11.1 SR 02-03-2025 Request for Action To Item Number City Council 11.1 Meeting Date Prepared By February 3, 2025 Ryan Sandhoefner, Engineering Project Manager Item Description Reviewed by Specht Farm Traffic Impact Study Review Justin Femrite Cal Portner Tina Allard Action Requested Discuss the traffic impact study surrounding the proposed development of Specht Farm. Background/Discussion As conversations regarding the development of the Specht Farm site increase, traffic impacts on the local system and state highway are actively being studied. With the long-term vision of the corridor laid out in the previously completed TH10 Corridor Study, the group is determining the best short and mid-term layout for the system to effectively manage the traffic load added due to development. The development is expected to include approximately 538 single-family homes, along with some commercial acreage. The main discussion point is to determine the safest interim primary access configuration across from 165th Ave NW. It is anticipated this access will be removed once the long-term goal of a full-access interchange is constructed to the north. The developer's traffic engineer will be in attendance to present the findings of their traffic impact study, as well as a MnDOT representative to discuss their analysis. Financial Impact N/A Mission/Policy/Goal Responsibly grow Attachments 1. MnDOT Letter 2. Specht Farm Traffic Impact Study 3. Specht Farm Traffic Study Overview 4. 3-4 J Turn Access Option Exhibit The Elk River Vision A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and community engagement that encourages and inspires prosperity Metropolitan District 1500 County Road B-2 West Roseville, MN 55113 January 29,2025 Justin Femrite Public Works Director/Chief Engineer City of Elk River 13065 Orono Parkway Elk River, MN 55330 SUBJECT:Specht Farm Traffic Impact Study MnDOT Review #STUDY25-001/S25-001 thth SW side of US 10 from 167Ave. to South of 165Ave. NW Elk River SherburneCounty Dear Justin Femrite Thank you for submitting the Traffic Impact Study(TIS)forthe Specht Farm/Capstone Homes development. The Minnesota Department of Transportation (MnDOT) has reviewed the study, and has the following comments: Intersection Control: MnDOT concurs with page 21 of the TIS which states that “The signalized access option is not recommended due to high costs to construct additional Highway 10 through lanes for an interim condition, increased crash potential, minor movement right angle crash potential and reduced corridor mobility.” MnDOT has removed several signalized intersectionson Highway 10 due to serious crash issues. The TIS also states that “A ¾ J-Turn intersection is recommended for 2038 Build Conditions.” Construction of unsignalized J-turn intersections in Minnesota have proven to reduce fatalities by 70% and injury crashes by 42%by eliminating risky movements across several lanes of traffic (preventing “T-bone”crashes). Additional information on J-Turns (Including truck movementsthrough J-turns) is located at: J-turns -MnDOT . Further review through the layout review process (below) is needed to determine design requirements including whether to allow left turns directly from Highway 10 to th Specht’s Lane/165Ave. Based on anticipated current and future trafficvolumesat the intersection MnDOT does not anticipate that the J-turn intersection will need to be signalized by 2038. MnDOT will likely require acceleration lanes for motorists turning right from Specht’s Lane to southbound Highway 10. The existing acceleration lane on the northbound side would be a complimentary design. th Additionally, with the J-turn configuration, those motorist turning onto Highway 10 from 165Ave. NW or Specht’s Lane that will be using the J-turns can turn directly into the turn lane without having to weave through traffic. Page 1of 3 Please contact Ashley Hansen, Traffic Safety, at 651-234-7815 or ashley.hansen@state.mn.us with any questions. Intersection Control Evaluation (ICE) Letter: The TIS states that “It is recommended that MnDOT complete a detailed Intersection Control Evaluation (ICE) report for this intersection.” For the unsignalized J-turn, an ICE letter is needed, which is an abbreviated ICE report. Since the intersection improvements are a result of private development, the developer will need to write the report. For questions concerning the ICE letter, please contact Ashley Hansen at 651-234-7815 or ashley.hansen@state.mn.us. Traffic Modeling Files: Please provide the traffic modeling files for MnDOT to review. Please send to brandi.kastner@state.mn.us Noise MnDOT's policy is to assist local governments in promoting compatibility between land use and highways. Residential uses located adjacent to highways often result in complaints about traffic noise. Traffic noise from this highway could exceed noise standards established by the Minnesota Pollution Control Agency (MPCA), the U.S. Department of Housing and Urban Development, and the U.S. Department of Transportation. Minnesota Rule 7030.0030 states that municipalities having the authority to regulate land use shall take all reasonable measures to prevent the establishment of land use activities, listed in the MPCA's Noise Area Classification(NAC), anywhere that the establishment of the land use would result in immediate violations of established State noise standards. MnDOT policy regarding development adjacent to existing highways prohibits the expenditure of highway funds for noise mitigation measures in such developed areas. The project proposer is required to assess the existing noise situation and take the action deemed necessary to minimize the impact to the proposed development from any highway noise. If you have any questions regarding MnDOT's noise policy please contact Natalie Ries in Metro District’sNoise and Air QualityUnitat 651-234-7681 or natalie.ries@state.mn.us. Design Layout guidelines: Any intersection development of this magnitude with need to be reviewed through the Level 1 Layout review process. The MnDOT Metro Area Engineer, Mike Kronzer, will be able to guide you through the layout review process. The following website provides layout design guidance and identify layout requirements: http://www.dot.state.mn.us/design/geometric/index.html The first link under Guidance is helpful, as well as the Design Resources tab. Page 2 of 3 Review Submittal Options MnDOT’s goal is to complete reviews within 30 calendar days. Review materials received electronically can be processed more rapidly. Do not submit files via a cloud service or SharePoint link. In order of preference, review materials may be submitted as: 1. Email documents and plans in PDF format to metrodevreviews.dot@state.mn.us. Attachments may not exceed 20 megabytes per email. Documents can be zipped as well. If multiple emails are necessary, number each message. 2. For files over 20 megabytes, upload the PDF file(s) to MnDOT’s Web Transfer Client site: https://mft.dot.state.mn.us. Contact MnDOT Planning development review staff using the same email abovefor uploading instructions andsend an email listing the file name(s) after the document(s) has/have been uploaded. You are welcome to contact me at tod.sherman@state.mn.us with any questions. Sincerely, Tod Sherman Metro Planning Director Copy sent via email: Matt Barker, Director-Land Development, Brandi Kastner, Traffic Safety Capstone Homes Katie Schmidt, CEO/Traffic Engineer, SSTS Zach Carlton, Elk River Community LLC Development Director Buck Craig, Permits Luke Wehseler, Project Development, D3 Mike Kruse, Design Mike Kowski, MaintenanceJim Henricksen, Modeling Jason Swenson, Water Resources Suzy Scotty, Ped/BikePlanning Forest Paulson, Right of Way Amrish Patel, Transit Ashley Hansen, Traffic SafetyScott Shaffer, Planning Natalie Ries, Noise Cameron Muhic, Planning Mike Kronzer, Area Engineer/Coordinator Joe Widing, Metropolitan Council Page 3 of 3 Esbgu Esbgu Esbgu Esbgu ¸ ¸ ¸ Esbgu Esbgu ¸ ¸ ¸ Esbgu Esbgu Esbgu Esbgu ¸ ¸ ¸ Esbgu ¸ ¸ Esbgu Esbgu Esbgu Esbgu Esbgu Esbgu Esbgu Esbgu th ¾ J Turn Access Option – 187 Ln and Hwy 65