Loading...
11.1 SR 09-03-2024The Elk River Vision A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and community engagement that encourages and inspires prosperity Request for Action To City Council Item Number 11.1 Meeting Date September 3, 2024 Prepared By Zack Carlton, Community Development Director Item Description Concept Review: Holzem Properties - Kent Roessler Reviewed by Zack Carlton Cal Portner Tina Allard Action Requested Provide staff and the applicant with informal, non-binding, feedback regarding their proposed residential project. Background/Discussion The applicant requests initial feedback regarding a proposed residential subdivision near Twin Lakes Elementary School and along the city’s border with Nowthen. The submitted plan proposes a 98-lot single- family subdivision consistent with the R-1b non-sewered zoning standards – 1-acre lots with 160 feet of frontage. The Comprehensive Plan guides the property for Mixed Residential use with city utilities and was included in the utility expansion study completed in early 2023. The study included cost estimates and contemplated funding options for the trunk utilities. Direction from the City Council and Elk River Municipal Utilities have been to work with the developer to install the new infrastructure. The estimated trunk extension costs for the subject site are $36,351/gross acre or $7,161,147. Based on density guidance in the Comprehensive Plan, the developer could expect to construct between 450 and 500 homes, for a trunk utility cost of $15,000 per home. The developer has stated this cost is unaffordable and that his project would not be competitive with other developers currently working within the community. City staff reviewed their concerns and would like direction from the City Council regarding the long-term vision for this area of the city. If the project site were removed from the urban service district and developed as proposed, the remainder of the northeast urban service area would likely no longer be economical, and the Comprehensive Plan should be amended to support larger lots with private wells and septic. Alternatively, if the Council envisions this area as the next phase of urban development and expansion for the community, the current urban service area and feasibility study could be amended to take a closer look at the development potential within the current urban service area. The findings and recommendations in the Page 174 of 197 feasibility study identified a potentially smaller urban service area in this area of the city. With the Council's direction, city staff would initiate a review of the current plans and studies, which may lead to a more economical recommendation for a targeted expansion of city utilities. Financial Impact None Mission/Policy/Goal Support the growth and development of the community. Attachments 1. Location Map 2. Applicant's Narrative 3. Concept Plan Page 175 of 197 Page 176 of 197 Narrative Holzem Property Concept Plan Prepared for: Kent Roessler June 19, 2024 SUBMITTED TO City of Elk River 13065 Orono Parkway Elk River, MN 55330 PREPARED BY Landform Professional Services, LLC 105 5th Ave S, Suite 513 Minneapolis, MN 55401 Landform®, SensiblyGreen® and Site to Finish® are registered service marks of Landform Professional Services, LLC Page 177 of 197 TABLE OF CONTENTS Introduction .................................................................................................................................................. 1 Concept Plan ................................................................................................................................................. 1 Summary ....................................................................................................................................................... 1 Contact Information ...................................................................................................................................... 2 Page 178 of 197 Holzem Site, Elk River, MN June 19, 2024 KER24001 1 Introduction On behalf of Kent Roessler, Landform is pleased to submit this application for concept plan review of the Holzem site which includes the following PID numbers; 75-00869-0010, 75-00125-4101, 75-00125-4102, 75-00761-0040, 75- 00125-1100. The site includes five parcels that total 197.13 acres. Our concept plan was created to show a rural residential development on well and septic rather than municipal sewer and water. We are excited about the plan proposed for this site and look forward to discussing this proposal with the City. Concept Plan The site is currently guided Mixed Residential by the future land use plan and zoned R-1a Single Family Residential on the zoning map. The land is also shown within the future urban service area. We are requesting a land use change from Mixed Residential to Rural Residential and removal from the future urban service area. The concept plan has been prepared consistent with the dimensional standards of the R-1b zoning district which is the zoning change that would be requested with support of the land use and urban service area changes. We are requesting a change to remove the project site from the future urban service area. The project site was originally not part of the future urban service area, but the designation was changed as part of the 2040 Comprehensive Plan Update adopted in 2021. LGI Homes came forward with a concept plan in 2022 to develop the site with municipal services, which prompted the City to hire a consultant to perform a study for the expansion of sewer and water into the future urban service areas, specifically the northeast area where this project is located. The study showed the significant infrastructure necessary to serve the northeast area with sewer and water. A new force main from the wastewater treatment site over 3 miles away is necessary to serve the northeast area and this project site. This would require participation from several smaller adjacent properties to the south. The cost and additional properties that need to participate make it not feasible for this site to develop with sewer and water. Following the results of the study, LGI Homes decided not to pursue the development given the costs associated. The City has the option to bond for the infrastructure project and assess the costs through the Section 429 process. This would result in higher taxes for Elk River residents and large assessments for the benefitting properties in the northeast district. This would involve a lengthy process and would likely receive pushback from many of the property owners. Therefore, the discussion with the council was that all improvements would be a cost borne by the developer as properties develop. This project site cannot bear the infrastructure costs to bring a new trunk sanitary line from the wastewater treatment plant, therefore we are requesting an amendment to the comprehensive plan to remove this site from the future urban service area. We believe this is the only viable option to develop this site in the foreseeable future and we request the City to consider amending the comprehensive plan to provide a path forward for the property to develop. Summary We respectfully request feedback on the Concept Plan to develop the Holzem site as a rural residential community without sewer and water. Page 179 of 197 Holzem Site, Elk River, MN June 19, 2024 KER24001 2 Contact Information This document was prepared by: Kevin Shay, AICP Landform 105 South Fifth Avenue, Suite 513 Minneapolis, MN 55401 Any additional questions regarding this application can be directed to Eric Luth at eluth@landform.net or 612.638.0261. Page 180 of 197 WET WET WET WET WET WETWETWET WET WE T WETWETWETWETWETWETWET WET WETWETWETWE T W E T WE T WE T WET WET WET WET WET WE T W E T WETWET WETWETWETWETWETWET WET WET WETWETWETWETWETWET WETWETWETWETWET WETWETWETWETWETWET WETWETWETWETWETWETWETWETWETWETWETWET WETWETWETWETWETWE T WETWETWET WETWETWETWET WETWET WET WETWET WETWETWET WET WETWETWETWETWET WETWETWETWET WETWET WET WETW E T WET WETWETWE T WET WE T WET WET WE T WET WETWET WET WET WETWET WETWETWETWETWETWETWETWETWETWETWET WETWETWETWETWETWETWETWET WET WET WET WET WET WET WETWETWET WETWETWETWETWETWET Shed 120 CO. HWY NO. 40C.S.A.H. NO. 13120 120 120 120 120COUNTY H IGHWAY NO . 40COUNTY HIGHWAY NO. 40NO. 40 WOOD FENCE 7.1 FT. NORTH OF LINE EDGE OF GRASS 5.7 FT. WEST OF LINE BARBED WIRE FENCE 4.1 FT. WEST OF LINE BARBED WIRE FENCE 3.1 FT. WEST OF LINE FENCE LINE NO WIRE WOOD FENCE 1.3 FT. NORTH OF LINE 12012 0 BARBED WIRE FENCE ON LINE COUNTY H IGHWAY SS SS SS 1.4 Ac. 1.0 Ac. 1.0 Ac. 1.0 Ac.1.0 Ac.1.0 Ac. 1.0 Ac. 1.1 Ac. 1.1 Ac. 1.0 Ac.1.0 Ac. 1.4 Ac. 1.0 Ac. 1.1 Ac. 1.2 Ac.1.0 Ac.1.0 Ac.1.0 Ac. 1.4 Ac. 2.2 Ac. 1.0 Ac. 1.6 Ac. 1.9 Ac. 3.6 Ac. 2.9 Ac. 1.0 Ac. 1.0 Ac. 1.1 Ac. 1.3 Ac. 1.0 Ac. 1.0 Ac. 1.0 Ac. 1.0 Ac. 1.0 Ac. 1.1 Ac. 1.0 Ac. 1.0 Ac. 1.0 Ac. 1.0 Ac. 1.0 Ac. 1.0 Ac. 1.1 Ac. 1.1 Ac. 1.3 Ac. 1.7 Ac. 1.0 Ac. 1.0 Ac. 1.0 Ac.1.0 Ac. 1.0 Ac. 1.0 Ac. 1.0 Ac. 1.0 Ac. 1.0 Ac. 1.0 Ac. 1.1 Ac. 1.0 Ac.1.0 Ac. 1.0 Ac. 2.3 Ac. 1.0 Ac. 1.0 Ac. 1.2 Ac. 1.0 Ac. 1.0 Ac. 1.7 Ac. 1.0 Ac. 1 2 4 3 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 90 91 92 93 94 95 96 89 88 87 86 85 84 83 828180 79 78 77 7675 64 65 66 67 68 69 70 71 72 73 74 43 42 41 40 39 38 37 36 35 34 25 26 27 28 29 30 31 32 33 WETLAND A 1.30 ACRES WETLAND D1 0.71 ACRES WETLAND D2 0.48 ACRES WETLAND 1 38.89 ACRES WETLAND 2 0.27 ACRES WETLAND L 0.14 ACRES WETLAND 3 0.65 ACRES WETLAND 4 0.46 ACRES WETLAND 5 3.30 ACRES EXISTING POND 1.17 AC. 1.3 Ac. 1.4 Ac. 1.8 Ac. 1.8 Ac. 97 1.2 Ac. 1.2 Ac. 1.3 Ac. 1.1 Ac. 1.1 Ac. 1.1 Ac.1.1 Ac.1.1 Ac. 1.1 Ac. 1.1 Ac. 1.7 Ac. 1.3 Ac. 1.3 Ac. 1.6 Ac. 1.8 Ac. 1.7 Ac. 1.4 Ac. 1.9 Ac. 2.5 Ac.1.9 Ac.1.9 Ac. 1.5 Ac. 1.5 Ac. 1.5 Ac. 1.7 Ac. 2.0 Ac. 4.4 Ac. 2.3 Ac. 98 Landform and Site to Finish are registered service marks of Landform Professional Services, LLC.R R in collaboration with: Concept Plan Submittal Holzem Site • Elk River, MN • 06.19.2024 Summary Total Project Area:197.13 acres Wetland Area:47.08 acres Wetland Buffer Area:7.91 acres Existing Pond Area:1.17 acres Developable Area:140.97 acres R.O.W.:60ft Cul-de-sac R.O.W. Radius:60ft Proposed Design Parameters R1-b Zoning ·Nonsewered ·1 Ac. Minimum ·160 ft. Minimum Lot Frontage Front Yard Setback:35ft Rear Yard Setback:25ft Side Yard Setback: 10ft Garage Side Setback:5ft Total Lots:98 Total Length of New Roads: 11870 LF Landform® and Site to Finish® are registered service marks of Landform Professional Services, LLC. NORTH 0 200 Page 181 of 197