Loading...
5.2. SR 02-13-2006 City of Elk River REQUEST FOR COUNCIL ACTION Agenda Section Meeting Date Worksession Februa 13,2006 Item Description Street De artment Office Ex anSlon Item Number 5.2. Prepared by Phil Hals, Street Su erintendent Reviewed by Introduction The office situation at the Street Department has three supervisors sharing one office and the receptionist/ secretary, along with her sign making equipment sharing, the other office. Discussion Staff has looked at various options to add office space and the consensus is to convert bay one in the garage area to a receptionist area, sign making shop, four offices and an expansion area with a mezzanine above for additional break room space and storage. The existing office would be converted to locker rooms and a small conference room. Financial Impact Weare waiting for the first design/build cost estimate. Attachments Floor plan and design/build cost estimate as a handout at the meeting. Action Requested Staff requests Council direction as to how to proceed. Council Action Motion by _ Second by _ Vote Follow Up C: \Documents and Settings \tallard\Local Settings \ Temporary Internet Files \ OLKF\2-8-0G Me public works expansion. doc