Loading...
5.2. SR 02-21-2006 City of Elk River REQUEST FOR COUNCIL ACTION Agenda Section Meeting Date Administration February 21, 2006 Item Description Resolution Authorizing Staff to Submit an Application for a MN DNR Outdoor Recreation Grant-Public Hearin Item Number 5.2. Prepared by Bill Maertz, Parks and Recreation Director Reviewed by Introduction The Parks and Recreation Department would like to apply for a grant through the DNR Outdoor Recreation Grant Program. This grant is due to the DNR by March 31, 2006 and, if awarded, would be for work performed in 2007 and 2008. Discussion Hillside Park has become a very popular facility for mountain biking with a regional draw. We have received many letters of support for improvements at this facility. The total proposed budget is $199,022. The grant would cover 50% of the project expenses. Project includes two shelters, accessible water, play area, benches, picnic tables, grills, garbage cans, signs, and paving. Financial Impact Financial impact would be 50% of the total budget over two years from the Park Dedication Fund. If the grant is awarded, the park would have facilities that would need to be maintained and the funding source would be the Park Maintenance budget. Attachments · Site Plan · Proposed Budget · Estimated Project Operation and Maintenance · Resolution Action Requested Staff requests authorization to apply for a grant under the DNR Outdoor Recreation Grant Program. Council Action Motion by _ Second by _ Vote Follow Up C: \Docwnents and Settings \tallard\Local Settings \ Temporary Internet Files \ OLKF\REQUEST COUNCIL ACTION Hillside Park.doc I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I (I w C) <( z C) (f) (f) -.-J -.-J <( f-- (f) o w > <( D- O N ~ cod ~ O~ ....... ~ ~ 0.. ~ cod .c ;;; (j) U .;: ~ v ~ U ~ 00 (j) <Zl ~ ~ i ~ ~~ ~2 8~ Hillside Park Improvements Proposed Budget Facility Description Estimated Cost Expected Completion Date Two shelters-16x30 and Install two shelters including concrete pad $48,990 August 31, 2007 16x16 underneath Bring water to site Remove bituminous pavement, saw cut bituminous, $11,623 August 31, 2007 saw cut concrete curb, remove concrete curb, install I" copper water service, connect to existing HDPE watermain, curbstop, aggregate base cl V, bituminous pavement, concrete curb, restore green areas Paved access road/parking Pave access road and 20 stall parking area $70,000 August 31, 2008 Landscaping Add shade trees around parking area and add shrubs $ 3,000 August 31, 2008 and rocks around sign area Entrance sign and kiosk $ 7,925 August 31, 2007 Drinking fountain/jug filler Stone fountain with attached jug filler $ 2,590 August 31,2007 4 benches $ 2,600 August 31, 2007 Rock climbing play area Two play structures-Mt. Hood and Mt. $40,304 August 31, 2007 Kilimanjaro rock climbers including 12" depth wood fiber Screening for portable 3 sided screening for portable toilets made out of $ 3,000 August 31, 2007 toilets natural wood 6 Picnic tables, 4 garbage 6 heavy duty picnic tables - 2 ADA compliant and 4 $ 8,990 August 31, 2007 cans, grills standard tables, 4 garbage cans, 2 family-sized grills Total Cost $199,022 Hillside Park Improvements Proposed Maintenance and Replacement Budget Quantity Item Description Estimated Estimated Cost Replacement /Maintenance Date 6 Picnic Tables - Replace in 20 yrs. $7,380 August 31, 2027 2 Grilles - Replace in 10 yrs. $911 August 31, 2017 4 Benches - Replace in 20 yrs. $3,748 August 31, 2027 4 Garbage Cans - Replace in 20 yrs. $2,460 August 31, 2027 2 Shelters - Replace in 40 yrs. $108,000 August 31, 2047 Seal Coat Drive and Parking Area - $2,428 August 31, 2016 Once every 8 yrs. 1 Bike Rack - Replace in 20 yrs. $615 August 31, 2027 1 Drinking Fountain - Replace in 20 $4,028 yrs. 1 Portable Toilet Screening - Repaint $100 August 31, 2017 every 10 yrs. 1 Portable Toilet Screening - Replace $3,642 August 31, 2027 every 20 yrs. 2 Signs/Kiosk - Revarnish every 5 yrs. $50 August 31, 2011 2 Signs/Kiosk - Replace every 20 yrs. $12,973 August 31, 2027 2 Play Structure Components $58,362 August 31, 2022 Annual Expenses Water $200 Filler for Play Structure Area $50 Portable Toilets $950 Repairs as Needed $1,000 RESOLUTION 06- A RESOLUTION OF THE CITY OF ELK RIVER A RESOLUTION AUTHORIZING STAFF TO SUBMIT AN APPLICATION FOR A MINNESOTA DNR OUTDOOR RECREATION GRANT WHEREAS, The City of Elk River recognizes the importance of providing high quality recreational resources to the community; and WHEREAS, The City of Elk River recognizes the need to partner with other governmental agencies in order to improve natural areas in a cost effective manner; and WHEREAS, the City of Elk River acts as legal sponsor for the project contained in the Outdoor Recreation Grant Program Application to be submitted on March 31, 2006 and that the Director of Parks and Recreation is hereby authorized to apply to the Department of Natural Resources for funding of this project on behalf of the City of Elk River; and WHEREAS, the City of Elk River has the legal authority to apply for financial assistance, and financial capability to meet the match requirement and ensure adequate construction, operation, maintenance, and replacement of the proposed project for its design life; and WHEREAS, the City of Elk River has not incurred any development costs described on Item 5 of the grant application. NOW, THEREFORE, BE IT RESOLVED that upon approval of its application by the state, the City of Elk River may enter into an agreement with the State of Minnesota for the above- referenced project, and that the City of Elk River certifies that it will comply with all applicable laws and regulations as stated in the grant agreement including dedicating the park property for outdoor recreation uses into perpetuity. BE IT FURTHER RESOLVED that the Director of Parks and Recreation is hereby authorized to execute such agreements as are necessary to implement the project on behalf of the applicant. Passed and adopted by the City Council of the City of Elk River this 21st day of February 2006. Stephanie Klinzing, Mayor ATTEST: Joan Schmidt, City Clerk