• Staff is working through the second round of maps for the new GIS mapping system that
we plan to move forward with in the future. Maps 1 through 60 are complete.
• The dehydration of the existing Cooper/Eaton switchgear is going well.
• Staff is still dealing with the lack of communication and action taken on the reclosers
that were recalled. We are waiting for all 30 of our units to be repaired at this time.
• ERMU received its new Vac-Tron and trailer the week of March 24.
• We are working on lining up projects for 2025 construction season.