Loading...
4.3 SR 10-21-2024The Elk River Vision A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and community engagement that encourages and inspires prosperity Request for Action To City Council Item Number 4.3 Meeting Date October 21, 2024 Prepared By Ryan Sandhoefner, Engineering Project Manager Item Description Pay Estimates Reviewed by Justin Femrite Lori Stich Joe Stremcha Cal Portner Tina Allard Action Requested Approve, by motion, the pay estimate detailed below. Background/Discussion The following pay estimates have been reviewed and found to be accurate and in accordance with approved contracts. Financial Impact Project Pay Estimate # Contractor Amount Mega Loop Trail Improvements 1 Veit & Company, Inc. $265,841.09 Mission/Policy/Goal Responsible for every dollar - good stewards Attachments 1. Pay App 1 - Veit & Company, Inc. Page 36 of 294 Page 37 of 294 Contractor's Application for Payment 0R1.129679 SP 204-090-005 1 From 08/27/24 to 09/27/24 A C D E F F1 F2 G H I J Item Quantity Units Unit Price ($) Value of Bid Item (C X E) ($) Quantity Previous Estimate Value Previous Estimate Estimated Quantity Incorporated in the Work Value of Work Completed to Date (E X G) ($) 1 1.00 L S 66,300.00 66,300.00 0.50 33,150.00 33,150.00 2 15.00 E A 339.00 5,085.00 15.00 5,085.00 5,085.00 3 19.00 E A 51.00 969.00 20.00 1,020.00 1,020.00 4 4.00 E A 281.00 1,124.00 2.00 562.00 562.00 5 37.00 L F 30.25 1,119.25 21.00 635.25 635.25 6 227.00 L F 22.25 5,050.75 125.00 2,781.25 2,781.25 7 46.00 S Y 27.75 1,276.50 44.00 1,221.00 1,221.00 8 229.00 S Y 8.00 1,832.00 60.00 480.00 480.00 9 20.00 L F 63.50 1,270.00 - - - 10 2,699.00 CY 24.00 64,776.00 2,453.00 58,872.00 58,872.00 11 2,025.00 C Y 7.97 16,139.25 1,149.00 9,157.53 9,157.53 12 204.00 C Y 71.50 14,586.00 - - - 13 204.00 C Y 2.30 469.20 - - - 14 4,267.00 C Y 7.90 33,709.30 2,968.00 23,447.20 23,447.20 15 42.00 C Y 139.00 5,838.00 - - - 16 206.00 TON 61.00 12,566.00 - - - 17 1,884.00 C Y 40.50 76,302.00 1,047.00 42,403.50 42,403.50 18 1,783.00 TON 97.50 173,842.50 - - - 19 540.00 S F 55.50 29,970.00 - - - 20 4.00 E A 202.00 808.00 2.00 404.00 404.00 21 4.00 E A 2,450.00 9,800.00 - - - 22 4.00 E A 2,660.00 10,640.00 4.00 10,640.00 10,640.00 23 132.00 L F 65.50 8,646.00 8.00 524.00 524.00 24 163.00 L F 78.50 12,795.50 112.00 8,792.00 8,792.00 25 10.00 L F 269.00 2,690.00 4.00 1,076.00 1,076.00 26 24.00 L F 548.00 13,152.00 - - - 27 4.00 E A 808.00 3,232.00 2.00 1,616.00 1,616.00 28 6.00 L F 942.00 5,652.00 - - - 29 3.00 E A 2,390.00 7,170.00 4.00 9,560.00 9,560.00 EXCAVATION - COMMON (EV) STABILIZING AGGREGATE (CV) SUBGRADE EXCAVATION (EV) REMOVE PIPE CULVERTS REMOVE CONCRETE PAVEMENT Work Completed Materials Currently Stored (not in G) ($) Work Completed and Materials Stored to Date (H + I) ($) Contract Information Bid Item No. Previous Estimate SALVAGE SIGN SALVAGE CONCRETE APRON COMMON EMBANKMENT (CV) Progress Estimate - Unit Price Work Owner:City of Elk River Bolton & Menk, Inc. Veit & Company, Inc. Mega Loop Trail Improvements Owner's Project No.: Engineer's Project No.: Contractor's Project No.: Agency's Project No.: Application Period:Application No.: Engineer: Contractor: Project: Contract: 09/27/24Application Date: B 18" RC PIPE SEWER DES 3006 CL V 54" RC PIPE SEWER DES 3006 CL V CONNECT TO EXISTING STORM SEWER CONST DRAINAGE STRUCTURE DESIGN H ADJUST DRAINAGE STRUCTURE REMOVE BITUMINOUS PAVEMENT REMOVE CONCRETE PIPE INSTALL CONCRETE APRON 12" RC PIPE APRON (WITH TRASH GUARD) 15" RC PIPE APRON (WITH TRASH GUARD) 12" RC PIPE SEWER DES 3006 CL V 15" RC PIPE SEWER DES 3006 CL V AGGREGATE SURFACING CLASS 2 (CV) AGGREGATE SURFACING SPECIAL (CV) AGGREGATE BASE CLASS 5 (CV) TYPE SP 9.5 WEARING COURSE MIX (2,B) MODULAR BLOCK RETAINING WALL EXCAVATION SPECIAL (6" TOPSOIL STRIP)(EV) Original Contract MOBILIZATION GRUBBING Description REMOVE CURB & GUTTER Unit Price EJCDC C-620 Contractor's Application for Payment (c) 2018 National Society of Professional Engineers for EJCDC. All rights reserved.1 of 2 Page 38 of 294 Contractor's Application for Payment 0R1.129679 SP 204-090-005 1 From 08/27/24 to 09/27/24 A C D E F F1 F2 G H I J Item Quantity Units Unit Price ($) Value of Bid Item (C X E) ($) Quantity Previous Estimate Value Previous Estimate Estimated Quantity Incorporated in the Work Value of Work Completed to Date (E X G) ($) Work Completed Materials Currently Stored (not in G) ($) Work Completed and Materials Stored to Date (H + I) ($) Contract Information Bid Item No. Previous Estimate Progress Estimate - Unit Price Work Owner:City of Elk River Bolton & Menk, Inc. Veit & Company, Inc. Mega Loop Trail Improvements Owner's Project No.: Engineer's Project No.: Contractor's Project No.: Agency's Project No.: Application Period:Application No.: Engineer: Contractor: Project: Contract: 09/27/24Application Date: B Description 30 516.00 C Y 104.00 53,664.00 327.00 34,008.00 34,008.00 31 835.00 S F 32.25 26,928.75 - - - 32 181.00 L F 59.50 10,769.50 - - - 33 159.00 S F 88.50 14,071.50 - - - 34 2.00 E A 339.00 678.00 - - - 35 2.00 E A 169.00 338.00 - - - 36 1.00 L S 8,980.00 8,980.00 0.50 4,490.00 4,490.00 37 19.00 E A 254.00 4,826.00 - - - 38 3.00 H R 452.00 1,356.00 15.50 7,006.00 7,006.00 39 5.00 E A 222.00 1,110.00 - - - 40 10,428.00 L F 2.70 28,155.60 7,060.00 19,062.00 19,062.00 41 300.00 L F 3.00 900.00 1,280.00 3,840.00 3,840.00 42 4.70 ACRE 576.00 2,707.20 - - - 43 1,645.00 L B 1.40 2,303.00 - - - 44 5,096.00 S Y 2.10 10,701.60 - - - 45 4.70 ACRE 350.00 1,645.00 - - - 46 10,518.00 L B 1.50 15,777.00 - - - 47 900.00 L B 4.60 4,140.00 - - - 48 9.00 L B 56.50 508.50 - - - 49 52.00 L F 12.50 650.00 - - - 50 300.00 S F 9.00 2,700.00 - - - - - - - - - 779,719.90$ -$ 279,832.73$ -$ 279,832.73$ Original Contract Totals RELOCATE MAIL BOX CROSSWALK MULTI-COMPONENT SEEDING HYDRAULIC BONDED FIBER MATRIX SEED MIXTURE 25-151 SEED MIXTURE 32-242A 24" SOLID LINE MULTI-COMPONENT SILT FENCE, TYPE MS SEDIMENT CONTROL LOG TYPE WOOD FIBER SOIL BED PREPARATION FERTILIZER TYPE 3 ROLLED EROSION PREVENTION, CAT 25 MAILBOX SUPPORT TRAFFIC CONTROL INSTALL SIGN PRUNE TREES STORM DRAIN INLET PROTECTION RANDOM RIPRAP CLASS III 6" CONCRETE WALK CONCRETE CURB & GUTTER DESIGN B618 TRUNCATED DOMES Unit Price EJCDC C-620 Contractor's Application for Payment (c) 2018 National Society of Professional Engineers for EJCDC. All rights reserved.2 of 2 Page 39 of 294