagement that encourages and inspires prosperity
Request for Action
To
Parks and Recreation Commission
Item Number
9.1
Meeting Date
May 8, 2024
Prepared By
Item Description
Assistant City Administrator Update - May 8, 2024
Reviewed by:
Joe Stremcha
Cal Portner
Action Requested
Discuss the monthly report.
Background/Discussion
The report is a monthly highlight of department activities related to recent collaborations, strategic planning,
staff changes/developments, and park operations.
Financial Impact
None.
Mission/Policy/Goal
Work with citizens to achieve goals
Attachments
1. 5-8-2024 Staff Report
Page 81 of 125
Memorandum
To: Parks and Recreation Commission
From: Joe Stremcha, Business Services Director/Assistant City Administrator
Date: May 8, 2024
Subject: Parks and Recreation Staff Report
This report is a monthly highlight of department activities related to recent collaborations, strategic planning,
staff changes/developments, and park operations.
Park and Recreation Manager Vacancy
The application period has closed. Applications will be reviewed promptly, and interviews scheduled later this
month.
Food Trucks
Food trucks are extremely popular in our parks. This increase in business activity has raised several public safety
concerns for the pedestrians traveling around these mobile operators. Staff will be recommending to the City
Council revisions to the current ordinance to provide clarity on approved surfaces for conducting business and
redefine their presence downtown as the language is specific to the summer concert series rather than city events
(such as the farmers market) as a whole.
Play My Way
The Play My Way program launched on April 30. The City of Elk River has many playgrounds that will need to
be replaced over the next 5 to 10 years. Staff are actively engaging with the youth of Elk River to help design
those playgrounds! There are several ways to get involved:
▪Take an online survey with your children where they get to choose the equipment, they would like to
have on their dream playground.
▪Join us at one of our Play My Way interactive booths this summer and vote in person. A list of events are
located on our website.
▪Download one of the playground creator worksheets on our website to do at home or with your school.
Copies are available at the Parks and Recreation office in City Hall.
▪For more information, please visit our website: https://elkrivermn.gov/playmyway
Plants and Things Recreation Complex
Staff collaborated with Steve Hickman about opportunities to market Plants and Things, USA during the
upcoming baseball/softball season. Various outdoor patio furniture will be displayed for use in accordance with
their sponsorship agreement. Elk River Youth Baseball donated to the City artificial turf and it was installed in
the batting cages at the PT Complex. Staff also installed the batting cage nets this year due to the project
timeline. Sponsorship banners have begun being placed on the outfield fences at the PT Complex.
Item: 8
Page 82 of 125
This year, each field will have five sponsorship banners. Staff are designing a sign that will attach to the second
floor of the concession stand promoting Plants and Things, USA and welcome guests to the PT Complex.
Staff from Flagship Recreation and the manufacturer of the shade structure at the PT Complex met with Public
Works to review the installation of the shade structure on April 23. The poles for the shade structure have tilted
significantly since their installation last year. It was determined that the fabric will not be installed until a solution
is found to make the posts level.
If the fabric was put up under current conditions, the fabric has too much play in it and will cause it to fail. The
manufacturer is working with their engineering team to find a solution for leveling the posts. Their goal was to
get this timeline and solution to us in the coming weeks.
Summer Programs
Youth-Youth summer program and league registration is in full swing. Staff are delighted to see many programs
are full and have a waiting list. Adult Men’s Softball started on April 23 and there are 13 teams registered.
Facility Rentals
Shelter and pavilion rentals continue to be in high demand. There have been 401 scheduled rentals so far for
2024. Last years entire total for rentals was 686.
Athletic Fields Master Plan
HKGi presented detailed concepts for site development of athletic fields based on projected growth outlined in a
2022-23 study. The commission will continue to discuss these concepts in work session following the regularly
scheduled meetings to refine and improve this plan. The construction timeline below preserves the number of
fields available for play prior to adding new additional fields. The proposed plan creates the following benefits:
▪Centralized Bathrooms
▪Centralized Concessions
▪Centralized Equipment storage based on sport/activity.
▪Organized Parking
▪Field locations based on activity creating ownership cleanliness amongst user groups.
▪Fans at “ground level” are at higher elevation than playing surface for improved sightlines.
Project Impact Summary
Site Fields removed Fields added
PT Complex 1 rectangular field 3 rectangular fields
4 softball fields
Dave Anderson Athletic Complex 2 softball fields 1 rectangular field
Oak Knoll Complex/ Hales field 3 baseball fields
2 rectangular fields
4 baseball fields
1 miracle field
Net Change
+2 Softball fields
+3 rectangular fields
+1 baseball field
+ 1 miracle field
Page 83 of 125
Project Phasing Potential
Approx.
Year Site Fields Removed Fields Added
2026 PT Complex (Southeast) none 3 rectangular fields
2028 Oak Knoll Complex/Hales Field
(South/East)
2 rectangular fields
1 ballfield 2 baseball fields
2030 Oak Knoll Complex/Hales Field
(North/West)2 baseball fields 2 baseball fields
1 miracle field
2032 PT Complex (Southwest &
Northeast) 4 softball fields
2 rectangular fields
2034 Dave Anderson Athletic Complex 2 softball fields 1 rectangular field
+/–
9-years TOTAL SCOPE
2 softball fields
2 rectangular fields
3 baseball fields
4 baseball fields
4 softball fields
1 miracle field
5 rectangular fields
Page 84 of 125
The Elk River Vision
A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and community
engagement that encourages and inspires prosperity
Request for Action
To
Parks and Recreation Commission
Item Number
12.1
Meeting Date
May 8, 2024
Prepared By
Joe Stremcha, Business Services Director/Assistant
City Administrator
Item Description
Athletic Facilities Master Plan
Reviewed by:
Joe Stremcha
Cal Portner
Action Requested
Discuss the Athletic Facilities Master Plan for Oak Knoll (OKAC), Dave Anderson Athletic Complex (DAAC),
and Plants and Things Recreation Complex (PT Complex) presented by HKGi.
Background/Discussion
HKGi presented detailed concepts for site development of athletic fields based on projected growth outlined
in a 2022-23 study. The commission will continue to discuss these concepts in work session following the
regularly scheduled meetings to refine and improve this plan. The construction timeline below preserves the
number of fields available for play prior to adding new additional fields. The proposed plan creates the
following benefits:
▪ Centralized bathrooms, concessions, and equipment storage based on sport/activity.
▪ Organized Parking
▪ Field locations are based on activity creating ownership cleanliness among user groups.
▪ Fans at “ground level” are at a higher elevation than the playing surface for improved sight lines.
Project Impact Summary
Site Fields Removed Fields Added
PT Complex 1 rectangular field 3 rectangular fields
4 softball fields
Dave Anderson Athletic
Complex
2 softball fields 1 rectangular field
Oak Knoll Complex/ Hales
field
3 baseball fields
2 rectangular
fields
4 baseball fields
1 miracle field
Net Change +2 Softball fields
+3 rectangular fields
+1 baseball field
Page 85 of 125
+ 1 miracle field
Project Phasing Potential
Approx.
Year
Site Fields Removed Fields Added
2026 PT Complex (Southeast) none 3 rectangular fields
2028 Oak Knoll Complex/Hales
Field
(South/East)
2 rectangular
fields
1 ballfield
2 baseball fields
2030 Oak Knoll Complex/Hales
Field
(North/West)
2 baseball fields 2 baseball fields
1 miracle field
2032 PT Complex (Southwest &
Northeast)
4 softball fields
2 rectangular fields
2034 Dave Anderson Athletic
Complex
2 softball fields 1 rectangular field
+/–
9-years
TOTAL SCOPE 2 softball fields
2 rectangular
fields
3 baseball fields
4 baseball fields
4 softball fields
1 miracle field
5 rectangular fields
Financial Impact
The concept to be considered identifies more than $45 million in athletic facility improvements over the next
decade.
Mission/Policy/Goal
Responsible for every dollar – good stewards
Attachments
1. 12.1 PRSR 04-10-2024
Page 86 of 125
Parks & Recreation
Commission
Regular Meeting
Wednesday, April 10, 2024
6:30 p.m.
Elk River City Hall
1. CALL MEETING TO ORDER
2. PLEDGE OF ALLEGIANCE
3. CONSIDER AGENDA
4. CONSIDER MINUTES
4.1 March 13, 2023, Regular Meeting Minutes
5. OPEN FORUM
An opportunity for residents and guests to provide comments and feedback to the Parks & Recreation Commission regarding items not on the agenda. Information provided
in Open Forum will not be discussed by the commission; rather, the information will be referred to staff and/or scheduled for discussion at a future meeting.
6. PRESENTATIONS
6.1 Plat Review Process – Park Dedication
7. ACTION ITEMS
7.1 Park Dedication – Natures Edge Business Park Fifth Addition
7.2 Farmers Market Coloring Contest
7.3 Parks and Recreation Commission Ordinance Review
7.4 Camp Cozy Park Natural Resources Management Plan
8. DISCUSSION ITEMS
8.1 Recreation Amenities Length of Season
9. PARKS & RECREATION MANAGER UPDATE
10. ANNOUNCEMENTS
Other business and updates from the Parks and Recreation Commission or staff.
11. MOTION TO ADJOURN REGULAR MEETING
12. WORK SESSION
Start at 7:00 p.m. or after the Regular Parks and Recreation Commission meeting, whichever is latest.
12.1 Athletic Facilities Master Plan
12.2 Disc Golf Open House Discussion Recap and Next Steps
13. MOTION TO ADJOURN
Meeting Protocol
No sidebar discussions
No interruptions
State your concern
Ensure you understand
Don’t take things personally
Adhere to time limits
Come prepared
Ensure all are heard
Page 87 of 125
The Elk River Vision
A welcoming community with revolutionary and spirited resourcefulness, exceptional
service, and community engagement that encourages and inspires prosperity. Updated: January 2023
Request for Action
To
Parks and Recreation Commission
Item Number
12.1
Agenda Section
Work Session
Meeting Date
April 10, 2024
Prepared by
Joe Stremcha, Assistant City Administrator
Item Description
Athletic Facilities Master Plan
Reviewed by
Cal Portner, City Administrator
Reviewed by
Action Requested
Discuss the Athletic Facilities Master Plan for Oak Knoll (OKAC), Dave Anderson Athletic Complex (DAAC),
and Plants and Things Recreation Complex (PT Complex) presented by HKGi.
Background/Discussion
On March 8, 2023, the Parks and Recreation Commission recommended the Athletic Field Analysis. Results from
the analysis report presented to the City Council on June 5 included a shortage of dedicated fields and an overuse
of existing fields. The next step was the master planning process.
The master planning process started in June of 2023 for OKAC, DAAC, and PT Complex with a project advisory
committee formed including Dave Williams, Mike Brown, and Ryan Holmgren. Dave Williams was replaced by
Greg Loidolt in December of 2023.
The last meeting of the advisory committee was on December 13 to review the latest concept drafts of the athletic
facilities. The plan incorporated highlights from premier facilities including Schwan’s Regional Amateur Sports
Complex in Marshall, Riverside Park Ballfield in Springfield, Johnson Ballpark in New Ulm, Caswell Complex in
Noth Mankato and Gleason Fields in Maple Grove that staff visited in October.
Financial Impact
Cost estimates for the master plan updates were presented at the last commission meeting.
Mission/Policy/Goal
Opportunity to live, work, and play
Attachments
Athletic Facilities Master Plan
Page 88 of 125
ATHLETIC
FIELDS
MASTER
PLANNING
Elk River Parks & Recreation
March 2024
Page 89 of 125
Agenda
Recap Findings From Utilization Study
Concept Review
Costs
Phasing
Discussion
ELK RIVER PARKS & RECREATIONATHLETICFIELDSMASTERPLANSPage 90 of 125
Project Purpose
Provide a long term vision to guide
development of athletic fields in Elk River
Meet the needs of a growing community
Guide investments where they will last
Help the City plan for future costs
Continue to position Elk River as a place
with great recreation opportunities for
families and youth
ELK RIVER PARKS & RECREATIONATHLETICFIELDSMASTERPLANSPage 91 of 125
ELK RIVER PARKS & RECREATIONATHLETICFIELDSMASTERPLANSPage 92 of 125
Utilization Study Findings
Expansion for growing population and to
add capacity/resiliency
Preference for improved user (player and
spectator) experience
Desire for tournament capabilities
Safety/Functionality concerns at DAAC
short term)
ELK RIVER PARKS & RECREATIONATHLETICFIELDSMASTERPLANSPage 93 of 125
Utilization Study Findings
In the next 10-15 years:
3-4 60’ ballfi elds with 200-225’ fences
1-2 75’ ballfi elds
1-2 90’ ballfi elds
4 rectangle fields
ELK RIVER PARKS & RECREATIONATHLETICFIELDSMASTERPLANSPage 94 of 125
Master Plans
50'
125'
88_STALLS
204_STALLS
WARMUPSPACE
75'
320'
60'225'
0
SCALE: 1" = 100'
200'100'50'
Sheet Number:
2023SD/DDDRAFTELKRIVERATHLETICFIELDSDescription:
Key:Project
Number:
Date:Drawn
by:Checked
By:
Client:
Sheet Title:
Project:
SignatureRegistration
No.Date023-
00101.01.01IherebyceritfythatthisplanwaspreparedbymeorundermydirectsupervisionandthatIamadulylicensedLandscapeArchitectunderthelaws
of
the State
ofMinnesota.Date:Landscape
Architecture /Planning / Urban
Design www.
hkgi.
com
Minneapolis, MinnesotaOKAC
OPTION
01.
01.01JBHKCELKRIVERPARKS & Page 95 of 125
Master Plan Initiatives
Create a distinct “Home of” for each sport
Add capacity to the system
Help PTRC facilitate tournaments
ELK RIVER PARKS & RECREATIONATHLETICFIELDSMASTERPLANSPage 96 of 125
Dave Anderson Athletic Complex
Shifts from outmoded
facility to rec focused
extension of Orono Park/
City Hall/YMCA district
BUSINESS CENTER DR. NWBUSINESSCENTERDR. NW
PARKINGPARKING
124 STALLS+/- 124 STALLS
EXISTINGEXISTING
PARKINGPARKING
EXISTINGEXISTING
PLAYGROUNDPLAYGROUND
EXISTINGEXISTING
SPLASH PLAY
EXISTINGEXISTING
SHELTERSHELTER
NEWNEW
TRAILTRAIL
EXISTINGEXISTING
PONDINGPONDING
EXISTINGEXISTING
PONDINGPONDING
BALLFIELDBALLFIELD
DRAIN TILETODRAINTILETO
IMPROVEDRAINAGEIMPROVEDRAINAGE
DRAIN TILETODRAINTILETO
IMPROVEDRAINAGEIMPROVEDRAINAGE
SHELTERSHELTER
PLAZAPLAZA
BALLFIELDBALLFIELD
280’280’
MULTI-USEMULTI-USE
FIELDFIELD
280’280’
280’280’
280’280’
EXISTINGEXISTING
POWERPOWER
LINESLINES
EXISTINGEXISTING
DOGPARKDOGPARK
280’280’
2
1
0’
2
1
0
360’360’
280’280’ELKRIVERPARKS & RECREATIONATHLETIC FIELDS Page 97 of 125
ELK RIVER PARKS & RECREATIONATHLETICFIELDSMASTERPLANSPage 98 of 125
BUSINESS CENTER DR. NWBUSINESSCENTERDR. NW
PARKINGPARKING
124 STALLS+/- 124 STALLS
EXISTING EXISTING
PARKINGPARKING
EXISTING EXISTING
PLAYGROUNDPLAYGROUND
EXISTINGEXISTING
SPLASH PLAY
EXISTING EXISTING
SHELTERSHELTER
NEWNEW
TRAILTRAIL
EXISTINGEXISTING
PONDINGPONDING
EXISTINGEXISTING
PONDINGPONDING
BALLFIELDBALLFIELD
DRAIN TILETODRAINTILETO
IMPROVEDRAINAGEIMPROVEDRAINAGE
DRAIN TILETODRAINTILETO
IMPROVEDRAINAGEIMPROVEDRAINAGE
SHELTERSHELTER
PLAZAPLAZA
BALLFIELDBALLFIELD
280’280’
MULTI-USEMULTI-USE
FIELDFIELD
280’280’
280’280’
280’280’
EXISTING EXISTING
POWER POWER
LINESLINES
EXISTING EXISTING
DOGPARKDOGPARK
280’280’
2
1
0’
2
1
0
360’360’
280’280’ELKRIVERPARKS & RECREATIONATHLETIC FIELDS Page 99 of 125
Dave Anderson Athletic Complex
Removes 2 softball fields and replaces them with open
field space that can accommodate up to a full sized
rectangle field or multiple youth sized fields
Improves safety considerations by reducing the
number of softball fields and having play occur behind
spectators
Installation of drain tile in the outfi elds to reduce
flooding/ponding that is occurring today
ELK RIVER PARKS & RECREATIONATHLETICFIELDSMASTERPLANSPage 100 of 125
Dave Anderson Athletic Complex
Addition of a centralized plaza and shelter to support
recreational field use
Creation of new parking to support field programming,
as well as Orono Park
Retains flexibility for potential long term change with
adjacent land uses
Needs short term safety issues addressed (netting)
ELK RIVER PARKS & RECREATIONATHLETICFIELDSMASTERPLANSPage 101 of 125
Dave Anderson Athletic Complex
All costs are planning level to help the City budget based on contractor pricing. Additional
design will further refi ne the costs. Costs may change based on infl ation, labor & material
costs, permitting, timing, and other factors.
Project Cost: $1,985,000
Parking and Roads: $760,000
Plaza and Trails: $645,000
Other: $235,000
Soft Costs: $165,000
10% Contingency: $180,000
ELK RIVER PARKS & RECREATIONATHLETICFIELDSMASTERPLANSPage 102 of 125
Oak Knoll Athletic Complex
Creates a destination
baseball complex for players
of all ages and abilities
anchored by a revamped,
realigned, and improved
premier ballfi eld
MAIN MAIN
PARKINGPARKING
207+/- 207
DROP-OFF + DROP-OFF +
PLAZAPLAZA
STORAGE
BATTING
CAGESCAGES
BATTINGBATTING
CAGESCAGES
SHELTERSHELTER
COVERED STADIUM SEATINGWITHCOVEREDSTADIUMSEATINGWITH
CONCESSIONS, VIEWING DECK, CONCESSIONS, VIEWING DECK,
ANDSTORMSHELTERANDSTORMSHELTER
DROP-OFF + DROP-OFF +
PLAZAPLAZA
EXPANDED EXPANDED
PONDINGPONDING
STORMWATER STORMWATER
PONDING PONDING
EXISTING EXISTING
PONDPOND
MIRACLE MIRACLE
FIELD
PLAY-PLAY-
GROUNDGROUND
PREMIER PREMIER
FIELDFIELD
INTERMEDIATE INTERMEDIATE
FIELDFIELD
YOUTH YOUTH
FIELDFIELD
YOUTH YOUTH
FIELD
375’375’
320’320’
225’225’
225’225’
225’225’
225’225’
225’225’
225’225’
320’320’
320’320’
330’330’
PROCTOR AVE. NWPROCTORAVE. NWSCHOOL
ST. NWSCHOOL
ST. NWPROCTOR
R
D . N
W PROCT
O R
R D.
NW
330’330’90’
90’
EXISTING
PONDEXISTING POND
FUTURE PARKING
86
STALLSOVERFLOWOVERFLOWPARKINGPARKING
87
STALLS+/-
87
STALLS
TTSSSSSTSSABATTINGFUTURFUTUREPARKINGPARKING
86 STALL+/- 86STALLSELKRIVERPARKS & Page 103 of 125
ELK RIVER PARKS & RECREATIONATHLETICFIELDSMASTERPLANSPage 104 of 125
MAIN MAIN
PARKINGPARKING
207+/- 207
DROP-OFF + DROP-OFF +
PLAZAPLAZA
STORAGE
BATTING
CAGESCAGES
BATTING BATTING
CAGESCAGES
SHELTERSHELTER
COVERED STADIUM SEATINGWITHCOVEREDSTADIUMSEATING WITH
CONCESSIONS, VIEWING DECK, CONCESSIONS, VIEWING DECK,
ANDSTORMSHELTERANDSTORMSHELTER
DROP-OFF + DROP-OFF +
PLAZAPLAZA
EXPANDEDEXPANDED
PONDINGPONDING
STORMWATERSTORMWATER
PONDINGPONDING
EXISTINGEXISTING
PONDPOND
MIRACLE MIRACLE
FIELDFIELD
PLAY-PLAY-
GROUNDGROUND
PREMIERPREMIER
FIELDFIELD
INTERMEDIATEINTERMEDIATE
FIELDFIELD
YOUTHYOUTH
FIELDFIELD
YOUTHYOUTH
FIELDFIELD
375’375’
320’320’
225’225’
225’225’
225’225’
225’225’
225’225’
225’225’
320’320’
320’320’
330’330’
PROCTOR AVE. NWPROCTORAVE. NWSCHOOL
ST. NWSCHOOL
ST. NWPROCTOR
R
D . N
W PROCT
O R
RD.
NW
330’330’90’
90’
EXISTING
PONDEXISTING POND
FUTUREPARKING
86
STALLSOVERFLOWOVERFLOW PARKINGPARKING
87
STALLS+/-
87
STALLSTTSSSSSTSSABATTING
FUTURFUTUREPARKNGPARKING
86 STALL+/- 86STALLSELKRIVERPARKS & Page 105 of 125
MAINMAIN
PARKINGPARKING
207+/- 207
DROP-OFF + DROP-OFF +
PLAZAPLAZA
STORAGE
BATTING
CAGES
BATTING BATTING
CAGESCAGES
SHELTERSHELTER
COVERED STADIUM SEATINGWITHCOVEREDSTADIUMSEATING WITH
CONCESSIONS, VIEWING DECK, CONCESSIONS, VIEWING DECK,
ANDSTORMSHELTERANDSTORMSHELTER
DROP-OFF + DROP-OFF +
PLAZAPLAZA
EXPANDED EXPANDED
PONDINGPONDING
STORMWATER
PONDING
EXISTINGPOND
MIRACLE MIRACLE
FIELDFIELD
PLAY-PLAY-
GROUNDGROUND
PREMIERPREMIERFIELDFIELD
INTERMEDIATE INTERMEDIATE
FIELDFIELD
YOUTH YOUTH
FIELDFIELD
YOUTH YOUTH
FIELDFIELD
375’
320’
225’225’
225’225’
225’225’
225’225’
225’225’
225’225’
320’320’
320’
330’330’
PROCTOR AVE. NWPROCTOR
AVE. NWSCHOOL ST. NWPROCTOR R
D . N
W 330’
90’
90’
EXISTINGPOND
FUTURE
PARKING
86STALLS
OVERFLOW
PARKING 87STALLSTTSSSSSSSTELKRIVERPARKS & Page 106 of 125
Oak Knoll Athletic Complex
Anticipates the removal/relocation of Ivan Sand and the
Education Technology Center
Reconfi gures access to Proctor Road and School Street,
and creates a connection between the two entries
New parking to support expanded ballfi eld program
Plazas/shelters/gathering spaces to support ballfi eld
programs
ELK RIVER PARKS & RECREATIONATHLETICFIELDSMASTERPLANSPage 107 of 125
Oak Knoll Athletic Complex
New, re-oriented full size (90’ basepath)
ballfi eld with grandstand seating
Adds miracle field and inclusive playground
Creation of two dedicated youth (60’ basepath) baseball
fields with grass infi elds
Creation of a dedicated intermediate (70-80’ basepaths)
baseball field with grass infi eld
ELK RIVER PARKS & RECREATIONATHLETICFIELDSMASTERPLANSPage 108 of 125
Oak Knoll Athletic Complex
All costs are planning level to help the City budget based on contractor pricing. Additional
design will further refi ne the costs. Costs may change based on infl ation, labor & material
costs, permitting, timing, and other factors.
Project Cost: $17,645,000
Premier Field: $3,125,000 includes turf option
Miracle Field and playground: $1,070,000
Other fields: $1,410,000
Parking and roads: $3,800,000
Trails and plazas: $1,210,000
Other costs: $2,175,000
Soft Costs: $1,915,000
20% Contingency: $2,940,000
ELK RIVER PARKS & RECREATIONATHLETICFIELDSMASTERPLANSPage 109 of 125
Plants and Things Recreation Complex
Expansion and reconfi guration
create dedicated homes for
each youth sport user while
also providing the flexibility to
host larger tournaments
BALLFIELDBALLFIELD
BALLFIELDBALLFIELD
BALLFIELDBALLFIELD
NEW
TRAILTRAIL
NEWNEW
TRAILTRAIL
NEWNEW
TRAILTRAIL
NEW
TRAILTRAIL
NEWNEW
TRAILTRAIL
BALLFIELDBALLFIELD
BALLFIELDBALLFIELD
BALLFIELDBALLFIELD
PULL BACKINFIELDPULLBACKINFIELD
TOACCOMMODATETO ACCOMMODATE
INTERMEDIATEPLAYINTERMEDIATEPLAY
MULTI-USEFIELDSMULTI-USE FIELDS
CANACCOMMODATECAN ACCOMMODATE
FB/LAX/SOCCERINFB/LAX/SOCCER IN
YOUTH AND FULLSIZEFIELDSYOUTHANDFULLSIZEFIELDS
MULTI-USEFIELDSMULTI-USE FIELDS
CAN ACCOMMODATE FB/LAX/SOCCERCANACCOMMODATEFB/LAX/SOCCER
IN YOUTH AND FULLSIZEFIELDSINYOUTHANDFULLSIZEFIELDS
CHAMPIONSHIP
FIELDFIELD
210’210’
W
360’
360’PARKINGPARKING382STALLS+/-
382
STALLS PARKINGPARKING
185 STALLS
STORM
STORM PONDPOND
EXISTING
EXISTING
TURBINETURBINEPARKINGPARKING525STALLS+/-
525 STALLS
STORM
STORM PONDPOND
EXSTING
EXSTINGPONDINGPONDING
200’200’
WW
200’200’
200’200’
200’200’165THAVE. NW165TH
AVE. NWPLAZAWITH
PLAZA
WITHSHELTERSHELTERPLAZAWITH
PLAZA WITH
CONCESSIONS/CONCESSIONS/STORM
SHELTERSTORM
SHELTERSTORAGESTORAGEPLAZAWITH
PLAZA WITH
CONCESSIONS/CONCESSIONS/STORM
SHELTERSTORM SHELTERELKRIVERPARKS & RECREATIONATHLETIC FIELDS Page 110 of 125
ELK RIVER PARKS & RECREATIONATHLETICFIELDSMASTERPLANSPage 111 of 125
BALLFIELDBALLFIELD
BALLFIELDBALLFIELD
BALLFIELDBALLFIELD
NEW
TRAILTRAIL
NEWNEW
TRAILTRAIL
NEWNEW
TRAILTRAIL
NEW
TRAILTRAIL
NEWNEW
TRAILTRAIL
BALLFIELDBALLFIELD
BALLFIELDBALLFIELD
BALLFIELDBALLFIELD
PULL BACKINFIELDPULLBACK INFIELD
TO ACCOMMODATETO ACCOMMODATE
INTERMEDIATEPLAYINTERMEDIATEPLAY
MULTI-USEFIELDSMULTI-USE FIELDS
CAN ACCOMMODATECAN ACCOMMODATE
FB/LAX/SOCCERINFB/LAX/SOCCER IN
YOUTH AND FULLSIZEFIELDSYOUTHANDFULLSIZEFIELDS
MULTI-USEFIELDSMULTI-USE FIELDS
CAN ACCOMMODATE FB/LAX/SOCCERCANACCOMMODATEFB/LAX/SOCCER
IN YOUTH AND FULLSIZEFIELDSINYOUTHANDFULLSIZEFIELDS
CHAMPIONSHIP
FIELDFIELD
210’210’
W
360’
360’PARKINGPARKING382 STALLS+/-
382
STALLS PARKINGPARKING
185STALLS
STORM
STORMPONDPOND
EXISTING
EXISTING
TURBINETURBINEPARKINGPARKING525 STALLS+/-
525STALLS
STORM
STORMPONDPOND
EXSTING
EXSTINGPONDINGPONDING
200’200’
WW
200’200’
200’200’
200’200’165THAVE. NW165TH
AVE. NWPLAZA WITH
PLAZA
WITH SHELTERSHELTERPLAZA WITH
PLAZA WITH
CONCESSIONS/CONCESSIONS/STORM
SHELTERSTORM
SHELTER STORAGESTORAGEPLAZA WITH
PLAZA WITH
CONCESSIONS/CONCESSIONS/STORM
SHELTERSTORM SHELTERELKRIVERPARKS & RECREATIONATHLETIC FIELDS Page 112 of 125
BALLFIELD
BALLFIELD
BALLFIELD
NEW
TRAILTRAIL
NEW
TRAIL
NEW
TRAIL
NEW
TRAIL
NEW
TRAIL
BALLFIELD
BALLFIELD
BALLFIELD
PULLBACKINFIELD
TOACCOMMODATE
INTERMEDIATEPLAY
MULTI-USEFIELDS
CANACCOMMODATE
FB/LAX/SOCCERIN
YOUTHANDFULLSIZEFIELDS
MULTI-USE FIELDS
CAN ACCOMMODATE FB/LAX/SOCCER
IN YOUTH AND FULL SIZE FIELDS
CHAMPIONSHIP
FIELD
210’
360’
PARKING382
STALLS
PARKINGPARKING185STALLS+/- 185
STALLS STORM
STORM
PONDPOND EXISTING
EXISTING
TURBINETURBINE
PARKING 525
STALLS
STORM
POND
EXSTING
PONDING200’
200’200’
200’200’
200’200’
200’165THAVE. NW165TH AVE.
NW PLAZA
WITH
SHELTER PLAZA
WITH
CONCESSIONS/STORM
SHELTER
STORAGEPLAZAWITHPLAZA
WITH CONCESSIONS/
CONCESSIONS/STORMSHELTERSTORM
SHELTER ELKRIVERPARKS & RECREATIONATHLETIC FIELDS MASTER Page 113 of 125
BALLFIELDBALLFIELDBALLFIELDNEWTRAILNEWTRAIL
NEWNEW
TRAILTRAIL
NEW
TRAILTRAIL
NEW NEW
TRAILTRAIL
BALLFIELDBALLFIELDBALLFIELDPULLBACKINFIELDTOACCOMMODATETOACCOMMODATEINTERMEDIATEPLAYINTERMEDIATEPLAY
MULTI-USEFIELDSMULTI-USE FIELDS
CANACCOMMODATECAN ACCOMMODATE
FB/LAX/SOCCERINFB/LAX/SOCCER IN
YOUTH AND FULLSIZEFIELDSYOUTHANDFULLSIZEFIELDS
MULTI-USEFIELDSMULTI-USE FIELDS
CAN ACCOMMODATE FB/LAX/SOCCERCANACCOMMODATEFB/LAX/SOCCER
IN YOUTH AND FULLSIZEFIELDSINYOUTHANDFULLSIZEFIELDS
CHAMPIONSHIP CHAMPIONSHIP
FIELDFIELD
210’210’
W
360’360’PARKING+/- 382STALLSPARKING+/- 185STALLSSTORM
PONDEXISTING
TURBINEPARKINGPARKING525 STALLS+/-
525STALLS
STORM
STORMPONDPOND
EXSTING
EXSTINGPONDINGPONDING 200’200’200’200’165TH
AVE. NWPLAZA WITH
PLAZA
WITH SHELTERSHELTERPLAZA WITH
PLAZA WITH
CONCESSIONS/CONCESSIONS/STORM
SHELTERSTORM
SHELTERSTORAGESTORAGEPLAZAWITHCONCESSIONS/
STORM SHELTERELKRIVERPARKS & RECREATIONATHLETIC FIELDS Page 114 of 125
Plants and Things Recreation Complex
Relocates softball from DAAC and creates a 4 field
dedicated complex with youth sized fields
Softball tournaments could incorporate the existing
pinwheel for an 8 field schedule
Creates a new rectangle field destination that can
accommodate football, lacrosse, and soccer with up to 5
full sized fields or many youth sized layouts
ELK RIVER PARKS & RECREATIONATHLETICFIELDSMASTERPLANSPage 115 of 125
Plants and Things Recreation Complex
Creates showcase opportunities for Plants and Things at
plaza areas in each of the three areas
Parking to accommodate extensive field use
Each sport area would have concessions/restroom/
storm shelter
ELK RIVER PARKS & RECREATIONATHLETICFIELDSMASTERPLANSPage 116 of 125
Plants and Things Recreation Complex
Existing ballfi elds would have parking paved
The smaller 90’ field would have infi eld grass pulled
back to accommodate intermediate play
New trails incorporated into the park
ELK RIVER PARKS & RECREATIONATHLETICFIELDSMASTERPLANSPage 117 of 125
Plants and Things Recreation Complex
All costs are planning level to help the City budget based on contractor pricing. Additional
design will further refi ne the costs. Costs may change based on infl ation, labor & material
costs, permitting, timing, and other factors.
Northwest Area Project Cost: $3,800,000
Parking and Roads: $1,650,000
Trails and Plazas: $1,030,000
Other Costs: $325,000
Soft Costs: $300,000
15% Contingency: $495,000
ELK RIVER PARKS & RECREATIONATHLETICFIELDSMASTERPLANSPage 118 of 125
Plants and Things Recreation Complex
All costs are planning level to help the City budget based on contractor pricing. Additional
design will further refi ne the costs. Costs may change based on infl ation, labor & material
costs, permitting, timing, and other factors.
Softball Area Project Cost: $8,785,000
Fields: $1,750,000
Parking and Roads: $1,660,000
Trails and Plazas: $1,265,000
Other Costs: $1,440,000
Soft Costs: $915,000
25% Contingency: $1,755,000
ELK RIVER PARKS & RECREATIONATHLETICFIELDSMASTERPLANSPage 119 of 125
Plants and Things Recreation Complex
All costs are planning level to help the City budget based on contractor pricing. Additional
design will further refi ne the costs. Costs may change based on infl ation, labor & material
costs, permitting, timing, and other factors.
Rectangle Fields Project Cost: $15,550,000
Fields: $1,940,000
Parking and Roads: $3,945,000
Trails and Plazas: $2,075,000
Other Costs: $2,860,000
Soft Costs: $1,620,000
25% Contingency: $3,110,000
ELK RIVER PARKS & RECREATIONATHLETICFIELDSMASTERPLANSPage 120 of 125
Plants and Things Recreation Complex
All costs are planning level to help the City budget based on contractor pricing. Additional
design will further refi ne the costs. Costs may change based on infl ation, labor & material
costs, permitting, timing, and other factors.
Project Cost: $28,135,000
Northwest Section (wheel): $3,800,000
Softball: $8,785,000
South Section (rectangles): $15,550,000
ELK RIVER PARKS & RECREATIONATHLETICFIELDSMASTERPLANSPage 121 of 125
BALLFIELDBALLFIELD
BALLFIELDBALLFIELD
BALLFIELDBALLFIELD
TRAIL
NEWNEW
TRAILTRAIL
NEWNEW
TRAILTRAIL
NEW
TRAIL
NEWNEW
TRAILTRAIL
BALLFIELDBALLFIELD
BALLFIELDBALLFIELD
BALLFIELDBALLFIELD
PULL BACKINFIELDPULLBACKINFIELD
TOACCOMMODATETO ACCOMMODATE
INTERMEDIATEPLAYINTERMEDIATEPLAY
MULTI-USEFIELDSMULTI-USE FIELDS
CANACCOMMODATECAN ACCOMMODATE
FB/LAX/SOCCERINFB/LAX/SOCCER IN
YOUTH AND FULLSIZEFIELDSYOUTHANDFULLSIZEFIELDS
MULTI-USEFIELDSMULTI-USE FIELDS
CAN ACCOMMODATE FB/LAX/SOCCERCANACCOMMODATEFB/LAX/SOCCER
IN YOUTH AND FULLSIZEFIELDSINYOUTHANDFULLSIZEFIELDS
CHAMPIONSHIP
FIELDFIELD
210’210’
W
360’
360’PARKINGPARKING382 STALLS+/-
382
STALLS PARKINGPARKING
185STALLS
STORM
STORMPONDPOND
EXISTING
EXISTING
TURBINETURBINEPARKINGPARKING525 STALLS+/-
525STALLS
STORM
STORMPONDPOND
EXSTING
EXSTINGPONDINGPONDING
200’200’
200’200’
200’200’
200’200’165THAVE. NW165TH
AVE. NWPLAZAWITH
PLAZA
WITH SHELTERSHELTERPLAZA WITH
PLAZA WITH
CONCESSIONS/CONCESSIONS/STORM
SHELTERSTORM
SHELTERSTORAGESTORAGEPLAZAWITH
PLAZA WITH
CONCESSIONS/CONCESSIONS/STORM
SHELTERSTORMSHELTER 0’0’
300’300’ELKRIVERPARKS & RECREATIONATHLETIC FIELDS
MASTER PLANS PLANTS
AND THINGS
RECREATION COMPLEX Creates showcase opportunities for
Plants and Things at plaza areas in each of the
three areas Relocates softball from DAAC and creates
a 4 field dedicated complex with youth
sized fields Softball tournaments could
incorporate the existingpinwheel for an 8
field schedule Parking to accommodate extensive
field use Creates a new rectangle field
destination that can accommodate football, lacrosse,
and soccer with up to 5 full sized fields or many
youth
sized layouts Each sport area would
have concessions/restroom/
storm shelter Existing ballfields would have
parking paved The smaller 90’ field would have
infield grass pulled back to accommodate
intermediate play New trails incorporated into
thepark
MAIN
MAINPARKINGPARKING
207+/- 207DROP-OFF +
DROP-
OFF +
PLAZAPLAZA
STORAGE CAGESCAGES
BATTING
BATTING
CAGESCAGES SHELTERSHELTER COVEREDSTADIUMSEATINGWITHCOVEREDSTADIUM
SEATING WITH CONCESSIONS, VIEWING DECK, CONCESSIONS,
VIEWING DECK, ANDSTORMSHELTERAND
STORMSHELTERDROP-OFF +
DROP-
OFF + PLAZAPLAZA
EXPANDED
EXPANDED PONDINGPONDING
STORMWATERSTORMWATER
PONDING PONDING
EXISTING
EXISTING
PONDPOND
MIRACLEFIELD
PLAY-
PLAY-GROUNDGROUND
PREMIER
PREMIERFIELDFIELD
INTERMEDIATE
INTERMEDIATEFIELD
YOUTH
YOUTHFIELDFIELD
YOUTH
YOUTHFIELD
375’375’
320’320’
225’225’
225’225’
225’
225’225’
225’225’
225’225’
320’320’
320’320’
330’330’PROCTORAVE. NWPROCTOR
AVE. NWSCHOOL ST. NWSCHOOL ST. NW
P R
O C
TO
R R D .
N W
PRO CT
OR
RD.
NW330’
330’90’
90’EXISTING
PONDEXISTING
POND86STALLS OVERFLOW
OVERFLOW
PARKINGPARKING87STALLS+/- 87
STALLSTTSSSSSTSS 86STALL+/-
86 STALLS 0’0’200’200’ELK
RIVER PARKS & RECREATIONATHLETIC FIELDS
MASTER PLANS OAK KNOLL ATHLETIC COMPLEX Anticipates
the removal/relocation of Ivan
Sand and the Education Technology Center Reconfigures
access to Proctor Road and School Street,
and creates
a connection between the two entries New,
re-oriented full size (
90’ basepath) ballfield with grandstand seating
Adds miraclefield and inclusive playground Plaza to
support the premier field,
inclusive play area, and miracle field Creation
of two dedicated youth (60’
basepath) baseball fields with grass infields Creation
of a dedicated intermediate (70-80’
basepaths) baseball field with grass infield
Centralized, elevated plaza with shelter to
support the youth and intermediate field
New
parking tosupportexpandedballfieldprogram BUSINESS
CENTER
DR. NWBUSINESSCENTERDR.
NW PARKINGPARKING
124
STALLS+/- 124
STALLS
EXISTING EXISTING
PARKINGPARKING EXISTING
EXISTING
PLAYGROUNDPLAYGROUNDEXISTING
EXISTING
EXISTING
EXISTING
SHELTERSHELTER
NEW
NEW
TRAILTRAIL EXISTINGEXISTINGPONDINGPONDINGEXISTINGEXISTINGPONDINGPONDINGBALLFIELDBALLFIELD
DRAINTILETO
DRAIN TILETOIMPROVEDRAINAGEIMPROVEDRAINAGE
DRAINTILETO
DRAIN
TILE
TO
IMPROVEDRAINAGEIMPROVE
DRAINAGE SHELTERSHELTERPLAZAPLAZABALLFIELDBALLFIELD
280’
280’MULTI-
USEMULTI-
USEFIELDFIELD
280’280’
280’280’
280’
280’EXISTING
EXISTINGPOWERPOWER
LINESLINES EXISTING
EXISTINGDOG
PARKDOG
PARK280’
280’
21
0’2 10
360’360’280’280’0’0’100’
100’ELK
RIVER PARKS &
RECREATIONATHLETIC FIELDS MASTER PLANS DAVE ANDERSON ATHLETIC
COMPLEX Removes 2 softball fields and replaces them
with open field space that can accommodate up to
a full
sized rectangle field or multiple youth
sized fields Improves safety considerations by reducing the
number of
softball fields and having play occur behind spectators Installation
of drain tile in the outfields
to reduce flooding/ponding that is occurring today
Addition of a centralized
plaza and shelter to support recreational field
use Creation of new parking to
support field programming, as well as Orono
Park Retains flexibility for
potential
long
term
change
with
adjacent land uses 1 2 3 4
Phasing Minor investmentin safety netting
at DAAC 1 - Rectangle fi elds at YAC Allowsfor
removal of existing YAC and
OKAC fi elds)2 - Softball Fieldsat YAC Allows for removal of
DAAC fi elds and add
grass at OKAC)3 - Baseball Complex at OKAC Keep DAAC fi elds
for baseball capacity while under construction? ISD
timing?)4 - Removal of Softball Fields at DAAC Could happenearlier with coordination:
use of
ISD/LJW
fi elds,
adult
softball)Potential Variables:
Other
projects parks & development)BudgetCoordinationwithISDPage 122 of 125
Utilization Study Findings
Expansion for growing population and to
add capacity/resiliency
Preference for improved user (player and
spectator) experience
Desire for tournament capabilities
Safety/Functionality concerns at DAAC
short term)
ELK RIVER PARKS & RECREATIONATHLETICFIELDSMASTERPLANSPage 123 of 125
Tournament Capacity in One Location
Sport Existing Proposed Notes
Youth Baseball (60’) 4 8 DAAC or PTRC today, PTRC Proposed
Intermediate Baseball (75’) 4 5 DAAC or PTRC today, PTRC Proposed
Full Sized Baseball (90’) 2 2 PTAC for both, ISD adds capacity if OKAC
Fast Pitch Softball 4 8 DAAC or PTRC today, PTRC Proposed
Slow Pitch Softball 4 4 DAAC or PTRC today, PTRC Proposed
Rectangle Fields (FB/Lacrosse/Soccer)2 5 OKAC today, PTRC Proposed
ELK RIVER PARKS & RECREATIONATHLETICFIELDSMASTERPLANSPage 124 of 125
Utilization Study Findings
In the next 10-15 years:
3-4 60’ ballfi elds with 200-225’ fences
1 60’ baseball field
2 60’ softball fields
1-2 75’ ballfi elds
1 capacity, 1 more enhanced
1-2 90’ ballfi elds
0, but enhanced facilities
4 rectangle fields
3, plus increased flexibility
ELK RIVER PARKS & RECREATIONATHLETICFIELDSMASTERPLANSPage 125 of 125