6.1g ERMUSR 03-11-2025UTILITIES COMMISSION MEETING TO:FROM: ERMU Commission Mike Tietz – Technical Services Superintendent MEETING DATE: AGENDA ITEM NUMBER: March11, 2025 6.1g SUBJECT: Staff Update ACTION REQUESTED: None DISCUSSION: • In February, the locators processed 111 locate tickets. These consisted of 82 normal tickets, 7 emergency tickets, 18 updated tickets, 1 meet, 1 planning, and 2 cancellations. This resulted in an 8.3% decrease in tickets from the previous month and a 0.9% increase from the prior February. • Staff continues to research the GPS solutions from locating equipment vendors. The locators are currently demoing the Subsite unit from Ditch Witch. We will also plan on demoing the unit from Radio Detection when it becomes available. • Electrical technicians completed 98 service order tasks, updated the power bill, addressed customer meter issues and any off-peak concerns. • The Advanced Metering Infrastructure (AMI) residential water meters and residential electric meters continue to be installed in new services. The electrical technicians have been busy changing out our Automated Meter Reading meters to AMI for off-peak around the system. Approximately 5000 water meters and 9000 electric meters are currently active within our AMI system. • Staff have successfully completed oil replacement/dehydration on seven switchgears so far utilizing the trailer-mounted oil collection system. Contaminated oil is reconditioned overnight and then used in another switchgear the next day. Tests of oil in completed units shows the moisture levels returning to acceptable levels. We are looking at extending the timeframe on this project to recondition the oil on as many switchgear as possible by the end of March. • Our monthly peak was 49.45 MW on February 17 at 12:04pm. ______________________________________________________________________________ Page 1 of 1 150