Loading...
6.1e EMRUSR 10-08-2024��i Elk River , Municipal Utilities UTILITIES COMMISSION MEETING TO: FROM: ERMU Commission Thomas Geiser —Operations Director MEETING DATE: AGENDA ITEM NUMBER: October 8, 2024 6.1e SUBJECT: Staff Update ACTION REQUESTED: None DISCUSSION: • Working through the second round of maps for the new GIS mapping system that we plan to move forward with in the future. • Attending Advanced Metering Infrastructure meetings weekly with other ERMU staff. • Working through 2025 projects and 2025 equipment/material needs. • There is one month left of Highway 169 Redefine meetings. • Working on the 2025 Capital/Expense Budget along with the 2025 Wire Bid. • Working with staff on our future East substation project. • Working with staff on pole attachment agreements. • Working with staff on security/streetlight service agreements and the 2025 Fee Schedule. • Starting the design process of the Highway 169 overhead rebuild from the North substation to the landfill. We will be replacing the poles and the 4/0 aluminum conductor steel reinforced (ACSR) lines with new poles and 336 ASCSR. This will take a few winters to complete. • Working with city staff on the timing for ERMU to install the wreaths on the downtown Elk River streetlights. We are currently planning for the week of November 18. • On September 18, Technical Service Superintendent Mike Tietz and I attended the Central Municipal Power Agency/Services Meeting in St. Peter, MN. Page 1 of 4 Page 2 of 4 RK Page 3 of 4 01 Page 4 of 4