Loading...
6.1f ERMUSR 05-13-2025______________________________________________________________________________ Page 1 of 1 UTILITIES COMMISSION MEETING TO: ERMU Commission FROM: Chris Sumstad – Electric Superintendent MEETING DATE: May 13, 2025 AGENDA ITEM NUMBER: 6.1f SUBJECT: Staff Update ACTION REQUESTED: None DISCUSSION: • Installed 17 new residential services, which involves the connection of a secondary line once the customer requests service. • Joe Schmidt, safety instructor from Minnesota Municipal Utilities Association, was here on April 24, and held a safety meeting for field staff on chainsaw operations. • Crews finished tree trimming on April 15. • The bore crew along with a line crew are currently working on replacing older open concentric wire in the Deerfield Addition in Elk River. • Crews replaced 500 MCM underground wire at West substation, Feeder 71, from the sub out to the first pole. This was older wire due for replacement. A ganged switch was also installed at the pole replacing single blades. • The second phase of the overhead rebuild on Feeder 65, north of our North substation was recently started. • Crews along with the substation technician are in the process of changing out the controllers at our switched capacitor banks located at various locations on our overhead feeders. They are also confirming operations and performing any maintenance needed at each location. • Crews are working on maintenance items we have identified through our equipment checks over the winter on both the overhead and underground system. We are also replacing fault indicators. These instruments are placed on the line, and blink if the fault has passed through, helping to pinpoint the location of the problem and reduce outage time. These instruments have a battery life of 15-20 years. 115