6.1e EMRUSR 02-11-2025Elk River
Municipal Utilities UTILITIES COMMISSION MEETING
TO:
FROM:
ERMU Commission
Thomas Geiser— Operations Director
MEETING DATE:
AGENDA ITEM NUMBER:
February 11, 2025
6.1e
SUBJECT:
Staff Update
ACTION REQUESTED:
None
DISCUSSION:
• Working through the second round of maps for the new GIS mapping system that we
plan to move forward with in the future. Maps 1 through 60 are complete.
• Diversified inspected our line trucks during the week of January 20.
• ERMU has chosen Leidos Engineering for our third -party reviews on all pole
attachments.
• ERMU has chosen DGR Engineering for its 2025 Fault Current/Fuse Coordination Study.
• Tuesday, January 28 a vehicle struck a regulator bank along Highway 10, east of
Broadway Pizza, requiring crews to shut down the feeder for ten minutes. The accident
started a grass fire as well, picture below.
• On Sunday, January 26, ERMU had another Cooper/Eaton Switchgear failure.
• Ordering material for the 2025 construction season.
• Working with JonnyPops on their third service needs.
Page 1 of 1
122