8.2 SR 04-07-2025[ITEM_HEAD] To City Council Meeting Date April 7, 2025 Item Description LSE Architects Letter of Engagement - Northbound and Cannabound Request for Action Item Number 8.2 Prepared By Joe Stremcha, Business Services Director/Assistant City Administrator Reviewed by Joe Audette Cal Portner Tina Allard Action Requested Approve, by motion, the Letter of Engagement for professional architectural services with LSE Architects Background/Discussion The Letter of Engagement between LSE Architects (Architect) and City of Elk River (Owner) provides standard and special professional architectural services for Northbound and Cannabound to be located in the City of Elk River - site(s) to be determined. The architect understands that there is a city building design team of city staff that will be part of the review and approval process. Financial Impact The architect requires a $15,000 retainer to begin services upon approval of the engagement agreement. Retainer is included in the total fee. Mission/Policy/Goal Meet changing needs - agile Attachments I . Letter of Engagement_03.32.25 2. Exhibit A - LSE Hourly Rates _2025 3. Exhibit B - LSE Reimbursable Expenses_2025 The Elk River Vision A welcoming community, with revolutionary and spirited resourcefidnm, exceptional service, and community P� d W E R E D 0d engagement that encourages and inspires prosperityINPaU 249 is don= GVEW L A IR C INN II IF IE C IF March 32, 2025 City of Elk River Attn: Mr. Joe Stremcha 13065 Orono Parkway Northwest Elk River, MN 55330 Subject: Northbound (Liquor) and Cannabound (Cannabis) Retail Stores Professional Architectural Services Letter of Engagement Dear Joe and team: Thank you and your team for the kind words in our last phone conversation — we are thrilled. Outlined below is a Letter of Engagement between LSE Architects (Architect) and City of Elk River (Owner) to provide standard and special professional Architectural Services for a new Liquor Store and a new Cannabis Store to be located in the City of Elk River - site(s) to be determined. Architect understands that there is a City Building Team of city staff that will be part of the review and approval process. PROJECT DESCRIPTION The Owner has begun reviewing sites for Northbound Liquor Retail Store and Cannabound Cannabis Retail Store in the City of Elk River. Architect understands that there are three relevant project scenarios. Scenario One: There is one new consolidated store (both liquor and cannabis offerings). Scenario Two: There are two separate newly constructed buildings — one for liquor and one for cannabis. Scenario Three: There are two separate buildings, the liquor store to be newly constructed and the cannabis store will be a tenant improvement (TI) within an existing structure. These options will be determined in the first 30 days of the project. Engineering services will include civil engineering and landscape design, structural engineering, MEP engineering, as well as added specialty services regarding low voltage engineering, B3 level building integration, and building energy modeling. The following project components are included in the design scope of work: A. Site: 1. Site assessment and placement to verify site capability (fit plan) 2 Review building size, parking count, delivery area, trash, green space, transformer location, and storm water management B. Building: 1. Northbound: retail space, counter check out, restroom, back of house, mechanical/janitor 2 Cannabound: retail space, counter checkout, restroom, back of house, mechanical/janitor 3. Both buildings to review utility capacity, structural systems, MEP systems, energy alignment with codes 1401 Glenwood Ave. LSE -Arch itects.corn Minneapolis, IVIN 55405 (612) 343 10.10 Page 182 of 249 Page 2 GENERAL CONSTRUCTION BUDGET Owner has shared that an initial general construction budget is as follows: Scenario One: Northbound I Cannabound Combined: $6,000,000 Scenario Two: Northbound stand alone: $4,000,000 Scenario Two: Cannabound (new) stand alone: $2,000,000 Scenario Three: Cannabound (TI) $1,000,000 PROJECT SCHEDULE Owner would like to proceed expeditiously for a project timeline as follows: • April 7, 2025 City of Elk River— City Council Meeting • Spring 2025 Programming/ Site assessment/ Concept Design/ Planning/ Select CM • Summer 2025 Design/ Construction Documents (Specifications) • Fall 2025 Bidding/ CM award/ Groundbreaking • Winter 2025/ 2026 General Construction • Spring 2026 Cannabound Substantially Complete • Summer/ Fall 2026 Northbound Substantially Complete SCOPE OF SERVICES Architect will provide the following: Project will be organized into three phases as follows: A. Phase I: Programming/ Site Assessment/ Concept Design/ Planning Architect will complete the concept design required to achieve city entitlements (if required). This package will be used for estimating verification as well. Specific scope of services in this phase may include: 1. Confirm project direction, work scope, entitlement requirements (if any) and issues impacting the project development. This will include a site visit to perform a existing site walk through. 2 Confirm a building program of spaces (with Owner) 3. Assess site data for fit plan. Key elements include - site access, service, entry points and parking. 4 Develop site plan layout with floor plan diagram based on approved program. 5. Exterior building massing, roof form, exterior expression (materials) and overall 3D image. 6. Interior Design layout indicating primary materials and branding elements 7. Begin services on B3 process and discussion sustainable elements to be integrated 8. Anticipate up to one 90-minute meeting with city officials (code, zoning - as needed) 9. Anticipate up to two 90-minute public engagement meetings with City Building team 1Q Anticipate up to four 90-minute Owner meetings (present plans, building design and interior design elements for review and approval) 11. Provide concept level price estimate range to review with Owner budget 12 Deliverables may include: i. Architectural site plan, building floor concept diagram, code plan ii. Exterior building elevations (four major facades) and 3D massing forms iii. Entitlement documents (civil engineering and landscape design — if needed) 13. Structural and MEP narrative (system description) 14 Assist Owner in selection of construction manager (CM) (as required) III,,. IE I Il -- II T il:..: T , IIINC. 1401 Glenwood Ave. 1...5E Arclhitects.corn Minneapolis, MN 5.5405 (612) 343.1010 Page 183 of 249 Page 3 B. Phase II: Design and Construction Documentation (CD's) Architect will complete the approved design and achieve final construction documentation for the Owner's CM to bid and subsequently submit for permitting and eventual construction. Specific scope of services in this phase may include: 1. Architectural/ Interior Design/ consultant CD's and Specifications (Project Manual) 2 Review final pricing (pro vided by Owner CM 3. Anticipate up to three 90-minute meetings with Owner team 4 Complete B3 level review process and energy modeling C. Phase III — Bidding and Construction Administration Architect will provide standard administrative services to observe and administer the construction as described in the documents. Specific scope of services in this phase may include: 1. Attend one 90-minute governmental agency review meeting (as needed). Additional required meetings will be billed on an hourly basis. 2 Assist the Owner's CM in successfully attaining the required building permits. 3. Provide monthly site visits through the duration of construction to observe construction adherence with design intent. Architect assumes 9 - 10-month construction duration. 4 Review and approve required shop drawings and product submittals related to the architecture and interior design items from the specifications. 5. Provide coordination of RFI's and responses to Owner's CM. 6. Review monthly contractor's Applications for Payment to verify the pay requests are in alignment with the work installed or stored on the construction site. 7. Provide final construction observation and project punch list upon completion of construction. PROPOSED COMPENSATION Based on the project description and scope of services listed within this proposal, Architect proposes to provide services for a stipulated sum amount as shown below (depending on option selected). A Project Invoice Schedule of progress/ payments will be created once the preferred Scenario is selected. Option Fee (base) Reimbursable Expenses Total Base Scenario One $423,550.00 $4,200.00 $427,750.00 Scenario Two $460,500.00 $5,000.00 $465,500.00 Scenario Three $395,150.00 $4,500.00 $399,650.00 Added special fee items include (in addition to fee structure noted above): Low Voltage (AV/ security/ data) $ 9,250.00 B3 level process Energy Modeling (exterior envelope) 31,250.00 28,250.00 Please see the attached EXHIBIT - A for a description of anticipated project related reimbursable expenses. This includes such things as renderings, mileage, photocopies and other project related materials. Architect requires a $15,000.00 (Fifteen Thousand Dollarsandno%nts) retainer to begin services upon signature of this engagement agreement. Retainer is included in the total fee. As discussed, LSE will execute a formal AIA B101 Owner -Architect agreement for the full scope services through project duration once this letter is signed. III,,. IE I IllyUI'TIIE..: "r u IIIN . 1401 Glenwood Ave. 1...5E Ardhitects.corn Minneapolis, MN 5.5405 (612) 343.1010 Page 184 of 249 Page 4 LSE anticipates beginning immediately after receiving a signed Letter of Engagement and the retainer. ASSUMPTIONS AND CLARIFICATIONS • Once the site is selected - Owner to provide site surveys showing boundaries, easements, topography, utilities, roadways, existing construction/buildings, etc. • Owner to provide geotechnical (soil,boringreport) information for use in design and documentation process. This information is critical to get design team moving. • A CM, once selected, will provide design and documentation level construction pricing based on knowledge of the local construction market. Architect to review this information with Owner. • Once site is selected - Owner to verify utility capacity. • Furniture/ Fixtures/ Equipment (FF&E) is limited to initial conversation in this engagement letter. LSE wants to discuss with you and your team in detail about full services of specifications, selection, and administration of this item. On behalf of LSE, we appreciate the opportunity to serve the City of Elk River on the design and ultimate construction of this important project and we look forward to creating a dynamic solution for your team. Please contact us should you have any questions or comments related to this Letter of Engagement. If this engagement letter meets with your approval, please sign below and return one copy plus the retainer to our offices for our records. LSE will work to develop an AIA B101 agreement for full execution and signature. LSE Architects Inc. uintin J. Scott, , AIA President I Principal Architect Approved: Brian Tempas, AIA Principal I Sr. Architect City Representative (title) Date Cc: Mohammed Lawal, FAIA Brenda West, Interior Designer Attachments: EXHIBIT -A LSE Reimbursable Expenses EXHIBIT - B LSE Hourly Rates III,,. IE' IIh'�III ril:..:c" , III 1401 Glenwood Ave. Minneapolis, MN 5.5405 I...SE Ardhftects.corn (612) 343.1010 Page 185 of 249 I S don= 4RV= L A IR C INN II IF IE C IF S EXHIBIT A - LSE HOURLY RATES Category/Position Billing Rate Description of Category Principal $250 - Principals who lead client projects Senior Professional $150 - $200 - All registered or licensed professionals with 10 years or more experience - All personnel in equivalent roles in related professional disciplines in which there is no registration, but who have 15 years experience in their field including 10 years experience in leadership roles in those related disciplines. Examples of these disciplines are: Construction Administration, Design, Technology or similar areas of expertise. Professional Professional Support Technical Clerical Effective January 1, 2025 Subject to Periodic Adjustment $100 - $125 - New registrants and all registered professionals with less than 10 years since registration - Non -registered Architectural or Design personnel who have more than 15 years experience in their professional discipline and are in direct professional leadership roles in their field. - All personnel in equivalent roles in related professional disciplines in which there is no registration, but who have 15 years experience and are in direct leadership roles in their field. Examples of these disciplines are: Construction Administration, Design, Technology or similar areas of expertise. $85 - $100 - New professional degreed graduates and interns who are not yet registered - Non -registered Architectural or Design personnel who have 10 years experience in their professional discipline under the supervision of registered professionals or related discipline professionals. All personnel in related professional disciplines in which there is no registration, but have 10 years experience in their field. Examples of these disciplines are: Construction Administration, Design, Technology or similar areas of expertise and work under the supervision of others in their field. - Drafters, CADD technicians, Designers and similar technicians without registration, but with 10 years experience in their professional support field $75 - Non -registered Architectural or Design personnel who have less than 10 years experience in their professional discipline. - All personnel in related professional disciplines in which there is no registration, but have less than 10 years experience in their professional support field. - Drafters, CADD technicians, Designers and similar technicians without registration, but with less than 10 years experience in their professional support field. - All Administrative support, clerical and word processing personnel with 10 years experience. $50 - All Administrative support, clerical and word processing personnel with less than 10 years experience. II....S IIE.:, A IR C IH III "'r IE' "'Ir u IIINC. 1401 Glenwood Ave. LSE-Archil:ects.com Minneapolis, MN 55405 (612) 343.1010 Page 186 of 249 EXHIBIT B - LSE REIMBURSABLE EXPENSES Description Rates I S don= 4NEW L IR C INN II "If IE C "If S Reproduction 8-1/2" x 11" B&W -------------------------------------------------------------------------------- $ .15 8-1/2" x 11" Color -------------------------------------------------------------------------------- $ 1.35 11" x 17" B&W ------------------------------------------------------------------------------------ $ .30 11" x 17" Color ------------------------------------------------------------------------------------ $ 2.50 HP Plotter Bond ---------------------------------------------------------------------------------- $ .75/sf CANON Plotter 7 mil Matte or Satin ---------------------------------------------------- $ 7.25/sf Foam Core Boards (depending on size) $5.00 — 15.00 Mileage (rate per mile) Prevailing Government Rate Air Fare As billed to LSE Auto Rental As billed to LSE Other Transportation As billed to LSE Parking and Tolls As billed to LSE Meals As billed to LSE Lodging As billed to LSE Postage/Delivery Charges As billed to LSE Telephone (Long Distance) As billed to LSE Materials and Supplies As billed to LSE Models and Renderings (Presentation) As billed to LSE Photographic/Film As billed to LSE Codes/Ordinances As billed to LSE Legal As billed to LSE Consultants Cost plus 10% - 25% Sales Tax, If Applicable As billed to LSE Project Reimbursable Expenses will be invoiced at cost plus 10%, except Consultants which will be billed as noted. Effective January 1, 2025 Subject to Periodic Adjustment II....S IIE.:, A IR C IH III "'r IE' "'Ir u IIINC. 1401 Glenwood Ave. LSE-Architects.com Minneapolis, MN 55405 (612) 343.1010 Page 187 of 249