Loading...
6.1g EMRUSR 10-08-2024��i Elk River , Municipal Utilities UTILITIES COMMISSION MEETING TO: FROM: ERMU Commission Mike Tietz —Technical Services Superintendent MEETING DATE: AGENDA ITEM NUMBER: October 8, 2024 6.1g SUBJECT: Staff Update ACTION REQUESTED: None DISCUSSION: In September, locators processed 544 locate tickets. These consisted of 448 normal tickets, 10 emergency tickets, 53 updated tickets, 12 cancellations, 7 meets, 5 boundary surveys, 3 corrections, and 6 non -excavations. This resulted in a 23.9% increase in tickets from the previous month and a 0.4% increase from the prior September. Electrical technicians completed 450 service order tasks, updated the power bill, addressed customer meter issues and any off-peak concerns. • The Advanced Metering Infrastructure (AMI) residential water meters and residential electric meters continue to be installed in new services. The electrical technicians have been busy changing out our Automated Meter Reading meters to AMI around the system and recently completed the meter installations at several different apartment buildings. Approximately 2,500 water meters and 1,600 electric meters are currently active within our AMI system. • For the month of September, staff did not run generators at the power plant. We will no longer plan on running generators going forward based on the Commission's decision to move forward with the decommissioning of the power plant. • Staff will begin grading the East substation site the week of October 7. Sitework should take approximately three weeks to complete. • We have received 14 of the 26 NOVA reclosers that were ordered from the awarded bid in April. This is a bit of a surprise as we were not expecting these until Q1 of 2025. This should allow us to get a few more projects completed in 2024. • Our monthly peak was 65.86 MW on September 16, at 3:41pm. Page 1 of 1