4.9 SR 06-17-2024City of Elk - River To City Council Meeting Date June 17, 2024 Item Description Resolution 24-33: Variance Request for Dodge Avenue and 5th Street Intersection Request for Action Item Number 4.9 Prepared By Ryan Sandhoefner, Engineering Project Manager Reviewed by Justin Femrite Lori Stich Joe Stremcha Cal Portner Tina Allard Action Requested Adopt, by motion, Resolution 24-33 detailing the proposed variance of Dodge Avenue NW (MSA Route 118), 5th Street NW (MSA Route 117), and Line Avenue NW (MSA Route 136). Background/Discussion As part of the city's frontage/backage road project scheduled for 2025, 5th Street is set to be realigned to run continuously from Dodge Avenue to Line Avenue. This includes implementing a new cul-de-sac on Line Avenue just north of 184th Circle. Because these segments are part of the city's State Aid routes, they must conform to all State Aid road requirements unless otherwise approved by MnDOT State Aid Operations. Due to right-of-way restrictions and to keep the curve consistent with the rest of Dodge Avenue, staff recommends requesting a variance from State Aid rules to allow a 25 MPH curve at the intersection of Dodge Avenue NW and 5th Street NW in lieu of a 30 MPH curve. Part of the variance application includes the need for a formal resolution passed by the City Council. Financial Impact If the variance request is approved, it is estimated to save approximately $195,000 in right-of-way and pond relocation costs. Mission/Policy/Goal Responsible for every dollar - good stewards Attachments I. Resolution 24-33 2. Variance Request The Elk River Vision A avelcoming community with revolutionary and spirited resourcefulness, exceptional service, and community p p W E R E U A Y engagement that encourages and inspires prosperity 372 CITY OF ELK RIVER, MINNESOTA RESOLUTION NO. 24-33 A Resolution Requesting a Variance from Standard for State Aid Operation for Project No. S.A.P. 204-117-002, S.A.P. 204-118-002, S.A.P. 204-136-002. WHEREAS, the City of Elk River is preparing plans for the reconstruction of Dodge Avenue NW (MSA Route 118), 51' Street NW (MSA Route 117), and Line Avenue NW (MSA Route 136) from 600' North of 51 Street NW to 100' South of Xavier Circle; and WHEREAS, Minnesota Rules for State Aid Operation 8820.9936 (Minimum Design Standards, Urban; New or Reconstruction Projects) requires the horizontal alignment to be designed to a minimum speed of 30 miles per hour; and WHEREAS, the reasons for this variance request are to keep this curve consistent with the two curves to the North on Dodge Avenue which are already designed for 25 miles per hour. This variance would also minimize the amount of right-of-way that needs to be purchased on the NE corner of Dodge Avenue NW and 5t' Street NW. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF ELK RIVER, MINNESOTA AS FOLLOWS; that 1. The City Council does hereby request a variance from the Minnesota Department of Transportation State Aid Operations Rules Chapter 8820.9936 Minimum Design Standards, Urban; New or Reconstruction Projects to allow a 25 MPH curve at the intersection of Dodge Avenue NW and 51' Street NW in lieu of a 30 MPH curve, and 2. The City Council hereby indemnifies, saves and hold harmless the State of Minnesota and its agents and employees of and from claims, demands, actions, or causes of action arising out of or by reason of (project descriptions) in accordance with Minnesota Rules 8820.9936 and further agrees to defend at their sole cost and expense any action or proceeding commenced for the purpose of asserting any claim arising as a result of the granting this variance. Adopted by the Elk River City Council this 171 day of June, 2024 ATTEST: L-02 City Clerk CITY OF ELK RIVER, MINNESOTA Mayor Page 58 of 372 QBOLTON . & MENK Real People. Real Solutions. Page 59 of 372 Certification Variance Request For Dodge Avenue & 51b Street Intersection City of Elk River OR1.133186 May 31, 2024 Prepared by: Bolton & Menk, Inc. Dodge Avenue & 51h Street Intersection Variance Request I OR1.133186 Certification Page 60 of 372 Table of Contents I. RESOLUTION.........................................................................................................................................1 II. LOCATION MAP AND TYPICAL SECTION................................................................................................1 III. ADJACENT LAND USES..........................................................................................................................1 IV. MOTORIST, PEDESTRIAN, VEHICLES AND COMMERCIAL NEEDS.........................................................1 V. EFFECTS OF DESIGNING IN ACCORDANCE WITH RULE AND WITHOUT................................................1 A. With the rule (30 MPH Curve)......................................................................................................1 B. With the rule (30 MPH Super Elevated Curve).............................................................................1 C. Without the rule (25 MPH curve).................................................................................................1 VI. DEFINE CRITICAL DESIGN ELEMENT.....................................................................................................2 VII. ESTIMATED ADDITIONAL COSTS...................................................................................................... 2 A. 30 MPH Curve...............................................................................................................................2 B. 30 MPH Super Elevated Curve......................................................................................................2 Vill. ACCIDENT DATA...............................................................................................................................2 IX. TRAFFIC COUNTS..................................................................................................................................2 A. Existing ADT — 5,350 (2024) ..........................................................................................................2 B. Projected ADT — 6,290(2044)....................................................................................................... 2 X. LEGAL, POSTED SPEED.......................................................................................................................... 2 XI. FUTURE IMPROVEMENTS.....................................................................................................................2 XII. SAFETY, MITIGATION.......................................................................................................................2 XIII. PERTINENT FACTORS........................................................................................................................2 Appendix Appendix A: Preliminary Cost Estimates Appendix B: Figures Prepared by: Bolton & Menk, Inc. Dodge Avenue & 51h Street Intersection Variance Request I OR1.133186 Table of Contents Page 61 of 372 I. RESOLUTION Variance Request — Requesting variance for 25 MPH horizontal curves instead of 30 MPH horizontal curves as required by State Aid Rule 8820.9936 — to be acted on by the Elk River City Council prior to the variance committee meeting. Parking Restrictions on State Aid Routes - Establishing Parking Restrictions on Particular Municipal State Aid Routes— to be acted on by the Elk River City Council in a future meeting. II. LOCATION MAP AND TYPICAL SECTION See Figure 1 for existing and proposed typical sections. Existing roadway section is a 32'-42' wide urban roadway. Proposed section is a 32-ft urban roadway. See Figure 2 for proposed variance request design. Figures 3 and 4 show potential designs that would stay within the parameters of 8820.9936 but would include additional cost. III. ADJACENT LAND USES Land uses along Dodge Avenue NW include Various restaurants and buisnesses including but not limited to an auto shop, tattoo shop, buffet, and veterinary clinic. Land use along 51h Street NW include apartments, residential homes, and buisnesses including a mortgage broker and tailor. IV. MOTORIST, PEDESTRIAN, VEHICLES AND COMMERCIAL NEEDS The proposed conditions would turn an existing stop condition with conflict points into a continuous curve improving the safety of the intersection. With all options the city intends to add a sidewalk on the north side of the road increasing pedestrian safety and access to the larger sidewalk network. V. EFFECTS OF DESIGNING IN ACCORDANCE WITH RULE AND WITHOUT A. With the rule (30 MPH Curve) 1. Need for acquiring additional right-of-way from two properties. 2. Relocation of pond due to 30 MPH curve requirements. 3. Existing 25 MPH curve outside project limits to the north will remain in place restricting speeds. R. With the rule (30 MPH Super Elevated Curve) Need for acquiring additional right-of-way from two properties. 2. Relocation of pond due to 30 MPH curve requirements. 3. Existing 25 MPH curve outside project limits to the north will remain in place restricting speeds. C. Without the rule (25 MPH curve) 1. Minimal right-of-way acquisition and impact on 522 Dodge Avenue. 2. Two already existing curves on Dodge Avenue are design as 25 MPH curves and we would simply match that constraint. Prepared by: Bolton & Menk, Inc. RESOLUTION Dodge Avenue & 51h Street Variance Request I OR1.132180 Page 1 Page 62 of 372 VI. DEFINE CRITICAL DESIGN ELEMENT Critical element is the horizontal curve, which provides for a design speed curve of 25 MPH (182' Radius) with 2% crown, in lieu of the 30 MPH (300' Radius) minimum design speed curve. VII. ESTIMATED ADDITIONAL COSTS A. 30 MPH Curve The additional cost for the 30 MPH curve would include relocation of a pond due to the horizontal design requirements for the 30 MPH curves. This option would also have the added cost of right-of-way acquisition for two properties. The total additional cost over the requested variance would be $195,140 B. 30 MPH Super Elevated Curve The additional cost for the 30 MPH super elevated curve would also include the relocation of a pond due to the design requirements for the 30 MPH curves. This option would also have added cost of right-of-way acquisition for two properties. The total additional cost over the requested variance woul be $240,650 VIII. ACCIDENT DATA There is no history of accidents at this location. IX. TRAFFIC COUNTS A, Existing ADT — 5,350 (2024) B. Projected ADT — 6,290 (2044) X. LEGAL, POSTED SPEED Posted 30 MPH XI. FUTURE IMPROVEMENTS No future improvements are anticipated at this time. XII. SAFETY, MITIGATION Roadway to be signed with 25 MPH advisory and curve signs along with no parking signs, consistent with the MMUTCD Manual, if variance is granted. All options would eliminate a stop condition turning the intersection into a continuous curve improving the safety of said intersection. Sidewalk will also be added through the project area to improve pedestrian safety. XIII. PERTINENT FACTORS The existing curves to the north are 25 MPH curves and have had no recorded accidents. The proposed improvement would be to add another 25 MPH curve at the intersection of Dodge Avenue and 51h Street along with eliminating a stop condition improving the safety of the intersection. Prepared by: Bolton & Menk, Inc. DEFINE CRITICAL DESIGN ELEMENT Dodge Avenue & 51h Street Variance Request I OR1.132180 Page 2 Page 63 of 372 Appendix A: Preliminary Cost Estimates Page 64 of 372 SBOLTON ENGINEER'S PRELIMINARY COST ESTIMATE & M E N K FOR REQUESTED VARIANCE LIMITS Real People. Real Solutions. DODGE AVENUE & 5TH STREET INTERSECTION VARIANCE REQUEST (25 MPH CURVES) CITY OF ELK RIVER BMI Project No.: 0111.133186 H:\ELKR\OR1133186\3_Design\Variance Request\[Preliminary Cost Estimate 1.xlsx]Eng. Prelim. Estimate (3; 5/31/2024 Subtotal $83,800.00 10% Contingency $8,380.00 Total:0 00 R/W Acquisition $16,160.00 Design, Administration and Construction Engineering $13,830.00 NOTE: Assume removal and roadway grading will be in all alternates so they have been excluded from this estimate to only define cost differences Page 65 of 372 BOLTON ENGINEER'S PRELIMINARY COST ESTIMATE & MENK FOR REQUESTED VARIANCE LIMITS Real People. Real Solutions. DODGE AVENUE & 5TH STREET INTERSECTION VARIANCE REQUEST (30 MPH CURVE) CITY OF ELK RIVER BMI Project No.: 0111.133186 H:\ELKR\OR1133186\3_Design\Variance Request\[Preliminary Cost Estimate 1.xlsx]Eng. Prelim. Estimate (3; 5/31/2024 Subtotal $201,400.00 10% Contingency $20,140.00 Total Estimated Construction Cost 0.00 R/W Acquisition $62,540.00 Design, Administration and Construction Engineering $33,230.00 NOTE: Assume removal and roadway grading will be in all alternates so they have been excluded from this estimate to only define cost differences Page 66 of 372 BOLTON ENGINEER'S PRELIMINARY COST ESTIMATE & MENK FOR REQUESTED VARIANCE LIMITS Real People. Real Solutions. DODGE AVENUE & 5TH STREET INTERSECTION VARIANCE REQUEST (30 MPH SUPER ELEVATION) CITY OF ELK RIVER BMI Project No.: 0111.133186 H:\ELKR\OR1133186\3_Design\Variance Request\[Preliminary Cost Estimate 1.xlsx]Eng. Prelim. Estimate (3; 5/31/2024 Subtotal $242,700.00 10% Contingency $24,270.00 Total Estimated Construction Cost 0.00 R/W Acquisition $55,800.00 Design, Administration and Construction Engineering $40,050.00 NOTE: Assume removal and roadway grading will be in all alternates so they have been excluded from this estimate to only define cost differences Page 67 of 372 Appendix 6: Figures Page 68 of 372 Dodge Avenue & 5th Street Intersection Variance Request Figure 1: Existing & Proposed Typical Sections ® BOLTON City of Elk River May 2024 & M ENK PROPOSED TYPICAL SECTION - DODGE AVENUE & 5TH STREET 4 \ VARIES VARIES \ 0.67' 16' 16' 0.67' 5' SIDEWALK PROPOSED B618 CENTERLINE I CL=100.00 CONC GRADE CURB VARIABLE SLOPE 2.00% 2.00% VARIES VARIABLE SLOPE 0 1.5' 1.5"TYPE SP 9.5 WEARING COURSE (2,C(SPWEA240C(2360) BACKFILL WITH SELECT GRADING MATERIAL (TYP) BITUMINOUS TACK COAT (2357) 2.5" TYPE SP 12.5 NON -WEARING COURSE (2,C) (SPWNWB230C) (2360) 8" AGGREGATE BASE, CL 5 (2211) SUBGRADE PREPARATION (2112) (INCIDENTAL) �1 PROPOSED TYPICAL SECTION NOT TO SCALE v EXISTING TYPICAL SECTION - DODGE AVENUE & 5TH STREET 4 VARIES VARIES 3 0.67' 32'-42' 0.67' PROPOSED B618 _ CENTERLINE I CL=100.00 CO NC \� GRADE CURB VARIES VARIES VARIES VARIES VARIABLE SLOPE VARIABLE SLOPE EXISTING SECTION BACKFILL WITH SELECT n 4" BITUMINOUS PAVEMENT GRADING MATERIAL(TYP) 5 8"AGGREGATE BASE i � EXISTING TYPICAL SECTION NOT TO SCALE Dodge Avenue & 5th Street Intersection Variance Request City of Elk River Figure 2: 25 MPH Curve BOLTON May2024 ®&MENK N \ EXISTING 25 MPH CURVES \ \ V \\ioo \ � \ -- — — � — — — — — — � scn\e Feel 71 ail � � I ICI \ O II II 21NET.3l E�` \ - TRANSITION 25 MPH CURVE 2 \ \ 522 DODGE - TO MATCH EXISTING m \\ AVENUE NW 1 I III 3 I I 175 SQ VD - D \ ROW ACQUISITION c 25 MPH REVERSE CURVES \ VARIANCE REQUESTED R=19U (C/L) III v 2%CROWN \ D I i � III m I� "STH STREET NW- y ROAD PREVIOUSLY REMOVED 'i �3 t _ NEW PROPOSED 25 v _ `. \ • - p b MPH CURVE T11J � Z - v z o z � z Dodge Avenue & 5th Street Intersection Variance Request City of Elk River Figure 3: 30 MPH Curve BOLTON May2024 ®&MENK 0 00 - om 1 EXISTING 25 MPH CURVE � 1 50 100 I I sILE FEET `R-316' (C/L)\ \ \ \ 30 MPH CURVE 2%CROWN I I 522 DODGE - 580 SQVD AVENUE NW \ ROWACQUISITION III � l I � III i II II \ I I III � 610 SQVD z ROWACQU ISITION ICI a v III n — PONDATE 29'CR R 306' =�s 30 MPH CURVE 5TH STREET NW OWN � -" � � Q' RECONSTRUCTTO TIE '" � i � \ p INTO NEW CURVE I Dodge Avenue & 5th Street Intersection Variance Request City of Elk River Figure 4: 30 MPH Super Elevation BOLTON May2024 (D&MENK o 0 YG / m2 G � EXISTING 26 MPH CURVE m � L ------, ; - - - - --� o so �oo II � II I I s—E FEET R=316(C/L) y'\ \ 30 MPH CURVE 2%CROWN III I I II I IIII I i � III L � — \ \ 200' SUPERTRANSITION IIII o I I l` II I SQVD \ 622DODGE III -_ ROW ACQUISITION \\ AVENUE NW \ IIII ' \ 330 SO. VD \ ROW ACQUISITION _ IIII I I I 3 III I I _ I I s D m L n RELOCATET--�--`�- er- i POND __ _ Po 6TH STREET NW n 30 MPH CU RVE vim` e n _ 4%SUPER' ` �—_-� 200'SU PERTRANSITION n \ + i RECONSTRUCTTOTIE 2 \ SUPER ELEVATION INTO .l -.. -0)..- ym EXISTING ROADWAY 7 yry m