Loading...
6.01f EMRUSR 11-12-2024��i Elk River Municipal Utilities UTILITIES COMMISSION MEETING TO: FROM: ERMU Commission Chris Sumstad — Electric Superintendent MEETING DATE: AGENDA ITEM NUMBER: November 12, 2024 6.01f SUBJECT: Staff Update ACTION REQUESTED: None DISCUSSION: • Installed 24 new residential services, which involves the connection of a secondary line once the customer requests service. • Joe Schmidt, Safety Instructor from Minnesota Municipal Utilities Association (MMUA), was here September 25-26 and held safety meetings for all staff on fire safety and fire extinguishers. • New three-phase services were installed at Heritage Millwork and Collins Towing. • The bore crew assisted with soil prep at the new East substation location. Over 3,200 tons of Class 5 gravel was brought in to build the substation pad and driveway. • We have started work extending Feeder 42 as well as installing new service to Great River Energy's old refuse -derived fuel site. These are directly south of the new East substation. • Jay Reading, MMUA Assistant Director of Technical Services, was here on October 2 and held a Job Training & Safety session on accidents and safety culture. • Crews finished the rebuild jobs at the 1851" Avenue and Pinewood Golf Course areas. We replaced both open concentric primary and overhead primary with new underground cable. • Replaced the three regulators going into Dayton. These devices maintain voltage levels and require maintenance after a set amount of operations. We also lowered the controls to the ground for future ease of operation. • Crews are taking care of map auditing tasks when they get a chance, aiding in the construction of the GIS mapping system. • We will be starting some maintenance and upgrades at West Substation, Bank 1 in November. • We are planning winter work which involves an overhead rebuild on Feeder 65 from the North substation towards the landfill, and lining up tree trimming locations. • Inventory & procurement staff have been busy cleaning up the yards and buildings with the construction season winding down and winter coming. Page 1 of 1 160