Loading...
6.1g ERMUSR 06-03-2025______________________________________________________________________________ Page 1 of 1 UTILITIES COMMISSION MEETING TO: ERMU Commission FROM: Mike Tietz – Technical Services Superintendent MEETING DATE: June 3, 2025 AGENDA ITEM NUMBER: 6.1g SUBJECT: Staff Update ACTION REQUESTED: None DISCUSSION: • As of May 28, the locators processed 506 locate tickets. These consisted of 421 normal tickets, 1 emergency ticket, 55 updated tickets, 4 meetings, 3 planning, 10 boundary surveys, 3 corrections, and 9 cancellations. This resulted in a 2.2% increase in tickets from the previous month and a 16.4% decrease from the prior May. • To date, the electrical technicians have completed 515 service order tasks, updated the power bill, addressed customer meter issues and any off-peak concerns. • The Advanced Metering Infrastructure (AMI) residential water meters and residential electric meters continue to be installed in new services. The electrical technicians have been busy changing out the old Automated Meter Reading meters to AMI meters for small non-demand commercial customers. We received our shipments of 4S, 3S, and 2S- 320 amp electric meters from Sensus and I have been told that our RMA/Warranty meters should be shipping back to us sometime in June. We will be exchanging those meters as time allows. Approximately 5,413 water meters and 12,208 electric meters are currently active within our AMI system. • Staff completed the changing out all the capacitor bank controllers. • Our monthly peak was 63.14 MW on May 14, at 4:40pm. 203