5.2u EMRUSR 12-10-2024Elk River
Municipal Utilities
LARGE INDUSTRIAL DEMAND ELECTRIC SERVICE RATE
Available: Within Elk River Municipal Utilities (ERMU) established service territory.
Applicable to: vail h-le fer ^ Non-residential customer accounts. Existing or new Customer accounts
with actual or projected demand greater than or equal to 1 MW. A Customer account with a billing
demand of less than 1 MW for 12 consecutive months may be switched to the Demand Electric Service
Rate. The Customer accounts shall be in compliance with all policies, procedures, safety requirements,
and shall be taken through one or more meters. Not applicable to resale, standby or auxiliary service.
Character Of Service: 3-Phase Primary, 7,200/12,470 volt, AC, 60 cycles.
Special Conditions: Customer must provide a location suitable for the installation of a utility metering
cabinet(s). Customer will be responsible for providing suitable wire and connection in the utility owned
metering cabinet(s). The primary meter(s) and cabinet(s) shall be installed to service one class of
business. If additional buildings are required for a given business, they shall be interconnected by the
customer to the existing meter(s), unless an exception is approved by management. If additional meters
and services are requested by the customer, each shall be treated as a separate customer and billed
individually. A customer on the rate may qualify for integrity testing.
ERMU equipment and metering must be accessible to ERMU 24 hours per day.
Demand Service Rate:
Basic Monthly Electric Charge: $115.00 per month.
Summer Winter
Demand Charge: $ 16.25 $ 11.25 in kW / month
Energy Charge: $ 0.06962 $ 0.06962 in kWh / month
Summer Rate: Applicable during the five monthly billing periods of June — October.
Winter Rate: Applicable during the seven monthly billing periods of November — May.
Rates are subject to application of Power Cost Adjustment (PCA).
Federal, state, and local taxes may apply.
Minimum Bill: Maximum billing demand during previous twelve months times 3.0% of the demand
charge, or the actual demand multiplied by the demand charge, whichever is greater plus $1.00 per kW
per month of excess transformer capacity requested by customer.
Page 1 of 2
110
Large Industrial Demand Electric Service Rate
Determination of Billing Demand: The billing demand shall be the highest measured demand (corrected
for power factor if required) during any fifteen (15) minute period occurring in the current billing period.
Fluctuating Loads: Customers operating equipment having a highly fluctuating or large instantaneous
demand, such as welders and X-ray machines, shall be required to pay all non -betterment costs of
isolating the load from the balance of ERMU's system so that the load will not unduly interfere with
service on ERMU's lines. No motor larger than ten (10) HP (or 7.355 kW) will be allowed to be across -
the -line started without notification and written authorization from ERMU.
Power Factor Adjustment: Power factor adjustments may be made in the billing demand, when the
power factor, as determined by test, at the time of the Customer's maximum use is less than 98%. If the
power factor, as measured by ERMU's electric department, is lower than 98%, the monthly demand
charge may be multiplied by the ratio 98% divided by the measured power factor, or at ERMU's option,
the power factor may be corrected at the Customer's expense.
Billing and Terms of Payment: See ERMU Service Policies Policy (Billing Due Dates, and Penalties and
Delinquent Notices.)
Terms and Conditions:
1. Usage may be fractionalized on the actual days of service for application of a change in rate.
2. Service will be furnished pursuant to ERMU's rules.
3. Extensions made for service under this schedule are subject to the provisions of ERMU's rules
governing Extension of Service and Facilities.
4. The rates set forth herein may be modified by the amount of any governmental changes
imposed and levied on transmission, distribution, production, or the sale of electrical power.
5. Exceptions by management approval only.
Adopted seeefflbeF 12, zSz3December 10, 2024
Effective January 1, POP42025
Page 2 of 2
111