Loading...
5.4 ERMUSR 04-08-2025Elk River Municipal Utilities UTILITIES COMMISSION MEETING TO: FROM: ERMU Commission Mike Tietz —Technical Services Superintendent MEETING DATE: AGENDA ITEM NUMBER: April 8, 2025 5.4 SUBJECT: Advanced Metering Infrastructure Update ACTION REQUESTED: None DISCUSSION: As of April 3, Allegiant has completed 4,054 residential water meter replacements and 523 retrofits. Allegiant has pulled their staff from the residential part of the project due to intermittent appointments. Existing scheduled appointments will be completed by an Allegiant technician who is still working on the commercial project. ERMU staff will be scheduling and completing the remaining residential meter exchanges as time allows. The residential water meter exchange work is approximately 92% complete. To date we have made 86 residential repairs utilizing master plumber Karsten Nelson (Archer Plumbing) with a running total of $30,610.36 in repair costs. In April 2024, the Commission voted to absorb these residential costs at an estimate of $300 per job for approximately 100- 150 homes, totaling between $30-$45K. Allegiant's commercial meter subcontractor (Archer Plumbing) has completed 244 commercial meter replacements and 31 retrofits as of April 3. The commercial water meter exchange work is about 45% complete. As of April 3, Allegiant has completed 9,547 residential electric meter replacements. Allegiant has removed staffing from the residential part of the project due to a lack of available meters which stems from a supply chain issue with our supplier. ERMU staff will complete these meter replacements once meters become available. The residential electric meter exchange work is about 78% completed. We are still waiting for the delivery of our commercial electric meters for the project. ERMU staff will be utilized for all commercial electric meter installations and will be testing current transformers/potential transformers during each visit to verify equipment is working correctly and accurately. We are still waiting for the remainder of our residential meters, 3S, 4S & 2S- 320A, which are expected in Q2 of 2025. Overall, approximately 85% of the total available AMI meters have been installed. Page 1 of 1 1: