Loading...
City Council Packet 06-02-2025 City Council Regular Meeting & Work Session Agenda Monday, June 2, 2025 6:30 PM Elk River City Hall ▪ Regular meeting in Council Chambers ▪ Work Session meeting in Upper Town Conference Room immediately following regular meeting 1. CALL MEETING TO ORDER 2. PLEDGE OF ALLEGIANCE 3. CONSIDER AGENDA 4. CONSENT AGENDA Considered to be routine and noncontroversial and will be approved by one motion. There will be no separate discussion of these items unless there is a request to remove the item from the consent agenda to the regular agenda. 4.1 May 19, 2025, Minutes 4.2 Check Register 4.3 2025-2026 Liquor License Renewals 4.4 Law Enforcement Services Agreement 2025-09 4.5 FT Center Field House Improvements 4.6 Adoption of City Council Goals 4.7 Hire Police Officer 4.8 Hire Human Resources Specialist 5. OPEN FORUM An opportunity to provide comments and feedback regarding items not on the agenda. Information provided in Open Forum will not be discussed at this meeting; rather, the information will be referred to staff and/or scheduled for discussion at a future meeting. 6. PRESENTATIONS, AWARDS, AND RECOGNITION 7. PUBLIC HEARINGS An opportunity for the public to express their opinions and raise questions pertaining to the agenda item. All comments become part of the official public record. For this reason, all comments must be made at the podium so they can be heard and recorded. Comments may also be provided in writing. There will not be deliberations, discussions, or answers to questions until the hearing is closed. It is important to be courteous and allow each presenter to comment before adding additional testimony. 8. GENERAL BUSINESS Items in which the information is presented by city staff or consultants, then deliberation and action occur. General Business items are not opportunities to receive or provide public input. However, the presiding officer may, at its sole discretion, solicit public feedback. Page 1 of 247 The Elk River Vision A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and community engagement that encourages and inspires prosperity 8.1 The Keeping of Chickens on City Lots 8.2 Downtown Master Plan 8.3 Select Consultant for the Jackson Street Water Tower Historic Park Agreement 2025-10 8.4 Appoint Community Event Center Commissioners 8.5 Liquor License Renewal: The Confluence LLC dba Edge Bar & Boutique 8.6 Pinewood Contract for Deed Amendment, Agreement 2025-11 8.7 Discuss Work Session Items 9. COUNCIL LIAISON UPDATES 9.1 Council Liaison Updates 10. MOTION TO ADJOURN REGULAR MEETING 11. WORK SESSION Work Sessions are less formal meetings to encourage dialog. Official action or votes are not typically taken. At the conclusion of a discussion, a simple consensus provides staff direction for execution of the item. This portion of the agenda is audio recorded but not video recorded or broadcast. Work Sessions are open to the public; however, visitors who wish to provide input must be invited by the presiding officer, assume a seat at the discussion table and provide their full name and address for the official record. 11.1 165th Avenue and Trunk Highway 10 Access Improvements 12. MOTION TO ADJOURN Page 2 of 247 Meeting of the City Council Held at the Elk River City Hall Monday, May 19, 2025 Members Present:Mayor John Dietz, Councilmember Jennifer Wagner, Councilmember Cory Grupa, Councilmember J. Brian Calva Members Absent:Councilmember Mike Beyer Staff Present:City Administrator Cal Portner, City Attorney Jared Shepherd, Economic Development Director Brent O'Neil, Senior Planner Chris Leeseberg, Business Services Director/Assistant City Administrator Joe Stremcha, Environmental Services and Projects Specialist Joe Hale, Community Event Center Manager Katie Harstad, Northbound Liquor Store Manager Megan Knopik, and City Clerk Tina Allard 1.CALL MEETING TO ORDER Pursuant to due call and notice thereof, the meeting was called to order at 6:17 p.m. 2.PLEDGE OF ALLEGIANCE The Pledge of Allegiance was recited. 3.CONSIDER AGENDA Moved by Councilmember Wagner and seconded by Councilmember Grupa to approve the agenda. Motion Carried 4-0. 4.CONSENT AGENDA Moved by Councilmember Grupa and seconded by Councilmember Wagner to approve the following consent items as outlined in their respective staff reports. Motion Carried 4- 0. 4.1 April 28, 2025 Council Retreat Minutes 4.2 May 5, 2025, Minutes 4.3 Check Register 4.4 Ordinance 25-08 Regarding Membership Requirements of the Elk River Municipal Utilities Commission Page 3 of 247 City Council Minutes May 19, 2025 --------- Page 2 of 6 4.5 Resolution 25-23 Accepting Donation from Zimmerman Fire Relief Association 4.6 Temporary On-Sale Liquor License: Davis-Darrow-Meyer American Legion Post 112 4.7 Library Shelving 4.8 Resolution 25-24: Final Plat of Vinje Commercial Addition 4.9 Hire Part-time Community Service Officer I 4.10 Hire Custodian 4.11 Resolution 25-25: Yale Court and Line Avenue Realignment Project Parking Restrictions 5.OPEN FORUM Anthony Pietrzak, 19040 Ulysses Street asked when the City Council would be discussing the allowance of chickens on smaller city lots noting he thought it was supposed to be on tonight's agenda as mentioned at the last meeting. Mayor Dietz stated he has received numerous calls from residents stating they are opposed to chickens but the topic could be brought back for discussion. Councilmember Wagner stated she is open to discuss the topic but she has no interest in changing the ordinance to anything less than two acres. Councilmember Calva stated he is on large acreage and he has chickens that used to be free-range, but they would wander into neighboring yards. He stated if they were allowed, they would have to be confined. Councilmember Grupa stated he is not in favor of changing the ordinance. The Council asked that this item be added to their next meeting agenda. 6.PRESENTATIONS, AWARDS, AND RECOGNITION 6.1 City of Elk River Volunteer of the Month Mayor Dietz presented the May Volunteer of the Month award to Cory Grupa. He highlighted the following: ▪Liaison to the Heritage Preservation and Parks and Recreation Commissions. ▪Member of the Gateway Church Board of Directors and Finance Board ▪Member of the Gideons ▪Member of the Capernaum Young Life Club ▪Service on the Economic Development Authority and the City Council 6.2 Utilities Commission Candidate Interviews Page 4 of 247 City Council Minutes May 19, 2025 --------- Page 3 of 6 The Council interviewed Jill Larson-Vito. 7.PUBLIC HEARINGS 7.1 Conditional Use Permit: AEGIR Brewing Company LLC, 19050 Industrial Blvd. NW The staff report was presented. Mayor Dietz opened the public hearing. Tim Jones, 13284 Islandview Drive, stated that events would be held on weekends when the area businesses are closed, and his parking area would be utilized for the events, with customers parking in the street. Mayor Dietz closed the public hearing. Moved by Councilmember Grupa and seconded by Councilmember Wagner to approve, by motion, the amended Conditional Use Permit with the following conditions to satisfy the standards set forth in Section 30-654: 1. The Conditional Use Permit shall not be recorded until the city building official and fire marshal have inspected and approved the building for compliance with all state and local building codes and all applicable conditions of approval have been completed. 2. The space labeled “Event Space” may only be used for corn hole/corn bag toss lanes; any other use shall require a special event permit. 3. All comments on the Comment Letter dated July 20, 2023, shall be addressed. 4. No tap room operations or expanded brewery operations can occur until: 1. The Conditional Use Permit has been recorded. 2. The building has received a Certificate of Occupancy. 5. A taproom license shall be obtained from the state and city. 6. No more than 20,000 barrels of its own brands of malt liquor may be brewed annually. 7. Parking areas shall be used for parking only, except for the 12 special events allowed per year. 8. Any outdoor patio area shall be delineated with a permanent fence and shall not be in required parking areas. 9. No demolition or construction activities can occur within or on the exterior of the building until the Conditional Use Permit is approved and a building permit has been applied for and issued. 10. Conditional Use Permit CU 20-15 shall become void. Motion Carried 4-0. 7.2 Interim Use Permit: Residential Occupation, Benjamin Gomez, 14270 201st Ave. NW Page 5 of 247 City Council Minutes May 19, 2025 --------- Page 4 of 6 The staff report was presented. Mayor Dietz opened the public hearing. There being no one to speak to this matter, Mayor Dietz closed the public hearing. Moved by Councilmember Wagner and seconded by Councilmember Calva to approve the Interim Use Permit with the following conditions to satisfy the standards set forth in Section 30-654: 1. All openings to the accessory structure shall be closed when the business is in operation. 2. There shall be no outdoor storage of any business products or equipment. 3. The building must meet all commercial building requirements. 4. There shall be no customers/retail sales on site. 5. The IUP will expire upon the sale of the property. Motion Carried 4-0. 8.GENERAL BUSINESS 8.1 Transition Organic Recycling Program to Sherburne County The staff report was presented. Moved by Councilmember Calva and seconded by Councilmember Wagner to approve of having Sherburne County's organic recycling program operate in place of the city's current program. Motion Carried 4-0. 8.2 Utilities Commission Appointment Moved by Councilmember Wagner and seconded by Councilmember Grupa to appoint Jill Larson-Vito to the Utilities Commission to a term ending February 28, 2027. Motion Carried 4-0. 8.3 Ordinance 25-09 Multipurpose Facility Advisory Commission Amendment The staff report was presented. The council concurred that the employment requirement should be full time. Moved by Councilmember Wagner and seconded by Councilmember Calva to adopt Ordinance 25-09, regarding membership and duties of the Community Event Center Commission. Motion Carried 4-0. 9.MOTION TO ADJOURN REGULAR MEETING Page 6 of 247 City Council Minutes May 19, 2025 --------- Page 5 of 6 Moved by Councilmember Wagner and seconded by Councilmember Grupa to adjourn the meeting of City Council. Motion Carried 4-0. The meeting adjourned at 6:39 p.m. 10.WORK SESSION 10.1 FT Center Field House Improvements Mr. Stremcha presented this item as outlined in the staff report. Ms. Harstad outlined what the scheduling responsibilities would be among the staff and how once the updates are made they should be able to book larger events in the space. 10.2 Fire Dept. CIP The staff report was presented. Mayor Dietz stated he feels the burn building for Station #1 is not needed, and there should be a discussion with the Council. He further stated residents would not be in favor of a 12% property tax increase. Mr. Stremcha reviewed proposed legislation around changes to the sales tax laws. Mr. Portner suggested the Council could review their policy on the percentage of general fund balance they want to keep, which may free up some extra funds. The Council decided to wait until the legislative session was completed before discussing how to pay for the fire station. 10.3 City Council Goals Review The staff report was presented. The Council moved the gravel road topic up on the list of goals. The Council consented to accepting the goals presented with the change noted above and moved the discussion about the mission statement to a future meeting. 11.MOTION TO ADJOURN Moved by Councilmember Grupa and seconded by Councilmember Calva to adjourn the meeting of City Council. Motion Carried 4-0. The meeting adjourned at 7:25 p.m. 12.CLOSED MEETING - PID 75-00566-0220 Page 7 of 247 City Council Minutes May 19, 2025 --------- Page 6 of 6 12.1 Statement to be read by the Mayor: "The City Council will be holding a closed meeting per MN Statute 13D.05, subd. 3(c)(5) to develop or consider offers relating to the possible purchase of real property at: PID 75-00566-0220 Mayor Dietz read the statement stated above. 12.2 Motion Calling Closed Meeting Moved by Councilmember Wagner and seconded by Councilmember Calva to open the closed meeting. Motion Carried 4-0. Members Present: Mayor Dietz, Councilmembers Grupa, Calva, and Wagner Members Absent: Councilmember Beyer Staff Present: City Administrator Cal Portner, Assistant City Administrator Joe Stremcha, Economic Development Director Brent O'Neil, Northbound Liquor Store Manager Megan Knopik, and City Clerk Tina Allard 12.3 Hold Closed Meeting The closed meeting was held. 12.4 Motion to Adjourn Closed Meeting Moved by Councilmember Wagner and seconded by Councilmember Grupa to adjourn the closed meeting of City Council. Motion Carried 4-0. Moved by Councilmember Calva and seconded by Councilmember Grupa to adjourn the regular meeting of City Council. Motion carried 4-0. Minutes prepared by City Clerk Tina Allard. The meeting adjourned at 7:46 p.m. 13.INFORMATION 13.1 April Financial Reports ___________________ John J. Dietz, Mayor ___________________ Tina Allard, City Clerk Page 8 of 247 The Elk River Vision A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and community engagement that encourages and inspires prosperity Request for Action To City Council Item Number 4.2 Meeting Date June 2, 2025 Prepared By Amy Stangler, Accounting Clerk Item Description Check Register Reviewed by Lori Stich Joe Stremcha Cal Portner Tina Allard Action Requested Approve, by motion, the check registers for the period ending June 2, 2025. Background/Discussion The details for the period ending June 2, 2025, are attached to this request for action. Total for All Funds $1,422,490.93 Financial Impact N/A Mission/Policy/Goal N/A Attachments 1. 4.2 at1 Check Register 2. 4.2 at2 Check Register & Taxes 3. 4.2 at3 Check Register-Cr Card Page 9 of 247 CITY OF ELK RIVER Unpaid Invoice Report - COUNCIL Page: 1 Report dates: ALL-ALL May 28, 2025 05:05PM Report Criteria: Invoice Detail.GL account (3 Characters) = {<>} "920" Invoice Detail.GL account (3 Characters) = {<>} "910" Invoice Detail.Created by = {<>} "jdengerud" Invoice Sequence Description Type Invoice Invoice GL Account Number Number Date Amount Number ASPEN MILLS 101 345535 1 RESERVE UNIFORM - FOLKERINGA Invoice 12/24/2024 331.79 101-4-2160-4217 101 354279 1 UNIFORMS - FIRKUS Invoice 05/15/2025 284.20 101-4-2130-4217 101 354280 1 UNIFORMS - MARTIN Invoice 05/15/2025 380.37 101-4-2130-4217 101 354281 1 UNIFORMS - COWLEY Invoice 05/15/2025 217.80 101-4-2130-4217 Total 10749 ASPEN MILLS: 1,214.16 CITY OF MONTICELLO 101 35632 1 ANIMAL CONTROL CHARGES Invoice 05/09/2025 416.00 101-4-2150-4409 Total 27050 CITY OF MONTICELLO: 416.00 DIAMOND MOWERS, LLC 101 284548 1 PARTS #80 Invoice 05/20/2025 371.55 101-4-3120-4221 Total 16347 DIAMOND MOWERS, LLC: 371.55 EVERGREEN RECYCLING LLC 228 3705 1 MATTRESS RECYCLING-CLN UP DA Invoice 04/29/2025 3,985.00 228-4-7000-4409 Total 18213 EVERGREEN RECYCLING LLC: 3,985.00 M A C I A 101 597 1 INVESTIGATIONS & ANALYSIS CONF Invoice 05/15/2025 375.00 101-4-2130-4331 Total 10956 M A C I A: 375.00 MEDICINE LAKE TOURS 101 5222025 1 JUNE TRIP - PADELFORD RIVERBOA Invoice 05/23/2025 2,125.00 101-4-5510-4409 Total 13038 MEDICINE LAKE TOURS: 2,125.00 MN ASSOC. OF GOVT COMMUNI 101 2312 1 MAGC MEMBERSHIP RENEWAL FOR Invoice 05/28/2025 400.00 101-4-1120-4433 Total 14225 MN ASSOC. OF GOVT COMMUNI: 400.00 M-R SIGN CO., INC 101 227779 1 SIGN SUPPLIES Invoice 05/13/2025 337.60 101-4-3120-4226 Page 10 of 247 CITY OF ELK RIVER Unpaid Invoice Report - COUNCIL Page: 2 Report dates: ALL-ALL May 28, 2025 05:05PM Invoice Sequence Description Type Invoice Invoice GL Account Number Number Date Amount Number Total 24442 M-R SIGN CO., INC: 337.60 PRINCETON RENTAL INC 101 1-573167 1 EQUIPMENT RENTAL - SOD CUTTER Invoice 05/14/2025 154.98 101-4-5110-4415 Total 10469 PRINCETON RENTAL INC: 154.98 RECYCLE TECHNOLOGIES INC 228 255236 1 RECYCLE BULBS & LIGHTS Invoice 04/30/2025 492.89 228-4-7000-4409 Total 14560 RECYCLE TECHNOLOGIES INC: 492.89 RYAN COWLEY 101 5162025 R C 1 CONF MEAL REIMBURSEMENT - CO Invoice 05/16/2025 63.00 101-4-2130-4331 Total 15242 RYAN COWLEY: 63.00 STAR TRIBUNE 101 10694366 5-11-25 1 SUBSCRIPTION 5/28 - 8/27/25 Invoice 05/11/2025 97.66 101-4-5510-4433 Total 10866 STAR TRIBUNE: 97.66 STEP SAVER INC 211 184330 1 BULK SALT -- LIBRARY Invoice 05/21/2025 195.00 211-4-5600-4219 101 184331 1 BULK SALT -- POLICE DEPARTMENT Invoice 05/21/2025 121.50 101-4-2190-4219 101 184332 1 BULK SALT -- FIRE STATION #3 Invoice 05/21/2025 118.50 101-4-2310-4219 Total 13048 STEP SAVER INC: 435.00 TIFFANY ROSSMEISL 101 5202025 T R 1 REIMB CONF MILEAGE/MEALS - RO Invoice 05/20/2025 245.30 101-4-2150-4331 Total 15268 TIFFANY ROSSMEISL: 245.30 TYLER TECHNOLOGIES, INC. 290 25-509765 1 INCODE SOFTWARE PROJ MGMT - R Invoice 05/14/2025 250.00 290-4-1350-4409 Total 34992 TYLER TECHNOLOGIES, INC.: 250.00 WINE MERCHANTS 603 7519040 1 WINE Invoice 05/14/2025 1,076.00 603-4-9111-4253 603 7519040 2 FREIGHT Invoice 05/14/2025 16.24 603-4-9111-4332 603 7520288 1 WINE Invoice 05/23/2025 904.00 603-4-9111-4253 Page 11 of 247 CITY OF ELK RIVER Unpaid Invoice Report - COUNCIL Page: 3 Report dates: ALL-ALL May 28, 2025 05:05PM Invoice Sequence Description Type Invoice Invoice GL Account Number Number Date Amount Number 603 7520288 2 FREIGHT Invoice 05/23/2025 13.05 603-4-9111-4332 603 7520289 1 WINE Invoice 05/23/2025 152.00 603-4-9151-4253 603 7520289 2 FREIGHT Invoice 05/23/2025 2.18 603-4-9151-4332 603 7520290 1 WINE Invoice 05/23/2025 408.00 603-4-9151-4253 603 7520290 2 FREIGHT Invoice 05/23/2025 5.22 603-4-9151-4332 Total 36425 WINE MERCHANTS: 2,576.69 AID ELECTRIC CORPORATION 101 1202313 1 DISCONNECT HEAT PUMP - FIRE ST Invoice 05/15/2025 182.00 101-4-2310-4401 Total 10373 AID ELECTRIC CORPORATION: 182.00 ALLINA HEALTH SYSTEM 101 CI00063381 1 AED SUPPLIES Invoice 02/28/2025 175.00 101-4-1600-4219 101 CI00063382 1 AED SUPPLIES Invoice 02/28/2025 175.00 101-4-2190-4219 Total 10406 ALLINA HEALTH SYSTEM: 350.00 AMAZON CAPITAL SERVICES 602 163K-QC6M-TRM7 1 SUPPLIES Invoice 05/05/2025 8.54 602-4-9020-4219 101 166C-D1GQ-CY4Q 1 PROGRAM SUPPLIES Invoice 05/21/2025 16.95 101-4-5510-4219 602 17LD-MCLG-KM7K 1 OFFICE SUPPLIES Invoice 05/19/2025 92.33 602-4-9010-4201 101 17LN-X33G-3WJV 1 CONCERT SUPPLIES Invoice 05/13/2025 9.99 101-4-5220-4219 101 1K4Y-6VRF-9K6C 1 RIVEFRONT CONCERT SUPPLIES Invoice 05/14/2025 179.38 101-4-5220-4219 101 1MFY-MGFJ-QNVD 1 EAP BINDER CLIPS Invoice 05/19/2025 3.99 101-4-5220-4219 602 1RXJ-1NFN-VV1J 1 SUPPLIES - GEL FILLED PH ELECTR Invoice 05/19/2025 458.00 602-4-9020-4219 101 1WQV-VV7V-TFTL 1 SUPPLIES Invoice 05/16/2025 174.99 101-4-5110-4219 101 1YVK-3KJQ-KR7K 1 SQUAD 629 - ORGANIZERS Invoice 05/15/2025 93.98 101-4-2130-4219 Total 13706 AMAZON CAPITAL SERVICES: 1,038.15 ARTISAN BEER COMPANY 603 3766922 1 BEER Invoice 05/14/2025 173.80 603-4-9111-4252 603 3766923 1 THC PRODUCTS Invoice 05/14/2025 58.95 603-4-9111-4256 603 3768680 1 BEER Invoice 05/21/2025 648.00 603-4-9111-4252 Page 12 of 247 CITY OF ELK RIVER Unpaid Invoice Report - COUNCIL Page: 4 Report dates: ALL-ALL May 28, 2025 05:05PM Invoice Sequence Description Type Invoice Invoice GL Account Number Number Date Amount Number 603 3768681 1 THC PRODUCTS Invoice 05/21/2025 248.60 603-4-9111-4256 603 3768682 1 BEER Invoice 05/21/2025 161.50 603-4-9151-4252 603 3768683 1 THC PRODUCTS Invoice 05/21/2025 248.60 603-4-9151-4256 603 421912 1 THC PRODUCTS CREDIT Invoice 05/09/2025 11.44- 603-4-9111-4256 Total 12167 ARTISAN BEER COMPANY: 1,528.01 ASTLEFORD INTERNATIONAL 101 1P131148 1 REFRIGERANT Invoice 05/19/2025 440.00 101-4-3150-4219 Total 10762 ASTLEFORD INTERNATIONAL: 440.00 ATLAS STAFFING, INC 101 698912 1 TEMP STAFF 5/5/25 - FACILITIES MAI Invoice 05/11/2025 1,008.00 101-4-1600-4409 101 698949 1 TEMP STAFF 5/12/25 - FACILITIES MA Invoice 05/18/2025 806.40 101-4-1600-4409 Total 52380 ATLAS STAFFING, INC: 1,814.40 ATT LLC 101 S28955 1 VB COMP LEAGUE WINNER SHIRTS Invoice 05/20/2025 144.00 101-4-5220-4219 Total 15332 ATT LLC: 144.00 B & D PLBG, HTG & AIR CON 602 6198241 1 TEST RPZ VALVES Invoice 04/28/2025 1,400.00 602-4-9020-4404 Total 10950 B & D PLBG, HTG & AIR CON: 1,400.00 BECKER BIG LAKE YOUTH HOCKEY ASSOC. 221 #000054 1 REFUND OF ICE PAYMENT Invoice 05/19/2025 408.00 221-3-0000-3464 Total 52402 BECKER BIG LAKE YOUTH HOCKEY ASSOC.: 408.00 BERGANKDV, LTD. 101 1259899 1 AUDIT SERVICES Invoice 05/19/2025 4,000.00 101-4-1310-4301 602 1259899 2 AUDIT SERVICES Invoice 05/19/2025 1,200.00 602-4-9010-4301 603 1259899 3 AUDIT SERVICES Invoice 05/19/2025 1,000.00 603-4-9112-4301 603 1259899 4 AUDIT SERVICES Invoice 05/19/2025 1,000.00 603-4-9152-4301 605 1259899 5 AUDIT SERVICES Invoice 05/19/2025 400.00 605-4-9210-4301 607 1259899 6 AUDIT SERVICES Invoice 05/19/2025 400.00 607-4-9310-4301 Page 13 of 247 CITY OF ELK RIVER Unpaid Invoice Report - COUNCIL Page: 5 Report dates: ALL-ALL May 28, 2025 05:05PM Invoice Sequence Description Type Invoice Invoice GL Account Number Number Date Amount Number Total 14652 BERGANKDV, LTD.: 8,000.00 BERNICK'S 603 10357814 1 POP Invoice 05/21/2025 204.50 603-4-9111-4255 603 10357815 1 THC PRODUCTS Invoice 05/21/2025 261.00 603-4-9111-4256 603 10357816 1 BEER Invoice 05/21/2025 2,086.70 603-4-9111-4252 603 10357817 1 POP/MISC Invoice 05/21/2025 119.66 603-4-9151-4255 603 10357818 1 THC PRODUCTS Invoice 05/21/2025 80.50 603-4-9151-4256 603 10357819 1 BEER Invoice 05/21/2025 1,377.65 603-4-9151-4252 221 I72289 1 CONCESSIONS SUPPLIES - LIDS Invoice 05/19/2025 40.45 221-4-5430-4219 221 I72289 2 POP/COFFEE Invoice 05/19/2025 333.71 221-4-5430-4259 Total 11950 BERNICK'S: 4,504.17 BERRY COFFEE COMPANY 101 1060713 1 COFFEE Invoice 05/27/2025 251.81 101-4-5510-4219 101 1061016 1 COFFEE - PD Invoice 05/27/2025 416.89 101-4-2190-4219 101 1061456 1 COFFEE Invoice 05/27/2025 48.81 101-4-3120-4219 Total 11959 BERRY COFFEE COMPANY: 717.51 BLAINE LOCK & SAFE, INC 221 33256 1 REPLACE LOCK - UPSTAIRS OFFICE Invoice 05/15/2025 291.50 221-4-5400-4401 Total 12256 BLAINE LOCK & SAFE, INC: 291.50 BOLTON & MENK, INC 401 362430 1 2025 STREET IMPROVEMENTS Invoice 05/09/2025 6,254.00 401-4-8080-4303 403 362432 1 LINE AVE CUL-DE-SAC Invoice 05/09/2025 44,418.68 403-4-8440-4303 225 362433 1 MEGA LOOP TRAIL IMPROVEMENTS Invoice 05/09/2025 2,541.00 225-4-8546-4303 406 362434 1 MEADOWWOODS VILLAGE - SEWER Invoice 05/09/2025 18,468.50 406-4-8050-4303 403 362435 1 YALE STREET EXTENSION Invoice 05/09/2025 3,575.42 403-4-8440-4303 Total 11019 BOLTON & MENK, INC: 75,257.60 BOND TRUST SERVICES CORPORATION 343 95107 1 SALES TAX REV BONDS 2019A Invoice 04/17/2025 469,043.75 343-4-7000-4611 Page 14 of 247 CITY OF ELK RIVER Unpaid Invoice Report - COUNCIL Page: 6 Report dates: ALL-ALL May 28, 2025 05:05PM Invoice Sequence Description Type Invoice Invoice GL Account Number Number Date Amount Number Total 52260 BOND TRUST SERVICES CORPORATION: 469,043.75 BOURGET IMPORTS LLC 603 217399 1 LIQUOR Invoice 05/14/2025 136.00 603-4-9111-4251 603 217399 2 WINE Invoice 05/14/2025 608.00 603-4-9111-4253 603 217399 3 FREIGHT Invoice 05/14/2025 27.00 603-4-9111-4332 603 217606 1 WINE Invoice 05/21/2025 360.00 603-4-9111-4253 603 217606 2 FREIGHT Invoice 05/21/2025 13.50 603-4-9111-4332 Total 14411 BOURGET IMPORTS LLC: 1,144.50 BREAKTHRU BEVERAGE MINNESOTA 603 121456304 1 LIQUOR Invoice 05/15/2025 1,008.00 603-4-9151-4251 603 121456304 2 FREIGHT Invoice 05/15/2025 5.80 603-4-9151-4332 603 121562314 1 POP/MISC Invoice 05/22/2025 201.89 603-4-9151-4255 603 121562314 2 FREIGHT Invoice 05/22/2025 7.25 603-4-9151-4332 603 121562315 1 LIQUOR Invoice 05/22/2025 2,900.54 603-4-9151-4251 603 121562315 2 FREIGHT Invoice 05/22/2025 24.04 603-4-9151-4332 603 413566757 1 LIQUOR CREDIT Invoice 05/22/2025 612.00- 603-4-9151-4251 603 413566757 2 FREIGHT CREDIT Invoice 05/22/2025 2.90- 603-4-9151-4332 603 413575580 1 LIQUOR CREDIT Invoice 05/22/2025 288.00- 603-4-9151-4251 603 413575580 2 FREIGHT CREDIT Invoice 05/22/2025 2.90- 603-4-9151-4332 603 413575581 1 LIQUOR CREDIT Invoice 05/22/2025 144.00- 603-4-9151-4251 603 413575581 2 FREIGHT CREDIT Invoice 05/22/2025 1.45- 603-4-9151-4332 Total 8002 BREAKTHRU BEVERAGE MINNESOTA: 3,096.27 603 121452263 1 WINE Invoice 05/15/2025 320.00 603-4-9111-4253 603 121452263 2 FREIGHT Invoice 05/15/2025 2.90 603-4-9111-4332 603 121452264 1 WINE Invoice 05/15/2025 360.00 603-4-9111-4253 603 121452264 2 FREIGHT Invoice 05/15/2025 4.35 603-4-9111-4332 603 121453198 1 BEER Invoice 05/15/2025 270.00 603-4-9111-4252 603 121453199 1 BEER Invoice 05/15/2025 53.10 603-4-9111-4252 Page 15 of 247 CITY OF ELK RIVER Unpaid Invoice Report - COUNCIL Page: 7 Report dates: ALL-ALL May 28, 2025 05:05PM Invoice Sequence Description Type Invoice Invoice GL Account Number Number Date Amount Number 603 121456503 1 LIQUOR Invoice 05/15/2025 4,792.51 603-4-9111-4251 603 121456503 2 FREIGHT Invoice 05/15/2025 92.80 603-4-9111-4332 603 121562409 1 WINE Invoice 05/22/2025 768.00 603-4-9111-4253 603 121562409 2 FREIGHT Invoice 05/22/2025 8.70 603-4-9111-4332 603 121562410 1 LIQUOR Invoice 05/22/2025 4,637.92 603-4-9111-4251 603 121562410 2 FREIGHT Invoice 05/22/2025 60.41 603-4-9111-4332 Total 12893 BREAKTHRU BEVERAGE MINNESOTA: 11,370.69 BRENDA GOULD 101 803 LINE 1 REIMB MAILBOX REPAIR - GOULD 80 Invoice 05/16/2025 98.65 101-4-3120-4219 Total 52401 BRENDA GOULD: 98.65 BRYCE HEGGE 101 3022 1 FARMERS MARKET ENTERTAINMEN Invoice 06/12/2025 150.00 101-4-5230-4409 Total 52344 BRYCE HEGGE: 150.00 C & L DISTRIBUTING CO 603 1839001330 1 BEER CREDIT Invoice 05/27/2025 21.20- 603-4-9151-4252 603 1839001331 1 BEER CREDIT Invoice 05/27/2025 7.41- 603-4-9151-4252 603 1839001332 1 BEER CREDIT Invoice 05/27/2025 90.30- 603-4-9151-4252 603 2106182 1 LIQUOR Invoice 05/21/2025 40.02 603-4-9151-4251 603 2106183 1 BEER Invoice 05/21/2025 7,653.05 603-4-9151-4252 603 2106185 1 BEER CREDIT Invoice 05/21/2025 8.44- 603-4-9151-4252 603 2109058 1 LIQUOR Invoice 05/27/2025 1,125.00 603-4-9151-4251 603 2109059 1 BEER Invoice 05/27/2025 11,385.55 603-4-9151-4252 603 2109814 1 BEER Invoice 05/27/2025 2,260.30 603-4-9151-4252 Total 8003 C & L DISTRIBUTING CO: 22,336.57 603 1839001313 1 BEER CREDIT Invoice 05/14/2025 196.70- 603-4-9111-4252 603 1839001314 1 BEER CREDIT Invoice 05/14/2025 252.33- 603-4-9111-4252 603 1839001323 1 BEER CREDIT Invoice 05/21/2025 357.13- 603-4-9111-4252 603 1839001329 1 BEER CREDIT Invoice 05/27/2025 42.00- 603-4-9111-4252 Page 16 of 247 CITY OF ELK RIVER Unpaid Invoice Report - COUNCIL Page: 8 Report dates: ALL-ALL May 28, 2025 05:05PM Invoice Sequence Description Type Invoice Invoice GL Account Number Number Date Amount Number 603 1839001329 2 LIQUOR CREDIT Invoice 05/27/2025 13.96- 603-4-9111-4251 603 2103353 1 BEER Invoice 05/14/2025 5,097.65 603-4-9111-4252 603 2104871 1 BEER Invoice 05/19/2025 15.90 603-4-9111-4252 603 2105242 1 BEER Invoice 05/19/2025 8,737.20 603-4-9111-4252 603 2107534 1 THC PRODUCTS Invoice 05/21/2025 539.44 603-4-9111-4256 603 2107535 1 LIQUOR Invoice 05/21/2025 387.98 603-4-9111-4251 603 2107535 2 WINE Invoice 05/21/2025 670.00 603-4-9111-4253 603 2107536 1 BEER Invoice 05/21/2025 9,402.20 603-4-9111-4252 603 2108879 1 LIQUOR Invoice 05/27/2025 1,301.40 603-4-9111-4251 603 2108880 1 BEER Invoice 05/27/2025 11,603.20 603-4-9111-4252 603 2109997 1 LIQUOR Invoice 05/27/2025 1,125.00 603-4-9111-4251 Total 13375 C & L DISTRIBUTING CO: 38,017.85 CHARTER COMMUNICATIONS 602 175341701 MAY 25 1 PHONE LINE & TV CHGS-WW Invoice 05/14/2025 165.80 602-4-9010-4321 Total 13954 CHARTER COMMUNICATIONS: 165.80 CINTAS CORPORATION LOC 470 602 4230545607 1 UNIFORMS RENTAL/CLEANING Invoice 05/14/2025 159.82 602-4-9020-4417 603 4230813659 1 MATS, TOWELS, SCRAPERS, MOPS Invoice 05/16/2025 47.35 603-4-9152-4404 603 4230813874 1 MATS, TOWELS, SCRAPERS, MOPS Invoice 05/16/2025 52.78 603-4-9112-4404 602 4231216528 1 UNIFORMS RENTAL/CLEANING Invoice 05/21/2025 151.18 602-4-9020-4417 603 4231545891 1 MATS, TOWELS, SCRAPERS, MOPS Invoice 05/23/2025 52.78 603-4-9112-4404 Total 14080 CINTAS CORPORATION LOC 470: 463.91 CRYSTAL SPRINGS ICE 603 1-500379 1 SOFT DRINKS/MISC Invoice 05/27/2025 216.55 603-4-9151-4255 603 1-500379 2 FREIGHT Invoice 05/27/2025 4.00 603-4-9151-4332 603 1-500380 1 ICE CREDIT Invoice 05/27/2025 5.65- 603-4-9151-4255 Total 52407 CRYSTAL SPRINGS ICE: 214.90 CUB FOODS Page 17 of 247 CITY OF ELK RIVER Unpaid Invoice Report - COUNCIL Page: 9 Report dates: ALL-ALL May 28, 2025 05:05PM Invoice Sequence Description Type Invoice Invoice GL Account Number Number Date Amount Number 101 123610 - 104351123610 1 PROGRAM SUPPLIES Invoice 05/28/2025 17.23 101-4-5510-4219 Total 15550 CUB FOODS: 17.23 DACOTAH PAPER CO 221 38725 1 HAND SOAP, TOILET PAPER Invoice 05/15/2025 217.80 221-4-5400-4219 211 43810 1 TOILET PAPER Invoice 05/28/2025 145.94 211-4-5600-4219 101 43813 1 TOILET PAPER/TOWEL ROLLS Invoice 05/28/2025 1,541.50 101-4-5110-4219 Total 15887 DACOTAH PAPER CO: 1,905.24 DAHLHEIMER BEVERAGE, LLC 603 2470650 1 THC PRODUCTS Invoice 05/15/2025 88.00 603-4-9151-4256 603 2470651 1 BEER Invoice 05/15/2025 150.00 603-4-9151-4252 603 2470652 1 LIQUOR Invoice 05/15/2025 540.00 603-4-9151-4251 603 2470729 1 BEER Invoice 05/15/2025 7,176.30 603-4-9151-4252 603 2471238 1 BEER Invoice 05/19/2025 25.60 603-4-9151-4252 603 2471239 1 LIQUOR Invoice 05/19/2025 246.25 603-4-9151-4251 603 2471240 1 BEER Invoice 05/19/2025 8,296.30 603-4-9151-4252 603 2476604 1 BEER Invoice 05/22/2025 56.00 603-4-9151-4252 603 2476605 1 THC PRODUCTS Invoice 05/22/2025 250.00 603-4-9151-4256 603 2476606 1 BEER Invoice 05/22/2025 16,903.55 603-4-9151-4252 603 2478826 1 BEER CREDIT Invoice 05/22/2025 82.50- 603-4-9151-4252 603 2479118 1 THC PRODUCTS Invoice 05/27/2025 129.83 603-4-9151-4256 603 2479119 1 LIQUOR Invoice 05/27/2025 722.53 603-4-9151-4251 603 2479120 1 BEER Invoice 05/27/2025 1,423.05 603-4-9151-4252 603 976-00177 1 BEER CREDIT Invoice 05/27/2025 180.00- 603-4-9151-4252 Total 8005 DAHLHEIMER BEVERAGE, LLC: 35,744.91 603 2470730 1 POP/MISC Invoice 05/15/2025 85.00 603-4-9111-4255 603 2470730 2 THC PRODUCTS Invoice 05/15/2025 823.00 603-4-9111-4256 603 2470731 1 BEER Invoice 05/15/2025 10,697.17 603-4-9111-4252 603 2472154 1 BEER Invoice 05/19/2025 10,905.29 603-4-9111-4252 Page 18 of 247 CITY OF ELK RIVER Unpaid Invoice Report - COUNCIL Page: 10 Report dates: ALL-ALL May 28, 2025 05:05PM Invoice Sequence Description Type Invoice Invoice GL Account Number Number Date Amount Number 603 2476541 1 THC PRODUCTS Invoice 05/22/2025 876.00 603-4-9111-4256 603 2476542 1 BEER Invoice 05/22/2025 25,835.87 603-4-9111-4252 603 2479160 1 THC PRODUCTS Invoice 05/27/2025 83.00 603-4-9111-4256 603 2479162 1 BEER Invoice 05/27/2025 9,984.00 603-4-9111-4252 Total 15900 DAHLHEIMER BEVERAGE, LLC: 59,289.33 DAKOTA SUPPLY GROUP 101 S104709707.001 1 SUPPLIES - ORONO SPLASH PAD Invoice 05/15/2025 486.92 101-4-5110-4219 Total 13183 DAKOTA SUPPLY GROUP: 486.92 DEMCO INC 292 P0057301 DEP 1 LIBRARY SHELVING-DOWN PYMT Invoice 05/20/2025 66,331.70 292-4-5600-4530 Total 16275 DEMCO INC: 66,331.70 E C M PUBLISHERS INC 101 1049778 1 LEGAL NOTICE OA 25-07 Invoice 05/24/2025 258.00 101-4-1110-4359 101 1049779 1 LEGAL NOTICE OA 25-08 Invoice 05/24/2025 129.00 101-4-1110-4359 101 1049780 1 LEGAL NOTICE OA 25-09 Invoice 05/24/2025 258.00 101-4-1110-4359 Total 17000 E C M PUBLISHERS INC: 645.00 ELK RIVER MUNICIPAL UTILITIES 603 5-14-25 ERMU 1 WATER/ELECTRIC/SEWER/STMWTR Invoice 05/14/2025 2,044.20 603-4-9152-4389 101 5-14-25 ERMU 2 WATER/ELECTRIC/SEWER/STMWTR Invoice 05/14/2025 4,133.48 101-4-1600-4389 211 5-14-25 ERMU 3 WATER/ELECTRIC/SEWER Invoice 05/14/2025 2,922.65 211-4-5600-4389 101 5-14-25 ERMU 4 WATER/ELECTRIC/SEWER Invoice 05/14/2025 7,337.56 101-4-2190-4389 101 5-14-25 ERMU 5 WATER/ELECTRIC/SEWER Invoice 05/14/2025 806.40 101-4-2310-4389 101 5-14-25 ERMU 6 WATER/SEWER Invoice 05/14/2025 462.59 101-4-5110-4389 101 5-14-25 ERMU 7 WATER/ELECTRIC Invoice 05/14/2025 3,340.82 101-4-5110-4389 602 5-14-25 ERMU 8 WATER/ELECTRIC Invoice 05/14/2025 30,663.01 602-4-9020-4389 101 5-14-25 ERMU 9 ELECTRIC Invoice 05/14/2025 57.00 101-4-3120-4389 101 5-14-25 ERMU 10 ELECTRIC Invoice 05/14/2025 32.53 101-4-3120-4389 602 5-14-25 ERMU 11 ELECTRIC Invoice 05/14/2025 4,206.59 602-4-9050-4389 Page 19 of 247 CITY OF ELK RIVER Unpaid Invoice Report - COUNCIL Page: 11 Report dates: ALL-ALL May 28, 2025 05:05PM Invoice Sequence Description Type Invoice Invoice GL Account Number Number Date Amount Number 101 5-14-25 ERMU 12 ELECTRIC Invoice 05/14/2025 78.53 101-4-2330-4389 101 5-14-25 ERMU 13 ELECTRIC Invoice 05/14/2025 636.84 101-4-5110-4389 101 5-14-25 ERMU 14 ELECTRIC Invoice 05/14/2025 64.63 101-4-2190-4389 221 5-21-25 ERMU 1 WATER/ELECTRIC/SEWER/STMWTR Invoice 05/21/2025 26,724.62 221-4-5400-4389 101 5-21-25 ERMU 2 WATER/ELECTRIC/SEWER/STMWTR Invoice 05/21/2025 3,896.81 101-4-3120-4389 101 5-21-25 ERMU 3 WATER/ELECTRIC Invoice 05/21/2025 2,863.48 101-4-5110-4389 602 5-21-25 ERMU 4 ELECTRIC Invoice 05/21/2025 1,101.53 602-4-9050-4389 101 5-21-25 ERMU 5 ELECTRIC Invoice 05/21/2025 321.87 101-4-2330-4389 101 5-21-25 ERMU 6 ELECTRIC Invoice 05/21/2025 64.38 101-4-2190-4389 101 5-21-25 ERMU 7 ELECTRIC Invoice 05/21/2025 33.92 101-4-5110-4389 Total 17700 ELK RIVER MUNICIPAL UTILITIES: 91,793.44 ELK RIVER WINLECTRIC 101 412427 01 1 SUPPLIES Invoice 05/16/2025 85.05 101-4-1600-4219 101 412434 02 1 SUPPLIES-LED DRIVERS Invoice 05/22/2025 1,023.68 101-4-3120-4319 Total 17890 ELK RIVER WINLECTRIC: 1,108.73 EMILY'S PET ENTERPRISES LLC 101 8652 1 ENTERTAINMENT IN THE PARK 6/26/ Invoice 01/15/2025 359.00 101-4-5220-4409 Total 52321 EMILY'S PET ENTERPRISES LLC: 359.00 FACTORY MOTOR PARTS CO 101 128-Z18067 1 PARTS #723 Invoice 05/14/2025 134.72 101-4-5110-4221 Total 18408 FACTORY MOTOR PARTS CO: 134.72 FASTENAL COMPANY 101 MNELK142202 1 SUPPLIES - VENDING Invoice 05/16/2025 70.90 101-4-3120-4219 101 MNELK142202 2 SUPPLIES - VENDING Invoice 05/16/2025 38.46 101-4-5110-4219 101 MNELK142202 3 SUPPLIES - VENDING Invoice 05/16/2025 30.57 101-4-1600-4219 101 MNELK142202 4 SUPPLIES - VENDING Invoice 05/16/2025 7.94 101-4-3150-4219 Total 18453 FASTENAL COMPANY: 147.87 FIRST STATE TIRE RECYCLING Page 20 of 247 CITY OF ELK RIVER Unpaid Invoice Report - COUNCIL Page: 12 Report dates: ALL-ALL May 28, 2025 05:05PM Invoice Sequence Description Type Invoice Invoice GL Account Number Number Date Amount Number 228 123924 1 TIRE RECYCLING-CLEAN UP DAY Invoice 04/26/2025 1,301.75 228-4-7000-4409 Total 12673 FIRST STATE TIRE RECYCLING: 1,301.75 FLEETPRIDE 101 125719604 1 PARTS Invoice 05/13/2025 74.99 101-4-2320-4221 Total 11711 FLEETPRIDE: 74.99 FLORENCE HICKMAN 821 5222025 THE COVE 1 REFUND GRADING ESCROW THE C Invoice 05/22/2025 30,000.00 821-2200 Total 52302 FLORENCE HICKMAN: 30,000.00 FUTURE PLUS BATTERIES 101 P82530616 1 BATTERIES Invoice 05/15/2025 116.55 101-4-3120-4219 Total 11835 FUTURE PLUS BATTERIES: 116.55 GOODIN COMPANY 101 1443397-00 1 SUPPLIES Invoice 05/19/2025 115.26 101-4-5110-4219 Total 20113 GOODIN COMPANY: 115.26 GRACE O'KONEK 101 5162025-2 G O 1 CONF MEAL REIMBURSEMENT - O'K Invoice 05/16/2025 63.00 101-4-2130-4331 Total 52400 GRACE O'KONEK: 63.00 GRANITE CITY JOBBING CO 603 456253 1 POP/MISC Invoice 05/16/2025 1,223.06 603-4-9111-4255 603 456253 2 FREIGHT Invoice 05/16/2025 5.00 603-4-9111-4332 603 456253 3 SUPPLIES Invoice 05/16/2025 116.26 603-4-9112-4219 603 456258 1 POP/MISC Invoice 05/16/2025 404.37 603-4-9151-4255 603 456258 2 SUPPLIES Invoice 05/16/2025 39.09 603-4-9152-4219 603 456258 3 FREIGHT Invoice 05/16/2025 5.00 603-4-9151-4332 603 457723 1 POP/MISC Invoice 05/23/2025 1,235.85 603-4-9111-4255 603 457723 2 FREIGHT Invoice 05/23/2025 5.00 603-4-9111-4332 603 457723 3 SUPPLIES Invoice 05/23/2025 88.91 603-4-9112-4219 603 457725 1 POP/MISC Invoice 05/23/2025 1,195.31 603-4-9151-4255 Page 21 of 247 CITY OF ELK RIVER Unpaid Invoice Report - COUNCIL Page: 13 Report dates: ALL-ALL May 28, 2025 05:05PM Invoice Sequence Description Type Invoice Invoice GL Account Number Number Date Amount Number 603 457725 2 SUPPLIES Invoice 05/23/2025 55.93 603-4-9152-4219 603 457725 3 FREIGHT Invoice 05/23/2025 5.00 603-4-9151-4332 Total 10654 GRANITE CITY JOBBING CO: 4,378.78 GRIMCO, INC 101 34057938-01 1 SIGN MATERIALS Invoice 05/14/2025 112.00 101-4-1120-4226 Total 14770 GRIMCO, INC: 112.00 HAWKINS, INC. 602 7067526 1 CHLORINE & SULFER DIOXIDE Invoice 05/15/2025 40.00 602-4-9020-4219 602 7076168 1 CHLORINE & SULFER DIOXIDE Invoice 05/22/2025 1,610.80 602-4-9020-4219 Total 21053 HAWKINS, INC.: 1,650.80 HEARTLAND BUSINESS SYSTEMS, LLC 290 793822-H 1 SECURITY CAMERAS Invoice 05/13/2025 15,091.99 290-4-1350-4219 290 794579-H 1 SECURITY CAMERA LABOR INSTALL Invoice 05/20/2025 2,357.50 290-4-1350-4409 101 796301-H 1 PD GARAGE CAMERAS Invoice 05/20/2025 3,242.33 101-4-1350-4219 290 796303-H 1 SECURITY CAMERAS Invoice 05/20/2025 2,346.62 290-4-1350-4219 Total 14882 HEARTLAND BUSINESS SYSTEMS, LLC: 23,038.44 HEIJEU 211 2025-10 1 TINY SCHOOL OF ART & DESIGN 7/1 Invoice 04/15/2025 1,380.00 211-4-5600-4409 Total 52354 HEIJEU: 1,380.00 HOISINGTON KOEGLER GROUP INC 440 24-031-8 1 PROF SVCS-RIVERS EDGE RENO Invoice 05/15/2025 628.24 440-4-5110-4319 Total 21475 HOISINGTON KOEGLER GROUP INC: 628.24 HOME DEPOT CREDIT SERVICES 602 8622737 1 SUPPLIES Invoice 05/23/2025 59.91 602-4-9020-4219 Total 21600 HOME DEPOT CREDIT SERVICES: 59.91 HORIZON CHEMICAL LLC 101 INV101525 1 SUPPLIES Invoice 05/08/2025 321.07 101-4-5110-4219 Total 15355 HORIZON CHEMICAL LLC: 321.07 Page 22 of 247 CITY OF ELK RIVER Unpaid Invoice Report - COUNCIL Page: 14 Report dates: ALL-ALL May 28, 2025 05:05PM Invoice Sequence Description Type Invoice Invoice GL Account Number Number Date Amount Number INK WIZARDS 101 11715 1 STAFF T-SHIRTS Invoice 05/14/2025 291.60 101-4-5110-4217 Total 22250 INK WIZARDS: 291.60 INSIGHT BREWING COMPANY, LLC 603 24086 1 BEER Invoice 05/23/2025 169.16 603-4-9151-4252 Total 52377 INSIGHT BREWING COMPANY, LLC: 169.16 ISTATE TRUCK INC 101 C244014204: 01 1 PARTS #U008 Invoice 05/16/2025 165.96 101-4-3150-4221 101 C244014295: 01 1 PARTS #U0008 Invoice 05/19/2025 137.27 101-4-3150-4221 101 C244014350: 01 1 PARTS CREDIT #U0008 Invoice 05/20/2025 142.06- 101-4-3150-4221 Total 22000 ISTATE TRUCK INC: 161.17 JAMES RODRIGUEZ 101 5192025 6/12/25 1 RIVERFRONT CONCERT FINAL 06-12 Invoice 05/19/2025 3,500.00 101-4-5220-4409 Total 15313 JAMES RODRIGUEZ: 3,500.00 JOHN CHALMERS 602 5858 1 HYBRID SUNFISH Invoice 05/23/2025 530.00 602-4-9020-4219 Total 52392 JOHN CHALMERS: 530.00 JOHN P KERNS 101 61225 1 ENTERTAINMENT IN THE PARK 6/12/ Invoice 06/12/2025 350.00 101-4-5220-4409 Total 52322 JOHN P KERNS: 350.00 JOHNSON BROS LIQUOR 603 134413 1 LIQUOR CREDIT Invoice 05/13/2025 165.20- 603-4-9111-4251 603 134414 1 WINE CREDIT Invoice 05/13/2025 253.33- 603-4-9111-4253 603 134415 1 WINE CREDIT Invoice 05/13/2025 1,058.98- 603-4-9111-4253 603 2788666 1 LIQUOR Invoice 05/14/2025 1,973.65 603-4-9111-4251 603 2788666 2 FREIGHT Invoice 05/14/2025 17.40 603-4-9111-4332 603 2788667 1 LIQUOR Invoice 05/14/2025 1,021.10 603-4-9111-4251 603 2788667 2 FREIGHT Invoice 05/14/2025 20.60 603-4-9111-4332 603 2788668 1 WINE Invoice 05/14/2025 1,660.00 603-4-9111-4253 Page 23 of 247 CITY OF ELK RIVER Unpaid Invoice Report - COUNCIL Page: 15 Report dates: ALL-ALL May 28, 2025 05:05PM Invoice Sequence Description Type Invoice Invoice GL Account Number Number Date Amount Number 603 2788668 2 FREIGHT Invoice 05/14/2025 45.68 603-4-9111-4332 603 2788669 1 POP/MISC Invoice 05/14/2025 222.00 603-4-9111-4255 603 2788669 2 FREIGHT Invoice 05/14/2025 12.18 603-4-9111-4332 603 2793407 1 LIQUOR Invoice 05/21/2025 10,641.21 603-4-9111-4251 603 2793407 2 FREIGHT Invoice 05/21/2025 122.67 603-4-9111-4332 603 2793408 1 WINE Invoice 05/21/2025 3,454.00 603-4-9111-4253 603 2793408 2 FREIGHT Invoice 05/21/2025 74.82 603-4-9111-4332 603 2793409 1 POP/MISC Invoice 05/21/2025 56.95 603-4-9111-4255 603 2793409 2 FREIGHT Invoice 05/21/2025 1.74 603-4-9111-4332 603 2793410 1 THC PRODUCTS Invoice 05/21/2025 445.54 603-4-9111-4256 603 2793411 1 LIQUOR Invoice 05/21/2025 6,343.28 603-4-9111-4251 603 2793411 2 FREIGHT Invoice 05/21/2025 95.70 603-4-9111-4332 603 2793412 1 WINE Invoice 05/21/2025 440.00 603-4-9151-4253 603 2793412 2 FREIGHT Invoice 05/21/2025 10.44 603-4-9151-4332 603 2793414 1 THC PRODUCTS Invoice 05/21/2025 68.52 603-4-9151-4256 603 2793415 1 LIQUOR Invoice 05/21/2025 2,117.00 603-4-9151-4251 603 2793415 2 FREIGHT Invoice 05/21/2025 26.10 603-4-9151-4332 603 2793416 1 LIQUOR Invoice 05/21/2025 2,718.71 603-4-9151-4251 603 2793416 2 FREIGHT Invoice 05/21/2025 34.80 603-4-9151-4332 603 2793417 1 WINE Invoice 05/21/2025 1,919.91 603-4-9151-4253 603 2793417 2 FREIGHT Invoice 05/21/2025 53.94 603-4-9151-4332 Total 22775 JOHNSON BROS LIQUOR: 32,120.43 KROMER PRO LLC 101 582405 1 PARTS FOR PAINTER Invoice 05/12/2025 83.39 101-4-5110-4221 Total 14417 KROMER PRO LLC: 83.39 LAKE STATE RECYCLING INC 228 77973 1 RECYCLING - CLEAN UP DAY Invoice 05/27/2025 3,605.68 228-4-7000-4409 Total 13119 LAKE STATE RECYCLING INC: 3,605.68 Page 24 of 247 CITY OF ELK RIVER Unpaid Invoice Report - COUNCIL Page: 16 Report dates: ALL-ALL May 28, 2025 05:05PM Invoice Sequence Description Type Invoice Invoice GL Account Number Number Date Amount Number LARRY SWENSON 225 5-15-25 SWENSON 1 EASEMENT 75-00122-0310 & FENCE Invoice 05/28/2025 34,412.48 225-4-8546-4409 Total 52414 LARRY SWENSON: 34,412.48 M T I DISTRIBUTING INC 101 1473716-00 1 PARTS #723 Invoice 05/13/2025 61.00 101-4-5110-4221 101 1474118-00 1 PARTS #723 Invoice 05/19/2025 74.58 101-4-5110-4221 101 1474118-01 1 PARTS #723 Invoice 05/19/2025 48.15 101-4-5110-4221 101 1474343-00 1 PARTS #724 Invoice 05/15/2025 217.57 101-4-5110-4221 101 1474343-01 1 PARTS #724 Invoice 05/19/2025 62.83 101-4-5110-4221 101 1474984-00 1 PARTS Invoice 05/20/2025 85.56 101-4-5110-4221 101 1474989-00 1 PARTS Invoice 05/20/2025 2,329.70 101-4-5110-4221 Total 24475 M T I DISTRIBUTING INC: 2,879.39 MANSFIELD OIL CO 101 26534267 1 UNLEADED GASOLINE Invoice 05/16/2025 18,104.79 101-4-3120-4212 Total 12310 MANSFIELD OIL CO: 18,104.79 MARCO HOLDINGS LLC 101 INV13907732 1 ACE365 Invoice 05/24/2025 6,350.00 101-4-1350-4404 Total 24714 MARCO HOLDINGS LLC: 6,350.00 MARCO TECHNOLOGIES LLC 603 556506665 1 COPIER LEASE/MAINT Invoice 05/27/2025 212.59 603-4-9112-4404 603 556506665 2 COPIER LEASE/MAINT Invoice 05/27/2025 212.59 603-4-9152-4404 602 556506665 3 COPIER LEASE/MAINT Invoice 05/27/2025 510.02 602-4-9010-4404 221 556506665 4 COPIER LEASE/MAINT Invoice 05/27/2025 658.17 221-4-5400-4415 101 556506665 5 COPIER LEASE/MAINT Invoice 05/27/2025 2,114.82 101-4-1350-4404 Total 12332 MARCO TECHNOLOGIES LLC: 3,708.19 MAVERICK BEVERAGE CO MN LLC 603 INV1604953 1 LIQUOR Invoice 05/15/2025 780.00 603-4-9111-4251 603 INV1604953 2 WINE Invoice 05/15/2025 574.00 603-4-9111-4253 603 INV1604953 3 FREIGHT Invoice 05/15/2025 21.00 603-4-9111-4332 Page 25 of 247 CITY OF ELK RIVER Unpaid Invoice Report - COUNCIL Page: 17 Report dates: ALL-ALL May 28, 2025 05:05PM Invoice Sequence Description Type Invoice Invoice GL Account Number Number Date Amount Number Total 14588 MAVERICK BEVERAGE CO MN LLC: 1,375.00 MHSRC/RANGE 101 337900-11837 1 DRIVING SCHOOL - POST MANDATE Invoice 05/16/2025 1,575.00 101-4-2120-4331 Total 26394 MHSRC/RANGE: 1,575.00 MN VALLEY TESTING LAB INC 602 1305857 1 WATER TESTING Invoice 05/16/2025 474.40 602-4-9020-4319 602 1306734 1 WATER TESTING Invoice 05/22/2025 474.40 602-4-9020-4319 Total 24500 MN VALLEY TESTING LAB INC: 948.80 OXYGEN SERVICE CO, INC 101 8834833 1 PROPANE - FORK LIFT Invoice 05/13/2025 220.35 101-4-3120-4221 101 8834833 2 SUPPLIES Invoice 05/13/2025 15.90 101-4-3150-4219 Total 28960 OXYGEN SERVICE CO, INC: 236.25 PAUSTIS WINE COMPANY 603 266347 1 FREIGHT Invoice 05/22/2025 10.00 603-4-9151-4332 603 266347 2 WINE Invoice 05/22/2025 385.50 603-4-9151-4253 Total 29251 PAUSTIS WINE COMPANY: 395.50 PHILLIPS WINE & SPIRITS CO 603 6976300 1 LIQUOR Invoice 05/14/2025 2,804.67 603-4-9111-4251 603 6976300 2 FREIGHT Invoice 05/14/2025 52.20 603-4-9111-4332 603 6976301 1 WINE Invoice 05/14/2025 955.50 603-4-9111-4253 603 6976301 2 FREIGHT Invoice 05/14/2025 31.32 603-4-9111-4332 603 6976302 1 POP/MISC Invoice 05/14/2025 292.05 603-4-9111-4255 603 6976302 2 FREIGHT Invoice 05/14/2025 7.83 603-4-9111-4332 603 6976303 1 THC PRODUCTS Invoice 05/14/2025 63.00 603-4-9111-4256 603 6977256 1 WINE Invoice 05/15/2025 67.20 603-4-9111-4253 603 6977256 2 FREIGHT Invoice 05/15/2025 6.96 603-4-9111-4332 603 6977257 1 WINE Invoice 05/15/2025 134.40 603-4-9151-4253 603 6977257 2 FREIGHT Invoice 05/15/2025 13.92 603-4-9151-4332 Page 26 of 247 CITY OF ELK RIVER Unpaid Invoice Report - COUNCIL Page: 18 Report dates: ALL-ALL May 28, 2025 05:05PM Invoice Sequence Description Type Invoice Invoice GL Account Number Number Date Amount Number 603 6978229 1 WINE Invoice 05/16/2025 100.80 603-4-9111-4253 603 6978229 2 FREIGHT Invoice 05/16/2025 10.44 603-4-9111-4332 603 6982117 1 LIQUOR Invoice 05/23/2025 7,254.40 603-4-9111-4251 603 6982117 2 FREIGHT Invoice 05/23/2025 104.40 603-4-9111-4332 603 6982118 1 WINE Invoice 05/23/2025 1,032.95 603-4-9111-4253 603 6982118 2 FREIGHT Invoice 05/23/2025 29.58 603-4-9111-4332 603 6982119 1 POP/MISC Invoice 05/23/2025 103.53 603-4-9111-4255 603 6982119 2 FREIGHT Invoice 05/23/2025 3.48 603-4-9111-4332 603 6982120 1 THC PRODUCTS Invoice 05/23/2025 441.00 603-4-9111-4256 603 6982121 1 LIQUOR Invoice 05/23/2025 2,329.01 603-4-9151-4251 603 6982121 2 FREIGHT Invoice 05/23/2025 31.32 603-4-9151-4332 603 6982122 1 FREIGHT Invoice 05/23/2025 5.22 603-4-9151-4332 Total 29665 PHILLIPS WINE & SPIRITS CO: 15,875.18 PUBLIC SAFETY EQUIPMENT L 410 10764 1 TZD TRUCK SUPPLIES Invoice 05/20/2025 2,210.00 410-4-2110-4560 Total 30421 PUBLIC SAFETY EQUIPMENT L: 2,210.00 QUALITY FLOW SYSTEMS INC 602 48919 1 PUMP/SAND FILTER REPLACEMENT Invoice 05/16/2025 11,963.00 602-4-9020-4560 Total 30500 QUALITY FLOW SYSTEMS INC: 11,963.00 RAD ACQUISITION HOLDINGS 101 INV-20250517C20GEW 1 SUPPLIES Invoice 05/19/2025 236.00 101-4-5110-4219 Total 15217 RAD ACQUISITION HOLDINGS: 236.00 RED BULL DISTRIBUTION COM 603 5016896506 1 POP/MISC Invoice 05/21/2025 242.68 603-4-9151-4255 Total 12944 RED BULL DISTRIBUTION COM: 242.68 SANITATION PRODUCTS INC 101 93013 1 PARTS #88 Invoice 05/20/2025 77.31 101-4-3120-4221 Total 52385 SANITATION PRODUCTS INC: 77.31 Page 27 of 247 CITY OF ELK RIVER Unpaid Invoice Report - COUNCIL Page: 19 Report dates: ALL-ALL May 28, 2025 05:05PM Invoice Sequence Description Type Invoice Invoice GL Account Number Number Date Amount Number SCHWAB\VOLLHABER\LUBRATT SCV CORP 101 249967 1 DAIKIN HEAT PUMP Invoice 05/19/2025 5,442.00 101-4-2190-4219 Total 31928 SCHWAB\VOLLHABER\LUBRATT SCV CORP: 5,442.00 SHAMROCK GROUP INC 603 122-00304 1 ICE Invoice 05/19/2025 174.50 603-4-9111-4255 603 122-00304 2 FREIGHT Invoice 05/19/2025 4.00 603-4-9111-4332 603 122-00306 1 FREIGHT Invoice 05/19/2025 4.00 603-4-9151-4332 603 122-00306 2 ICE Invoice 05/19/2025 124.76 603-4-9151-4255 Total 12909 SHAMROCK GROUP INC: 307.26 SHANNON GILBERTSON 101 24794622708 1 PLAQUE-CONCERT SPONSORSHIP Invoice 05/22/2025 218.00 101-4-5220-4219 Total 14724 SHANNON GILBERTSON: 218.00 SHERBURNE CO ABSTRACT & TITLE 225 SP2025-0153 MAHER 1 MAHER PROPERTY - PID 75-00131-2 Invoice 05/22/2025 72,987.86 225-4-5110-4510 Total 32170 SHERBURNE CO ABSTRACT & TITLE: 72,987.86 SHERWIN-WILLIAMS 101 6368-2 1 SUPPLIES Invoice 05/15/2025 4.84 101-4-1600-4219 Total 32280 SHERWIN-WILLIAMS: 4.84 SMALL LOT MN 603 MN94893 1 LIQUOR Invoice 05/14/2025 821.00 603-4-9151-4251 Total 13561 SMALL LOT MN: 821.00 SOUTHERN GLAZER'S WINE & SPIRITS OF MN 603 2624188 1 LIQUOR Invoice 05/15/2025 1,355.28 603-4-9151-4251 603 2624188 2 FREIGHT Invoice 05/15/2025 14.72 603-4-9151-4332 603 2624189 1 WINE Invoice 05/15/2025 183.68 603-4-9151-4253 603 2624189 2 FREIGHT Invoice 05/15/2025 5.12 603-4-9151-4332 603 2626894 1 LIQUOR Invoice 05/22/2025 962.55 603-4-9151-4251 603 2626894 2 FREIGHT Invoice 05/22/2025 7.68 603-4-9151-4332 603 2626895 1 WINE Invoice 05/22/2025 297.00 603-4-9151-4253 Page 28 of 247 CITY OF ELK RIVER Unpaid Invoice Report - COUNCIL Page: 20 Report dates: ALL-ALL May 28, 2025 05:05PM Invoice Sequence Description Type Invoice Invoice GL Account Number Number Date Amount Number 603 2626895 2 FREIGHT Invoice 05/22/2025 7.25 603-4-9151-4332 Total 8000 SOUTHERN GLAZER'S WINE & SPIRITS OF MN: 2,833.28 603 2624185 1 LIQUOR Invoice 05/15/2025 5,374.46 603-4-9111-4251 603 2624185 2 FREIGHT Invoice 05/15/2025 46.87 603-4-9111-4332 603 2624186 1 WINE Invoice 05/15/2025 2,080.80 603-4-9111-4253 603 2624186 2 FREIGHT Invoice 05/15/2025 32.92 603-4-9111-4332 603 2624187 1 FREIGHT Invoice 05/15/2025 2.50 603-4-9111-4332 603 2626892 1 LIQUOR Invoice 05/22/2025 3,007.31 603-4-9111-4251 603 2626892 2 FREIGHT Invoice 05/22/2025 40.62 603-4-9111-4332 603 2626893 1 WINE Invoice 05/22/2025 1,605.64 603-4-9111-4253 603 2626893 2 FREIGHT Invoice 05/22/2025 32.08 603-4-9111-4332 603 9641010 1 LIQUOR CREDIT Invoice 05/16/2025 26.83- 603-4-9111-4251 603 9641010 2 FREIGHT CREDIT Invoice 05/16/2025 .10- 603-4-9111-4332 Total 11314 SOUTHERN GLAZER'S WINE & SPIRITS OF MN: 12,196.27 SPEEDCUTTERS OUTDOOR MAINT LLC 211 28736 1 MOWING & FERTILIZER - LIBRARY Invoice 05/15/2025 654.56 211-4-5600-4409 101 28736 2 MOWING & FERTILIZER - RIVERS ED Invoice 05/15/2025 314.47 101-4-5110-4409 101 28736 3 MOWING & FERTILIZER - CITY HALL Invoice 05/15/2025 589.94 101-4-1600-4401 101 28736 4 MOWING & FERTILIZER - PUBLIC SA Invoice 05/15/2025 760.88 101-4-2190-4401 101 28736 5 MOWING & FERTILIZER - FIRE STATI Invoice 05/15/2025 244.86 101-4-2310-4401 101 28736 6 MOWING & FERTILIZER - PUBLIC W Invoice 05/15/2025 1,544.17 101-4-5110-4409 101 28736 7 MOWING & FERTILIZER - JACKSON Invoice 05/15/2025 244.86 101-4-1600-4401 101 28736 8 MOWING & FERTILIZER - FIRE STATI Invoice 05/15/2025 759.35 101-4-2310-4401 603 28737 1 MOWING & FERTILIZER - MAY Invoice 05/15/2025 565.08 603-4-9152-4404 603 28737 2 MOWING & FERTILIZER - MAY Invoice 05/15/2025 576.02 603-4-9112-4404 Total 11661 SPEEDCUTTERS OUTDOOR MAINT LLC: 6,254.19 STARR SORHEIM 101 5/19/25 S.S.1 HOTEL - GSM CONFERENCE/SORHE Invoice 05/27/2025 582.76 101-4-1120-4331 Page 29 of 247 CITY OF ELK RIVER Unpaid Invoice Report - COUNCIL Page: 21 Report dates: ALL-ALL May 28, 2025 05:05PM Invoice Sequence Description Type Invoice Invoice GL Account Number Number Date Amount Number 101 5/19/25 S.S.2 TRANSPORTATION - GSM CONF/SO Invoice 05/27/2025 35.20 101-4-1120-4331 Total 52357 STARR SORHEIM: 617.96 STREICHER'S 101 I1763277 1 INITIAL ISSUE - NEW CSO - JOHNSO Invoice 05/22/2025 1,776.80 101-4-2150-4217 101 I1763285 1 INITIAL ISSUE - NEW OFFICER - REA Invoice 05/22/2025 2,145.71 101-4-2120-4217 Total 33300 STREICHER'S: 3,922.51 STREICHER'S INC 101 I1762238 1 UNIFORMS - BALABON Invoice 05/15/2025 56.98 101-4-2130-4217 Total 52346 STREICHER'S INC: 56.98 SUMMER LAKES BEVERAGE LLC 603 9523 1 POP/MISC Invoice 05/14/2025 561.00 603-4-9111-4255 Total 14779 SUMMER LAKES BEVERAGE LLC: 561.00 SUSAN MONTAGUE 101 5-27-25 SM 1 INSTRUCTOR FEE - MAY Invoice 05/27/2025 120.00 101-4-5510-4409 Total 14562 SUSAN MONTAGUE: 120.00 THE AMERICAN BOTTLING CO 603 4847904299 1 POP Invoice 05/19/2025 217.50 603-4-9111-4255 Total 10415 THE AMERICAN BOTTLING CO: 217.50 THE UPS STORE #5093 602 5-9-25 WW 1 DELIVERY CHGS - WW Invoice 05/09/2025 13.85 602-4-9010-4322 Total 35549 THE UPS STORE #5093: 13.85 TIFCO INDUSTRIES INC 602 72091448 1 SUPPLIES Invoice 05/19/2025 592.14 602-4-9020-4219 Total 13394 TIFCO INDUSTRIES INC: 592.14 TREVOR J. BROWN 101 5122025 6/11/25 1 PRESENTATION FEE - 6/11/25 Invoice 05/12/2025 75.00 101-4-5510-4409 Total 52397 TREVOR J. BROWN: 75.00 TRI-COUNTY LAW ENFORCEMENT Page 30 of 247 CITY OF ELK RIVER Unpaid Invoice Report - COUNCIL Page: 22 Report dates: ALL-ALL May 28, 2025 05:05PM Invoice Sequence Description Type Invoice Invoice GL Account Number Number Date Amount Number 101 5202025 1 ANNUAL DUES Invoice 05/12/2025 90.00 101-4-2130-4433 Total 34691 TRI-COUNTY LAW ENFORCEMENT: 90.00 TWENTY4SEVEN FIRE & SEC CORP 101 6808 1 FIRE ALARM MONITORING-FS 1 Invoice 05/21/2025 525.00 101-4-2310-4401 101 6808 2 FIRE ALARM MONITORING-FS 3 Invoice 05/21/2025 575.00 101-4-2310-4404 Total 14878 TWENTY4SEVEN FIRE & SEC CORP: 1,100.00 TWIN CITY GARAGE DOOR-GARAGE DOOR STORE 101 418772426 1 GARAGE DOOR REPAIR Invoice 05/16/2025 398.00 101-4-2190-4401 Total 34925 TWIN CITY GARAGE DOOR-GARAGE DOOR STORE: 398.00 UKG INC. 101 I01100004794 1 USAGE FEES JUN-AUG Invoice 05/16/2025 16,559.83 101-4-1220-4404 101 I01100007929 1 USAGE OVERAGE FEES APR 2025 Invoice 05/16/2025 2,763.51 101-4-1220-4404 Total 12920 UKG INC.: 19,323.34 VIKING COCA-COLA CO 603 3670177 1 POP/MISC Invoice 05/16/2025 499.20 603-4-9151-4255 603 3684044 1 POP/MISC Invoice 05/23/2025 1,139.70 603-4-9111-4255 Total 35725 VIKING COCA-COLA CO: 1,638.90 VINOCOPIA 603 373815-IN 1 LIQUOR Invoice 05/21/2025 275.25 603-4-9151-4251 603 373815-IN 2 WINE Invoice 05/21/2025 72.00 603-4-9151-4253 603 373815-IN 3 FREIGHT Invoice 05/21/2025 7.50 603-4-9151-4332 603 373818-IN 1 WINE Invoice 05/21/2025 352.00 603-4-9111-4253 603 373818-IN 2 FREIGHT Invoice 05/21/2025 7.50 603-4-9111-4332 603 374077-IN 1 WINE Invoice 05/23/2025 480.00 603-4-9111-4253 Total 35763 VINOCOPIA: 1,194.25 WASTE MANAGEMENT 605 49665-1706-4 1 MAY GARBAGE TIPPING FEES 5/6-5/ Invoice 05/16/2025 24,796.89 605-4-9210-4384 Total 36033 WASTE MANAGEMENT: 24,796.89 Page 31 of 247 CITY OF ELK RIVER Unpaid Invoice Report - COUNCIL Page: 23 Report dates: ALL-ALL May 28, 2025 05:05PM Invoice Sequence Description Type Invoice Invoice GL Account Number Number Date Amount Number WHITE CAP, LP 101 50031382601 1 SUPPLIES Invoice 05/13/2025 170.09 101-4-3120-4219 Total 15018 WHITE CAP, LP: 170.09 WINEBOW 603 MN00166309 1 LIQUOR Invoice 05/16/2025 552.00 603-4-9111-4251 603 MN00166309 2 FREIGHT Invoice 05/16/2025 14.00 603-4-9111-4332 Total 14002 WINEBOW: 566.00 ZIEGLER INC 101 IN001918294 1 PARTS #318/313 Invoice 05/14/2025 124.96 101-4-3120-4221 Total 36900 ZIEGLER INC: 124.96 Total : 1,274,968.01 Grand Totals: 1,274,968.01 Summary by General Ledger Account Number GL Account Number Debit Credit Net 101-4-1110-4359 645.00 .00 645.00 101-4-1120-4226 112.00 .00 112.00 101-4-1120-4331 617.96 .00 617.96 101-4-1120-4433 400.00 .00 400.00 101-4-1220-4404 19,323.34 .00 19,323.34 101-4-1310-4301 4,000.00 .00 4,000.00 101-4-1350-4219 3,242.33 .00 3,242.33 101-4-1350-4404 8,464.82 .00 8,464.82 101-4-1600-4219 295.46 .00 295.46 101-4-1600-4389 4,133.48 .00 4,133.48 101-4-1600-4401 834.80 .00 834.80 101-4-1600-4409 1,814.40 .00 1,814.40 101-4-2120-4217 2,145.71 .00 2,145.71 101-4-2120-4331 1,575.00 .00 1,575.00 101-4-2130-4217 939.35 .00 939.35 101-4-2130-4219 93.98 .00 93.98 101-4-2130-4331 501.00 .00 501.00 101-4-2130-4433 90.00 .00 90.00 101-4-2150-4217 1,776.80 .00 1,776.80 101-4-2150-4331 245.30 .00 245.30 101-4-2150-4409 416.00 .00 416.00 101-4-2160-4217 331.79 .00 331.79 101-4-2190-4219 6,155.39 .00 6,155.39 101-4-2190-4389 7,466.57 .00 7,466.57 101-4-2190-4401 1,158.88 .00 1,158.88 101-4-2310-4219 118.50 .00 118.50 Page 32 of 247 CITY OF ELK RIVER Unpaid Invoice Report - COUNCIL Page: 24 Report dates: ALL-ALL May 28, 2025 05:05PM Summary by General Ledger Account Number GL Account Number Debit Credit Net 101-4-2310-4389 806.40 .00 806.40 101-4-2310-4401 1,711.21 .00 1,711.21 101-4-2310-4404 575.00 .00 575.00 101-4-2320-4221 74.99 .00 74.99 101-4-2330-4389 400.40 .00 400.40 101-4-3120-4212 18,104.79 .00 18,104.79 101-4-3120-4219 505.00 .00 505.00 101-4-3120-4221 794.17 .00 794.17 101-4-3120-4226 337.60 .00 337.60 101-4-3120-4319 1,023.68 .00 1,023.68 101-4-3120-4389 3,986.34 .00 3,986.34 101-4-3150-4219 463.84 .00 463.84 101-4-3150-4221 303.23 142.06- 161.17 101-4-5110-4217 291.60 .00 291.60 101-4-5110-4219 2,914.20 .00 2,914.20 101-4-5110-4221 3,097.50 .00 3,097.50 101-4-5110-4389 7,337.65 .00 7,337.65 101-4-5110-4409 1,858.64 .00 1,858.64 101-4-5110-4415 154.98 .00 154.98 101-4-5220-4219 555.36 .00 555.36 101-4-5220-4409 4,209.00 .00 4,209.00 101-4-5230-4409 150.00 .00 150.00 101-4-5510-4219 285.99 .00 285.99 101-4-5510-4409 2,320.00 .00 2,320.00 101-4-5510-4433 97.66 .00 97.66 211-4-5600-4219 340.94 .00 340.94 211-4-5600-4389 2,922.65 .00 2,922.65 211-4-5600-4409 2,034.56 .00 2,034.56 221-3-0000-3464 408.00 .00 408.00 221-4-5400-4219 217.80 .00 217.80 221-4-5400-4389 26,724.62 .00 26,724.62 221-4-5400-4401 291.50 .00 291.50 221-4-5400-4415 658.17 .00 658.17 221-4-5430-4219 40.45 .00 40.45 221-4-5430-4259 333.71 .00 333.71 225-4-5110-4510 72,987.86 .00 72,987.86 225-4-8546-4303 2,541.00 .00 2,541.00 225-4-8546-4409 34,412.48 .00 34,412.48 228-4-7000-4409 9,385.32 .00 9,385.32 290-4-1350-4219 17,438.61 .00 17,438.61 290-4-1350-4409 2,607.50 .00 2,607.50 292-4-5600-4530 66,331.70 .00 66,331.70 343-4-7000-4611 469,043.75 .00 469,043.75 401-4-8080-4303 6,254.00 .00 6,254.00 403-4-8440-4303 47,994.10 .00 47,994.10 406-4-8050-4303 18,468.50 .00 18,468.50 410-4-2110-4560 2,210.00 .00 2,210.00 440-4-5110-4319 628.24 .00 628.24 602-4-9010-4201 92.33 .00 92.33 602-4-9010-4301 1,200.00 .00 1,200.00 602-4-9010-4321 165.80 .00 165.80 602-4-9010-4322 13.85 .00 13.85 602-4-9010-4404 510.02 .00 510.02 602-4-9020-4219 3,299.39 .00 3,299.39 602-4-9020-4319 948.80 .00 948.80 Page 33 of 247 CITY OF ELK RIVER Unpaid Invoice Report - COUNCIL Page: 25 Report dates: ALL-ALL May 28, 2025 05:05PM Summary by General Ledger Account Number GL Account Number Debit Credit Net 602-4-9020-4389 30,663.01 .00 30,663.01 602-4-9020-4404 1,400.00 .00 1,400.00 602-4-9020-4417 311.00 .00 311.00 602-4-9020-4560 11,963.00 .00 11,963.00 602-4-9050-4389 5,308.12 .00 5,308.12 603-4-9111-4251 52,132.89 205.99- 51,926.90 603-4-9111-4252 95,510.08 848.16- 94,661.92 603-4-9111-4253 17,428.89 1,312.31- 16,116.58 603-4-9111-4255 5,515.64 .00 5,515.64 603-4-9111-4256 3,839.53 11.44- 3,828.09 603-4-9111-4332 1,087.44 .10- 1,087.34 603-4-9112-4219 205.17 .00 205.17 603-4-9112-4301 1,000.00 .00 1,000.00 603-4-9112-4404 894.17 .00 894.17 603-4-9151-4251 17,161.14 1,044.00- 16,117.14 603-4-9151-4252 57,038.01 389.85- 56,648.16 603-4-9151-4253 3,992.49 .00 3,992.49 603-4-9151-4255 3,004.42 5.65- 2,998.77 603-4-9151-4256 865.45 .00 865.45 603-4-9151-4332 290.50 7.25- 283.25 603-4-9152-4219 95.02 .00 95.02 603-4-9152-4301 1,000.00 .00 1,000.00 603-4-9152-4389 2,044.20 .00 2,044.20 603-4-9152-4404 825.02 .00 825.02 605-4-9210-4301 400.00 .00 400.00 605-4-9210-4384 24,796.89 .00 24,796.89 607-4-9310-4301 400.00 .00 400.00 821-2200 30,000.00 .00 30,000.00 Grand Totals: 1,278,934.82 3,966.81- 1,274,968.01 Summary by General Ledger Posting Period GL Posting Period Debit Credit Net 00/00 1,278,934.82 3,966.81- 1,274,968.01 Grand Totals: 1,278,934.82 3,966.81- 1,274,968.01 Report Criteria: Invoice Detail.GL account (3 Characters) = {<>} "920" Invoice Detail.GL account (3 Characters) = {<>} "910" Invoice Detail.Created by = {<>} "jdengerud" Page 34 of 247 CITY OF ELK RIVER Check Register - By Bank- Excludes P/R Page: 1 Check Issue Dates: 5/21/2025 - 5/27/2025 May 28, 2025 05:32PM Report Criteria: Report type: Invoice detail Check.Type = {<>} "Adjustment" Bank.Bank number = 1 [Report].Invoice GL Account = {<>} "1012040" GL Check Check Vendor Invoice Invoice Discount Invoice Check Bank Number Period Issue Date Number Number Payee Number GL Account Taken Amount Amount 129908 05/25 05/22/2025 129908 52399 BECKER & ASSOCIATES 4-18-25 BECK 403-4-8440-4440 .00 12,100.00- 12,100.00-V 1 Total 129908: .00 12,100.00- 129942 05/25 05/22/2025 129942 52398 MICEK REVOCABLE FAMILY TRUST 4-18-25 MICE 403-4-8440-4440 .00 22,800.00- 22,800.00-V 1 Total 129942: .00 22,800.00- 129976 05/25 05/23/2025 129976 10749 ASPEN MILLS 353037 101-4-2120-4219 .00 478.00 478.00 1 Total 129976: .00 478.00 129977 05/25 05/23/2025 129977 12175 BIG LAKE POLICE DEPT 52125 TZD 101-4-2120-4440 .00 398.27 398.27 1 Total 129977: .00 398.27 129978 05/25 05/23/2025 129978 16350 DIAMOND VOGEL 813171563 101-4-3120-4219 .00 247.50 247.50 1 Total 129978: .00 247.50 129979 05/25 05/23/2025 129979 14829 ELK RIVER YOUTH SOFTBALL 85909358 221-3-0000-3475 .00 360.00 360.00 1 Total 129979: .00 360.00 129980 05/25 05/23/2025 129980 52406 ASCENTEK CORP 3795617 101-4-3150-4212 .00 2,806.60 2,806.60 1 05/25 05/23/2025 129980 52406 ASCENTEK CORP 3813418 101-4-3150-4212 .00 168.44 168.44 1 M = Manual Check, V = Void Check Page 35 of 247 CITY OF ELK RIVER Check Register - By Bank- Excludes P/R Page: 2 Check Issue Dates: 5/21/2025 - 5/27/2025 May 28, 2025 05:32PM GL Check Check Vendor Invoice Invoice Discount Invoice Check Bank Number Period Issue Date Number Number Payee Number GL Account Taken Amount Amount Total 129980: .00 2,975.04 129981 05/25 05/23/2025 129981 10950 B & D PLBG, HTG & AIR CON 6198250 603-4-9112-4404 .00 200.00 200.00 1 05/25 05/23/2025 129981 10950 B & D PLBG, HTG & AIR CON 6198292 603-4-9152-4404 .00 200.00 200.00 1 Total 129981: .00 400.00 129982 05/25 05/23/2025 129982 52284 C&H PRECISION INV23156 101-4-2120-4219 .00 213.97 213.97 1 Total 129982: .00 213.97 129983 05/25 05/23/2025 129983 52396 CHAD YESS 5162025 YES 101-4-2320-4331 .00 741.38 741.38 1 Total 129983: .00 741.38 129984 05/25 05/23/2025 129984 14425 COLLINS BROTHERS TOWING 120033 101-4-5230-4409 .00 150.00 150.00 1 Total 129984: .00 150.00 129985 05/25 05/23/2025 129985 14651 COMMISSIONER OF TRANSPORTATIO P00019476 101-4-3120-4409 .00 654.11 654.11 1 Total 129985: .00 654.11 129986 05/25 05/23/2025 129986 15550 CUB FOODS 117256 603-4-9152-4219 .00 10.78 10.78 1 Total 129986: .00 10.78 129987 05/25 05/23/2025 129987 14948 DOUGLAS GREEN 1125 221-4-5430-4219 .00 236.90 236.90 1 Total 129987: .00 236.90 M = Manual Check, V = Void Check Page 36 of 247 CITY OF ELK RIVER Check Register - By Bank- Excludes P/R Page: 3 Check Issue Dates: 5/21/2025 - 5/27/2025 May 28, 2025 05:32PM GL Check Check Vendor Invoice Invoice Discount Invoice Check Bank Number Period Issue Date Number Number Payee Number GL Account Taken Amount Amount 129988 05/25 05/23/2025 129988 24716 MARTIN MARIETTA MATERIALS 45725974 101-4-3120-4219 .00 220.00 220.00 1 05/25 05/23/2025 129988 24716 MARTIN MARIETTA MATERIALS 45738269 101-4-3120-4219 .00 220.00 220.00 1 05/25 05/23/2025 129988 24716 MARTIN MARIETTA MATERIALS 45748926 101-4-3120-4219 .00 220.00 220.00 1 Total 129988: .00 660.00 129989 05/25 05/23/2025 129989 52409 MICHAEL MICEK 4-18-25 MICE 403-4-8440-4440 .00 22,800.00 22,800.00 1 Total 129989: .00 22,800.00 129990 05/25 05/23/2025 129990 14183 POMPEII PIZZERIA 05222025 101-3-0000-3211 .00 200.00 200.00 1 Total 129990: .00 200.00 129991 05/25 05/23/2025 129991 52403 SANDY WEIDENBACH 86871041 101-2080 .00 116.75 116.75 1 Total 129991: .00 116.75 129992 05/25 05/23/2025 129992 31890 SCHINDLER ELEVATOR CORP 8106870929 101-4-2190-4401 .00 1,278.45 1,278.45 1 05/25 05/23/2025 129992 31890 SCHINDLER ELEVATOR CORP 8106870930 101-4-1600-4401 .00 639.24 639.24 1 05/25 05/23/2025 129992 31890 SCHINDLER ELEVATOR CORP 8106873878 603-4-9112-4404 .00 581.04 581.04 1 05/25 05/23/2025 129992 31890 SCHINDLER ELEVATOR CORP 9100946112 101-4-2190-4401 .00 51.90 51.90 1 05/25 05/23/2025 129992 31890 SCHINDLER ELEVATOR CORP 9100946113 101-4-1600-4401 .00 25.95 25.95 1 Total 129992: .00 2,576.58 129993 05/25 05/23/2025 129993 32240 SHERBURNE CO SHERIFF'S OFFICE 52125 TZD 101-4-2120-4440 .00 1,853.77 1,853.77 1 Total 129993: .00 1,853.77 129994 05/25 05/23/2025 129994 12551 SYSCO MINNESOTA INC 547908027 221-4-5430-4259 .00 966.86 966.86 1 M = Manual Check, V = Void Check Page 37 of 247 CITY OF ELK RIVER Check Register - By Bank- Excludes P/R Page: 4 Check Issue Dates: 5/21/2025 - 5/27/2025 May 28, 2025 05:32PM GL Check Check Vendor Invoice Invoice Discount Invoice Check Bank Number Period Issue Date Number Number Payee Number GL Account Taken Amount Amount Total 129994: .00 966.86 129995 05/25 05/23/2025 129995 52410 THE CONFLUENCE LLC 05222025 101-3-0000-3211 .00 200.00 200.00 1 Total 129995: .00 200.00 129996 05/25 05/23/2025 129996 13946 T-MOBILE 965639928 05/ 603-4-9152-4321 .00 995.84 995.84 1 Total 129996: .00 995.84 129997 05/25 05/23/2025 129997 52408 TWIN LAKES TOWNHOMES ASSOCIAT 5-14-25 BECK 403-4-8440-4440 .00 12,100.00 12,100.00 1 Total 129997: .00 12,100.00 1008087 05/25 05/27/2025 1008087 13759 AERZEN USA CORPORATION SEPI-25-0012 602-4-9020-4560 .00 35,012.56 35,012.56 1 Total 1008087: .00 35,012.56 1008088 05/25 05/27/2025 1008088 13954 CHARTER COMMUNICATIONS 175341301 MA 603-4-9112-4321 .00 1,455.74 1,455.74 1 Total 1008088: .00 1,455.74 1008089 05/25 05/27/2025 1008089 13666 JOHNSON CONTROLS 41324302 290-4-9220-4409 .00 358.40 358.40 1 Total 1008089: .00 358.40 1008090 05/25 05/27/2025 1008090 29845 PLAISTED COMPANIES INC 91890 101-4-3120-4219 .00 105.39 105.39 1 Total 1008090: .00 105.39 M = Manual Check, V = Void Check Page 38 of 247 CITY OF ELK RIVER Check Register - By Bank- Excludes P/R Page: 5 Check Issue Dates: 5/21/2025 - 5/27/2025 May 28, 2025 05:32PM GL Check Check Vendor Invoice Invoice Discount Invoice Check Bank Number Period Issue Date Number Number Payee Number GL Account Taken Amount Amount 1008091 05/25 05/27/2025 1008091 33059 STAPLES BUSINESS ADVANTAGE 7005118465 101-4-6210-4440 .00 299.40 299.40 1 Total 1008091: .00 299.40 1008092 05/25 05/27/2025 1008092 13394 TIFCO INDUSTRIES INC 72047458 602-4-9020-4219 .00 1,540.98 1,540.98 1 Total 1008092: .00 1,540.98 1008093 05/25 05/27/2025 1008093 12920 UKG INC. 300173925 101-4-1220-4404 .00 3,199.18 3,199.18 1 05/25 05/27/2025 1008093 12920 UKG INC. 300189580 101-4-1220-4404 .00 3,134.05 3,134.05 1 Total 1008093: .00 6,333.23 Grand Totals: .00 59,541.45 Summary by General Ledger Account Number GL Account Debit Credit Proof 101-2020 .00 19,485.44- 19,485.44- 101-2080 9.25 .00 9.25 101-3-0000-3211 400.00 .00 400.00 101-3-0000-3472 107.50 .00 107.50 101-4-1110-4321 67.24 .00 67.24 101-4-1120-4201 14.97 .00 14.97 101-4-1120-4321 34.63 .00 34.63 101-4-1210-4201 59.88 .00 59.88 101-4-1220-4201 29.94 .00 29.94 101-4-1220-4404 6,333.23 .00 6,333.23 101-4-1310-4201 29.94 .00 29.94 101-4-1350-4321 190.00 .00 190.00 101-4-1500-4201 8.98 .00 8.98 101-4-1510-4201 44.91 .00 44.91 101-4-1600-4321 152.90 .00 152.90 M = Manual Check, V = Void Check Page 39 of 247 CITY OF ELK RIVER Check Register - By Bank- Excludes P/R Page: 6 Check Issue Dates: 5/21/2025 - 5/27/2025 May 28, 2025 05:32PM GL Account Debit Credit Proof 101-4-1600-4389 69.99 .00 69.99 101-4-1600-4401 665.19 .00 665.19 101-4-2110-4321 213.33 .00 213.33 101-4-2120-4219 691.97 .00 691.97 101-4-2120-4440 2,252.04 .00 2,252.04 101-4-2190-4389 99.98 .00 99.98 101-4-2190-4401 1,330.35 .00 1,330.35 101-4-2310-4321 378.24 .00 378.24 101-4-2320-4331 741.38 .00 741.38 101-4-2330-4389 41.82 .00 41.82 101-4-2410-4201 44.91 .00 44.91 101-4-2410-4321 57.81 .00 57.81 101-4-2420-4321 44.04 .00 44.04 101-4-2440-4219 5.99 .00 5.99 101-4-3120-4219 1,012.89 .00 1,012.89 101-4-3120-4321 170.01 .00 170.01 101-4-3120-4409 654.11 .00 654.11 101-4-3150-4212 2,975.04 .00 2,975.04 101-4-3150-4321 24.77 .00 24.77 101-4-3300-4201 14.97 .00 14.97 101-4-3300-4321 19.27 .00 19.27 101-4-5110-4321 59.40 .00 59.40 101-4-5110-4389 59.98 .00 59.98 101-4-5210-4219 29.94 .00 29.94 101-4-5210-4321 154.91 .00 154.91 101-4-5230-4409 150.00 .00 150.00 101-4-5510-4321 24.77 .00 24.77 101-4-6210-4440 14.97 .00 14.97 221-2020 .00 1,990.55- 1,990.55- 221-3-0000-3475 360.00 .00 360.00 221-4-5400-4321 426.79 .00 426.79 221-4-5430-4219 236.90 .00 236.90 221-4-5430-4259 966.86 .00 966.86 290-2020 .00 358.40- 358.40- 290-4-9220-4409 358.40 .00 358.40 403-2020 34,900.00 34,900.00- .00 403-4-8440-4440 34,900.00 34,900.00- .00 602-2020 .00 36,656.55- 36,656.55- 602-4-9010-4321 103.01 .00 103.01 602-4-9020-4219 1,540.98 .00 1,540.98 M = Manual Check, V = Void Check Page 40 of 247 CITY OF ELK RIVER Check Register - By Bank- Excludes P/R Page: 7 Check Issue Dates: 5/21/2025 - 5/27/2025 May 28, 2025 05:32PM GL Account Debit Credit Proof 602-4-9020-4560 35,012.56 .00 35,012.56 603-2020 .00 1,050.51- 1,050.51- 603-4-9112-4321 29.99 .00 29.99 603-4-9112-4404 781.04 .00 781.04 603-4-9152-4219 10.78 .00 10.78 603-4-9152-4321 28.70 .00 28.70 603-4-9152-4404 200.00 .00 200.00 Grand Totals: 129,341.45 129,341.45- .00 Dated: ______________________________________________________ Mayor: ______________________________________________________ City Council: ______________________________________________________ ______________________________________________________ ______________________________________________________ ______________________________________________________ ______________________________________________________ ______________________________________________________ City Recorder: _____________________________________________________ Report Criteria: Report type: Invoice detail Check.Type = {<>} "Adjustment" Bank.Bank number = 1 [Report].Invoice GL Account = {<>} "1012040" M = Manual Check, V = Void Check Page 41 of 247 CITY OF ELK RIVER Check Register - TAXES Page: 1 Check Issue Dates: 5/20/2025 - 5/20/2025 May 28, 2025 05:35PM Report Criteria: Report type: Invoice detail Vendor.Vendor number = 26275, 26300 Check.Type = {<>} "Adjustment" Bank.Bank number = 1 GL Check Check Vendor Invoice Invoice Discount Invoice Check Bank Number Period Issue Date Number Number Payee Number GL Account Taken Amount Amount 520202520 05/25 05/20/2025 520202520 26275 MN DEPT OF REVENUE APR 25 FUEL 101-4-3120-4212 .00 392.41 392.41 1 Total 520202520: .00 392.41 520202521 05/25 05/20/2025 520202521 26300 MN DEPT. OF REVENUE APR 25 SALE 603-4-9152-4404 .00 75,300.00 75,300.00 1 Total 520202521: .00 75,300.00 Grand Totals: .00 75,692.41 Summary by General Ledger Account Number GL Account Debit Credit Proof 101-2020 .00 1,107.75- 1,107.75- 101-2080 762.35 .00 762.35 101-3-0000-3417 14.56 .00 14.56 101-4-3120-4212 330.84 .00 330.84 221-2020 .00 4,776.55- 4,776.55- 221-2080 4,776.55 .00 4,776.55 602-2020 .00 61.57- 61.57- 602-4-9050-4212 61.57 .00 61.57 603-2020 .00 69,746.54- 69,746.54- 603-2080 69,661.23 .00 69,661.23 603-4-9112-4219 2.72 .00 2.72 603-4-9112-4404 16.74 .00 16.74 603-4-9152-4219 49.11 .00 49.11 603-4-9152-4404 16.74 .00 16.74 M = Manual Check, V = Void Check Page 42 of 247 CITY OF ELK RIVER Check Register - TAXES Page: 2 Check Issue Dates: 5/20/2025 - 5/20/2025 May 28, 2025 05:35PM GL Account Debit Credit Proof Grand Totals: 75,692.41 75,692.41- .00 Dated: ______________________________________________________ Mayor: ______________________________________________________ City Council: ______________________________________________________ ______________________________________________________ ______________________________________________________ ______________________________________________________ ______________________________________________________ ______________________________________________________ City Recorder: _____________________________________________________ Report Criteria: Report type: Invoice detail Vendor.Vendor number = 26275, 26300 Check.Type = {<>} "Adjustment" Bank.Bank number = 1 M = Manual Check, V = Void Check Page 43 of 247 CITY OF ELK RIVER Check Register - CITY CR CARD Page: 1 Check Issue Dates: 5/7/2025 - 5/7/2025 May 27, 2025 04:57PM Report Criteria: Report type: Invoice detail Vendor.Vendor number = 35099 Check.Type = {<>} "Adjustment" Bank.Bank number = 1 GL Check Check Vendor Invoice Invoice Discount Invoice Check Bank Number Period Issue Date Number Number Payee Number GL Account Taken Amount Amount 507202522 05/25 05/07/2025 507202522 35099 US BANK 4252025 CITY 221-4-5430-4259 .00 12,289.06 12,289.06 1 Total 507202522: .00 12,289.06 Grand Totals: .00 12,289.06 Summary by General Ledger Account Number GL Account Debit Credit Proof 101-2020 779.96 7,818.65- 7,038.69- 101-4-1110-4331 296.21 .00 296.21 101-4-1120-4319 67.45 .00 67.45 101-4-1120-4331 190.00 .00 190.00 101-4-1310-4201 199.00 .00 199.00 101-4-1350-4404 24.00 .00 24.00 101-4-1510-4433 724.00 .00 724.00 101-4-1600-4321 346.54 .00 346.54 101-4-1600-4331 20.00 .00 20.00 101-4-2110-4331 1,466.16 .00 1,466.16 101-4-2120-4331 1,410.98 .00 1,410.98 101-4-2130-4331 .00 779.96- 779.96- 101-4-2150-4331 60.00 .00 60.00 101-4-2310-4359 124.37 .00 124.37 101-4-2410-4331 470.00 .00 470.00 101-4-2410-4404 160.00 .00 160.00 101-4-3150-4219 507.20 .00 507.20 101-4-5110-4219 1,253.09 .00 1,253.09 101-4-5110-4221 72.37 .00 72.37 101-4-5110-4404 75.00 .00 75.00 M = Manual Check, V = Void Check Page 44 of 247 CITY OF ELK RIVER Check Register - CITY CR CARD Page: 2 Check Issue Dates: 5/7/2025 - 5/7/2025 May 27, 2025 04:57PM GL Account Debit Credit Proof 101-4-5510-4331 352.28 .00 352.28 221-2020 12.15 2,952.44- 2,940.29- 221-4-5400-4219 250.07 12.15- 237.92 221-4-5400-4331 105.00 .00 105.00 221-4-5400-4349 97.57 .00 97.57 221-4-5420-4219 38.00 .00 38.00 221-4-5430-4219 2,288.57 .00 2,288.57 221-4-5430-4259 173.23 .00 173.23 228-2020 .00 167.90- 167.90- 228-4-7000-4219 104.55 .00 104.55 228-4-7000-4409 63.35 .00 63.35 290-2020 .00 97.67- 97.67- 290-4-2350-4219 97.67 .00 97.67 602-2020 .00 1,329.16- 1,329.16- 602-4-9020-4219 1,329.16 .00 1,329.16 603-2020 .00 688.15- 688.15- 603-4-9112-4331 57.47 .00 57.47 603-4-9112-4349 318.47 .00 318.47 603-4-9152-4331 57.46 .00 57.46 603-4-9152-4349 254.75 .00 254.75 821-2020 .00 27.20- 27.20- 821-2200 27.20 .00 27.20 Grand Totals: 13,873.28 13,873.28- .00 M = Manual Check, V = Void Check Page 45 of 247 CITY OF ELK RIVER Check Register - CITY CR CARD Page: 3 Check Issue Dates: 5/7/2025 - 5/7/2025 May 27, 2025 04:57PM Dated: ______________________________________________________ Mayor: ______________________________________________________ City Council: ______________________________________________________ ______________________________________________________ ______________________________________________________ ______________________________________________________ ______________________________________________________ ______________________________________________________ City Recorder: _____________________________________________________ Report Criteria: Report type: Invoice detail Vendor.Vendor number = 35099 Check.Type = {<>} "Adjustment" Bank.Bank number = 1 M = Manual Check, V = Void Check Page 46 of 247 The Elk River Vision A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and community engagement that encourages and inspires prosperity Request for Action To City Council Item Number 4.3 Meeting Date June 2, 2025 Prepared By Jolene Richter, Deputy Clerk Item Description 2025-2026 Liquor License Renewals Reviewed by Cal Portner Tina Allard Action Requested Approve, by motion, the attached list of liquor license renewals for the period of July 1, 2025, through June 30, 2026. Background/Discussion Liquor licenses run from July 1 through June 30. Financial Impact N/A Mission/Policy/Goal Elk River Mission Attachments 1. 2025-2026 Liquor License Renewals Page 47 of 247 2025-2026 LIQUOR LICENSES Brewer Off-Sale ($100/year) ■Aegir Brewing Company Brewer Pub Off-Sale ($100/year) ■Aegir Brewing Company Tap Room On-Sale ($225/year) ■Aegir Brewing Company 3.2 Percent Malt Beverage On-Sale ($225/year) ■Pompeii Pizzeria 3.2 Percent Off-Sale ($75/year) ■Cub Foods ■McCoy’s Pub ■Speedway #4196 ■Speedway #4338 ■Speedway #4470 ■Wal-Mart Supercenter #3209 On-Sale Liquor ($5,000/year) ■American Legion ■Applebee's Neighborhood Grill & Bar ■Broadway Bar & Pizza ■Elk River Golf Club ■Furniture and Things Community Event Center ■Hajime Sushi Restaurant ■McCoy’s Pub ■Mucho Loco ■Sammy’s Perrella’s Pizza & Restaurant ■Serrano Brothers Catering ■Sunshine Depot ■Tipsy on Main On-Sale Sunday ($200/year) ■American Legion ■Applebee's Neighborhood Grill & Bar ■Broadway Bar & Pizza ■Elk River Golf Club ■Furniture and Things Community Event Center ■Hajime Sushi Restaurant ■McCoy’s Pub ■Mucho Loco ■Sammy’s Perrella’s Pizza & Restaurant Page 48 of 247 ■Serrano Brothers Catering ■Sunshine Depot ■Tipsy on Main Wine ($700/year) ■Pompeii Pizzeria Strong Beer Permission (no fee) ■Pompeii Pizzeria Page 49 of 247 The Elk River Vision A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and community engagement that encourages and inspires prosperity Request for Action To City Council Item Number 4.4 Meeting Date June 2, 2025 Prepared By Lindsay Brandner, Senior Administrative Assistant Item Description Law Enforcement Services Agreement 2025-09 Reviewed by David Kuhnly Cal Portner Tina Allard Action Requested Approve, by motion, the Law Enforcement Services Agreement 2025-09 between the City of Elk River and the Elk River Area School District. Background/Discussion The city was previously entered into a service agreement with the district to provide law enforcement liaison services. The agreement will expire June 30, 2025, and the district would like to renew the agreement for a two-year period commencing July 1, 2025, and concluding on June 30, 2027. Financial Impact The agreement specifies that the district pay the city $189,885 for the 2025-2026 school year and $201,279 for the 2026-2027 school year for the services of three (3) officers at the rate of $63,295 per officer for the 2025-2026 school year and at a rate of $67,093 per officer for the 2026-2027 school year. The total financial benefit of the city for the period of the agreement is $391,164. Mission/Policy/Goal Elk RIver Mission Statement Attachments 1. 2025 - 2027 ERPD Contract - Final Page 50 of 247 LAW ENFORCEMENT SERVICES AGREEMENT THIS AGREEMENT made and entered into by and between the City of Elk River, Sherburne County, State of Minnesota, (hereinafter referred to as the “City”) 13065 Orono Parkway, Elk River, Minnesota 55330 and the Independent School District 728, 11500 193rd Ave NW, Minnesota, 55330, (hereinafter referred to as the “District”). WITNESSETH WHEREAS, both the City and the District desire to enter into this Agreement (hereinafter referred to as “Agreement”) for the provision of law enforcement services by the Elk River Police Department (hereinafter referred to as the “Police”, to the District; and WHEREAS, this Agreement is authorized and provided for by Minnesota Statute §471.59. NOW, THEREFORE, in consideration of the mutual undertaking and agreements hereinafter set forth, the City and the District agree as follows: 1. SERVICES TO BE PROVIDED The Police will provide general law enforcement services at District facilities as more fully described in Attachment A. 2. TERM OF THE AGREEMENT The term of this Agreement shall be for the 2025-2026 and 2026-2027 school years, beginning July 1, 2025 and ending June 30, 2027. 3. PAYMENT FOR SERVICES The District shall pay the City for providing services outlined on Attachment A. The amount of the payment for the 2025-2026 school year shall be $189,885 ($63,295 per officer, up to three (3) officers) The amount of the payment for the 2026-2027 school year shall be $201,279 ($67,093 per officer, up to three (3) officers). The District shall make payment to the City upon presentation of an invoice from the City. Payment for services will be made in two equal payments for the periods of July to December and January to June. Payment shall be made within thirty (30) days from receipt of the invoice. 4. CONTRACT ADMINISTRATION The City designates the City Administrator or his/her designee to represent the City in all matters connected with the Agreement on behalf of the City. The District designates its Executive Director of Business Services or his/her designee to represent the District in all matters connected with this Agreement on behalf of the District. The City’s designee shall be available at reasonable times upon reasonable notice to confer with the District. Page 51 of 247 The District, City and the Police shall provide the full cooperation and assistance of its officers, employees, and agents to each other in the performance of this Agreement. 5. RELATIONSHIP OF THE PARTIES The parties agree that nothing herein contained is intended or should be construed in any manner as creating or establishing the relationship of co-partners between the parties or as constituting either party as the agent, representative or employee of the other for any purposes or in any manner whatsoever. The City and the Police shall be independent contractors of the District with respect to all services performed under this Agreement. The parties represent that they will secure all personnel required to execute, administer and perform this Agreement. The District shall provide input into the assignment of Police Officers; however, the City retains the right to make all final hiring decisions. 6. INDEMNIFICATION AND INSURANCE Each party agrees that it will be responsible for its own acts and the results thereof to the extent authorized by law and shall not be responsible for the acts of the other party and the results thereof. Each party agrees to indemnify the other in accordance with its responsibility. The City’s and the District’s liability is governed by Minnesota Statutes, Section 466. The City and District each warrant that they are able to comply with the foregoing indemnity requirement through an insurance or self-insurance program. 7. SUCCESSORS, SUBCONTRACTING AND ASSIGNMENTS The parties agree not to assign, subcontract, transfer this Agreement or its services whether in whole or in part without prior written consent of the other party. 8. AMENDMENTS AND MODIFICATIONS The parties agree and understand that the entire Agreement between the parties is contained herein and that this Agreement supersedes all oral agreements and negotiations between the parties relating to the subject matter hereof. All items referred to in this Agreement are incorporated or attached and are deemed to be part of this Agreement. Unless provided to the contrary herein, the parties may from time to time make amendments or modifications to this Agreement. Such changes, including any adjustments in the level of service, which are mutually agreed upon by and between the City and the District shall be effective when incorporated in written amendments to this Agreement. 9. NOTICES Any notice or demand which must be given or made to a party hereto under the terms of this Agreement or any statute or ordinance governing the same shall be in writing, and shall be sent by certified mail or courier addressed as follow: Page 52 of 247 CITY: City Administrator City of Elk River 13065 Orono Parkway Elk River, MN 55330 With a copy to: Chief of Police City of Elk River 13077 Orono Parkway Elk River MN 55330 DISTRICT: Executive Director of Business Services Elk River Area School District #728 11500 193rd Ave NW Elk River, MN 55330 10. ACCESS TO EDUCATION RECORDS School officials shall allow the Police access to educational records in accordance with state and federal law and school board policy 515. 11. GOVERNMENT DATA PRACTICES ACT The City and District must comply with the Family Educational Rights and Privacy Act (“FERPA”) and the Minnesota Government Data Practices Act, Minnesota Statutes Chapter 13, as it applies to all data provided by District in accordance with this agreement, and as it applies to all data created, collected, received, stored, used, maintained, or disseminated by the City in accordance with this agreement. 12. MINNESOTA LAWS GOVERN The laws of the State of Minnesota shall govern all questions and interpretations concerning the validity and construction of this Agreement and the legal relations between the parties and performance under this Agreement. 13. REPORTING The Police will provide statistical reporting on selected data to the School District a minimum of two times per school year (mid-year and end-of-year reports). 14. TRAINING The SRO shall receive such training as is necessary to permit the SRO to effectively advance the school’s educational mission in the context of his or her duties as SRO. Therefore, the Parties agree to jointly deliver and require onboarding training. This training will cover the mandated training requirements in MN State Statute and topics including: Page 53 of 247 BASIC SRO TRAINING OVERVIEW ●Transitioning from patrol to SRO mindset ●Building effective relationships with school administration and staff ●Best practices in active threat procedures/drills ●Legal considerations for juveniles and schools ●School facility assessments ●Awareness of special education services ●Youth specific topics such as: truancy, runaway, exploitation, social media and more Note that training delivered by ISD 728 may or may not meet the requirements for Minnesota P.O.S.T. Board continuing education credits. CITY OF ELK RIVER Date Tina Allard, City Clerk Date John Dietz, Mayor INDEPENDENT SCHOOL DISTRICT 728 Date Kimberly Eisenschenk, Interim Executive Director of Business Services Page 54 of 247 Attachment A 1. The police officer(s) will assist in the establishment and coordination of a cooperative community approach among schools, parents, police and other resources in meeting the students and community’s needs. 2. Duties: a. A school resource officer's contractual duties with a school district or charter school shall include: 1. fostering a positive school climate through relationship building and open communication; 2. protecting students, staff, and visitors to the school grounds from criminal activity; 3. serving as a liaison from law enforcement to school officials; 4. providing advice on safety drills; 5. identifying vulnerabilities in school facilities and safety protocols; 6. educating and advising students and staff on law enforcement topics; and 7. enforcement of criminal laws. b. A school district or charter school may contract with a school resource officer's employer for the officer to perform additional duties to those described in paragraph (a). c. A school resource officer must not use force or the authority of their office solely to enforce school rules or policies or participate in the enforcement of discipline for violations of school rules. d. Nothing in this subdivision limits any other duty or responsibility imposed on peace officers; limits the expectation that peace officers will exercise professional judgment and discretion to protect the health, safety, and general welfare of the public when carrying out their duties; or creates a duty for school resource officers to protect students, staff, or others on school grounds that is different from the duty to protect the public as a whole. 3. Uniforms: a. A school resource officer’s uniform shall allow for a modified or “softer” uniform on a daily basis, such as (a polo style shirt with embroidered badge and name clearly displayed on the chest. And casual police style pants). However, at certain times, officers may wear a traditional uniform during the school day, when mutually agreed upon by the school principal and officers and/or at events such as sporting events, dances, etc. 4. Notification: a. The school will notify the public that School Resource Officers will be present in the schools. 5. Police officers shall spend approximately fifty-six and one quarter percent (56.25%) of their time annually working directly on school district issues as identified in paragraph 2, items a, b and c. This represents approximately 36 weeks with approximately 4.5 hours of daily availability. Whenever possible, the District would like an officer to be present at Elk River High School between the hours of 7:00 AM-7:30 AM and 2:10 PM- 3:00 PM. Page 55 of 247 6. The services to be provided under this agreement shall be performed at Meadowvale Elementary, Twin Lakes Elementary, Parker Elementary, Lincoln Elementary, Handke Family Center, Salk Middle, VandenBerge Middle, Elk River High, Ivan Sand Community High School, Elk River Middle School ALC, and the COMPASS Program. 7. In the event that the Police, upon written request of the Executive Director of Business Services of the District, perform other services not herein described or which exceed the agreed upon level of services provided herein, such services shall be billed, in addition to the stated agreement payment, based on the direct and actual costs of services requested by the District. 8. The District shall at its sole expense provide the police officers with office space, furnishings, computer equipment, telephone, utilities and supplies required to perform the agreed upon duties. 9. The rendition of enforcement services provided herein, the selection of officers, performance standards and discipline of police officers and any other personnel matters incidental to the performance of services provided herein shall remain with the City. The District; however, shall provide input of an advisory nature in regards to the selection and evaluation of the officers. 10. Police officers will be required to familiarize themselves with District policies, procedures and the District’s mission and core values. 11. Police officers will be present at after school events and activities, including but not limited to Varsity Football, Varsity Hockey, Homecoming, MORP, Prom and Graduation events. These events will be billed to the district quarterly in conjunction with approvals and actual cost of service as outlined in Attachment A, number 5 of this agreement. 12. Police officers will be present at out-of-school time crisis and/lockdown drills without additional compensation beyond that described in section 3 of this agreement, including canine and other routine building searches. Page 56 of 247 2025-2026 and 2026-2027 Pre-Authorized Events •Hockey Games: •approximately 11-12 games. •1-2 officers per game. •Football Games: •approximately 4 games. •3-4 officers per game. •Boy’s Basketball Games: •approximately 13 games •1-2 officers per game •ERAHS Prom Grand March: •1 officer @ 2 hours •Ivan Sand Prom: •1 officer @ 3 hours •ERAHS school dance (MORP) •1 officer @ 3 hours •Homecoming parade and events (parade and dance etc.): •Up to 12 officers @ 2 hours •ERAHS Graduation (honor guard and security): •6 officers @ 3 hours •Miscellaneous speaking engagements: •1 officer @ 1 event @ 2 hours •Driver’s Education Presentations Community Education will contact the Police Department and arrange presentations directly. These events should be billed to Community Education and noted as such on the billing. All pre-authorized events will be billed based on actual costs, on a quarterly basis. Bills are to be sent to: Independent School District 728 Attn: Executive Director of Business Services 11500 193rd Ave NW Elk River, MN 55330 Page 57 of 247 The Elk River Vision A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and community engagement that encourages and inspires prosperity Request for Action To City Council Item Number 4.5 Meeting Date June 2, 2025 Prepared By Joe Stremcha, Business Services Director/Assistant City Administrator Item Description FT Center Field House Improvements Reviewed by Katie Harstad Cal Portner Tina Allard Action Requested Approve, by motion, the proposal from Thompson Construction of Princeton Inc. for $109,665 for a concrete floor installation in the field house as detailed in our request for proposals. Approve, by motion, the proposal from Becker Arena Products, Inc. for $127,557 to remove, modify, and reinstall our existing AT740 Sporturf by adding Velcro. Background/Discussion The primary source of funding is a result of the American Rescue Plan Act (ARPA) revenue replacement for the FT Center due to the negative impacts of COVID. The city has $405,000 earmarked for field house improvements. The project is not supplemented with any property or sales tax revenue. Staff sought $500,000 through the Minnesota Multi-Purpose Community Facility Projects FT25 Grant, but our project was not awarded. Staff solicited quotes for the following: Concrete floor 196' x 114' beneath turf: ▪ Remove 4" of the existing gravel base ▪ Form and pour 4" of 4500 PSI concrete with fiber mesh, ▪ Smooth finish ▪ Place control joints ▪ Apply sealer. The turf was newly installed in 2020 and has a life expectancy of roughly 10 years. The turf has had limited use due to COVID and seasonal high utilization since its installation. Sporturf modifications to be completed by Becker Arena Products, Inc. include: ▪ All existing AT740 Sporturf to be cut at 12’ increments and rolled: Page 58 of 247 o Install Velcro strips to existing AT740 Sporturf seams and perimeter (glued application) o Install Velcro strips to the exterior concrete along the perimeter (glued application) ▪ Roll out and reinstall turf. Per our request, all modifications to the existing turf will be completed onsite. An alternative process would've involved shipping the turf to their facility in Georgia, resulting in production delays. Becker Arena Products, Inc. has assured staff that the quality of Velcro installation will not be negatively impacted. Other Misc. Improvements Include: ▪ Pickleball netting, fencing, and equipment. ▪ Event draping for the facility perimeter. ▪ Entryway remodel. These miscellaneous improvements are expected to be under $50,000 and approved by staff in accordance with our Financial Management Policy. Financial Impact The budget for the FT Center field house improvements is $405,000. The concrete floor and turf will be completed for $237,222. This will negatively impact the FT Center operational budget in 2025 as the revenues were captured in the prior year, resulting in a 2024 budget surplus. Mission/Policy/Goal Opportunity to live, work, and play. Meet changing needs - agile. Attachments 1. Thompson Furniture & Things Est 2. Elk River MN Fieldhouse Turf r3 3. Concrete 4. Turf Page 59 of 247 Page 60 of 247 Page 61 of 247 Page 62 of 247 Page 63 of 247 Page 64 of 247 Page 65 of 247 beckerarena.com Quotation #: Elk River Fieldhouse Field House Upgrades Revision #: 3 Date: May 28, 2025 Proposal Expiration Date: June 28, 2025 Sales Consultant: Dan Mehren Prepared For: Project Location: Katie Harsted Furniture and Things Event Center Furniture and Things Event Center 1000 School Street 1000 School Street Elk River MN 55330 Elk River MN 55330 Thank you for considering Becker Arena Products, Inc., we appreciate the opportunity… Benefits of Choosing to Partner with Becker Arena Products • A stable and reliable company since 1988 • A staff with in-depth knowledge of the industry and products • Quality products that last • Experienced and professional installers • Excellent customer service • Worry Free Projects – Guaranteed Per your request, please see the below revised pricing and information to both modify or replace the turf in the field house. All material FOB Destination. All modifications to the existing turf to be completed onsite. Turf to remain onsite either in arena or storage container/trailer outside arena. Turf Modifications Becker Arena Products will furnish turf materials and labor to upgrade the existing multi-purpose field house. Scope to include: - All existing AT740 Sporturf to be cut at 12’ increments and rolled up. - Install Velcro strips to existing AT740 Sporturf seams and perimeter (glued application) - Install Velcro strips to exterior concrete along perimeter (glued application) - Roll out and re-install turf. COMPLETE INSTALLATION: An approved Becker Arena Products Inc.® installation team will install the above-described turf modifications. Daily clean up and maintenance of the site included. Installation is based on non-union/non-prevailing wage rates. Total BASE Price (material, freight, installation) Accept _____ $ 127,557.00 Breakdown: Turf Materials $ 11,134.00 Turf Labor $ 116,423.00 Page 66 of 247 beckerarena.com Page 2 EXCLUSIONS: - Tariffs. All tariffs, determined on day of importation, will be added to final invoice. - Concrete inserts for net posts - Court/concrete coloring or striping - Performance or payment bonding - Permits. Will be added to total if applicable - Testing of any kind - Taxes. Will be added if applicable The site must be accessible to a tractor-trailer and industrial forklift and driveways to the rink slab/surface must support all necessary equipment. Power outlets with no less than a 30amp breaker must be within 50’of the rink slab/surface or a portable generator with a minimum of 5KW power rating. The surface will be broomed clean and work area will be free of all materials and debris. A dumpster (minimum size of 10 yards) and/or an area for trash must be available within 100’ of the rink slab/surface so the installers can remove their debris. When job is completed or nearing completion, the purchaser must be available for a final walk-through to inspect the rink with a Becker Arena Products Inc.® installation supervisor. This will be the purchaser’s chance to formulate a final punch list of items left unfinished or needing to be changed. All items not listed on the punch list will not be considered a punch list item, and unless covered by Becker Arena Products Inc.® warranty, will be replaced at the purchaser’s expense. Delays or extra work and expenses caused by the site not being ready will be charged to the purchaser. Please Note: Taxes are the responsibility of the purchaser. Prices do not include special insurance requirements, bonding, or applicable permits and/or license fees. Prices subject to site visit and/or receipt of final construction drawings and specifications. If sales tax is applicable, it will be added to the proposal totals and noted on a Contract Summary Sheet that will be sent back with your executed contract. Material Price Escalation & De-Escalation Clause (Due to the volatility of all components of the above dasher board system) • In the event that the price of any of the material(s) used in the Becker Arena Products, Inc. production of the above product increase or decrease by 3% or greater from the price used for that material(s) at the time the quote was signed, then the price for the material(s) in the contract between Becker Arena Products, Inc. and the purchaser shall be increased or decreased to reflect the additional or reduced cost to obtain that material or materials. Purchaser agrees that Becker Arena Products, Inc. shall be entitled to an adjustment to the contract price to reflect and price increases of material(s) that occur because of Becker Arena Products, Inc. incurring additional costs when ordering materials. All payment terms are based on credit approval. Our Standard Payment terms are: 45% with placement of signed quotation or purchase order 45% two weeks prior to shipping 10% due 10 days after installation The above payment amounts will be filled in based on total contract price and any applicable sales tax and sent back on the Contract Summary Sheet with your executed contract. We are looking forward to the opportunity of working with you on your project and if we can be of further assistance please do not hesitate to call. This proposal is subject to Becker Arena Products, Inc. Standard Terms and Conditions and Limited Warranty and may be withdrawn without penalty at any time before contract execution. If accepted, please sign, and return this copy to Becker Arena Products. When approved and signed by one of our officers a fully executed copy will be forwarded for your records. This pro posal Page 67 of 247 beckerarena.com Page 3 is subject to change, withdrawal, or cancellation until accepted by you. If Becker Arena Products, Inc. have not received your acceptance within 60 days from the date hereof, this proposal shall automatically expire. Becker Arena Products, Inc. retain s a security interest in all products covered in this agreement until all payment terms have been met. In addition, the purchaser agrees to sign any additional documents for Becker Arena Products, Inc. to perfect its security interest in the products. Proposal/Contract # Elk River Fieldhouse Field House Upgrades R3 is accepted with initialed options: _________________________________ _____________________________ Purchaser Signature Becker Arena Products, Inc. ____________________________________ ___VP of Sales and Operations____ Title Title ____________________________________ _____Jeff Brosz________________ Print Name Print Name ____________________________________ _____________________________ Today’s Date Today’s Date Page 68 of 247 beckerarena.com Page 4 BECKER ARENA PRODUCTS INC. STANDARD TERMS AND CONDITIONS OF SALE ‐ EFFECTIVE JANUARY 2021 1. Definitions. In these terms ‐"Seller" means the seller of the Goods as defined herein; "Buyer" means the entity purchasing the Goods, including any successors thereof; "Goods" means the goods, products and materials manufactured, imported, supplied and/or delivered for or by Seller t o Buyer, as such were approved by Seller in reply to Buyer's order and accordingly listed in the Approval of Order; "Approval of Order", in respect of any Buyer's order, means the instrument issued by Seller, bearing the same reference number of such order and specifying, among any other terms, the items of Goods, including their respective price and quantity, which shall be supplied to Buyer upon such order; "Contract" means the contract for the supply of Goods which have been order ed by Buyer and specified in Seller's Approval of Order, which contract is concluded based on these Terms and Conditions of Sale unless otherwise specified in the Approval of Order. 2. Payment. Payment for Goods shall be due on or prior to the delivery date of Goods and no discount may be taken. Payments received afte r the due date thereof shall bear a service charge from their due date, at the maximum lawful interest rate applicable, and if none – at the annual rate of 5% above the base rate from time to time of the central bank of the place of Buyer's incorporation. All payments shall be made to Seller's designated bank acc ount in the same currency and for the same amounts as specified in the Approval of Order. 3. Prices, Duties and Taxes. Prices specified in the Approval of Order are net, excluding packaging, and shall be deemed Ex‐works (Incoterms 2000 as amend ed). Prices are based, inter alia, on production costs for supplies, labor, deliveries, duties, and services current on the order d ate. In the event of material increase in any such costs, Seller reserves the right either to adjust the prices for Goods accordingly, or to cancel any certain part of the sale s relating to undelivered Goods. Duties, taxes, fees, levies and other compulsory payments applicable to the sale of Goods any time, as well as freight, express, insurance and delivery charges, shall all b e borne and paid in full by Buyer, unless otherwise expressly stipulated. 4. Delivery. Delivery dates noted on the Approval of Order are estimates only, and are not guaranteed, and are all subject to adjustment a s determined by the Seller acting reasonably. The acceptance of shipment by a common carrier or by any licensed public truckman sha ll constitute proper delivery. Risk associated with the Goods shall pass to Buyer on delivery or with the passing of title in the Goods, whichever occurs first; provided however, th at where delivery is delayed due to circumstances caused by or within the responsibility of Buyer, risk of loss shall pass to Buyer upon Seller's notification that Goods are ready for disp atch. 5. Retention of Title. Title shall pass to Buyer only upon full payment by Buyer for the Goods and following payment of any other outstanding debt b y Buyer to Seller. Buyer shall, at Seller's request, take any measures necessary under applicable law to protect Seller's title in the Goods, and lawfully notify Buyer’s present or potential creditors of Seller's title on and interest in the Goods. Buyer acknowledges that so long as title has not been transferred i n the Goods, it holds the Goods as bailee and fiduciary agent for the Seller and shall safely and securely store and keep the Goods separate and in good condition, clearly s howing the Seller’s ownership of the Goods and shall respectively record the Seller’s ownership of the Goods in its books. Notwiths tanding the above, Buyer may use Goods for its own use, or sell Goods, as fiduciary agent for the Seller, to a third party in the normal course of business by bona fide sale at market value, whereby proceeds of such usage or sale of Goods, as the case may be, shall, to the extent of the amount being owed by Buyer to Seller at the time of receipt of such proceeds, be held by Buye r on trust for Seller and specifically ascertained, until payment in full for all payable debts by Buyer to Seller. 6. Warranty. a) If applicable, Seller warrants that Goods as set out in the warranty applicable thereto given by Seller to Buyer, subject always to the terms and conditions thereof, and subject to use, storage, and application thereof in accordance with and based on Seller's standard tolerances, instructions o f use and recommendations. b) Unless otherwise restricted by mandatory applicable law, THE WARRANTY SET FORTH HEREIN IS EXPRESSLY I N LIEU OF ALL OTHER WARRANTIES, WHETHER EXPRESSED OR IMPLIED, INCLUDING, WITHOUT LIMITATION, ANY AND ALL WARRANTIES OF MERCHANTABILITY, QUALITY AND FITNESS FOR USE AND FOR PURPOS E, ANY ADVICE AND RECOMMENDATION AND ANY OBLIGATIONS OR LIABILITIES WHICH MAY BE IMPUTED TO SELLER, ANY AND ALL OF WHICH ARE HEREBY EXPRESSLY DISCLAIMED, DENIED AND EXCLUDED. BUYER EXPRESSLY AGREES THAT NO WARRANTY THAT IS NOT SPECIFICALLY STATED IN THIS AGREEMENT WILL BE CLAIMED OR OTHERWISE ADHERED TO BY BUYER AND/OR BY ANYONE ACTING ON BUYER’S BEHALF AND/OR BY ANYONE DERIVING THE LEGALITY OF ITS CLAIM FROM BUYER, NOR THAT WILL ANY SUCH WARRANTY BE VALID. SELLER NEITHER ASSUMES NOR AUTHORIZES ANY OTHER PERSON TO ASSUME FOR IT, ANY OTHER LIABILITY IN C ONNECTION WITH THE SALE, USE OR HANDLING OF ANY AND ALL GOODS SPECIFIED OR CONTEMPLATED BY THIS CONTRACT. NO WARRANTY IS MADE WITH RESPECT TO ANY OF THESE GOODS WHICH HAVE BEEN SUBJECT TO ACCIDENT, NEGLIGENCE, ALTERATION, IMPROPER CARE, IMPROPER STORAGE, IMPROPER MAINTENANCE, ABUSE OR MISUSE. 7. Claims and Liability. a) Unless Seller shall within 30 days after delivery of the Goods, receive from Buyer written notice of any matter or thing b y reason whereof it is alleged that Goods are not in accordance with the Contract, Goods delivered shall be deemed to have been sup plied, delivered and accepted in all respects in full conformity with the Contract and Buyer shall be entitled neither to reject the same nor to raise any claim for damages or for other remedy in res pect of any alleged negligence and/or breach of warranty and/or any condition. b) In any claim, brought subject to the conditions above, Buyer must prove to the satisfaction of Selle r that it followed Seller's instructions for use, care, storage, maintenance, handling, and application of the Goods. c) Unless oth erwise specifically restricted by mandatory applicable law, Seller's liability under any claim and in connection with any possible allegation, whether based on negligence, contract , or any other cause of action, shall, if the Seller shall be liable hereunder, be limited to either (i) the replacement of the Goods or the supply of equivalent goods; (ii) the repair, or payment of the cost of repair, of the Goods; or (iii) credit in an amount equal to the purchase price specified in Seller's pertinent invoice, or in an amount of equivalent goods, all at Seller's sole option. Buyer acknowledges that the remedy available to him as specified herein, is in lieu of any remedies that may be other wise available to him, now or in the future, whether in law or in equity, relating to any loss or damage, whether directly or indirectly, arising from the purchase and/or the use of Goods, includin g without limitation, any actual or contingent damages, loss of production, loss of profit, loss of use, loss of contracts or any o ther consequential or indirect loss whatsoever, whether pecuniary or non‐pecuniary, and it is acknowledged and agreed by Buyer that in no circumstances shall Seller be liabl e for any such damages. Should any limitation on Seller's liability hereunder be held ineffective under applicable law, than Seller's liability shall in any event be limited to the minimum amount of damages to which Seller may limit its liability, where such is greater than the purchase price as specified in Seller's pertinent inv oice. Additionally, any action against Seller must be commenced within one year after the cause of action accrues. d) Buyer, for himself and for any other party which may claim either under or through Buyer, or independently of Buyer, including Buyer's employees, directors, officers, representatives and personnel, shall indemnify and hold Seller harmless, from and against any claim or liability for damages in any way relating to the supply or use of the Goods, including claims for negligence and including but not limited to, any claim in connection with the design, manufacture, use, care, storage, delivery, application or maintenance of any Goods sold hereunder , whether alleged to have been committed by Seller or by any other person whatsoever. Buyer's undertaking as specified in this subsection shall extend and inure to the benefit of Seller and of Seller's successors at any time, as well as to Seller's personnel, representatives, managers, directors, and officers. Nothin g contained herein shall take effect to exclude or limit liability where liability may not be excluded or limited under applicable law, including, without limitation, for de ath, personal injury, and fraudulent misrepresentations. e) Any and all warranties, undertakings, guarantees, or assurances pro vided herein by Seller, are specifically limited to Buyer herein, and not imputed by Seller, whether directly or indirectly, expressly, or impliedly, to any other person or entity, including any subs equent buyer or user, bailee, licensee, assignee, employee and agent of Buyer. 8. Default. Upon failure of Buyer to pay any amounts due to Seller, or in the event of any breach or anticipated breach by Buyer of any C ontract with Seller, or if Buyer shall either (i) become insolvent, (ii) call a meeting of its creditors, or (iii) make any assignm ent for the benefit of creditors, or if (iv) a bankruptcy, insolvency, reorganization, receivership or reorganization proceeding shall be commenced by or against Buyer, then, in each such occasion , Seller may, at its sole discretion, opt Page 69 of 247 beckerarena.com Page 5 to (1) cancel this and any other Contract with Buyer (without waiving any of Seller's rights to pursue any remedy against Buyer); (2) claim return of any Goods in the possession of Buyer, the title of which has not passed to Buyer, and enter Buyer’s premises (or the premises of any associate d company or agent where such Goods are located), without liability for trespass or any alleged damage, to retake possession of such Goods; (3) defer any shipment her eunder; (4) declare forthwith due and payable all outstanding bills of Buyer under this or any Contract; and/or (5) sell all or part of the undelivered Goods, without notice at pu blic and/or on private sale, while Buyer shall be responsible for all costs and expenses of such sale and be liable to Seller for any shortfall in t he discharge of the amounts due to Seller. 9. Independent Delivery. Each delivery of Goods shall (without prejudice to Seller's rights under clause 8 hereinabove) be considered a separate contract and the failure of any delivery shall not vitiate any contract as to deliverie s of other Goods and payment therefore. 10. Cancellation. Orders manufactured in whole or in part, pursuant to Buyer's specifications, may not be cancelled except with Seller's prior written consent, on terms which will compensate Seller for any resulting losses. 11. No‐Assignment. No rights or obligations of Buyer arising out of this Contract may be assigned without the express prior written consent of S eller. 12. Force Majeure. Should Seller be prevented from effecting deliveries of the Goods or any of them by reason of either an act of god, insurrect ion, riot, war hostilities, terror attacks, warlike operations, piracy, arrests, restraints or detainments by any competent authori ty, strikes or combinations or lock‐out of workmen, fire, floods, droughts, earthquakes, permanent or temporary delay or inability to obtain labor, material or services through Seller's usual and regular sources, or any other circumstances (whether of a nature similar to those specified, or not) beyond the absolute control of the Seller, then, in each such cas es, the obligation of the Seller to effect deliveries hereunder shall be suspended until after such prevention shall cease to conti nue. Should any deliveries under this Contract be suspended under this clause for more than 90 days – either party may withdraw from this Contract and be relieved from any liability; provided however, that Buyer shall neverthel ess accept delivery and pay for such Goods once the Seller is able to deliver in accordance with the period(s) of shipment named in this Contract. Seller shall not be liable for, and be relieved from, any loss or damages of any kind resulting from the causes mentioned hereinabove. 13. Advice. Any provisions specified or implied by herein or elsewhere notwithstanding, any advice, recommendation, information, assistan ce or service provided by Seller in relation to the Goods or in respect of their use or application is given in good faith, shall b e deemed accepted by Buyer without imputation of any liability to Seller, and it shall be the responsibility of Buyer to confirm the accuracy and reliability of the same in light of the use o f which Buyer makes or intends to make of the Goods. 14. Entire Agreement. This Contract merges the entire terms and conditions for sale of the Goods. In the event of any conflict between the terms he rein and any provisions included in the Approval of Order, the latter shall govern and prevail. Subject to the foregoing, nothing s pecified in, or referred to by, any other document, record or instrument whatsoever, which relates to and/or which otherwise subsists in connection with the sale of Goods herein , whether expressly or impliedly, including any written order, request or other standard or specific terms of any entity, shall or may be interpreted to attribute to Seller and/or to Seller's affiliates or representatives (i) any liability, obligation, commitment and/or undertaking, and/or (ii) any waiver in con nection with or of any right, whether contractual, proprietary, in‐person am and/or equitable, including but not limited to, any and all intellectual property rights in connection with the Goods, which are and shall always remain in the Seller's exclusive and complete ownership under all circumstances whatsoever, notwithstanding any sale of Goods hereunder and whether the Goods shall be standard Goods or manufactured to a specific order. No modification or waiver of any provision hereof shall become valid and effective except upon a written instrument duly signed beforehand by Seller. No waiver by either party o f any default of the other party shall be deemed a waiver of any subsequent or other default. If any provision of this Contract becomes or is declared by a court of competent jurisdiction to be illegal, unenforceable, o r void, the balance of this Contract shall continue in full force and effect without the provision. 15. Law and Arbitration. This Contract shall be governed by and construed in accordance with the laws of the state of Seller's incorporation. Any disp ute arising out of or in connection with this Contract shall, if so, determined by the Seller, be finally settled by arbitration in accordance with th e Rules of Conciliation and Arbitration of the International Chamber of Commerce ("ICC"), as shall be in effect from time to time, and if so determined, the balance of this Section shall apply. The arbitration shall be held at such location in the state of Seller's incorporation as shall be determined by Seller, in its sole discretio n. The arbitrator shall be mutually appointed by Seller and Buyer within 21 (twenty‐one) days following a written demand for arbitration by either of the parties. Failing to rea ch an agreement regarding the nomination of an arbitrator, the head of the relevant ICC national committee (located in the Seller's country of incorporation; and absent such local committee in that specific country – the ICC UK Committee (www.iccuk.net)) shall appoint an arbitrator at the request of any of the parties, a copy of which reque st for the appointment of an arbitrator shall be provided by the requesting party to the other party. Awards may be enforced in accordance with the 1958 New York Conventio n and judgment may be entered upon any award in any court having jurisdiction over the parties and/or their assets. The arbitrator 's fees shall be paid by both parties in equal parts unless otherwise determined by the arbitrator. This provision shall survive any termination of any of the terms and condition s herein and shall be deemed to constitute an independent arbitration agreement between Buyer and Seller for all purposes and intents. Page 70 of 247 Page 71 of 247 Page 72 of 247 The Elk River Vision A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and community engagement that encourages and inspires prosperity Request for Action To City Council Item Number 4.6 Meeting Date June 2, 2025 Prepared By Cal Portner, City Administrator Item Description Adoption of City Council Goals Reviewed by Cal Portner Tina Allard Action Requested Adopt, by motion, City Council Goals. Background/Discussion Each year since 2017, the City Council and the city leadership team meet in a day-long retreat to discuss pertinent topics and review and strategically plan short, medium, and long-term goals. The 2025 retreat was held on Monday, April 28. The goals were further refined on May 19. The Council also discussed amending the City Mission Statement and Vision Statement, which will be further discussed in a future work session. The importance of goal-setting lies in planning for capital improvements, accounting for potential issues on the horizon, and providing direction for future budgeting. Financial Impact N/A Mission/Policy/Goal City of Elk River Mission and Vision Attachments 1. 2026 Goals Final Page 73 of 247 Current Adopted Goals Approved June 2025 Short-term (2025-26) ▪Commercial Development ▪Budget and sinking fund for building repair. o Transition of PW Facility bond to general levy (ongoing) ▪Craft a Cost Participation Policy for Trail and Street Improvement Projects ▪Fire Station #1 Construction ▪Cannabound fully staffed and operational ▪Northbound Liquor Construction Mid-term (2030) ▪Acquire business park land. o Assist developers with private acquisition as needed. ▪Commercial development o CRT Zoning District o Hotel/Hospitality Growth ▪Oak Knoll/Hale’s Field improvement - collaboration with ISD #728 ▪Parks and Rec app – directions, ads, amenities, park features ▪Communitywide Strategic Planning Implementation (downtown district) ▪Implementation of Athletic Field Framework Plan ▪Implementation of new Housing Study recommendations (workforce housing) ▪Electronic Billboard Planning and Development ▪Implement Police Attrition Plan ▪Gravel Road Paving Plan Long-term (2035) ▪Urban Service Area expansion ▪C/I development ▪Trail connections ▪Pedestrian Trail Connection downtown over the railroad and TH10. ▪More retail development in western Elk River ▪Riverwalk from Orono Park to City of Ramsey ▪Highway 10 safety and mobility improvements, 165th Ave to Jarvis St. ▪TH169 and 225th Avenue Safety Improvements ▪Implementation of Downtown Small Area Study recommendations ▪County Fairgrounds Development ▪CRT Zoning review/update ▪Implement Athletic Field Framework Plan ▪Consider Wapiti Campground acquisition if available Page 74 of 247 The Elk River Vision A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and community engagement that encourages and inspires prosperity Request for Action To City Council Item Number 4.7 Meeting Date June 2, 2025 Prepared By Lauren Wipper, Human Resources Manager Item Description Hire Police Officer Reviewed by David Kuhnly Cal Portner Tina Allard Action Requested Approve, by motion, the hiring of Joseph Reak to the position of Police Officer effective June 3, 2025. Background/Discussion Joe Reak has been working for the city since 2021, first as a reserve officer and then as a part-time community service officer. Mr. Reak completed law enforcement school and passed his Minnesota POST Board exam last week. This makes him eligible to work as a police officer. We interviewed Mr. Reak in February in anticipation of this event. Mr. Reak's hiring will fill a position left vacant last December. Mr. Reak will start at pay step 2 of the LELS Local 231 contract. All pay and benefits will be consistent with city policy and the union contract. Financial Impact This is a budgeted position. Mission/Policy/Goal The Elk River Mission. Attachments None Page 75 of 247 The Elk River Vision A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and community engagement that encourages and inspires prosperity Request for Action To City Council Item Number 4.8 Meeting Date June 2, 2025 Prepared By Lauren Wipper, Human Resources Manager Item Description Hire Human Resources Specialist Reviewed by Cal Portner Tina Allard Action Requested Approve, by motion, the hiring of Michael Eichten to the position of Human Resources Specialist effective June 4, 2025. Background/Discussion Human Resources Specialist Karen Keast is retiring on June 18. We went to market to fill this position, received 83 applications, and interviewed six candidates. Following second interviews and background and reference checks, we recommend Michael Eichten for the position. Mr. Eichten has worked for Spee Dee Delivery Service for most of his career. In 2002, he became the Human Resources Manager for the Minnesota, North Dakota, and South Dakota region. In 2018, he became the Human Resources Director, reporting directly to the Board of Directors. After a short stint as the Director of Operations, Mr. Eichten decided to retire from the transportation industry and seek employment doing the things he likes most; working directly with employees. Mr. Eichten will start at step 2 of pay grade 3N. All other pay and benefits will be consistent with city policy. Financial Impact This is a budgeted position. Mission/Policy/Goal The Elk River Mission. Attachments None Page 76 of 247 The Elk River Vision A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and community engagement that encourages and inspires prosperity Request for Action To City Council Item Number 8.1 Meeting Date June 2, 2025 Prepared By Chris Leeseberg, Senior Planner Item Description The Keeping of Chickens on City Lots Reviewed by Zack Carlton Cal Portner Tina Allard Action Requested Provide direction to staff on whether to proceed with an ordinance amendment to reduce the minimum lot size required for keeping chickens. Background/Discussion The Council directed staff to review the chicken standards of our neighboring communities. Staff contacted 10 neighboring communities regarding their standards, and the results are included in the attached table. In 2017, the city drafted an ordinance to expand opportunities for the keeping of chickens on residential parcels, and in 2021, after receiving requests to allow chickens on lots less than 2 ½ acres in size, the Planning Commission and the City Council again reviewed the ordinance. At that time, the number of chickens allowed under the proposed ordinance reviewed was as follows: Lot Size in acres Chickens (roosters may be allowed with a CUP) 1 < 2 ½ 6 2 ½ < 5 12 5 and larger Follow ag animal regulations - Section 30-803 (e) The Planning Commission recommended denial of the request by a 5-2 vote, and the City Council also denied the request by a 4-1 vote. Reasons in favor: ▪ Homeowner associations or covenants that already prevent residents from keeping agricultural animals. Page 77 of 247 ▪ Numerous neighborhoods are not going to be impacted by this amendment because of parameters in place to prevent this type of activity. Reasons against: ▪ Anyone who wants to keep chickens would not move into the city to keep them. ▪ This type of farm animal is best on a lot larger than 2.5 acres to avoid negatively impacting neighbors. ▪ Chickens will attract other animals into the neighborhood, especially in smaller areas. ▪ 1 acre is too small, but 1.5 to 2 acres may be enough space. ▪ The urban setting is not appropriate. ▪ When drafted in 2017, the Planning Commission spent months reviewing and studying this ordinance and felt it was still adequate. ▪ Concerns regarding continued scope creep on smaller lots. If staff are directed to update the ordinance, a public hearing will be scheduled at both the Planning Commission and City Council, with tentative Council action scheduled for July 21, 2025. Financial Impact None Mission/Policy/Goal Ethical, efficient, and responsible. Work with citizens to achieve goals. Attachments 1. Chickens Neighboring Communities 2. Minutes from 1-19-2021 3. Submitted Petition 4. Petition for Chickens Page 78 of 247 Lot Size #ofBig Lake N/A 6ZimmermanN/A 6OtsegoN/A 10/acreRogers*1 100/acreRamseyN/A 25/acreAnokaN/A 4Monticello**N/A 6PlymouthN/A 6PrincetonN/A 4St. Michael 4 50/acre*Likely that the city will be going towards allowing chickens on all single family lots soon. Likely capped at 3 hens. **Written consent of the property owners adjoining the applicant's real estate. The written consent shal be required on the first and initial application and as often thereafter as the Animal Control Officer deems necessary.Chickens Neighboring CommunitiesPage 79 of 247 City Council MinutesJanuary19, 2021Motion carried 5-0. S. Open ForumNooneappeared for Open Forum. 6.1 City of Elk River Volunteer of the MonthMayorDietzpresentedtheJanuaryVolunteerof the Month award to TamaraAckerman. He highlighted the following: Chair, City of Elk River Beautification CommitteerPresident, Downtown Elk River Business AssociationPastBoardMember, Elk River Area Chamber of CommerceShiverElkRiverChair, 2017, 20186.2 Proclaim April 5, 2021, as Nate Dittbenner Day Page 2FireChiefDickinsondiscussedMr. Dittbenner's history with the city over more than20years. Mayor Dietz read and presented a plaque to Mr. Dittbenner. 7.1 Conditional Use Permit: Aggregate Industries d/b/a MWR, Inc., Amend Permit to Include Additional Parcels in Mineral ExcavationArea, 12001 213' AvenueMr. Leeseberg presented the staff report. Mayor Dietz opened the public hearing. There being no one to speak to this issue, Mayor Dietz closed the public hearing. Moved by Councilmember Christianson and seconded by CouncilmemberBeyertoapprovetheproposedamendmenttoAggregateIndustriesmineralextractionCUPwhichaddsanadditionalparceltotheapprovedminingarea, with the following conditions: 1. All conditions of approval from earlier conditions shall be incorporatedintothenewmineralextractionoperation. 2. A new mining license must be approved prior to commencing withmineralextractionactivitiesinthenewpermitareas. Motion carried 5- 0. 7.2 Ordinance Amendment: Allow Keeping of Chickens on Residential Lots Greater than One Acre Mr. Leeseberg presented the staff report. IIREREI IY NATURE Page 80 of 247 City Council MinutesJanuary19, 2021 Page 3MayorDietzopenedthepublichearing. There being no one to speak to this issue, Mayor Dietz closed the public hearing. Councilmember Christianson stated more urban cities have adopted an ordinanceallowingchickensonasmallparcelandhewouldbeinfavorofallowingchickens onthe1-acre lot size. Mayor Dietz asked how many requests there have been over the past three years forchickensonsmallerlots. Mr. Leeseberg estimated half a dozen. Councilmember Westgaard is surprised by the Planning Commission decision and has no strong opinion either way. Eric Johnson was in attendance representing the Planning Commission. He stated he, personally, was in favor of allowing chickens on smaller lots but stated the commission considered factors such as noise, bi-products, and increase in predators and recommended denial as a whole. Councilmember Christianson stated there are nuisance ordinances to help combat noise and smell and there is a process in place to mitigate those concerns. Councilmember Wagner is concerned about future neighbor disputes involving animals. She appreciates the amount of research the Planning Commission did in 2017 and respects their decision. Councihnember Beyer reviewed the history of the chicken ordinance over the past few years. He cited personal experience with neighborhood chickens getting out and having to be recaptured and thinks it may entice more predators to the area. Mayor Dietz supports the Planning Commission decision. Moved by Councihember Wagner and seconded by Councilmember Beyer to deny the proposed ordinance amendment. Motion carried 4-1. Christianson opposed. 8.1 Lake Orono Restoration Enhancement (LORE): Extension of Hours Request by New Look Contracting Ms. Erickson and Mr. Wisner presented the staff report. Moved by Councilmember Christianson and seconded by Councilmember Westgaard to extend operating hours for New Look Contracting, Inc. for the LORE project. Motion carried 5-0. POIERE0 1Y NAYURE Page 81 of 247 Name City State Postal CodeCountry Signed On Mandy P United States4/28/2025 Kailey MooreCambridge MN 55008 United States4/28/2025 Allison BallengerAnoka MN 55303 United States4/28/2025 Pilar Lara Milaca MN 56353 United States4/28/2025 Valerie McCorkleMinneapolisMN 55448 United States4/28/2025 Alicia DelaneyBig Lake MN 55309 United States4/28/2025 Jennifer KramerMinneapolisMN 55449 United States4/28/2025 Rosinda MajanoMinneapolisMN 55418 United States4/28/2025 Kyla Morris MinneapolisMN 55413 United States4/28/2025 Shannon PersellElk River MN 55330 United States4/28/2025 Markie FreyIsanti MN 55040 United States4/28/2025 Corinne BrewerElk River MN 55330 United States4/28/2025 Courtney VogelAnoka MN 55303 United States4/28/2025 Raeya McRaeSaint MichaelMN 55376 United States4/28/2025 Kelsey McAllisterMinneapolisMN 55051 United States4/28/2025 Amy Olson Hopkins MN 55343 United States4/28/2025 Rebecca O'DanielMinneapolisMN 55024 United States4/28/2025 Chris Holth Blaine MN 55449 United States4/28/2025 Shana MillerCambridge MN 55008 United States4/28/2025 Derek TahedlElk river MN 553ep United States4/28/2025 Megan FordCambridge MN 55008 United States4/28/2025 Natalie BarkerMinneapolisMN 55404 United States4/28/2025 Kendra ParksChicago IL 60605 United States4/28/2025 Nyssa VieauElk River MN 55330 United States4/28/2025 Guy WoodroffeElk River MN 55330 United States4/28/2025 Rosemary FranzZimmermanMN 55398 United States4/28/2025 Sarah JacobsAndover MN 55304 United States4/28/2025 Alicia WeckwerthNorth BranchMN 55398 United States4/28/2025 Michaela WirzSaint MichaelMN 55376 United States4/28/2025 Jess EricksonElk river MN 55330 United States4/28/2025 Jillian FisherMinneapolisMN 55423 United States4/28/2025 Julie NelsonAlbertville MN 55301 United States4/28/2025 Sarah Koester-OstendorfSaint Paul MN 55104 United States4/28/2025 Sara CampbellMinneapolisMN 55406 United States4/28/2025 Kelly WilsonMinneapolisMN 55405 United States4/28/2025 Ebba AlmqvistMalmö 212 16 Sweden 4/28/2025 Alexa Kilian Elk River MN 55330 United States4/28/2025 Chrissy BienhoffAnoka MN 55303 United States4/28/2025 Maggie YounkinElk River MN 55330 United States4/28/2025 Hailea CrapserElk River MN 55330 United States4/28/2025 Anthony PietrzakElk River MN 55330 United States4/28/2025 Brooke CollinsElk River MN 55330 United States4/28/2025 Jen DeCarli MinneapolisMN 55423 United States4/28/2025 Justine TopelElk River MN 55330 United States4/28/2025 Kissel, BreannaSaint MichaelMN 55376 United States4/28/2025 Vicky Sandhofer-krolickBig Lake MN 55309 United States4/28/2025 Page 82 of 247 Kimberly LynchPrior lake MN 55372 United States4/28/2025 Brooke BlomkerElk River MN 55330 United States4/28/2025 Taylor SandhoferElk river MN 55330 United States4/28/2025 Danielle DuerrMinneapolisMN 55430 United States4/28/2025 Hans Curtis Elk River MN 55330 United States4/28/2025 Cathy DolataElk River MN 55330 United States4/28/2025 Jenna OrcuttSaint Paul MN 55113 United States4/28/2025 Mystra JohnsonEden PrairieMN 55347 United States4/28/2025 Lera Nunn Lakeville MN 55044 United States4/28/2025 Madison AndersonElk River MN 55330 United States4/28/2025 Stacy GeorgeElk River MN 55330 United States4/28/2025 Kelly CichoszBurnsville MN 55337 United States4/28/2025 Amber CurtisElk River MN 55330 United States4/28/2025 Nickolas GundersonMinneapolisMN 55428 United States4/28/2025 Dani EnsmingerElk River MN 55330 United States4/28/2025 Amy Hogan Blaine MN 55434 United States4/28/2025 Iggy Doane Elk river MN 55330 United States4/28/2025 Breeanna DeyoMinneapolisMN 55418 United States4/28/2025 Mikayla SiemsenElk River MN 55330 United States4/28/2025 Jen SuehlerMinneapolisMN 55418 United States4/28/2025 Saturn JacobsAndover MN 55304 United States4/28/2025 Tonya HendersonElk River MN 55330 United States4/28/2025 David HalbakkenElk River MN 55330 United States4/28/2025 Meg B Thornton CO 80229 United States4/28/2025 Jacki Fette Victoria MN 55386 United States4/29/2025 Katie Lillo Elk River MN 55330 United States4/29/2025 Michelle TernusElk River MN 55330 United States4/29/2025 Tatyana VlasyukWaconia MN 55387 United States4/29/2025 Sena de LeonRiverside CA 92503 United States4/29/2025 Brianna PenaElk River MN 55330 United States4/29/2025 Sadee Ball Elk River MN 55330 United States4/29/2025 Jessica HerdingElk River MN 55330 United States4/29/2025 Ashley BronsinkMinneapolisMN 55421 United States4/29/2025 Cierra CombsElk River MN 55330 United States4/29/2025 Dawn SpinlerBig Lake MN 55309 United States4/29/2025 Jennifer GarzaMinneapolisMN 55413 United States4/29/2025 Kate BurgoonElk River MN 55330 United States4/29/2025 Courtney WirzBuffalo MN 55313 United States4/30/2025 Rebecca BernardElk river MN 55330 United States4/30/2025 Natalie NochezSaint Paul MN 55107 United States4/30/2025 Justin JensenMinneapolisMN 55429 United States4/30/2025 Juli StenmoMinneapolisMN 55437 United States4/30/2025 ROBIN HINTZMinneapolisMN 55433 United States4/30/2025 Sara SeversonSaint FrancisMN 55070 United States5/1/2025 Tracy McCumberAlbertville MN 55301 United States5/2/2025 Mari MullerMinneapolisMN 55408 United States5/2/2025 Dawn Doll Elk River MN 55330 United States5/2/2025 Page 83 of 247 Benjamin GomezElk River MN 55330 United States5/3/2025 Cassie VagleElk River MN 55330 United States5/3/2025 Jack Wilcox North BranchMN 55056 United States5/3/2025 Ann McArdleElk River MN 55330 United States5/4/2025 Tyler RauschElk River MN 55330 United States5/4/2025 Cole LebourgeoisMinneapolisMN 55429 United States5/5/2025 Michael FreyCambridge MN 55008 United States5/5/2025 Adrianna FioriniIsanti MN 55040 United States5/5/2025 Kristina DahlvangChamplin MN 55316 United States5/5/2025 Holly PenoyerMinneapolisMN 55408 United States5/5/2025 Nicole FredricksonIsanti MN 55040 United States5/5/2025 Cami GuimontSaint MichaelMN 55376 United States5/5/2025 Cammi SchwartzhoffRogers MN 55374 United States5/5/2025 Katrina JohnsonMinneapolisMN 55429 United States5/5/2025 Joaquin MajanoMinneapolisMN 55433 United States5/5/2025 Sofia MajanoMinneapolisMN 55433 United States5/5/2025 Nina Rentz MinneapolisMN 55478 United States5/5/2025 paul brott saint lcoud MN 56304 United States5/5/2025 Amy Kainz ELK RIVER MN 55358 United States5/5/2025 Tess Bertie Saint Paul MN 55114 United States5/5/2025 Lizbeth HernandezMinneapolisMN 55412 United States5/5/2025 Naomi ConjurskiMaple GroveMN 55369 United States5/6/2025 Stephanie SchultzElk River MN 55330 United States5/6/2025 Jake S Elk River MN 55330 United States5/6/2025 Tonya HendersonMinneapolisMN 55407 United States5/6/2025 Bre Clark Elk River MN 55330 United States5/6/2025 Neda MunsonSaint Paul MN 55105 United States5/6/2025 Tammy BurgoyneElk River MN 55330 United States5/6/2025 Jessica St . AubinSaint MichaelMN 55376 United States5/6/2025 Laurie Austin AustinMinneapolisMN 55426 United States5/6/2025 Ashleigh RudlongElk River MN 55330 United States5/6/2025 Zaccariah StrandMinneapolisMN 55407 United States5/6/2025 Janell ThieleElk River MN 55330 United States5/6/2025 Heidi BlaskeElk River MN 55330 United States5/6/2025 Chelsea KaliszewskiElk River MN 55330 United States5/6/2025 Jenny EricksonElk River MN 55330 United States5/6/2025 Veronika GagnerElk River MN 55330 United States5/6/2025 Gabrielle ColemanElk River MN 55330 United States5/6/2025 Blake ColemanElk River MN 55330 United States5/6/2025 Nichole DawsonElk River MN 55330 United States5/6/2025 Erin Lang MinneapolisMN 55406 United States5/6/2025 Celeste McLeanAtlanta GA 30301 United States5/6/2025 Jessica HackenmuellerElk River MN 55330 United States5/6/2025 Jacqui estradaBig Lake MN 55309 United States5/6/2025 Tiffany KnutsonElk River MN 55330 United States5/6/2025 Sydney SullivanElk River MN 55330 United States5/6/2025 Katelyn NordalElk River MN 55330 United States5/6/2025 Page 84 of 247 Mary Junes Elk River MN 55330 United States5/6/2025 Mark HillestadMinneapolisMN 55422 United States5/6/2025 Meggan BeehlerMinneapolisMN 55422 United States5/6/2025 Jenny halsethElk River MN 55330 United States5/6/2025 Shauna MuenzhuberElk River MN 55330 United States5/6/2025 Martin DuenowMinneapolisMN 55433 United States5/6/2025 Angie OlsonElk River MN 55330 United States5/6/2025 Jessica LockwoodElk River MN 55330 United States5/6/2025 Carolyn LarsonElk River MN 55330 United States5/6/2025 Sarah KettelhodtElk River MN 55330 United States5/6/2025 Raine HentgesMinneapolisMN 55411 United States5/6/2025 Sarah RusselElk River MN 55330 United States5/6/2025 Joel GagnerElk River MN 55330 United States5/6/2025 Melissa FrankmanMinneapolisMN 55406 United States5/6/2025 Theodore KeithMonticello MN 55362 United States5/6/2025 Kayla ZehowskiMinneapolisMN 55408 United States5/6/2025 Devin RusselSaint Paul MN 55104 United States5/6/2025 Amy SchmitzElk River MN 55330 United States5/6/2025 Jamie Reid Elk River MN 55330 United States5/6/2025 Crystal DahlSaint MichaelMN 55330 United States5/6/2025 Jacob NelsonMinneapolisMN 55406 United States5/6/2025 Amanda NelsonElk River MN 55330 United States5/6/2025 Lacey KompelienElk River MN 55330 United States5/6/2025 Mark SeubertMinneapolisMN 55410 United States5/6/2025 Don WalentinyMinneapolisMN 55407 United States5/6/2025 Chris AndersonElk river MN 55330 United States5/6/2025 Laura HofiusElk River MN 55330 United States5/6/2025 Matt MellenthinMinneapolisMN 55411 United States5/6/2025 Heather OpayElk River MN 55330 United States5/6/2025 JaNaye EricksonElk River MN 55330 United States5/6/2025 Lynn ZurniedenElk River MN 55330 United States5/6/2025 Abbey HaugeSaint MichaelMN 55376 United States5/6/2025 Sadie OlsonHolmen WI 54636 United States5/6/2025 Amelia OlsonMinneapolisMN 55478 United States5/6/2025 Tom RamacherMinneapolisMN 55429 United States5/6/2025 Erin Weeks Elk River MN 55330 United States5/6/2025 Angela StoltzElk River MN 55330 United States5/6/2025 Kristine CarlsonRamsey MN 55303 United States5/6/2025 Adrian CampbellSartell MN 56377 United States5/6/2025 Anna Cirlan Elk River MN 55330 United States5/6/2025 Christine EdelburgMinneapolisMN 55406 United States5/6/2025 Jessica HansonElk river MN 55330 United States5/6/2025 Ben StensonSaint Cloud MN 56303 United States5/6/2025 Stacey MitchellElk River MN 55330 United States5/6/2025 Michael SchneiderPlymouth MN 55446 United States5/6/2025 Julia DonovanProvidence RI 2904 United States5/6/2025 Cake Thom Saint JosephMN 56374 United States5/6/2025 Page 85 of 247 Catie Lee Elk River MN 55330 United States5/6/2025 Leslie WeinerMinneapolisMN 55404 United States5/6/2025 Brianne ChaffinElk River MN 55330 United States5/6/2025 Eddie JohnsonMinneapolisMN 55403 United States5/6/2025 Shadrack NambaElk River MN 55330 United States5/6/2025 Jessica DolandSartell MN 56377 United States5/6/2025 Amanda PludeElk River MN 55330 United States5/7/2025 McKena DyeElk River MN 55330 United States5/7/2025 Jana NelsonElk River MN 55330 United States5/7/2025 Lisa CarpentierMinneapolisMN 55478 United States5/7/2025 David FrancoMonticello MN 55330 United States5/7/2025 Julie WilsonAlbertville MN 55301 United States5/7/2025 Evelina GalaguzRamsey MN 55303 United States5/7/2025 Pa Vang Elk River MN 55330 United States5/7/2025 Brooke FrancoMinneapolisMN 55443 United States5/7/2025 Brian RichardElk River MN 55330 United States5/7/2025 Chris WojcikElk River MN 55330 United States5/7/2025 Colin AndersonElk River MN 55330 United States5/7/2025 Susanna RepasyE MN 55309 United States5/7/2025 Tracey SchudiIsanti MN 55040 United States5/7/2025 Victoria FishElk River MN 55330 United States5/7/2025 Mikayla ThurmanBig Lake MN 55330 United States5/7/2025 Selina Insel Elk River MN 55330 United States5/7/2025 Leah HerbstElk River MN 55330 United States5/7/2025 Alex McArdleElk River MN 55330 United States5/7/2025 Sarah HendersonMinneapolisMN 55406 United States5/7/2025 Jessica Greer-lorgeElk River MN 55330 United States5/7/2025 Anna ZahlerElk River MN 55330 United States5/7/2025 Zachary GullicksonElk River MN 55330 United States5/8/2025 Jake HoscheidElk River MN 55330 United States5/8/2025 Rainier VillarrealElk River MN 55330 United States5/8/2025 Dylan Witt ZimmermanMN 55398 United States5/8/2025 Nikki Kurtz Elk River MN 55330 United States5/8/2025 Patricia NiebolteCoon RapidsMN 55448 United States5/8/2025 Rebekah JudischElk River MN 55330 United States5/8/2025 Callie Lage Elk River MN 55330 United States5/8/2025 Raul VillarrealElk River MN 55330 United States5/8/2025 Ethan AntczakMinneapolisMN 55401 United States5/8/2025 Weston HallShakopee MN 55379 United States5/8/2025 Madalyn dubbinPlymouth MN 55447 United States5/8/2025 Perrie ElferingMinneapolisMN 55404 United States5/8/2025 Beverly LindenfelserMinneapolisMN 55401 United States5/9/2025 Jennifer HarrisOsseo MN 55311 United States5/9/2025 Alan Ness Sauk RapidsMN 56379 United States5/9/2025 Amy DahlheimerZimmermanMN 55398 United States5/9/2025 Matt FountainBurnsville MN 55337 United States5/9/2025 Beth FristromMinneapolisMN 55441 United States5/9/2025 Page 86 of 247 Yvonne MoffattMinneapolisMN 55440 United States5/10/2025 Saibeth BarrientosRoseville MN 55113 United States5/10/2025 Brooke LenningElk River MN 55330 United States5/10/2025 Matt WilliamsMinneapolisMN 55423 United States5/10/2025 Andrea OverbaughElk River MN 55330 United States5/11/2025 JaLene RosengrenMaple GroveMN 55369 United States5/11/2025 Elsie JohnsonElk River MN 55330 United States5/11/2025 Mike SavelkoulMinneapolisMN 55401 United States5/11/2025 Sarah spry Stevens PointWI 54481 United States5/12/2025 Brandon Svoboda United States5/12/2025 Sarah HackbarthCambridge MN 55008 United States5/12/2025 Iris JacksonMinneapolisMN 55421 United States5/12/2025 Kathleen GertjejansenBig Lake MN 55309 United States5/12/2025 Cheryl NELSONMinneapolisMN 55428 United States5/12/2025 Yanetsy AlonsoShepherdsvilleKY 40165 United States5/13/2025 Leah FergusonElk River MN 55330 United States5/13/2025 Kathryn Yocum United States5/13/2025 Suzie FennoMinneapolisMN 55428 United States5/13/2025 Kasey EricksonBig Lake MN 55309 United States5/13/2025 Bob Nylin Rogers MN 55343 United States5/13/2025 Matthew FergusonElk River MN 55330 United States5/13/2025 Barbara LaflinMinneapolisMN 55428 United States5/13/2025 Lakisha JonesMinneapolisMN 55429 United States5/13/2025 Mark SchuchGlencoe MN 55336 United States5/14/2025 Ava Gillson Coon RapidsMN 55433 United States5/14/2025 terrence williamsRuthven IA 51358 United States5/14/2025 Alicia HalversonElk River MN 55330 United States5/14/2025 Erin MantheyElk River MN 55330 United States5/14/2025 Tim MantheyMinneapolisMN 55406 United States5/14/2025 Caspian RademacherBurnsville MN 55306 United States5/15/2025 Russhell JohnsonMorrow GA 30260 United States5/15/2025 Cathy EricksonSt. Michael MN 55376 United States5/15/2025 Paullo BarbourSaint Cloud MN 56301 United States5/15/2025 Madeline BakkeAndover MN 55304 United States5/15/2025 Eli DeRushaSavage MN 55378 United States5/15/2025 Ana LukyanchukPrior Lake MN 55372 United States5/15/2025 Kya Sanner Olathe KS 66061 United States5/15/2025 Tessa TollefsonSaint Paul MN 55110 United States5/15/2025 Lucille SumnerMinneapolisMN 55408 United States5/15/2025 Justin Titus Apple ValleyMN 55124 United States5/15/2025 Olivya ClouseElk River MN 55330 United States5/16/2025 Nik IkonomovskiSaint Paul MN 55113 United States5/16/2025 Leah ShnitserColumbia SC 29210 United States5/16/2025 Afnan AhmedPrior Lake MN 55372 United States5/16/2025 Michelle KruseWoodbury MN 55125 United States5/16/2025 Ayu NegawoBronx 10454 United States5/16/2025 Maison RauerSaint Paul MN 55105 United States5/16/2025 Page 87 of 247 Geovani PazBlaine MN 55434 United States5/16/2025 Gabrielle MorrisseySaint Paul MN 55114 United States5/16/2025 Alyson PatteeFargo ND 58103 United States5/16/2025 Buddha IbranaMinneapolisMN 55422 United States5/16/2025 Ryan Baka MinneapolisMN 55411 United States5/17/2025 Madeline TraxlerBloomingtonMN 55438 United States5/17/2025 Solomon FarajAndover MN 55304 United States5/17/2025 Pryor LeonardMonticello MN 55362 United States5/17/2025 Elizabeth WhiteSaint Paul MN 55128 United States5/17/2025 Peyton CaterHastings MN 55033 United States5/18/2025 Aida HammillMilaca MN 56353 United States5/18/2025 Averi MarkunFarmington MN 55024 United States5/18/2025 Anon YmousSaint Cloud MN 56303 United States5/18/2025 Charly PorwollMinneapolisMN 55414 United States5/18/2025 Katia RubinchikGolden ValleyMN 55416 United States5/18/2025 Becca D Lakeville MN 55044 United States5/19/2025 Sonja BarthelElk River MN 55330 United States5/19/2025 Rhonda JeurissenRice MN 56367 United States5/19/2025 K4YD3N DabussySaint Paul MN 55113 United States5/19/2025 nicolas BarreraMinneapolisMN 55423 United States5/19/2025 KAILEE TRANPlymouth MN 55447 United States5/19/2025 Hannah LarsonSaint Paul MN 55101 United States5/19/2025 Socrates DeJoachimMinneapolisMN 55443 United States5/20/2025 imari jones brooklyn parkMN 55428 United States5/20/2025 Evelyn VerplankPlymouth MN 55446 United States5/20/2025 Ananya SinghMaple GroveMN 55369 United States5/20/2025 Quinn SchmuddeElmhurst IL 60126 United States5/20/2025 Grayson carpenterFlower MoundTX 75028 United States5/20/2025 Leah VodnickPrior Lake MN 55372 United States5/20/2025 Carley PlanteLittle Falls MN 56345 United States5/20/2025 Remy LenoreSauk RapidsMN 56379 United States5/21/2025 Nancy ZimmermanHamel MN 55340 United States5/21/2025 Cassandra LuttmerVillard MN 56385 United States5/21/2025 Yawriv Gillum United States5/21/2025 Christina RoebuckCarrollton GA 30116 United States5/22/2025 Winnie KopetSolon IA 52333 United States5/22/2025 christopher silvaMinneapolisMN 55407 United States5/22/2025 Brynne ClouseCottage GroveMN 55016 United States5/22/2025 Viktoriia KharaBurnsville MN 55337 United States5/23/2025 Henry Bell Victoria MN 55386 United States5/23/2025 Lori ClelandBig Lake MN 55309 United States5/23/2025 Keith CampbellMinneapolisMN 55432 United States5/23/2025 Sam RichardsSaint Paul MN 55110 United States5/24/2025 Owen HowardMinneapolisMN 55430 United States5/24/2025 raymond zhengNew York NY 10118 United States5/24/2025 Miss Jessica United States5/25/2025 Diana BalcomElk River MN 55330 United States5/25/2025 Page 88 of 247 Addison GustineMinneapolisMN 55407 United States5/25/2025 Emma PetersenGlencoe MN 55336 United States5/26/2025 Luther SatherElko MN 55020 United States5/26/2025 Hunter RnfjfjfElk River MN 55330 United States5/26/2025 Amanda JongewaardElk River MN 55330 United States5/26/2025 April AbbottLakeville MN 55044 United States5/27/2025 Nina Rentz Princeton MN 55371 United States5/27/2025 William KimberMinneapolisMN 55440 United States5/27/2025 Amy MorrisonBurlington IA 52601 United States5/27/2025 Laural M Saint Paul MN 55125 United States5/27/2025 Genavive KostuckMinneapolisMN 55478 United States5/28/2025 Sandra KananiHopkins MN 55343 United States5/28/2025 Trudie AndersonMinneapolisMN 55432 United States5/28/2025 Benjamin BiernatElk River MN 55330 United States5/28/2025 Michael Montano-AguilarMinneapolisMN 55455 United States5/28/2025 Maryna IerokhinaEden PrairieMN 55346 United States5/29/2025 Allison ReimannBig Lake MN 55309 United States5/29/2025 Ataya GradyMinneapolisMN 55421 United States5/29/2025 Grace PorterMerrifield MN 56465 United States5/29/2025 Michelle PaskoSaint Paul MN 55108 United States5/29/2025 Peter CosgroveFoley MN 56329 United States5/29/2025 Kristian BerquistMinneapolisMN 55330 United States5/31/2025 Page 89 of 247 For the best experience, open this PDF portfolio in Acrobat X or Adobe Reader X, or later. Get Adobe Reader Now! Page 90 of 247 The Elk River Vision A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and community engagement that encourages and inspires prosperity Request for Action To City Council Item Number 8.2 Meeting Date June 2, 2025 Prepared By Zack Carlton, Community Development Director Item Description Downtown Master Plan Reviewed by Cal Portner Tina Allard Action Requested Adopt, by motion, the 2024 Downtown Master Plan. Background/Discussion A steering committee representing the council, multiple commissions, and the downtown business community has been working with Bolton and Menk to prepare a long-range vision for Elk River's downtown area. The plan identifies redevelopment opportunities on both public and privately owned parcels and recommends a series of action steps to guide the city towards this shared vision. Plan highlights include development recommendations for key sites within the core downtown area - the King Avenue parking lot, the Elk River Lutheran Church site, and the block that includes Dare's Funeral Home. Redevelopment of these sites would largely be driven by property owners, and the plan is the tool the city has to guide the vision for the future of those properties. Additionally, substantial changes to Main Street and Jackson Ave within the core downtown area, including transitioning to parallel parking on both sides of the street and widening the sidewalks to improve the pedestrian areas in downtown. Changes include wider sidewalks, larger planters with trees and vegetation, and benches. This will result in the loss of 19 on-street parking stalls, which has been a concern of the steering committee. However, the plan also recommends partnering with downtown businesses to enter into shared parking agreements for the use of those lots during off-peak hours and considering time limits for the street parking to facilitate increased turnover. Looking beyond the core downtown, the plan identified the area along Railroad Drive between Jackson and Gates Avenue as a larger redevelopment site referred to as Uptown. Much of this area is envisioned as a higher-density residential area with commercial uses to complement the additional growth. Public Feedback A video summarizing and outlining the goals and recommendations of the Downtown Master Plan was posted to the city's Facebook page in advance of a public open house on April 22, 2025. The Facebook comments are included as an attachment. Concerns about tax increases and parking considerations dominate the comments, with many residents expressing concerns about affordability, specific to property taxes. Page 91 of 247 The public open house had a good turnout, with residents showing up to ask a large variety of questions. Affordability, parking, and taxes were again top areas of concern. Additional comments from the open house included the timing of the plan, implementation steps, and density of the uptown area. In response to these concerns, the plan has been updated to remove the three- to four-story apartment buildings along Gates Ave, and additional considerations for downtown parking, as noted earlier, have been included. Finally, regarding costs and property tax implications. Nothing in this plan obligates the city to spend tax dollars purchasing and redeveloping private property. What the plan does is provide a general vision for the city to evaluate proposed redevelopment opportunities as they are presented to the city. Most of these will be private developers who have already had conversations with landowners regarding the sale of their properties. The plans' recommendations for improvements to public assets, parking lots, and streets will be reviewed by the council in greater detail when those projects have been included in a city budget. Financial Impact The total cost of the plan was $102,400 and was included in the CIP. Mission/Policy/Goal Responsibly grow. Support the growth and development of the community. Attachments 1. Elk River Downtown Plan 2. Downtown Plan Facebook Comments from April 2025 Page 92 of 247 Prepared for: City of Elk River Prepared by:Bolton & MenkLeland Consulting DOWNTOWN MASTER PLANElk River, MinnesotaDraft Report as of May 28, 2025 Page 93 of 247 TABLE OF CONTENTS ACKNOWLEDGEMENTS Introduction & Executive Summary ........ 3 Analysis .......................................................... 5 Plan Process .................................................. 16 Recommendations ...................................... 23 Implementation .......................................... 38 Steering Committee Allison McDowell (Downtown Business Representative) Deana McLean (Downtown Business Representative) Jennifer Wagner (City Council Representative) Lance Lindberg (Heritage Preservation Commission Representative) Lynn Caswell (Housing and Redevelopment Authority Representative) Perry Beise (Planning Commission Representative) Jill Larson-Vito (Elk River Resident) City Staff Zack Carlton (Community Development Director) Chris Leeseberg (Senior Planner) Brent O’Neil (Economic Development Director) Josh Mollan (Economic Development Specialist) City Leadership John J. Dietz - Mayor Cory Grupa - Ward 1 J. Brian Calva - Ward 2 Mike Beyer - Ward 3 Jennifer Wagner - Ward 4 Page 94 of 247 1 INTRODUCTION Page 95 of 247 1 THE PURPOSE OF THIS DOWNTOWN PLAN The purpose of this Plan is to create a vision and series of action steps for the Downtown Area of Elk River — a vision that responds to the needs of today, and prepares for the desires of the future. Downtown is of particular importance to the community because it is the psychological center of the community. Comprised of small and medium sized properties, it is in many ways a place of opposites - a place of pride and community gatherings; a core separated from the rest of the city; a beautiful river that lacks a strong presence; major regional visibility offered by infrastructure that bisects the area; a community that takes pride in both its downtown, and country identities. It is also of particular importance because downtown Elk River, like many smaller downtown, sits at an inflection point in its history. As it wrestles with a post-COVID economic identity, downtown is seeking to become more than just a place to work and shop - but also one in which people can live, gather, celebrate, and play. With nearly all of the private land in the area developed, or encumbered by highways and rail, Downtown Elk River must creatively pursue strategies of redevelopment, creative connectivity, and people-oriented public spaces. The purpose of this Downtown Plan therefore is to provide clear, attainable guidance to align private and public investments towards goals of a more connected, inviting, vibrant destination for residents and visitors. “Elk River’s attractive and well-programmed downtown will be a destination for residents as well as tourists interested in enjoying a night out for shopping, dining, and entertainment. The downtown will leverage its waterfront to anchor events and draw thousands to the area. Pedestrian connections throughout the downtown will be enhanced, encouraging visitors to park once and explore on foot.” -Elk River 2040 Comprehensive Plan Page 96 of 247 2 BUFFALO MONTICELLO BECKER PRINCETON CAMBRIDGE NORTHBRANCH FOREST LAKEANOKA ROGERS MAPLE GROVE ELK RIVER MINNEAPOLIS ST. PAUL ST CLOUD ELK RIVER THROUGH THE YEARS The RegionA Trading Hub Like many present day river cities, Elk River originated as a hub for fishing and trading. The earliest human activity saw the Ojibwa and Dakota people using the land for hunting, fishing, and traveling along the Mississippi. Early European settlers eventually set up trade posts along the Mississippi and Elk River, and the Red River Trail, leveraging the confluence of each for travel and commerce. Over time, trading turned to farming, which eventually gave way to industry. Rail arrived in Elk River in the 1870’s, and with it came a shift of the economic center of the city to “Lower Town”, the current historic downtown area. Shortly after World War II, regional and state-wide paved roadways were introduced to the city. Highway 10, originally called the Jefferson Highway, was constructed in its current location along the northern edge of the downtown core. A few years later, Highway 169 was introduced. Even in its early days the highway saw major weekend backups extending miles out of town. ENERGY CITY Even before Elk River was established as a city in 1974, energy production played a major role in the regional economy. The first rural nuclear power station went online in the area in 1960, and subsequent energy innovations and sector growth help the city achieve the unofficial title of “energy city” in the late 1990’s. Elk River is just outside the official Twin Cities Metropolitan Region, however it relies on surrounding communities for much of its daily retail and dining needs. Located 30 miles from Downtown Minneapolis, Elk River is on the northern edge of the regions developed areas. Because of this, the City has adopted a tagline of “where the city and country flow together. Both of the city’s major highways, Hwy 10 and Hwy 169, provide direct access from Minneapolis and St. Paul, north to regional centers of commerce and recreation in greater Minnesota. 1943 1957 1991 2004 2004 CITY AND COUNTRY FLOW TOGETHER Elk River continues to embrace the converging of city and country within its borders. With near proximity to both St. Cloud and the Minneapolis/St. Paul Metro, Elk River is never more than a short journey away from city amenities. It also offers plenty of wide open country land for those seeking respite from city-living. With something for everyone, and anchored by the Mississippi and Elk Rivers, the city truly reflects the moniker of “Where City and Country Flow Together”. Page 97 of 247 3 DOWNTOWN ELK RIVER Downtown has been the economic and cultural heart of the city, ever since the first trains rolled into town in the 1870’s. Today, the downtown core area - the area on Main Street west of Highway 10 - is a series of walkable blocks with main street commercial buildings and apartment housing. This commercial heart quickly transitions to a single family neighborhood to the west. North of the core, is a mix of industrial and small commercial, eventually transitioning to a small residential neighborhood. To the east of the core then is a small commercial corridor along Main Street, connecting Highway’s 10 and 169. Downtown faces a series of infrastructure and natural challenges. Bounded by Highway 169 to the east, the downtown is bisected by Highway 10 and the rail line, right through its core. The difficulties each presents in terms of connectivity and development, cannot be overstated. Further, the Mississippi bounds the area to the south. While there are immense opportunities to better connect to the river, today, the downtown only minimally addresses the river. Despite these challenges, there are numerous opportunities for the city to guide transformational redevelopment, promote enhanced multimodal connectivity, and provide destination public space experiences. Scale of OpportunityHeart of the City The scale of the downtown area is comparable to several other downtowns in surrounding communities. Additionally, its a size in which its core area is all within an approximately 10-minute walk - a standard measure for a comfortable walking distance. Downtown Anoka Downtown Elk River Downtown Monticello Downtown St. Cloud 10 min walk DOWNTOWN CORE HWY 1 0 BNSF R A I L L I N E MISSISSIPPI RIVER HW Y 1 6 9 Page 98 of 247 4 Zoning Code Details allowable land uses, and site and building design guidance for Downtown, and immediately surrounding areas. Downtown Traffic and Parking Study (2021) Analyzed traffic and parking conditions within Downtown; Evaluated the pros and cons of transitioning Jackson Avenue to a one-way. Highway 10 Corridor Study The corridor study identifies a series of safety, access, and operational challenges for the Highway. 2040 Comprehensive Plan: Riverfront Planning Outlines future guidance for Rivers Edge Park, and an ADA accessible seasonal dock to the River; Recommends additional connections to the river front. Elk River Parks and Recreation Master Plan (2015) Provides facility and programming improvement recommendations for downtown area trails, river access, and area parks. Sherburne County Park, Trail, and Active Living Plan Identifies conditions and needs for improved trail connectivity with Downtown and the Great Northern Trail and Mississippi River Trail; Downtown is within Sherburne County’s Priority network corridor for improvements Key Takeaways • Much of the historic development pattern of downtown remains, though is constrained by natural features and regional infrastructure. • Existing land use and character area guidance is as in alignment with desired uses in downtown, but may benefit from some additional refinement. • Only about 1/3 of available parking downtown is utilized on an average day, however available parking isn’t necessarily perceived as convienant or “near” destinations. • Converting Jackson Avenue to a one-way street was determined to be more detrimental to downtown than beneficial. • Continued expansion of public space and access to the river is critical to maximizing downtown’s potential • New trail connections can connect downtown with the Great Northern Trail, Lion John Weicht Park, Bailey Point Nature Preserve, and other regional destinations 2040 Comprehensive Plan Guidance To guide city economic development actions, and promote cohesive developable areas, the city’s 2040 Comprehensive Plan ascribed a series of character areas to the downtown. Guidance, including area-specific city policies and strategies, seek to promote job creation, enhance delivery of goods and services, and raise quality of life in each area. Hw y 1 0 H w y 1 6 9 DOWNTOWNDOWNTOWN Downtown Mixed Use Neighborhood commercial Uptown Mixed Use Highway 169 commercial DOWNTOWN ELK RIVER Past and Current Plans Page 99 of 247 2 ANALYSIS Page 100 of 247 6 MARKET PUBLIC SPACE (P) The analysis of Downtown Elk River includes a review of Public Space, Connectivity, and Development. Understanding issues and opportunities through this holistic lens allows for targeted improvements, while recognizing their interrelated role each plays towards creating strong places. The Plan is also supported by a market analysis. Findings from the market analysis further refined the analysis to identify and explore area recommendations. KEY FINDINGS D1 - Defined Development Character Areas D2 - Railroad Dr Redevelopment Opportunities D3 - Parking Lot Site, Church Site, Funeral Home Site C1 - Main St Design, Crossings of Hwy 10 & BNSF Rail Line C2 - Mulitomodal Connectivity C3 - Main St / Parrish Ave Intersection P1 - Leverage the River P2 - More and more frequent events P3 - Enhanced Main St pedestrian experience CONNECTIVITY (C) DEVELOPMENT (D) C2 P1 P3 P2C1 D1 D2 D3 C3 HWY 169HWY 169 HW Y 1 0 HW Y 1 0 Rail L i n e Rail L i n e Main StMain St River’s EdgeRiver’s Edge CommonsCommons Main StMain St Jackson AveJackson AveBailey Point Nature Preserve Mississippi River Irving AveIrving AveGates AveGates AveRai l r o a d D r Rai l r o a d D r SYSTEMS OF ANALYSIS P3 Page 101 of 247 7 1 1 1 44 5 5 2 2 3 3 Downtown is wedged between the Mississippi River, Highway 10, and the BNSF rail. The City grew up along the river, therefore the older building stock extends west from Downtown. As Main Street extends east towards Hwy 169 it lacks a consistent development pattern. Most of the City’s commercial development is along HWY 169 and not Hwy 10. Though the rail line predates most of the city’s development, the block pattern on the north side of the rail line appears to have been disrupted by the rail alignment. Study Area DEVELOPMENT Existing Conditions KEY FINDINGS HW Y 1 0 HW Y 1 0 BNS F R A I L L I N E BNS F R A I L L I N E MAIN STMAIN ST JACKSON AVEJACKSON AVEHWY 169HWY 169 Page 102 of 247 8 Railroad Drive Opportunities • The Main Street portion of downtown is relatively well built out, therefore there are only a few opportunities for redevelopment. Railroad Drive, on the other hand, presents significant opportunities for redevelopment. • The properties are underperforming, in that land values exceed the building values - suggesting they are susceptible to change in the near term. • Given the inability to add housing into the immediate Downtown, the Railroad Drive properties are well positioned for multi-family housing. Key Downtown Sites • The City owns several key properties Downtown - including the public parking lot, riverfront properties as well as the street ROW. The City should use these properties to advance the goals of the Master Plan • The church and funeral home are legal non-conforming uses in the Downtown. They are permitted to operate however they are limited in their ability to expand in that location. Development Districts Character Areas • Though the rail line and Highway 10 disrupt the physical fabric of the community, they create the opportunity to clearly define different character areas in the downtown area. • Main Street, between Lowell Avenue and Highway 10 is generally considered the core of downtown - consisting of mercantile, commercial, and mixed use buildings. The area is a center of the community - a place where a mix of uses come together. • West of Lowell, the character changes to urban neighborhood - where housing is the dominant land use. The width of Main Street remains relatively wide, which is inconsistent with the residential character astride it. • Uptown, the area north of Railroad Drive, has never evolved into a place with a consistent character. The uses are not related to each other and the street grid and block pattern have abrupt edges along the rail line. DEVELOPMENT Key Findings MAIN ST MAIN ST MAIN ST JACKSON AVEPARKING LOT PARKING LOT LOWELL AVEJACKSON AVEHW Y 1 0 HW Y 1 0 RA I L R O A D D R RAILR O A D D RHWY 169Page 103 of 247 9 6 1 4 5 2 6 3 5 1 4 3 2 Hwy 10 bisects the study area, but also offers visibility and regional access The rail line bisects the center of the downtown area, and is a major barrier Main Street is the primary east/west connector in downtown, and the anchor to the local network Jackson Ave is the only north/south connection over Hwy 10 and rail line The Main St/Parrish Ave/Hwy 10/Rail Line intersections are very difficult to navigate by car, foot, and bike Improvements to Hwy 169 should alleviate area traffic, while offering another means of getting to downtown DOWNTOWNCORE UPTOWN COMMERCIAL CORRIDOR NEIGHBORHOOD NEIGHBORHOOD MAIN ST PARRISH AVEJACKSON AVEHWY 10 HWY 169 Ra i l L i n e INDUSTRIAL CONNECTIVITY KEY FINDINGS Page 104 of 247 10 More Places for Walking and Biking • Walking within the downtown is generally concentrated within two, circular networks - one north of Highway 10 and one south. While the sidewalk systems is relatively well built in each, pedestrian connections between downtown and uptown are poor. • There are currently no designated areas to bike into and around the downtown area, and wide vehicle lanes within downtown dissuades people from biking. Connecting downtown to area trails, particularly the Great Northern Trail, could bring another user group into downtown while promoting bike tourism. Vehicle Spot Improvements • Vehicle circulation into and within downtown is often very uncomfortable. This is especially true during large events, the many times per day that trains pass, and during summer weekend traffic. • Spot improvements at the Main Street / Parrish Avenue intersection could help with better circulation at the already location, while offering places to loop back into downtown. • Similarly, Lowell Avenue at the west end of downtown could be redesigned to offer a loop back opportunity into downtown. • Spot improvements at Jackson Avenue and Highway 10 crossing could help with vehicle access and safer pedestrian crossings. A Disconnected Downtown • The Downtown Core area is severely isolated due to Highway 10 and the rail line to the north, and the Mississippi River to the south. Getting into and out of the area requires “funneling” onto Jackson Ave, Main St east, and Parrish Ave - all of which have difficult crossings. • Crossing Highway 10 and the rail line is difficult, uncomfortable if walking or biking and limited in location - the only places to cross within downtown are along Main St or Jackson St. The presence of both make circulation around the area very difficult, particularly during events, trains, or summer weekend traffic. • The generous roadway widths, angled parking, and modest streetscape along Main Street, don’t promote an attractive retail and pedestrian experience. Reconsidering the roadway design towards one with more space for pedestrians, could better balance the many competing needs within the downtown core. H W Y 1 0 H W Y 1 0 / R a i l L i n e H W Y 1 0 MAIN S T MAIN S T MAIN S T 4th ST 4th ST 4th ST MAIN ST MAIN ST MAIN STJACKSON AVEJACKSON AVEJACKSON AVEPROCTOR AVEPROCTOR AVEPROCTOR AVEPARRISH AVEPARRISH AVEPARRISH AVEMISSISSIPPIRIVER MISSISSIPPIRIVER MISSISSIPPIRIVERHwy 169Hwy 169Hwy 169 CONNECTIVITY Key Findings Page 105 of 247 11 Right of Way Mississippi River Bailey Point Nature Preserve RIVERS EDGE COMMONS MAIN ST MAIN ST JASCKSON AVEHWY 169 RA I L R O A D D R 1 4 5 2 3 Main Street and Jackson Avenue are major public space amenities, but primarily serve vehicles The city-owned parking lot is a major event space for activities like the farmers market Rivers Edge Commons is the premier public space downtown, but its programming is limited to concerts and performances Surrounding public space destinations like Bailey Point Nature Preserve are not well connected to downtown for people walking and biking The riverfront has the potential to be a major downtown amenity and public space, but is largely disconnected from downtown. KEY FINDINGS 3 1 2 4 5 PUBLIC SPACE Page 106 of 247 12 Main Street and Jackson Avenue are the Key • Main Street is the only east-west through downtown. It is also the primary connector and public space within downtown. • Rethinking the design of Main Street and Jackson Avenue in the downtown core, would offer more space for pedestrian activity, eating and shopping, and events, all while improving multimodal connectivity in downtown. More and More Frequent Events • The community expressed a strong desire for more downtown events, particularly for families. Such events bring the community together to celebrate and socialize downtown. • The provision of public events will need to balance available city resources, and consider space and facility needs for these activities. If aligned with supportive public spaces downtown, additional events could bolster the role of downtown in civic life, while reconnecting people to downtown as a identity of the city. Leverage the River • The river is one of downtown’s strongest assets, yet it is only experienced via River’s Edge Commons and seasonal dock. Enhancing public space along the river and providing additional access and views, is a priority of this plan. • Improvements along the river and connective public space, could better connect people to each other, the natural environment, and offering new recreational and event opportunities. PUBLIC SPACE Key Findings +/-25% Pedestrian Space +/-75% Vehicle Space Page 107 of 247 13 Demographics Employment and Commuting Local Market Conditions • There is a higher concentration of lower-income households in the Downtown study area, largely due to the fact that nearly a third of multifamily housing units in this area are regulated affordable housing. Along with Jackson Place, the 23-unit Elk River Senior Apartments are affordable. However, the high concentration of upper-income households citywide suggests that there could be an opportunity to add higher-end housing and retail to Downtown. • 262 people live in the Downtown study area, making up just under one percent of the total population of 27,393. Between 2010 and 2024, population growth in Elk River outpaced county- and region-wide growth. The median per capita and household incomes are lower in Downtown than region wide due to the high concentration of affordable housing in Downtown Elk River. • Elk River has a total of 11,498 jobs, 81% of which are filled by workers from outside of the city limits (including unincorporated areas). Nearly 11,000 workers who live in Elk River commute to other communities for work. Just 2,169 (17 percent) of workers who live in Elk River work within city limits. • Among workers who live in Elk River, 14.5% work in the city and nine percent work in Minneapolis, while 52% of Elk River workers commute to other locations, including unincorporated areas. • Residents of Elk River and neighboring cities typically cross municipal boundaries to meet their daily needs. To understand the overall market dynamics in Elk River, the Plan analyzed a seven-mile radius from Downtown Elk River, which includes parts of Sherburne, Anoka, and Wright counties. Within this area, there are 8.3 million square feet of industrial space across 255 properties, with an additional nine proposed properties expected to add two million square feet of industrial space to the market. Multifamily • Permitting has not returned to pre-Great Recession levels. While between 2000 and 2006, Sherburne County permitted an average of over 1,200 units per year, between 2017 and 2023 the county permitted an average of around 500 units per year. In 2022, 596 units were permitted, over half of which were in structures with five or more units. It does not appear that the COVID-19 pandemic has had a significant negative impact on permitting. • Retail trade, manufacturing, health care and social assistance, and educational services dominate the Elk River employment sector. • Between 2012 and 2021, construction, manufacturing, accommodation and food services, and retail trade saw the biggest job gains among employment sectors. • Over that period, the city gained 722 new jobs, a 6.7% increase in overall employment. Manufacturing and retail are the biggest employment sectors in Elk River, employing over 1,800 workers each and accounting for nearly two thirds of total employment citywide. • Manufacturing sector employment in Elk River grew by 45% between 2012 and 2021 while retail grew by 23% percent. and retail are also among the most common use types by square feet, though there are more office properties than multifamily in this area. The relatively small office spaces support nonprofit offices, service providers like insurance agents, and mental health care providers. MARKET SUMMARY Housing Permits in Sherburne CountyLocation of Employment for Residents of Elk River Income Distribution in Downtown and Elk River Page 108 of 247 14 Retail Gap AnalysisVisitor Dynamics • Visits to Olde Main Eatery peak between 9 and 11 AM, while peak hours at Caribou Coffee are longer, lasting generally between 7 AM and 5 PM. Most visits to the Rivers Edge Commons and McCoy’s Irish Pub are in the evening hours. • Visits to Olde Main Eatery and McCoy’s Irish Pub are concentrated on weekends, while Caribou Coffee attracts more weekday traffic. This is likely due to the fact that Caribou Coffee caters to drive-through customers on their way to work. Over a quarter of visits to Rivers Edge Commons are on Thursdays, when summer programming brings residents to the waterfront for concerts and festivals. MARKET SUMMARY Visits by Time of Day Share of Visits by Day of Week Retail Square Footage per capitaSupply and demand for Selected Retail Categories within a Five Minute Drive of Downtown Elk River Restaurant Square Footage per capita • The category with the highest unmet demand within a five- minute drive of Downtown Elk River is full-service restaurants. This aligns with information provided by shareholders, who specifically stated the need for family dining as well as dining options open late enough for visitors to summer programming at the river. There is also an unmet demand for full-service and limited-service restaurants within a 20-minute drive of Downtown. • Although Elk River has a high concentration of retail and service sector employment, it does not have the same concentration of eating and drinking establishments as peer cities. In Albertville, there are three eating and drinking establishments for every thousand residents, while in Elk River there are fewer than two. Page 109 of 247 15 The Center of The City. The role of Downtown is not necessarily to be the City’s economic engine or a competitor to big-box anchored shopping centers, but rather to be a point of pride for the community and an amenity for residents, employees, and businesses. A healthy and thriving downtown communicates that the community is valued and helps to attract residents and businesses. A Strong Foundation Elk River is a small but growing city with an active Downtown and supportive business community. From an occupancy and placemaking perspective, Elk River’s Downtown is relatively healthy, especially for a town of its size. Creative Opportunities Post-COVID work-from-home trends in the office sector are causing problems for central downtown office and retail vitality. Those same trends, however, present an opportunity for outlying and suburban communities that combine high quality of residential life with a well-rounded offering of amenities and services. Downtowns like Elk River’s stand to benefit from the increased daytime “body count” to support walkable retail, dining, and small office spaces, especially with complementary residential options. Leverage Continued Growth Elk River is growing rapidly, with an average growth rate of 1.4 percent annually between 2010 and 2024. Although residential permitting is below pre-Great Recession levels, this level of growth will continue to fuel a need for housing, requiring a combination of single-family homes and apartments. Downtown could be a key location for new apartments, but more everyday amenities will likely be needed to support Downtown residents. This could include small-format grocery or convenience stores, pharmacies, health clinics, and other necessities. Introduce More Uses Downtowns are constantly improving and changing to meet resident needs. Adding more housing and mixed-use development proximate to Downtown and improving the connection between Downtown and the riverfront would help draw more visitors and support local businesses. Events and Business Hour Alignment Most visits to Downtown Elk River are evenings during the weekends, as well as Thursday nights in the summer when there is programming, including the Farmers’ Market and concerts at the riverfront. However, many of the stores, restaurants, and offices Downtown are not open into the evening hours. While there are limited spaces currently available for new family-friendly dining and entertainment, there could be an opportunity for the City to allow temporary or mobile vendors, like food carts. Leverage the River for Unique Amenities Downtown currently lacks a suitable site to build a competitive hotel. However, if riverfront properties currently occupied by the church and funeral home could be assembled at some point in the future, a boutique hotel as part of a mixed-use development could fill a high value niche in a market with little variety in current supply. KEY TAKEAWAYS Page 110 of 247 3 PLAN PROCESS Page 111 of 247 17 THE PROCESS Project Goals The Downtown Elk River Master Plan establishes a refined vision and set of implementation steps for Downtown and the immediately surrounding area. This vision builds on the City’s 2040 Comprehensive Plan, while reflecting a deeper analysis of downtown’s issues and opportunities. The Plan is guided by a set of Goals to promote a place that is unique to Elk River—one that affirms the historic center of economic and social activity that Downtown played for the City, while affirming a need to continue evolving into a modern center. It is envisioned that much of the existing fabric of Downtown will generally remain in place - the current roadway network, the types of land uses allowed, and the majority of the area’s public spaces. However, a series of targeted interventions are suggested that build on this foundation towards a more robust destination and year-round place of social and economic activity. A Market-Supported Vision A Place People Can Comfortably Get To, And Get Around Getting to downtown is critical considering the constraints of adjacent roadways, rail, and the river. Equally as important are clear ways to move around downtown once you’ve arrived. Downtown must therefore provide comfortable means of driving, walking, and biking to and around downtown for it to continue being successful. The future vision of downtown should be aspirational, while supported by current and anticipated market realities. Implementation steps should balance city resources with long-term returns on public investments. A Public Realm That Supports Businesses and Events Appropriately-Scaled Development The scale of future development in and around downtown must complement existing development, offer transitions in height and scale, and support the city’s long-range vision. Downtown’s public realm is the lifeblood of gathering and activity. Improvements to the Public Realm must continue to support current downtown events and businesses, who rely on the public realm for their success. In turn, improving these spaces must set the stage for strong events and business growth. Balance Evolution with Predictability Events and Businesses that Bring People Downtown Continued business success in downtown will require a level of predictability in the pace and scale of change. Future improvements downtown should be communicated proactively and regularly with downtown business owners. In doing so, local businesses can become active partners and champions of change. The busiest days in downtown are driven by events. The continuation and growth of downtown events should be paired with destination businesses that encourage people to visit the area more often, and extend their stay while downtown. Page 112 of 247 18 Project engagement was conducted using a two-phased approach. This provided for initial, broad input gathering from the public in Phase 1, followed by a feedback loop in Phase 2 to confirm findings and share recommendations. PHASE 1 • Project Website with project details and information • Online public preference survey (362 respondents, see Appendix A for results summary) • Downtown Farmers Market pop-up • Elk RiverFest pop-up • Street decals about the project throughout downtown PHASE 2 • A project overview video that summarized key plan elements • Public Open House at City Hall that presented key recommendations and outcomes of the plan. The project was guided by a steering committee comprised of city staff, downtown business owners, and local stakeholders. The steering committee met monthly to review public feedback, evaluate opportunities, craft recommendations, and establish an implementation plan. ENGAGEMENT AND STEERING COMMITTEE WHAT WE HEARD • The public deeply values downtown, particularly its businesses and events. • Free or low-cost activities downtown draw the most people, particularly where there are things to do for young families and kids - something that is missing elsewhere in the city. • Downtown should continue to attract more businesses, more places to gather, and better views and access to the River. • Parking, or at least the perception of available parking, is a concern for the public. • Within downtown itself, people did not want to see more housing, particularly if it comes at the expense of more stores and restaurants. Downtown plan engagement at the Farmers Market (left), and Elk Riverfest (right). Street decals about the project downtown April 2025 public open house Page 113 of 247 19 Downtown The steering committee explored and evaluated redevelopment concepts on two, key sites in downtown - the city-owned parking lot north of Main St, and the Elk River Lutheran Church property, should redevelopment ever occur on the site. The church is expected to continue being a valuable member of downtown, and as such, this plan does not anticipate a specific timeline for that property. Concepts explored on each site included: • What an appropriate balance of development, public space, and parking may be on the city-owned parking lot. • The amount and type of new public space that should occur along Main Street, what public improvements should be done to the Riverfront, and how might these spaces relate to each other. • How much development can be along Main St and what uses should it include. • Near and medium-term frontage or public realm improvement opportunities for the Church property, even while they remain at that site. “Front Porch”: Small green space with parking area “Double Liner”: A central parking ramp with adjacent development “Marketplace”: year-round space for Farmers Market, pop-up events “Riverfront Concessions”: Modest development with a destination riverfront “Town Green”: Larger outdoor space for events and gathering “Welcoming to the River”: Large development oriented to the river, with modest park space DOWNTOWN DEVELOPMENT CONCEPTS | City-Owned Parking Lot Development and Public Space DOWNTOWN DEVELOPMENT CONCEPTS | Riverfront Development and Public Space Downtown Development Guidance • Any development on the city-owned parking lot should prioritize active ground floor uses along Main Street, and continue the character of downtown. • A small green or public space on the parking lot site was desired, as a compliment to Rivers Edge Commons, and to continue hosting the Farmers Market • Development on the city-owned parking lot must balance available parking throughout downtown. • Any future development south of Main Street should ideally have a presence on Main Street, without turning its back to the river. • The riverfront experience should be improved, but must be mindful of access and program needs of the Rivers Edge Commons, the visibility of new amenities to promote use and safety, and have clear physical and visual site lines to Main Street. Main StMain St Main StMain St Main StMain St Main StMain St Hw y 1 0 Hw y 1 0 Hw y 1 0 Hw y 1 0 Hw y 1 0 Hw y 1 0 Hw y 1 0 Hw y 1 0 Hw y 1 0 Hw y 1 0 Hw y 1 0 Hw y 1 0 Main StMain St Main StMain St CONCEPT EVALUATION Development Page 114 of 247 20 Uptown Development Guidance • Redevelopment in Uptown should be primarily residential, and allow for a diversity of housing types, scales, ownership, and price points. • Denser development should be located along Railroad drive, and at major intersections. • As feasible, a small or medium grocery or convenience store was seen as a good fit for the Uptown area. • Closing Railroad Drive at Main Street could promote safer circulation at the rail road crossing area, but would require shifting access to Gates Ave. Uptown The steering committee also explored and evaluated a series of redevelopment blocks north of Highway 10 and the BNSF rail line - termed “Uptown” during the planning process. Recognizing the comparatively larger area of potential redevelopment sites, this area was looked at holistically as compared to the site-specific approach to Downtown. In Uptown, the development concept explored: • What an appropriate balance of residential and commercial uses should be, and where each should be located • The types, intensity, and general arrangement of residential uses throughout Uptown • The viability of a grocery or convenience store, and a centralized small commercial “node” at the railroad drive roundabout. Mix of housing types, price points, and ownership, with modest targeted commercial uses. UPTOWN DEVELOPMENT CONCEPT CONCEPT EVALUATION Development HW Y 1 0 HW Y 1 0 RAI L R O A D D R RAI L R O A D D R MAIN STMAIN STMAIN STMAIN STJACKSON AVEJACKSON AVEGATES AVE GATES AVE Page 115 of 247 21 Rebalancing Street Design The steering committee considered rethinking streets, and the balance of how the public right of way is utilized for vehicles, people, business activities, and public realm enhancements. For Main Street and Jackson Avenue downtown this included: • What an appropriate balance of streets, parking, and space for pedestrians may be. • How to promote more space for pedestrian and economic activity, like outdoor places to walk, eat, shop, and gather. • For Jackson Avenue, how to improve business access along the block, which is currently ramped on the east-side of the street, with a contiguous railing. For Main Street east of Highway 10 this included: • With a limited available right of way, what improvements might be viable, particularly those that improve and create pedestrian space on the north side of the street and a more welcoming environment into the downtown study area. MAIN STREET DOWNTOWN CONCEPT (80’ Right of Way) MAIN STREET EAST (65’ Right of Way) JACKSON AVE CONCEPT (80’ Right of Way) Current Current Current Redesign Concept Redesign Concept Redesign Concept Connectivity Guidance • Within Downtown, the usage of the ROW should be rebalanced towards serving pedestrians, events, and street-level economic activity. • On Main Street and Jackson Avenue there should be more trees and places to sit, while providing space for outdoor dining and selling of goods. • On Jackson Avenue, improvements should seek out opportunities to allow for mid-block access along the western ramp. • Main Street “east” shouild bury utilities, add more space for people to walk, and change the lighting to a more visually attractive style. Very large space for cars (60’), limited sidewalk space (10’ each side) Very large space for cars (56’), limited sidewalk space (12’ each side) Appropriate space for cars, with a single sidewalk and utilitarian utility poles and lighting Reduce travel and turn lane widths, allowing 8’ to be reallocated for another sidewalk and boulevard trees Parallel parking on both sides, allowing 30’ to be reallocated to sidewalks Parallel parking on both sides, allowing 16’ to be reallocated to sidewalks CONCEPT EVALUATION CONNECTIVITY Page 116 of 247 22 More Places to Gather and Play Public space improvements were considered along Main Street, within the city- owned parking lot, and the Riverfront. These spaces were recognized for their continued importance of hosting events, attracting people downtown, and supporting a strong sense of place to support downtown businesses. Public space considerations explored: • The size, location, and design of any new public space in the city-owned parking lot • Opportunities for improving the Riverfront’s access, visibility, and design, including trails, event space, natural areas, and navigating grade down to the river. • The relation of future public spaces downtown to Rivers Edge Commons. • How sidewalks and the street could better support area businesses and events. • The recognition that new public spaces in Uptown will likely come about through partnership with private developers. Public Space Guidance • The Farmers Market should continue to be hosted either in the city parking lot, or along Main Street. While a modest host structures could be of benefit, public space design and programming flexibility is important. • Any new public space on Main Street in the city-owned parking lot should be modestly sized, while accomodating new development and public parking. • While the riverfront could host some additional programming, most of this activity should remain along Main Street and Rivers Edge Commons. • Any gazebo, bathrooms, or other structures along the riverfront should be designed with clear site lines to Main Street to promote use and safety. • New public spaces in Uptown will be opportunity-driven, and in partnership with future private development. MAIN STREET PUBLIC SPACE RIVERFRONT IMPROVEMENTS Exploration of a large public green space (above), smaller covered market (top right), and covered streetscape features (bottom right) Riverfront improvements like trails (left), development-driven trails (middle), or pop-up vendor space (right) CONCEPT EVALUATION Public Space Page 117 of 247 4 RECOMMENDATIONS Page 118 of 247 24 THE PLAN UPTOWN A new walkable residential neighborhood, with many options to live, close to downtown. DOWNTOWN The community’s center offering places to work, shop, dine, gather, and play. THE RIVERFRONT A destination park, leveraging views of the river with new places to recreate, gather, and play. Page 119 of 247 25 DOWNTOWN Downtown will continue to evolve into the center of the city’s identity, offering year-round activities, commerce, and connections with friends and neighbors. Downtown Elk River has a strong foundation in which to build on. In leveraging its many assets - the business community, Rivers Edge Commons, year-round activities, and highway visibility - downtown will further assert itself as the destination center of the city. Improvements to the street and sidewalk will provide a public realm that both compliments downtown businesses, while creating flexible space for events to naturally expand into. Targeted and strategic redevelopment will expand existing street activity, while offering more places to work and live. Similarly, as improvements to the river are incrementally accomplished, new development will be drawn to the views and access of the river. Elsewhere, events and activities will continue to grow, offering families, residents, and visitors more things to do together throughout the year. Access into and around downtown will be enhanced by carefully implemented improvements along Main Street and Jackson Avenue. Strategically located gateway projects will provide people “loop backs” through downtown, addressing the challenges of a linear downtown, hemmed in by the highway and river. Page 120 of 247 26 DOWNTOWN City-Owned Block Key Outcomes • New publicly accessible park along Main St, that can accommodate the farmers market and other events • Active ground floor with direct access onto Main Street • Pedestrian-scale design and frontage along Main Street • Above-floor office or residential uses • Maintain ability for future structured, shared parking ramp • Explore the viability of a linear development along Highway 10 • A publicly-accessible restroom for the public space The City owns a 2 acre site in the middle of downtown. The site currently hosts a 160 space surface lot, and a small 4,000 sq ft turf green space. Future development of the site must balance the creation of an active retail frontage along main street, the provision of a publicly-accessible public space, and preservation of at least a portion of the site for public parking. An east/west oriented parcel (PID 75-00405-0240) in the center of the site could provide a convenient delineation between the development and parking areas, while maintaining vehicle access to existing development on the west side of Jackson Ave. As the city prepares for a future development RFP, it should remain flexible on the exact development and public space arrangement. Some options shown here illustrate how development and public space programming could be arranged. DEVELOPMENT VISION SITE PHASING The initial development may not be able to deliver structured public parking or linear development, so the city should anticipate multi-phased site improvements. Development on Main Street should ensure feasibility of future site improvements. DEVELOPMENT ALTERNATIVES The city should maintain an openness to working with a private developer on a feasible development plan that meets city goals. Recognizing this, other development alternatives were explored that could also meet the needs and expectations of the community. 2 1 3 5 4 1 Publicly-accessible green space along Main Street 2 Mixed-use building, with active ground floor and office or residential above ground 3 Surface, or future structured parking 4 Space for future “linear” development 5 Maintain access to existing building, with rear alley POTENTIAL DEVELOPMENT OUTCOMES • 8,000-12,000 sq ft ground floor retail space • 20-25 new housing units or 16,000 - 24,000 sq ft new office space • 6,000 - 10,000 sq ft public space to gather • 80-160 parking spaces (pending future structured parking) PHASE 1 PHASE 2/3 PHASE 2/3 Page 121 of 247 27 DOWNTOWN Elk River Lutheran Church Site Key Outcomes • Establish a shared parking agreement on the back surface lot, for public use • Coordinate on planned frontage and site improvements along Main Street, to reduce vehicle access points onto Main Street, create places to sit, and provide vegetation or a small greenspace • Continue to work with the church as a strong partner and amenity within downtown Key Outcomes • Active ground floor with direct access onto Main Street • Pedestrian-scale design and frontage along Main Street • Above-floor office or residential • Underground or podium parking, to reduce parking footprint • Convert the lower surface parking lot to extended green riverfront park space Elk River Lutheran Church is a strong downtown partner, and is an amenity for the community. The City and downtown stakeholders should continue to partner with the church towards opportunities for continued local partnerships If the church ever desires to relocate, the site could play an important role in the continued evolution of downtown business and public space improvements. A mixed use project that offers commercial uses along main street, residential, office, or event uses in the rest of the building, and extends park space along the River, could be a unique site that leverages both the River and Main Street. Existing Potential Future Redevelopment Page 122 of 247 28 DOWNTOWN King to Lowell Key Outcomes • Medium-to-high density housing, with active ground floor uses along Main Street, along the northern half of the block. • Townhomes or similar owner-occupied housing along the southwest quadrant of the block, leveraging views of the river. • A modest or boutique hotel along King Avenue NW, connecting Main Street to the Riverfront, leveraging views and access of the river. • As development along the riverfront occurs, portions of land along the river is transitioned to public riverfront park space, with trails connecting Rivers Edge Commons to Bailey Point Nature Preserve On the southwest edge of downtown, the “King to Lowell” block offers long-term, opportunity-driven redevelopment potential to extend the active frontage of downtown while further activating the river. The block is anchored by a funeral home that sits on the east half of the block. If it were to relocate in the future, that site could become a significant redevelopment opportunity in that the property spans Main Street to the River. A redevelopment could include a large mixed use project with active street frontage, or a modest boutique hotel. Adding a hotel downtown would further establish downtown as a destination. Elsewhere on the block, larger commercial or residential development should line Main Street, whereas town homes or small apartment housing could line the riverfront to the south. Redevelopment of the block should include extending the riverfront park west to at least Lowell Ave / Angel St. Structured or interior surface parking would likely be required, but could service the needs of the entire block if designed well. 2 3 1 4 1 Mixed-use buildings along Main St and Lowell Ave, with active ground floor on Main St, and office or residential above ground 2 Boutique hotel with views to the River 3 Expanded public park 4 Housing fronting the riverfront park Stillwater’s Hotel Crosby. Credit: Ironmark Building Co.Modest townhomes, tri-plexes, or similar scale housing could be located along the riverfront Page 123 of 247 29 DOWNTOWN Main Street and Jackson Avenue Redesign The city is planning to reconstruct Main Street and Jackson Avenue in the coming years, presenting an opportunity to rethink the layout and function of the street. The design “balance” of the street today has about 75% of the right of way used for vehicles - traveling, delivering, or parking. The redesign of Main Street and Jackson Ave should instead move each towards a 50/50 balance, in which the right of way supports vehicles and pedestrian activity in equal balance. The subsequent increase in available sidewalk space between buildings and the street, would allow for twice as much room to walk, roll, dine, shop, and gather, than currently exists today. To do this, the plan envisions all angled parking is shifted to parallel parking, and the two travel lanes are reduced to 11 feet. The space “gained” from these changes is enough to double the sidewalk space on both sides of the street, including a new boulevard space with seating and planters for trees. 20’ SIDEWALK & BOULEVARD 20’ SIDEWALK & BOULEVARD 20’ SIDEWALK & BOULEVARD 20’ SIDEWALK & BOULEVARD 9’ PARKING (incl. curb/gutter) 9’ PARKING (incl. curb/gutter) 11’ TRAVEL 11’ TRAVEL 11’ TRAVEL 11’ TRAVEL 9’ PARKING (incl. curb/gutter) 9’ PARKING (incl. curb/gutter) MAIN STREET JACKSON AVEMain Street RedesignJackson Ave Redesign MAIN STREET JACKSON AVECONTINUATION OF PLANTERS & STAIRS To account for the reduction of on-street parking, the city should pursue and secure parking agreements with surrounding private commercial properties, and Elk River Lutheran church. Such agreements could more than offset the anticipated change of on-street parking. This transition in street design has the potential to establish Main Street as a destination street in the city in which daily activities happens. Page 124 of 247 30 DOWNTOWN Main Street and Jackson Avenue Redesign Flexible Event Space The additional sidewalk and boulevard space on the north side of Main Street will compliment a future public space at the King Lot development. Events in this public space could spill out onto the sidewalk and boulevard - possibly even the street itself - offering flexible event space that can grow and contract with an event’s needs. New Access to Jackson Ave Shops By shifting Jackson Avenue’s angled parking to parallel, and tightening up travel lanes, a redesigned street will add on-street parking while also increasing the sidewalk space on the east side of the street. In doing so, the current ramped edge could include a landing, periodic stairs to create new points of access to shops, and seating space that “overlooks” the street. Casual Gathering The redesign of Main Street would allow for casual outdoor gathering, dining, and even shopping - something downtown lacks today. The new boulevard spaces could act as an extension of businesses, offering additional seating space, areas to advertise and sell goods, or simply to leverage the seating and trees for an attractive “front porch”. MAIN STREET JACKSON AVEKey Outcomes • Main Street and Jackson Avenue are destination streets that balance vehicles and pedestrians, and better serve downtown activities. • Leveraging a new public space with the King Lot development, events in downtown utilize the expanded sidewalk and boulevard space, while possibly extending into Main Street for larger events. • Construction occurs through a phased approach, that incrementally closes and constructs streets and sidewalks, and balances project cost, time, and property access. Page 125 of 247 31 As a narrow, linear downtown wedged between Highway 10 and the Mississippi River, Downtown Elk River lacks routes to “loop back” around to get to a destination. This east end of downtown particularly struggles with this, as missing a destination means having to navigate the Parrish Ave/Hwy 10/Rail Line intersections. As part of the reconstruction of Main Street, there are opportunities to establish both simple and innovate “loops” at either end of downtown, while also establishing clear gateways. At Main Street and Lowell Avenue, a mini roundabout would offer this circulation, create a modest welcome feature to downtown, and realign the intersection. To the east, a more complex intersection may warrant an interim solution, while more significant opportunities are explored (see pg X). A U-turn loop back feature could be added just before the parrish intersection, allowing vehicle U-turns while preserving access from Parrish Avenue and into the Bank of Elk River. Within this feature could be a modest art of signage feature, welcoming in visitors. While untraditional, the city of Columbia Heights recently implemented a similar feature. Key Outcomes • Conduct a design and operation feasibility study for the Main St/Parrish Ave intersection U-Turn design, as part of the Main Street reconstruction project. • Reconstruct both intersections as part of the Main Street reconstruction project, implementing public art, signage, or other gateway features. DOWNTOWN Entrances and Gateways Main St & Lowell Ave Mini Roundabout Main St & Parrish Ave Interim Design MAIN STREET MAIN STREET Bank of Elk River Milestone Orthodontics Cretex Granite Shores H W Y 1 0 PARRISH AVELOWELL AVEU-Turn loop back design in Columbia Heights Page 126 of 247 32 The east entrance into downtown is a complex convergence of road, rail, and river. The area is very difficult to cross east-west, particular during rush hour or when there is one of the dozens of trains that pass through the area on a given day. Improvements to the East Entrance will require significant, and long-term coordination between the City, MnDOT, and BNSF (the rail line owner). Highway 10 is still in a state of good maintenance, and likely won’t be due for reconstruction for many years. The City should therefore use this time to plan for and develop design improvements that enhance the entry experience into downtown, while ensuring MnDOT and BNSF needs are continued to be met. One solution could be to separate Highway 10 and Main Street - an approach called “grade separation”. In this scenario, Highway 10 would be elevated over Main Street, while adding a pair of roundabouts to Main Street to allow for easy on/off access from Highway 10, and the ability to “loop” back into downtown. The BNSF rail line would remain in its location, and Main Street would use the grade change to tunnel underneath the rail line, before coming back to grade at the Gates Ave intersection. This would require closing the Railroad Dr access to Main Street. Roundabouts aren’t necessarily the preferred route for pedestrians, however east-west pedestrian safety would be significantly approved as people would no longer need to cross Highway 10 or the rail line. Comfortable sidewalks, pedestrian scale lighting, and even the inclusion of art of other features could make it an attractive pedestrian route. While this is just one concept, the City should continue to coordinate with MnDOT and BNSF, while progressing additional feasibility studies for the area. Key Outcomes • Conduct a design and operations feasibility study, to determine the viability, and alternative layouts, for the interchange area. • Initate conversations with MnDOT and BNSF, to raise awareness of design opportunities and challenges. • As feasibility assessments occur, continue working with MnDOT and BNSF on design, funding, and timeline coordination. DOWNTOWN Downtown, Highway 10, and the Rail Road Closed Railroad Dr access Main St uses existing topography to tunnel under the BNSF rail line, which remains at current grade A roundabout between Highway 10 and the BNSF rail line allows for circulation and loop backs into downtown A roundabout between Highway 10 and downtown at Parish Avenue allows for circulation and “loop backs” into downtown Highway 10 is elevated over Main Street MAIN STRE E T PARRISH AVEH W Y 1 0 BN S F R A I L L I N E RA I L R O A D D R GATES AVEPage 127 of 247 33 The riverfront holds the potential to be an even more significant amenity for downtown, and a stronger part of its identity. Downtown has made several improvements to leverage the water to draw people and activity to downtown, yet could benefit greatly from even more investment. Establishing a signature public riverfront edge could become a defining feature within downtown, and offer a unique amenity in which to draw more activity, people, and private development interest. Such a space should be a gathering spaces for families, employees on a lunch break, friends meeting for coffee, or shoppers looking for a brief respite. The naturalized edge offers year-round views of the water, while providing flexible programming space that compliments commercial and event activity within the redesigned Main Street and Jackson Avenue. Expanding publicly-accessible space along the riverfront will be a multi-year, multi=phase approach, with strong partnerships and collaboration with current and future property owners. While the city can take some initial steps today, property owners and other stakeholders will be necessary partners to build this amenity. THE RIVERFRONT Downtown’s public riverfront will be a local and regional draw, while offering a unique place to rest, play, and gather that supports Downtown. Page 128 of 247 34 Today, the Riverfront plays a limited role within Downtown’s daily life, as many buildings back up to the river, and few provide direct visibility and access Changing this will require significant adaptations to existing buildings, or more practically, changing the expectations of future development along the river. As such, any future development facing the river should ensure strong visibility of the water, and whenever possible, direct access to future public space. Within this public space, the city and should implement trails connecting Rivers Edge Commons to Bailey Point, while exploring future feasibility of a suspended or elevated trail between Rivers Edge Commons and the Parrish Bridge (in response to bluff and grade). Supportive elements and programming should accompany this trail, including pedestrian scale lighting, plenty of seating, public art, and strategy places to pause and enjoy nature. The south terminus of King Avenue in particular could be such as place, offering an overlook at the rivers edge, and a modest plaza space for events. Future improvements should ensure continued drop off access for performers at the Rivers Edge Commons, which could be facilitated with a larger trail from King Avenue. Likewise, any future structures, restroom facilities, or similar programmable space should have clear visibility and sightlines, while ensuring maintenace staff have clear and easy access. Key Outcomes • Transition the city-owned parking lot to a riverfront park area, with wide trail access to allow for access to the amphitheater • Generous trails that connect riverfront park to Bailey Point nature preserve to the west • “Punch out” spaces such as docks or overlooks that people can look out over the river, particularly at the end of King St • Small pad spaces for park activation, such as coffee carts or book mobiles • Places to sit, rest, and play, with clear wayfinding and signage THE RIVERFRONT Page 129 of 247 35 Within and around Downtown, the strongest opportunity for new and more places to live is within “Uptown” - the four blocks within Jackson Avenue, 4th Street, Railroad Drive, and Gates Avenue. While Downtown will continue to offer a mix of places to shop, work, play, and live, Uptown will be defined as a residential neighborhood with a mix of housing options. Larger apartments could be located along Jackson Avenue and Railroad Drive, whereas smaller town homes, apartments, or even compact single-family homes, are found in the interior and Gates Avenue. As opportunity-driven commercial uses emerges, they will be located along a small activity “node” at the Railroad Drive, Irving Avenue, and 3rd Street intersection. Likewise, a small or modest grocer could be located in the southeast corner along Main Street, leveraging the proximity of Uptown and Downtown, along with visibility from Highway 10’s more than 30,000 daily travelers. Along Main Street “East”, an enhanced entry experience is provided with an additional sidewalk, improved streetscape, and signage the clearly orients travelers to downtown. UPTOWN Uptown will be a new, walkable residential neighborhood, offering more housing choices in close proximity to downtown. Page 130 of 247 36 Key Outcomes • A mix of housing types, styles, ownership, and price points, to provide a broad range of housing opportunities for the uptown area. • A walkable, pedestrian scaled area, that leverages the existing street network and grid. • Opportunity-driven commercial uses are oriented around the Railroad Drive/Irving Avenue/3rd St intersection, creating a small activity node within the neighborhood.. • A new modest grocery store in the southern area of Uptown, serving residents in Uptown, Downtown, the surrounding neighborhoods, and travelers along Highway 10. Railroad Drive access to Main Street should be closed off at this location. UPTOWN A New Neighborhood Uptown is strategically located to support downtown and surrounding commercial areas, while complementing surrounding residential neighborhoods. Additionally, future commercial uses in Uptown, such as a grocer, would benefit from the visibility and access to Highway 10. Residential Neighborhood Residential Neighborhood Commercial Center Downtown HW Y 1 0 1 4 3 2 1 A variety of housing types and options 2 Commercial uses oriented around the Railroad Dr intersection 3 Removed RailRoad Drive access to Main Street 3 A small, modest grocer Page 131 of 247 37 Key Outcomes • As the street pavement becomes due for repair or replacement, design the street with sidewalks on both sides, buried utilities, and more aesthetically attractive lighting. • Work with current and future owners on mutually beneficial opportunities to consolidate access, facilitating access agreements or new access points, as needed, to promote safety along Main Street East. UPTOWN Jackson Street Crossing & Main Street East Consolidated Access 6’SIDEWALK 6’SIDEWALK 6’BOULEVARD 6’BOULEVARD 11’ TRAVEL4’ SHOULDER, CURB, & GUTTER 4’ SHOULDER, CURB, & GUTTER 11’ TRAVEL11’ CENTER TURN LANE Main Street East Main Street East would benefit from minor design improvements. The existing street layout should remain, but should add a new sidewalk along the north side of the street. This would require reducing the current shoulders, and reconstructing and reversing the sidewalk and boulevard on the south side of the street. Additionally, the city should bury the existing utility poles, add new lighting, and add features like banners, trees, signage, and art. Jackson Avenue Crossing Improving the Jackson Avenue crossing at Highway 10 will offer better pedestrian safety and stronger connectivity between Downtown and Uptown. Solutions could include a longer and dedicated pedestrian crossing signal timing, pedestrian refuges within Highway 10 at the center medians, and tightening up the curbs at each intersection. Adding a marked cross walk across Jackson Avenue on the north side, will also help pedestrian visibility. Other improvements could come by working with current and future property owners to consolidate property access onto side streets, where possible. Minimizing driveways and vehicle access onto the street would benefit both vehicles and pedestrian by keeping vehicle access to intersections. This would require working with existing and future property owners to redirect access to side streets, or potentially establish new access points. Shared access and/or parking agreements may also be needed for some properties. HWY 10 BNSF RAI L L I N E JACKSON AVEPage 132 of 247 5 IMPLEMENTATION Page 133 of 247 39 Clarity and Prioritization To equip the City and its partners with the long-term guidance to realize the plan’s vision, the following implementation plan outlines both action steps necessary for downtown broadly, and those specific to five opportunity area projects. Downtown Vision Implementation Steps Implementation action steps are provided for the entire downtown, and are organized around Connectivity, Development, and Parks & Open Space. Opportunity Area Project Implementation Steps Implementation action steps specific to each Catalytic Project are also provided, and are structured as single-page project sheets for ease of use. IMPLEMENTING THE PLAN 1. City owned lot 2. King to Lowell 3. Riverfront 4. Main & Jackson 5. Uptown Page 134 of 247 40 DEVELOPMENT Action Timing Lead (L) / Support (S) 1. Develop the City Owned Lot Solicit and pursue development of the city-owned parking lot along Main Street Priority (L) Community Development, HRA, EDA (S) Engineering, Public Works 2. Continue Supporting Existing Businesses Continue to support existing businesses by establishing programs such as: • Façade improvement program • Business improvement grants • Business spotlight program Ongoing (L) Community Development, HRA, EDA (S) Engineering, Public Works 3. Prepare for private redevelopment • Proactively rezone Uptown to allow for denser residential and commercial mixed use • Establish general development partnership processes and outcomes expectations, for redevelopment within Downtown and Uptown • Case-by-case evaluation of city site acquisition, preparation, and sale Ongoing (L) Community Development, HRA, EDA (S) Engineering, Public Works, Private Property Owners, Private Developers 4. Market & Advertise Downtown In partnership with DERBA and area Chambers, continue to market and champion downtown for businesses, activities, and investment Ongoing L: Community Development, DERBA (S) Elk River Area Chamber of Commerce 5. Attract Specialty Users Begin attracting uses downtown such as a grocer and boutique hotel (see Appendix B) Priority / Ongoing (L) Community Development, HRA, EDA (S) DERBA 1 2 22 2 3 3 4 5 5 IMPLEMENTING THE PLAN Development Priority= 0 -2 Years Near Term= 2-5 Years Med. Term= 5-10 Years Long-Term= 10+ Years Ongoing= Periodically / Opportunity-Driven Page 135 of 247 41 CONNECTIVITY Action Timing Lead (L) / Support (S) 1. Reconstruct Main St & Jackson Ave Reconstruct Main Street and Jackson Avenue with wider, more comfortable space for people, events, and business activity Priority (L) Engineering, Public Works (S) Community Development 2. Improve Main St East Walkability Reconstruct Main Street East with a new sidewalk on the north side and work with property owners to consolidate access Med. Term (L) Engineering, Public Works (S) Community Development 3. Provide New Riverfront Trails Construct new trails along the riverfront, connecting Downtown to Bailey Point Nature Preserve Ongoing (L) Engineering, Parks & Rec (S) Public Works, Community Development 4. Continue Exploring Crossing Opportunities Continue to explore intersection and crossing improvement opportunities along the Main St / Hwy 10 / Rail Line intersection Ongoing (L) Engineering (S) MnDOT, BNSF, Sherburne County 5. Implement Strategic Parking Agreements Work with Elk River Lutheran Church to establish a parking agreement for public use of their parking lot. Priority (L) Community Development, Elk River Lutheran Church 1 1 2 1 IMPLEMENTING THE PLAN Connectivity 3 4 5 Priority= 0 -2 Years Near Term= 2-5 Years Med. Term= 5-10 Years Long-Term= 10+ Years Ongoing= Periodically / Opportunity-Driven Page 136 of 247 42 1 1 PUBLIC & OPEN SPACE Action Timing Lead (L) / Support (S) 1. Create a New Public Park In partnership with new development, establish a modest new public space along Main Street in the city-owned parking lot Priority (L) Community Development, Parks (S) Engineering, Public Works 2. Enhance Downtown Streetscape Provide high-quality streetscape and public realm amenities along Main Street & Jackson Avenue, as part of the reconstruction project Priority (L) Engineering, Public Works 3. Enhance Main Street East Provide enhanced streetscape and signage amenities along Main Street East, as part the reconstruction project Ongoing (L) Engineering, Public Works (S) Community Development 4. Host More & More Frequent Events Host more events throughout the year – both along Main Street and the River Near Term (L) Parks & Rec (S) DERBA 5. Expand the Riverfront Extend public riverfront park area along the River, as redevelopment occurs Ongoing (L) Parks & Rec, Engineering, Community Development (S) Public Works, Property Owners 1 5 4 2 3 IMPLEMENTING THE PLAN Public & Open Space Priority= 0 -2 Years Near Term= 2-5 Years Med. Term= 5-10 Years Long-Term= 10+ Years Ongoing= Periodically / Opportunity-Driven Page 137 of 247 43 Lead Implementer City Community Development, City Public Works, HRA, EDA Partners Private Developer Timeline Planning and design should begin over next 1-5 years; Implementation beginning by 2027 Funding Source(s)Private development KEY COMPONENTS • New publicly accessible park along Main St, that can accommodate the farmers market and other events • Active ground floor with direct access onto Main Street • Pedestrian-scale design and frontage along Main Street • Above-floor office or residential uses • Maintain ability for future structured, shared parking ramp • Explore the viability of a linear development along Highway 10 NEAR-TERM PRIORITY PRIORITY Establish necessary agreements during the development negotiation process, for shared access and use of the remaining parking area on the site As needed, partner with the developer on financial subsidies or other strategic partnership needs, as identified during development negotiations. Complete all required design approvals, site rezoning, project permitting, and begin construction Complete a site survey and environmental review of the city-owned property. Develop preliminary infrastructure designs and details for public infrastructure into and around the site. These plans should clearly delineate pedestrian crossing locations and the redesign Main St. Complete preliminary site environmental reviews to understand site conditions, and identify anticipated remediation needs Using the Downtown Plan, establish clear development outcomes that the City and area stakeholders expect from a future development on the site. Solicit a developer for the city- owned property redevelopment site through a competative RFP process. The developer should expect to partner with the City on the project. OPPORTUNITY AREA City-Owned Lot Priority= 0 -2 Years Near Term= 2-5 Years Med. Term= 5-10 Years Long-Term= 10+ Years Ongoing= Periodically / Opportunity-Driven Page 138 of 247 44 Lead Implementer City Community Development, City Public Works Partners Private Developer, HRA, EDA Timeline Planning and design should begin over next 1-5 years; Implementation beginning by 2027 KEY COMPONENTS • New mixed use and single unit residential development • Active ground floor with direct access onto Main Street • Pedestrian-scale design and frontage along Main Street • Above-floor office or residential uses • Attract a hotel to east side of the block • Negotiated new public park extension along the riverfront NEAR TERM NEAR TERM ONGOING Continue outreach and communication with current site owners, to track with and evaluate redevelopment opportunities, and timing. Begin networking with and positioning downtown for a hotel by building key relationships and attending industry events. Consider on a case- by-case basis the mutual benefits of city acquisition of sites, to facilitate assembling redevelopment sites. Develop preliminary infrastructure designs and details for public infrastructure into and around the site. These plans should clearly delineate pedestrian crossing locations and the redesign Main St. Prepare for future park extension on the south end of the block by preparing a conceptual park site plan, to use in owner and developer discussions. OPPORTUNITY AREA King to Lowell Priority= 0 -2 Years Near Term= 2-5 Years Med. Term= 5-10 Years Long-Term= 10+ Years Ongoing= Periodically / Opportunity-Driven • Identification of key sites, preferably along the river, that are suitable for hotel development and zoned appropriately to allow for an urban, boutique-style hotel. This can include sites suitable for both ground-up development and adaptive reuse. • Financial incentives such as tax abatements, infrastructure improvements, and/or shared planning costs. • Increasing visits to Downtown Elk River through branding, high-quality placemaking, and events that draw visitors from throughout the region and provide a reason to stay overnight. • Building and maintaining relationships with developers and key property owners to identify potential opportunities for partnerships. Hotel Attraction Attracting a hotel in this area could be somewhat challenging for Elk River, as it is not yet a tourism destination, and few small boutique hotels have been built in the area in recent years. However, as the City implements improvements that address connectivity challenges and emphasize Downtown’s connection to the river, the prospects for a new hotel development will improve. Strategies the City should consider to attract hotel development include: Page 139 of 247 45 Lead Implementer City Community Development, City Public Works, City Parks Partners Private property owners Timeline Near-Term / Ongoing KEY COMPONENTS • Convert the lower city parking lot to park • Incrementally transition properties along the riverfront, starting with the lower city-owned parking lot, and King Ave terminus • Extend trails west as park land is extended, eventually connecting to Bailey Point Nature Preserve. • Add elements into the park like seating, lighting, gazebos, docks over the water, and space for pop-up programming ONGOINGNEAR-TERM MED-TERM Prepare for future park extension on the south end of the block by preparing a conceptual park site plan, to use in owner and developer discussions. Transition the lower city-owned parking lot to park space, expanding Rivers Common Edge park and implementing initial trail and programming features. Transition the south end of King Ave to a park space, in preparation for future park exansions and improvements. Continue coordinating with property owners on future opportunities to continue expanding park land and programming features. As completed, install trails along Angel Ave to Bailey Point Nature Preserve OPPORTUNITY AREA Riverfront Improvement Phasing Realizing the vision for the Riverfront will require strategic phasing, and strong partnerships with current and future property owners. The plan recommends making improvements within city-owned property first, while seeking out opportunity-driven improvements for privately held property. Near-Term Park Medium-Term Park Opportunity-Driven Park Opportunity-Driven Trail Near-Term Trail Medium-Term Trail Opportunity-Driven Elevated/ Suspended TrailBailey Point Nature Preserve Rivers Edge Commons Priority= 0 -2 Years Near Term= 2-5 Years Med. Term= 5-10 Years Long-Term= 10+ Years Ongoing= Periodically / Opportunity-Driven Page 140 of 247 46 Lead Implementer City Community Development, City Public Works, Construction Contractor Partners DERBA, Private Property Owners Timeline Planning and design should begin over next 1-5 years; Implementation beginning by 2027 KEY COMPONENTS • Reconstruct Main St and Jackson Ave as envisioned by the Downtown Plan. • Prior to construction bidding, develop a desired construction phasing plan with DERBA that incrementally closes and reconstructs each street, and identify support programs during construction. • During construction, ensure clear and regular communication with area property and business owners. OngoingPRIORITY Initiate conversations with surrounding non- residential property owners, and secure public parking agreements for private surface lots, during off-hours. Progress Main St and Jackson Ave into detailed design, cost estimating, and funding. As part of project bidding, request options for phased construction scenarios, to weigh options and mitigate access issues. Work with DERBA to establish a construction phasing plan, identifying key performance outcomes and property/business owner support programs. During construction, ensure weekly contractor and business owner progress meetings, and the installation of clear signage that accurately directs to business access. OPPORTUNITY AREA Main Street & Jackson Avenue Construction Phasing To balance construction cost, time, and business access, the reconstruction project should utilize a phased construction plan, such as block-by-block phasing. The final phasing plan should be developed in partnership with DERBA to promote project transparency and business readiness. Property and Business Support During project bid preparation, develop a list of support options for area property and business owners. These could include: • Weekly progress report meetings • Contractor inventives for time and preserving clear access • Bi-weekly window and facade cleaning, using local cleaning business(es) • Artistic access and wayfinding signage, using local artists • Hosted events during construction to promote activities downtown Phase 1 Phase 2 Phase 3 Example Approach to Project Phasing MAIN STREET JACKSON AVEPriority= 0 -2 Years Near Term= 2-5 Years Med. Term= 5-10 Years Long-Term= 10+ Years Ongoing= Periodically / Opportunity-Driven MAIN STREET JACKSON AVEPage 141 of 247 47 Lead Implementer City Community Development, Private Property Owners Partners Public Works, HRA, EDA Timeline Opportunity driven as current owners decide to willingly sell and/or redevelop KEY COMPONENTS • Redevelopment of existing blocks that brings a greater variety of housing options, and commercial uses at the Railroad Dr intersection • A new small or medium grocer located along Main St East • Improvements to Main St East to enhance mobility, safety, and area aesthetics. • Improvements to the Jackson Ave / Hwy 10 intersection to enhance pedestrian crossing safety. ONGOING ONGOINGPRIORITY Design, fund, and reconstruct the identified portions of Main Street East, addining an additional sidewalk and enhanced streetscape features Partner with MnDOT to design, fund, and reconstruction the Jackson Ave/Hwy 10 intersection, with pedestrian crossing improvements. Rezone properties are needed to support desired redevelopment outcomes, and prepare clear expectations for future developers. OPPORTUNITY AREA Uptown Continue outreach and communication with current site owners, to track with and evaluate redevelopment opportunities, and timing. Consider on a case-by-case basis the benefits of city acquisition of sites, to facilitate assembling redevelopment sites. Begin networking with and positioning uptown for a grocer. by building key relationships and attending industry events. Priority= 0 -2 Years Near Term= 2-5 Years Med. Term= 5-10 Years Long-Term= 10+ Years Ongoing= Periodically / Opportunity-Driven Grocer Attraction Attracting a grocery store to the Uptown neighborhood will be challenging, especially because there are only few small-format grocery chains operating in the US. The most likely type of grocery store to locate in this area may be a cooperative. Strategies that cities can use to attract grocery stores include: • Financial incentives like land, infrastructure improvements, and/or tax credits • Regulatory incentives like zoning changes or modifications, design concessions, and expedited permitting • Alerting the local tenant broker community to a potential grocery location in Uptown • Attending local ICSC events to network and spread the word about the opportunity Page 142 of 247 6 APPENDIX Page 143 of 247 Elk River Downtown Area Plan - Community Survey 1 / 68 20.17%73 41.99%152 25.97%94 10.77%39 1.10%4 Q1 How often do you visit Downtown? Answered: 362 Sk ipped: 0 TOTAL 362 0%10%20%30%40%50%60%70%80%90%1 00% Dail y Weekly A few times per month A few times per year Never ANSWER CHOICES RESPONSES Daily Weekly A few times per month A few times per y ear Never APPENDIX A Page 144 of 247 Elk River Downtown Area Plan - Community Survey 2 / 68 0.28%1 1.66%6 6.08%22 1.38%5 90.61%328 0.00%0 Q2 When you visit Downtown, how do you usually get there? Answered: 362 Sk ipped: 0 TOTAL 362 0%10%20%30%40%50%60%70%80%90%1 00% I don't visit Downt own I already live in Dow ntown I wal k to Dow ntown I bike to Dow ntown I drive to Dow ntown I take transit t o Downtow n ANSWER CHOICES RESPONSES I don't vis it Downtown I already live in Downtown I walk to Downt own I bik e to Downtown I drive to Downtown I tak e transit to Downtown Page 145 of 247 Elk River Downtown Area Plan - Community Survey 3 / 68 3 1,157 362 Q3 How would you rate the ease of getting to Downtown area by each of the following travel modes? Use the slider to indicate between "Very difficult" and "Very easy" for each mode of travel.Walking Answered: 362 Sk ipped: 0 Total Respondents : 362 #DATE 1 4 9/18/2024 8:51 PM 2 1 9/17/2024 8:18 AM 3 4 9/15/2024 9:11 PM 4 5 9/15/2024 10:23 AM 5 5 9/14/2024 10:39 AM 6 3 9/12/2024 9:49 PM 7 3 9/12/2024 8:43 PM 8 5 9/12/2024 8:04 PM 9 5 9/12/2024 5:49 PM 10 4 9/12/2024 4:28 PM 11 5 9/12/2024 4:21 PM 12 5 9/12/2024 2:03 PM 13 1 9/12/2024 1:08 PM 14 4 9/12/2024 12:29 PM 15 5 9/12/2024 11:46 AM 16 4 9/12/2024 11:30 AM 17 2 9/12/2024 11:28 AM 18 3 9/12/2024 11:19 AM 0 1 2 3 4 5 6 7 8 9 10 ANSWER CHOICES AVERAGE NUMBER TOTAL NUMBER RESPONSES Page 146 of 247 Elk River Downtown Area Plan - Community Survey 14 / 68 3 1,123 362 Q4 How would you rate the ease of getting to Downtown area by each of the following travel modes? Use the slider to indicate between "Very difficult" and "Very easy" for each mode of travel.Biking Answered: 362 Sk ipped: 0 Total Respondents : 362 #DATE 1 4 9/18/2024 8:51 PM 2 2 9/17/2024 8:18 AM 3 4 9/15/2024 9:11 PM 4 5 9/15/2024 10:23 AM 5 5 9/14/2024 10:39 AM 6 3 9/12/2024 9:49 PM 7 3 9/12/2024 8:43 PM 8 5 9/12/2024 8:04 PM 9 4 9/12/2024 5:49 PM 10 4 9/12/2024 4:28 PM 11 5 9/12/2024 4:21 PM 12 4 9/12/2024 2:03 PM 13 1 9/12/2024 1:08 PM 14 3 9/12/2024 12:29 PM 15 5 9/12/2024 11:46 AM 16 5 9/12/2024 11:30 AM 17 3 9/12/2024 11:28 AM 18 2 9/12/2024 11:19 AM 0 1 2 3 4 5 6 7 8 9 10 ANSWER CHOICES AVERAGE NUMBER TOTAL NUMBER RESPONSES Page 147 of 247 Elk River Downtown Area Plan - Community Survey 25 / 68 4 1,277 362 Q5 How would you rate the ease of getting to Downtown area by each of the following travel modes? Use the slider to indicate between "Very difficult" and "Very easy" for each mode of travel.Driving Answered: 362 Sk ipped: 0 Total Respondents : 362 #DATE 1 5 9/18/2024 8:51 PM 2 5 9/17/2024 8:18 AM 3 4 9/15/2024 9:11 PM 4 2 9/15/2024 10:23 AM 5 2 9/14/2024 10:39 AM 6 5 9/12/2024 9:49 PM 7 2 9/12/2024 8:43 PM 8 3 9/12/2024 8:04 PM 9 2 9/12/2024 5:49 PM 10 2 9/12/2024 4:28 PM 11 4 9/12/2024 4:21 PM 12 3 9/12/2024 2:03 PM 13 3 9/12/2024 1:08 PM 14 4 9/12/2024 12:29 PM 15 5 9/12/2024 11:46 AM 16 2 9/12/2024 11:30 AM 17 4 9/12/2024 11:28 AM 18 3 9/12/2024 11:19 AM 0 1 2 3 4 5 6 7 8 9 10 ANSWER CHOICES AVERAGE NUMBER TOTAL NUMBER RESPONSES Page 148 of 247 Elk River Downtown Area Plan - Community Survey 36 / 68 2 669 362 Q6 How would you rate the ease of getting to Downtown area by each of the following travel modes? Use the slider to indicate between "Very difficult" and "Very easy" for each mode of travel.Transit Answered: 362 Sk ipped: 0 Total Respondents : 362 #DATE 1 3 9/18/2024 8:51 PM 2 1 9/17/2024 8:18 AM 3 1 9/15/2024 9:11 PM 4 1 9/15/2024 10:23 AM 5 2 9/14/2024 10:39 AM 6 1 9/12/2024 9:49 PM 7 1 9/12/2024 8:43 PM 8 3 9/12/2024 8:04 PM 9 4 9/12/2024 5:49 PM 10 1 9/12/2024 4:28 PM 11 5 9/12/2024 4:21 PM 12 2 9/12/2024 2:03 PM 13 1 9/12/2024 1:08 PM 14 1 9/12/2024 12:29 PM 15 1 9/12/2024 11:46 AM 16 5 9/12/2024 11:30 AM 17 1 9/12/2024 11:28 AM 18 3 9/12/2024 11:19 AM 0 0.2 0.4 0.6 0.8 1 1.2 1 .4 1.6 1.8 2 ANSWER CHOICES AVERAGE NUMBER TOTAL NUMBER RESPONSES Page 149 of 247 Elk River Downtown Area Plan - Community Survey 47 / 68 Q7 What are some strengths of Downtown? Select at least one (1) and up to three (3) strengths. Answered: 362 Sk ipped: 0 0%10%20%30%40%50%60%70%80%90%1 00% Housing Availability & Locations Housing Prices M ix o f Businesses Public Spaces to Gather & Recreat e Views and Access o f t he River Pl aces to Eat & Dr ink Unique Destinations Places to Work Ease of Getting Ar ound by Wal king a... Ease of Getting Ar ound by Driving Qual it y of Sidewal ks, Str eet Tr ees... A Place that Looks and Feels "Uniquely El ... Avail ability o f Locat ion and Par king Page 150 of 247 Elk River Downtown Area Plan - Community Survey 48 / 68 2.21%8 0.55%2 35.64%129 34.53%125 58.84%213 42.27%153 13.26%48 3.59%13 13.81%50 5.80%21 23.76%86 36.46%132 12.15%44 Total Respondents : 362 ANSWER CHOICES RESPONSES Hous ing Availability & Loc ations Hous ing Prices Mix of Bus ines s es Public Spac es to Gather & Recreate Views and Acc es s of the River Plac es to Eat & Drink Unique Destinations Plac es to Work Ease of Get ting Around by Walking and Biking Ease of Get ting Around by Driving Quality of Sidewalks , St reet Trees, and Overall Aesthetics A Place that Looks and Feels "Uniquely Elk River" Availability of Location and Parking Page 151 of 247 Elk River Downtown Area Plan - Community Survey 49 / 68 Q8 What some weaknesses of Downtown? Select at least one (1) and up to three (3) weaknesses. Answered: 362 Sk ipped: 0 0%10%20%30%40%50%60%70%80%90%1 00% Housing Availability & Locations Housing Prices M ix o f Businesses Public Spaces to Gather & Recreat e Views and Access o f t he River Pl aces to Eat & Dr ink Unique Destinations Places to Work Ease of Getting Ar ound by Wal king a... Ease of Getting Ar ound by Driving Qual it y of Sidewal ks, Str eet Tr ees... A Place that Looks and Feels “Uniquely El ... Availability & Location of Par king Page 152 of 247 Elk River Downtown Area Plan - Community Survey 50 / 68 8.01%29 9.39%34 29.28%106 16.85%61 14.64%53 43.09%156 27.62%100 7.18%26 13.81%50 28.18%102 17.40%63 12.71%46 49.17%178 Total Respondents : 362 ANSWER CHOICES RESPONSES Hous ing Availability & Loc ations Hous ing Prices Mix of Bus ines s es Public Spac es to Gather & Recreate Views and Acc es s of the River Plac es to Eat & Drink Unique Destinations Plac es to Work Ease of Get ting Around by Walking and Biking Ease of Get ting Around by Driving Quality of Sidewalks , St reet Trees, and Overall Aesthetics A Place that Looks and Feels “Uniquely Elk River” Availability & Loc ation of Parking Page 153 of 247 Elk River Downtown Area Plan - Community Survey 51 / 68 Q9 Thinking of the future, what would you most like to see in Downtown? List at least one (1) and up to three (3) things you'd like to see. Answered: 362 Sk ipped: 0 0%10%20%30%40%50%60%70%80%90%1 00% More and Different Types of Housing More and Different Types of Businesses Mor e Public Spaces to Gather &... M or e Pl aces t o Eat & Drink Mor e Unique Destinations M or e Pl aces t o Work Bet ter Ease of Getting Ar ound by Wal king a... Bet ter Ease of Getting Ar ound by Driving Higher Quality of Sidewalks, Street Trees... A Place that Looks and Feels “Uniquely El ... More Opt ions for Parking Page 154 of 247 Elk River Downtown Area Plan - Community Survey 52 / 68 1.93%7 40.88%148 23.76%86 69.61%252 37.02%134 4.70%17 15.47%56 23.48%85 21.55%78 24.31%88 38.12%138 Total Respondents : 362 ANSWER CHOICES RESPONSES More and Different Ty pes of Hous ing More and Different Ty pes of Businesses More Public Spaces to Gather & Rec reate More Places to Eat & Drink More Unique Des tinations More Places to Work Better Eas e of Getting Around by Walking and Bik ing Better Eas e of Getting Around by Driving Higher Quality of Sidewalk s, Street Trees , and Overall Aesthetic s A Place that Looks and Feels “Uniquely Elk River” More Options for Parking Page 155 of 247 Elk River Downtown Area Plan - Community Survey 53 / 68 Q10 Thinking of the future, what would you least like to see in Downtown? List at least one (1) and up to three (3) things you would not like to see. Answered: 362 Sk ipped: 0 0%10%20%30%40%50%60%70%80%90%1 00% More and Different Types of Housing More and Different Types of Businesses Mor e Public Spaces to Gather &... M or e Pl aces t o Eat & Drink Mor e Unique Destinations M or e Pl aces t o Work Bet ter Ease of Getting Ar ound by Wal king a... Bet ter Ease of Getting Ar ound by Driving Higher Quality of Sidewalks, Street Trees... A Place that Looks and Feels “Uniquely El ... More Opt ions for Parking Page 156 of 247 Elk River Downtown Area Plan - Community Survey 54 / 68 79.28%287 7.18%26 5.80%21 3.31%12 3.04%11 17.13%62 2.76%10 7.73%28 2.49%9 5.80%21 15.47%56 Total Respondents : 362 ANSWER CHOICES RESPONSES More and Different Ty pes of Hous ing More and Different Ty pes of Businesses More Public Spaces to Gather & Rec reate More Places to Eat & Drink More Unique Des tinations More Places to Work Better Eas e of Getting Around by Walking and Bik ing Better Eas e of Getting Around by Driving Higher Quality of Sidewalk s, Street Trees , and Overall Aesthetic s A Place that Looks and Feels “Uniquely Elk River” More Options for Parking Page 157 of 247 Elk River Downtown Area Plan - Community Survey 55 / 68 Q11 Is there anything else you'd like to share about your experience, concerns, or ideas for Downtown? Answered: 172 Sk ipped: 190 #RESPONSES DATE 1 DO NOT make it a mini rogers .... Rogers s ucks. Elk river is nic e. Please keep it lik e that and not dev elop too much. Thanks . - Out side v iewer. 9/18/2024 8:51 PM 2 We hope the his toric buildings keep their aes thetic and that more historic buildings aren’t t orn down! We would also love to s ee The Pit us ed for more event s throughout the year—ev er sinc e Elk River hos ted Hoc k ey Day MN in 2014 The Pit has felt neglec ted and forgotten. 9/15/2024 9:11 PM 3 Eas ier way to walk or bik e ac ross hwy 10 9/15/2024 10:23 AM 4 We s hould expand pas t the railroad also 9/12/2024 9:49 PM 5 Need more places to eat/drink that over look the s c enic views of t he riv er 9/12/2024 4:28 PM 6 We need way more plac es to eat around downtown elk river.9/12/2024 4:21 PM 7 Would lov e to see a v ariety of retail and res taurant s in the area. Things t hat bring people to the area. 9/12/2024 1:08 PM 8 Somehow, both s ides of Hwy 10 need to be inc orporated. Maybe a tunnel could go in under Hwy 10 and t he tracks at Jac k s on and mak e Jac k s on pedestrian only. Then, move the parking to t he north side of the trac k s . That frees up Downtown for more shops. There's plenty of room between Jacks on and Irv ing on Railroad Drive. 9/12/2024 12:29 PM 9 The bridge over the river has terrible ac c es s to downtown. I t's hard to s ee what is c oming when turning lef t from the bridge. Traffic thru town and pas t the bridge goes way too fast. I suggest a roundabout by taking out the bank and c reating a bet ter Traffic flow. 9/7/2024 12:25 PM 10 Is s ues with 3 way stop c rossing when walking. Would lik e t o s ee 4 way s top by dent ist of elk river and tattoo places. 9/6/2024 8:47 PM 11 The park ing areas along the river hav e high potential f or conv ersion to public spaces that highlight the beauty of the river and ties in with a trail s y stem. North of this along Main would be highly v aluable mixed use res idential with river v iews and s treet level retail. 9/6/2024 5:26 PM 12 It would be great to have businesses and gathering plac es that ac tually hav e views of the river. A mix of bus inesses t hat are destinations - s hopping, dining - as oppos ed to serv ices . 9/6/2024 5:00 PM 13 Driv ing is an overall night mare, es pecially during the morning and evening c ommute. The stoplights should be replaced with roundabouts and if possible there should be an ov erhaul and redesign of the streets and park ing. 9/6/2024 2:36 PM 14 I do not want unique plac es to be torn down to hav e c ookie cutter apartment buildings put up. I want the charm of Elk River to stay the way it is . I would like a c ouple more rest aurants and cute s hops to mov e in there. When they took out the little corner store and put in a dojo that was dis appointing. 9/6/2024 9:44 AM 15 Don't modernize with c heap new c onst ruc tion buildings . Leave it alone. Fix the river shoreline by adding proper v egetation. 9/6/2024 6:49 AM 16 Intersect ion at J ac kson and Hwy 10 is ex tremely dangerous, especially driv ing S on Jacks on towards downtown - c ars constant ly get locked up in t he int ers ec tion and are unable to go straight t hrough while waiting for turning c ars. Take out parking in front of busines ses there and create turn lanes!! So many accidents and near misses at that inters ec tion. 9/5/2024 10:29 PM 17 Please prov ide bat hrooms not s atellites. Other communit ies do…What c an be done about t he blind left t urn onto Main Street from Parrish- horrible, get rid of a park ing spot to inc reas e safety. Keep having family events downt own- may be s huttle f olk s 9/5/2024 10:07 PM Page 158 of 247 Elk River Downtown Area Plan - Community Survey 56 / 68 18 I like that there was a “more plac es to work” option. I feel like t he only plac e I can c ome and stay a while is The Edge, but I hones tly don’t lik e Edge so I don’t stay. I wish there were more plac es that weren’t just s it for a meal and leav e. But I LOVE our loc al res taurant s, t oo. All of them. 9/5/2024 9:37 PM 19 Get the f armers market out of downtown!9/5/2024 5:34 PM 20 Gett ing to Elk River from Otsego is trick y when driving. The stop s ign after c ros s ing the bridge and trying to turn into downtown is a c hallenge. It would be great to s ee this updated…may be a round about or s omething dif ferent would be great . 9/5/2024 4:08 PM 21 Would like to see more v ariety of restaurants , inc luding Asian and v egetarian/ vegan options. Even t hough parking is us ually adequate, during t he farmers mark et parking c an be an is s ue as well as general ability to get around in the area. Consider mov ing t he farmers mark et to anot her location that would offer more park ing / mobility. 9/5/2024 11:57 AM 22 I would like downtown to be family-oriented and a place that friends and family c an go to support local businesses while enjoying the plac e we c all home. 9/5/2024 10:43 AM 23 Public restrooms with running water at the park .9/5/2024 10:36 AM 24 Add rooftop res taurants with river v iews, and clean up the shoreline. Elk River should mak e paths down by the river and c lean up some if the fallen trees ec t. 9/5/2024 10:05 AM 25 People c omplain about street parking therefore they av oid vis it ing the area, but t hey dont realiz e parking options are free for blocks . I do not want t o s ee a parking ramp c log up the streets, its a his toric astetic and nature centered s treet, t he elite apartments already took over the riv er and quaint look of the area. We need to be proud of our old main st reet stores and res taurants instead of hide them or remove them. Let's not turn into a drive thru c ity lik e rogers and osseo and ramsey. 9/5/2024 9:45 AM 26 Bulldoz e it and tak e out the s toplights. Elk River is not a dest ination nor is 2 bloc k s of shopping and eating a “Downtown” 9/5/2024 8:46 AM 27 Would lov e a public playground. Possibly in Hank ee pit. For the kids who live in the downtown area, there is no walkable public play ground or park . The pit s its empty all s pring/summer/fall long. I would lov e the farmers market or mus ic or both be mov ed to a different night as Thursdays are bus y with cabin traffic as is . 9/5/2024 8:42 AM 28 We love downtown and the loc al s hops. Pleas e c ontinue to encourage local business.9/4/2024 11:33 AM 29 The north side of U.S. 10 c orrider from Main Street to Norfolk Av e. REALLY needs a facelif t. Go vis it Arlington Heights, Illinois charming downtown that dev eloped around t he railroad station. 9/3/2024 9:14 AM 30 The Parrish road int ers ec tion is terrible. Is there anyway to put a light in? I see near ac c idents there every day. 9/1/2024 12:35 PM 31 I lived in t his town for 17 years and this is the most beautiful part of the town. Don't ruin it.8/31/2024 1:13 AM 32 Nowhere to eat. General aes thetic is “rundown” or “old”8/30/2024 6:10 PM 33 Some businesses need to spruce up their ex terior - they look like they hav en’t been updated in years 8/30/2024 5:57 PM 34 We need more inclusiv ity and diversity! All should feel welcome in downtown Elk River, and be able to enjoy, including dietary res tric tions, ac c es sibility, etc . 8/30/2024 12:58 PM 35 I like the idea of closing Jac k s on and making it a public place. Unfort unately you will s ac rifice some driv ing and parking 8/30/2024 12:21 PM 36 Regular rest rooms f or Rivers Edge park 8/30/2024 11:35 AM 37 More plac es to eat and drink would definitely get me and my family to downtown more. It is such a great loc ation but not a lot that gets us there right now and we have to drive based on where we live. 8/30/2024 8:53 AM 38 Unique s hops and the views are awesome. They k eep the f eel of s mall town and are unique to Elk Riv er The apartments are either too pric ey for most people or to much lik e c heap public housing. I t’s not a good mix. Theirs nothing in between. 8/30/2024 8:46 AM Page 159 of 247 Elk River Downtown Area Plan - Community Survey 57 / 68 39 The farmers market needs c hairs and tables to vis it and recreate, maybe some food truc k s 8/29/2024 9:57 PM 40 Needs a legit , easily-acces s ible, public parking ramp.8/29/2024 3:38 PM 41 Traffic is heavy and there no where to secure bikes 8/29/2024 12:42 PM 42 Please fix the corner it’s hard t o s ee with the parking and traffic coming from all sides 8/28/2024 10:29 PM 43 Interactive businesses /wntertainment (I.e. bowling, game room (Dav e and bus ter lik e), indoor waterpark ), other winter indoor activities. 8/28/2024 8:56 PM 44 I lov e downt own Elk Riv er, but when ev ents are happening it can be diff icult to get around and find a parking s pot. Maybe more loc al shops or a new restaurant. 8/28/2024 7:02 PM 45 We love downtown Elk River & s pecific ally dec ided to liv e here because we wanted a small town with an old downtown area. Would lov e to see more restaurants downtown! We lov e t he addition of the Edge & would love to s ee more unique loc al plac es lik e that . 8/28/2024 5:17 PM 46 The bridge of f paris h bac k s up so badly I would think that would be the firs t priority before anyt hing els e c an really be addressed. The bridge traf fic backs up being able to access downtown or causes me to drive around it to avoid. 8/28/2024 4:19 PM 47 It would be great to have more f ood options. The loss of Daddyo’s was huge!8/28/2024 1:08 PM 48 I feel like I'm always heading out t o neighboring towns to find the good dining ex periences that aren't a chain or fas t food. We have a c ouple great places to eat here, but not enough in my opinion! 8/28/2024 12:59 PM 49 Mak e the area of Main Street (by the shops ) easier to get through by vehic le. The area bac k s up in rus h hour and becomes almost impossible to get through. 8/28/2024 12:06 PM 50 Riv ers Edge Commons Park needs to have a public res troom and indoor c hanging area for the weddings and bands 8/28/2024 12:01 PM 51 We need more modern st ores in elk River, lik e Homegoods / mars hals etc 8/28/2024 11:53 AM 52 Need a grade s eparated pedes trian crossing at adjac ent to Main Street over TH10 and RR tracks . 8/28/2024 10:17 AM 53 A high quality sandwich shop with options to order at c ounter then either sit ins ide and eat, or tak e to go would be fabulous! 8/28/2024 10:03 AM 54 Don’t los e, keep and maintain the Historic bldgs and vibrant Elk River history.8/28/2024 9:50 AM 55 Leave it alone, look s great how it is.8/28/2024 9:49 AM 56 We look for family-friendly and kid-friendly things to do, and fun outdoor s paces 8/28/2024 9:44 AM 57 Would lov e to see roof top dec k s on rest aurants located on the river. Better views.8/28/2024 9:33 AM 58 That inters ec tion by 10 and Wright count y bridge 42. That needs something different there not sure if a round about would be good or something different. Hopefully when 169 gets done it gets bett er but I still s ee it will be busy. 8/28/2024 9:23 AM 59 I’d love for downtown to utilize the riv erfront for areas to sit and have a drink with friends to enjoy the beaut iful setting 8/28/2024 9:19 AM 60 Please fix the traffic situation with the stoplights on highway 10 and the roads to it.8/28/2024 9:16 AM 61 Would lov e to see some ex isting bus inesses spruce up external appearance to add t o the overall look and feel of downtown. Some bus iness es look great while ot hers are falling apart. 8/27/2024 9:23 PM 62 The hardest part about getting downtown by bike and walk ing is t he c onnection t o my neighborhood to the trail sy s tem. Biking or walking along County 1 or 33 is not s afe t o get to a trail. There is not enough parking when there are large ev ents . I have not been to the entertainment for many y ears due t o the lac k of park ing and not enough s eating. 8/27/2024 6:13 PM 63 Try to get bus iness to take the v ac ant areas and more restaurants to make a more reas on to go downtown 8/27/2024 2:11 PM 64 I feel like so many bus iness es are leav ing Elk Riv er and very few are looking at Elk Riv er. There is little retail shopping, the variety of sit-down, cas ual dining establis hments is limited. It 8/26/2024 8:22 PM Page 160 of 247 Elk River Downtown Area Plan - Community Survey 58 / 68 seems lik e Elk River is a driv e-thru town vs a dest ination. 65 Better use of the riverfront for the public 8/26/2024 2:43 PM 66 We moved here after 30 years in St. Cloud. The at traction f or us was the downtown. We liv e downtown s o we don't hav e to park on the s treets but watching all the free on s treet parking fill up in the morning and people walk ing around town is what attracted us here. Downtown St. Cloud lost a lot of that when they redev eloped t hat area. Some of our favorite busines s es had to close. It's great that your as k ing for input. Thank you 8/26/2024 10:53 AM 67 Dev elop a riv er walk -- the river is Elk Riv er's biggest as set. Also, hold more events (art fests , food fest s) t o get people to go downtown and feel more lik e a community. 8/25/2024 4:19 PM 68 You have a unique opportunity of making a cute downtown with s hops, restaurants etc. Don't bog down with hous ing and business. Make it very walk able and a destinat ion for tourist s to come v isit. Don't have it pas t the train trac k s either that is idiotic . If your intent is to add, max imiz e the footprint between Jacks on and main going towards Handke. I wouldn't even allow tenants t hat aren't part of the v ibe you want. Chiropractors , law offic es and insurance agencies should go somewhere else. Think of Niss wa, stillwater and other high traffic lit tle downtowns that attract people. Mak e it a destination. 8/25/2024 3:05 PM 69 I would lov e to s ee more options for sit down restaurants , especially with v iews of the riv er. Daddy -os would be a great option for for a fun new restaurant, possible roof top patio. I think capitalizing on the River ac c es s will help driv e revenue to local busines s es. Look ing for fun, loc al food eateries with that s mall town feel (Niss awa town v ibes come to mind) - easy t o walk around, shop, and find a place to s top to eat or munch on the f ood y ou pick ed up. The accounting, ins uranc e, at torney, etc businesses - I would like t o s ee them mov ed to either a second st ory in downt own proper if that’s where they currently are or mov e all of those ty pes furt her down main, closer to 169. 8/25/2024 2:39 PM 70 Going in the right direc tion. However the karate bus iness seems like a wasted opportunity t o attract tourism and c ommerce to t he area overall. Lov e the book store! 8/25/2024 12:50 PM 71 I would like to see more restaurants with outdoor s paces overlook ing the riv er. The inters ec tion main and parish needs to be improved. 8/25/2024 9:34 AM 72 More usable greens pace 8/24/2024 3:02 PM 73 Mov e the Thursday conc ert s to lak e orono so people that work c an find a plac e to park and sit,people putting up chairs all day while people are at work is BS. 8/23/2024 11:01 PM 74 This c ity counc il has ‘progres s ed’ and ‘dev eloped’ a beautiful small town wit h natural areas, into a c oncrete, ov erc rowded jungle. STOP REDEVELOPING and s tart cons idering t he environmental impac t of the continual inf lux of people and developers. 8/23/2024 4:05 PM 75 It would be wonderful to have more soc ial options lik e downtown Anok a! It was a huge draw when had the brewery downtown. 8/23/2024 12:32 PM 76 Driv ing and park ing are diffic ult. It is c ramped and the Parris h intersec tion needs to be fixed. There needs to be traffic control there. 8/23/2024 12:04 PM 77 A long time ago there was a convenience st ore--Ron's. I really miss that. It would be good to have more everyday grocery options on the wes tern s ide of town. Also miss the gift s hop @ Kemper's. 8/23/2024 11:23 AM 78 Pedes trian and bic ycle acc es s from t he s outh is v ery poor ev en for people who would otherwise be in walking dist ance. I liv e by the train s tation and to get to downtown I hav e t o walk all t he way down Twin Lakes t o Main Street even though it's lik e a mile down the highway. 8/23/2024 11:05 AM 79 I really wis h we s till had a small grocery/convenience store downtown.8/23/2024 10:02 AM 80 Thank s 8/23/2024 9:57 AM 81 Please do not add more hous ing to downtown. It is a very tight locat ion as it is to nav igate traf fic and it takes away from that small town c harm. 8/23/2024 9:32 AM 82 I really enjoy the downtown but too busy with c ars at cert ain times. More park ing would ease the situation. I lik e how the Mississippi Riv er is ac c essible to vis itors and Elk River citizens. 8/23/2024 9:27 AM 83 More shopping and overall bett er and safer ac c es s to downtown 8/23/2024 9:20 AM Page 161 of 247 Elk River Downtown Area Plan - Community Survey 59 / 68 84 The businesses aren’t c onnect ed to community and aren’t inviting. Insurance agencies , law firms, etc . The bars are ins ular and unwelc oming if y ou hav en’t been going to them for years. We need more busines ses lik e The Edge and Pompeii and Minne Made who want to connec t with the public. 8/22/2024 10:48 PM 85 I lov e downt own. I think keeping it s afe but fun is key. I think a park would be nic e somewhere as another activ ity for the k iddos . I think other ex periences like the es c ape room plac e could als o be fun if it was walkable. Maybe an arc ade eatery or s omething. 8/22/2024 1:43 PM 86 Personally moving from Dallas TX to Elk Riv er there is s ev ere lac k of food options in the area. Food always brings people together. Beer garden would be lovely. 8/22/2024 11:48 AM 87 Inc reas ing the ov erall look of downtown. Bring a modern touch. A fac ade refres h to store fronts, modern artwork and better overall landscape. 8/22/2024 9:12 AM 88 I lov e the idea of what downtown Elk Riv er is . I think it needs a couple more bars /restaurants and at least one more of thos e should be open past 11pm. Mc Coy's is fine, but we would like more opt ions . Farmers mark et Thursday is one of my favorite day s! Maybe more block party ty pe ev ents where you shut down the s treets c ould be fun t oo! 8/22/2024 8:05 AM 89 There just not much that downtown elk river offers . We find ourselves heading elsewhere t o anoka, maple grov e, rogers or ots ego to the restaurants and shops . 8/21/2024 10:36 PM 90 Bring in bus ines s es . Es pec ially to more than just downtown. Lots of ey e soars in the c it y. I've lived in town for 31 y ears and very sad. 8/21/2024 10:02 PM 91 Need t o utiliz e the riverfront area better 8/21/2024 9:41 PM 92 More pat ios f or enjoying the Riv er.8/21/2024 8:14 PM 93 The city needs to add a way for local growers to sell things in town and t hey also need t o s top thinking that the down town area needs to be protected the town town area needs to grow with out city involment 8/21/2024 6:04 PM 94 No section 8 housing More retail More community event s / entertainment/ engagement Lights cros sing streets 8/21/2024 4:17 PM 95 Modern Res trooms at Rivers Edge Commons Park 8/21/2024 3:51 PM 96 I like a downtown center that c an be an entertainment and soc ial dis tric t! I lov e downtown Anok a and want to s ee Elk River invest in s imilar ways. Like plac es to relax and s ocializ e and see the river (either with more ac c essible shoreline or rooftop pat ios ), hidden unique s paces like Avant Garden Book s tore's patio in Anoka- perfect s pot would be if a cafe bought the Elk Riv er Chiroprac tic building and made a patio in the spac e behind it that connected to the dock and amphitheat er area... also an inv es tment in art! Maybe new murals or s c ulptures. I'm also eager to see the es c ape rooms reopen and am excited t hat the owners might invest in tabletop gaming as well. It would also be c ool to s ee an arcade or play area t hat is more k id friendly too... and more unique food options lik e thai or greek . Personally to me t here are buildings I wis h weren't right in downtown... lik e the funeral home and the churc h in the old bank. That space could be dev eloped better. 8/21/2024 3:35 PM 97 More stuff to do.8/21/2024 2:38 PM 98 The Parrish and Main street “s treet” needs to be t urned into s omething new. The afternoon traf fic is terrible. Build a bridge or s omething over hwy 10 and the railroad trac k s to ease conges tion. 8/21/2024 2:28 PM 99 Gett ing of f paris h is diffic ult and the trains back up traffic . Do not need more apartment buildings 8/21/2024 2:11 PM 100 Downtown inters ections are not pedes trian friendly. Too muc h traffic goes t hrough Downtown without Downtown as a des tination. Traff ic flow should be c hanged to enc ourage local traffic only, s uch as mak ing Jackson one way, changing parish to not be able to go wes t onto main, lower speed limits in old Downtown, etc . 8/21/2024 1:52 PM 101 Right now getting in and out of "downtown" is c umbersome. So muc h s o I don't s top & linger anymore. It's a plac e to pass through, sadly. Parking is bad, all businesses have their bac ks turned to the river. Look at Hudson WI or Stillwater MN as examples to striv e for. Thos e are both riv er towns that are des tinations . Emulate them, they are success fully attracting & keeping people coming there. 8/21/2024 1:48 PM Page 162 of 247 Elk River Downtown Area Plan - Community Survey 60 / 68 102 Main St and Parris h is an awful intersect ion. Too s mall f or t he amount of traffic it seems. It needs to be improved. 8/21/2024 1:42 PM 103 I feel Elk Riv er, es pecially t he DT area, is dy ing. Has been for years . If they want to maint ain it, I would suggest t ry ing to create it- like Ramsey is. We are not Anoka, we've never had a bust ling DT like Anoka. Let's try less to preserve some of what's t here to mak e room for new and attractive businesses/housing/features. You hav e a river- utiliz e it more. Spend some $ and buy up s ome of the areas between 169/10. I'd rather see $ going to beautify and create a nic e town. I'm sorry, but many of t he homes /bus ines s es in that area need to go if pos s ible. It's time to c reate a city (not a "town"). You c an't stop progres s , if y ou try to hold onto the pas t too muc h, your c ity becomes a relic of the pas t. And not in a good way. 8/21/2024 1:19 PM 104 The traffic and the t rains. Between the trains and traffic on Highway 10, oft en times it back s the traffic up terribly. The intersec tion by Granit e Shores and the Bank of Elk River is so dangerous. It ’s als o too clos e to Hwy 10. In a perfec t world the railroad tracks would move out of downtown. 8/21/2024 1:15 PM 105 Elk Riv er has no unique bars or restaurants. McCoys and The Depot are dives and all the other food options are chain fast food. The city needs to bring in more venues like Big Lak e or Zimmerman hav e to k eep res idents in town, ex amples, Willie’s on the Water, the Buff, Trails, Ds Smokehous e. Patio s eating or venues that hos t meat raffles, bingo etc . I pay huge tax es in a c it y I liv e in and have to leav e the city for any form of ent ertainment. 8/21/2024 1:07 PM 106 Downtown is horrible t o get to for people going north from otaego (over the bridge). Something needs to be done with that s toplight situation, especially on Thurs days. I would love to go to the farmer's mark et but I don't because it is so difficult to get into downtown from any direc tion. 8/21/2024 12:56 PM 107 I like the farmers mark et in the s ummer. A Chris tmas Mark et would be really cool.8/21/2024 12:41 PM 108 Intersect ion of Hwy 10, Main St, and Parish Ave is a dis as ter.8/21/2024 12:15 PM 109 Traffic at thos e lights are horrible. Ev ery one runs red lights making you worry if y ou walk or bik e or ev en drive y ou will get hit. Parking is always full unles s y ou go all the way down past the funeral home and walk down. Lov e the river and the fountains and the doc k t here. Love the businesses as well. 8/21/2024 12:06 PM 110 I’d love to s ee less ins uranc e and bank options and more places t o gather or shop at a co-op. A nic e dining spot would be really fun as well. 8/20/2024 10:47 AM 111 More Chris tmas tree light s, more weed and trash cont rol, food truck night, I scream sop, deli and market where my s tery plac e is , Americ an Flag in park, ex tension of down town through park ing lots. Food truck fronts along Main Street park ing area, greenery in triangle by Karate on Ten, a few real planted Chris tmas tree’s . 8/20/2024 9:22 AM 112 No pavers, do colored / tex tured c oncrete 8/18/2024 8:08 PM 113 We would love a long walking path along the river 8/18/2024 7:23 PM 114 The free public parking lot by the feed store is very unkempt and Un att rac tive. I t does not repres ent a c lean, modern and attractiv e entrance into our downtown area. It is a bit of an eye sore. The lights down the road by Lake Orono are v ery pretty. Something lik e that c ould look very good there by the public park ing t oo! With some trees and planters with flowers like the downtown area has. That would be a beautif ul welcome! 8/18/2024 3:19 PM 115 I would lov e to s ee a farm to table restaurant or a fun brewery ! I love having options for having a night out! I lov e edge c off ee, old main, and suns hine depot but I would love to see more! 8/18/2024 12:47 PM 116 Bik e path too babcock. More lights at babcock, es pecially the boat launch. A s mall parking ramp in downtown would be ideal. 8/17/2024 4:27 PM 117 Elk Riv er needs to bring in more retail, dining and boutique busines s es. Av oid franc hises , and commercial businesses. The c ity needs its res idents to stay, inv est and spend money in t he city, and attract people pas s ing through to want to stop and s pend money at the loc al shops . Ins tead as a communit y we are forc ed to leav e the area to all the surrounding cities for all our basic needs as well as all the addit ional things we buy. Liquor is the only ex ception. Elk River apparently has a need for 3+ liquor st ores ... 8/16/2024 9:20 PM 118 All of t he busines s es are, not even historic , but just old. As part of younger folk, we would lik e to see more updated bus inesses appearanc es , a business/res taurant c hain on this s ide of hwy 8/16/2024 3:22 PM Page 163 of 247 Elk River Downtown Area Plan - Community Survey 61 / 68 10, or s omething that people under 40 years-old can enjoy. And traffic is awful, espec ially the turn onto Parris h. 119 Downtown s hould hav e more places t o go and enjoy yourself not servic e places such as karate massage places, or hair places , may be more unique s tores and res taurant s. 8/16/2024 11:41 AM 120 I wish the church building on the river was a food & drink , art or some k ind of gathering s pace. It's under utilized as a c hurc h. I really wis h there was a walk ing/bik ing path that c onnect s Bailey point and Babc ock Park along t he riv er. This would make the city a destination to enjoy the riv er. We should embrace the riv er like Anok a & Stillwater do. I would lov e to s ee more bout ique shopping, deli, speak eas y, gift s hops. Les s insurance, investment, offic e s pac es. 8/16/2024 7:44 AM 121 Elk Riv er Downtown has an underutiliz ed resource in the river/views and potential as a unique dest ination that c ould serve as a "3rd place" (home, work, 3rd place t o go to for entertainment, food/bev erages /recreat ion/socializing). I'd like to s ee the downtown area as a hub for trails for walking and bik ing - s eparating v ehicle traffic to mak e this a safer and more pleasant and appealing destination. See Seat tle's waterfront as an ex ample of a destination area with entertainment, dining, shops connected by walking and biking paths . Connec ting the wonderful trails (Woodland, along Highway 10, Eas t of 169) perhaps with bik e/walk ing paths going behind the sc hools on School St reet and connec ting these trails to downt own as a hub. Budgeting for excellent wayfinding signs would be essential to enc ourage us e. Inv it e bike/scooter rent al companies to locate in the c ommunity. A public transit elec tric tram/bus route to include the Norths tar Park and Ride, Walmart, Coburns, Cub, School Street, Aegir's Brewery, Downtown and/or similar higher volume st ops. Eliminat ing vehicle t raff ic in t he c ore Downtown and rerouting ac c es s/park ing for thos e liv ing/delivering and with disabilities. Reorienting businesses to river v iews and adding 3/4 s eason patios... Mov e park ing away from downtown and provide bik e and pedes trian ac c es s that does not require cros sing vehicle traffic (bridge/tunnel). Enc ourage/support additional retail, recreat ion, dining in the downt own area - plac es lik e a late night coffee shop, specialty foods , artist st udios , bic y cle repair, t rain store, game night gathering space, s maller specialty s hops... The Downtown Plan s hould create a space t hat both invites res idents to spend more time in the downtown and draws people from acros s the state for a unique and memorable vis it . 8/15/2024 7:23 PM 122 Highway 10 makes downtown uneasy with the amount of traffic. A ris k of cros sing 10. I’m 50 years old and I don’t want to cross it. Also put ting the train station outs ide of Elk Riv er was dumbest thing. Should have put it where the lions and rental plac e is. Having people to come directly into downtown to spend money and have downtown grow should’ve been a no brainer. 8/15/2024 3:57 PM 123 Terrible planning in pas t 8/15/2024 9:53 AM 124 Traffic congestion and extreme lac k of park ing will continue to keep people av oiding downtown. Sips on Main is a great idea but needs a new location. Hot pavement in August is a horrible idea. 8/15/2024 9:21 AM 125 Farmers mark et loc ation s hould be moved- it’s too congested and traffic patterns for those who live in that area is horrible. 8/15/2024 9:03 AM 126 Some complain about the c ost of the f lowers in the summer. I disagree with them...I lov e the "old town" friendly feel. So many of thos e t hings are being lost. Love to see old photos of towns with the holiday decor along main streets. Howev er, I don't liv e in Elk River do I don't have to pay f or it. 8/15/2024 8:04 AM 127 It would be amazing if from Studio 107 to Edge Coffee were lil shops. A s afer way to c ross Hwy 10. More parking. 8/15/2024 8:04 AM 128 I saw tax payer dollars went to pay for flowers for downtown. That is an abomination! If they businesses want flowers they s hould pay for it out of their own poc k et- NOT TAX DOLLARS!!! 8/15/2024 8:03 AM 129 People use Main St reet and Jackson as through s treets to get through town rather t han TO town. Figure out how to k eep that traf fic out of downt own and it would add to the appeal tremendous ly! 8/15/2024 8:03 AM 130 Change the amphitheater area for better s eating that is level and has act ual seats with backs ins tead of unev en gras s and slabs of rock. The c urrent bus iness es and rest aurants are not anyt hing t hat I am interested in with the ex c eption of the dental offic e. Nicer (clean, updated) res taurants is really what we need. 8/15/2024 7:59 AM 131 Need t o abs olutely fix the inters ection of Perris h Ave and Main St. It's abs olut ely horrible and 8/15/2024 7:49 AM Page 164 of 247 Elk River Downtown Area Plan - Community Survey 62 / 68 why I av oid downtown Elk River. 132 Parking is a nightmare. Farmers market is great but bas ically closes a park ing lot and c reates problems. Thurs day nights traffic is horrible at 5-7pm because of the market and c oncerts which mak es it unappealing to return. Need to f ace the f acts that downt own is really along the river and not on the ot her side of HWY 10 8/15/2024 7:47 AM 133 Downtown lost it s c harm years ago.. losing Kempers and meat market was final straw..8/15/2024 7:36 AM 134 More eat ing and gathering plac es.8/14/2024 10:40 AM 135 As a new small bus ines s owner in downt own I would lov e to see more businesses come in that will attrac t people to the downtown area (unique s hops/res taurant s/ac tivities as oppos ed to private offic es ). As a bus iness on Jacks on I would love to see Jack s on turned into a one way in order t o mak e parking av ailable on bot h s ides and ideally the remov al of t he rail on the eas t side to s witch to s omething more inviting. 8/14/2024 7:29 AM 136 Cute town. Enjoy what has already been updated. Pleas e. KEEP hist oric buildings . So many torn down already. ☹ 8/13/2024 10:10 AM 137 A trail or walkway that goes along t he riv er f or people who like to do walks.8/13/2024 9:29 AM 138 I like how Downt own gets decorated f or t he dif ferent holidays!8/13/2024 9:14 AM 139 Don't remov e the old part of elk River from this area, if you do there will be nothing original left of t his town. 8/13/2024 5:09 AM 140 The park ing is terrible.8/12/2024 10:57 PM 141 It’s cute, I love t he c oncerts in the summer and the f ount ain. More dining options or a bus iness for social gathering would be nice- I’m thinking a s moothie or wine place? Definit ely not a c hain res taurant- just some plac e to go. 8/12/2024 10:09 PM 142 I would lov e to s ee s ome fun s hops and res taurants 8/12/2024 9:48 PM 143 Love the downtown but parking is the biggest issue. On a busy week end or farmers market days, parking c an be difficult. 8/12/2024 9:46 PM 144 Enforc ement of 30mph through town, restaurant in the Daddy Os location with better quality food options lik e Pour (Otsego), Main Street Farmer (St Michael) or Big Bore (Hanov er). 8/12/2024 9:46 PM 145 Riv ers ide dining. Patios riverside 8/12/2024 12:53 PM 146 Transit would be unique 8/10/2024 8:39 PM 147 Elk Riv er should look to make Downtown lik e the City of Anoka in terms of restaurants ,bars, and entertainment. Current offerings in downtown are s ubstandard and many of t he busines s serv e no general benefit to downtown visitors. 8/10/2024 5:38 PM 148 Parking is the is s ue! There should be a parking ramp - having parking acros s Hwy 10 is ridic ulous . If y ou c reate park ing, busines ses and people will c ome. 8/9/2024 8:53 AM 149 No more salons, bars, or agenc ies. Bring in businesses that will draw people who spend time in small towns. Us ed book s tore, c oz y c off ee s hop, and different types of s mall town s hops are great ideas. Parking street-side is a pain, and wit h a lot of new s paces to park, it's not really ov erly nec essary, except for handic ap ac cess. Also, increasing the draw to the river could be big. There is very little acces s to the actual edge of the water and no grass area to sit next to the river. Construction s uc k s all-around, but if there's s ome way that the construc tion traf fic c an be redirec ted, busines s es will do bet ter. 8/9/2024 12:52 AM 150 ER downtown is right on the river- t here s hould be many modern res taurants/bars (with live mus ic) ov erlooking that v iew - Rogers R-Social and many bar/restaurants in Anoka are great examples . We driv e to thos e places and pass by ER down town and that’s a shame - I’m glad this surv ey is addressing the issue. 8/8/2024 10:01 PM 151 Parking is an issue 8/7/2024 7:24 AM 152 NA 8/6/2024 9:41 AM 153 Public restroom is a necessity with the amount of downtown events and act ivities. Still hoping for one in the old meat mark et loc ation. 8/6/2024 9:01 AM Page 165 of 247 Elk River Downtown Area Plan - Community Survey 63 / 68 154 na 8/6/2024 8:43 AM 155 A public res troom would be a great asset to downtown. A higher end restaurant/coc k tail bar is a mus t. No more c obbles tone, maybe stamped conc rete. Reconf iguration of Main/Parrish/Hwy 10. Consider one way on Jacks on. Thank you! 8/6/2024 8:19 AM 156 I believ e t hey have turned away a lot of bus iness es and proposals, including one from Tips y Chicken. The "old s chool" businesses have kept new businesses from c oming in. We hav e los t a lot of opportunities to Ots ego as a result. They need to make J ackson Street a one way. Mak e parking available on t he other side, tak e down the railing and even out the sidewalks so thos e bus ines s es c an s urvive. We need more shopping and dining downtown, not another Karate s tudio or bank, neither of thos e bring foot traffic into downtown. The s mall town mentality needs to change and those dec ision makers need to see that bringing in more shopping and dining, only benefits them in the long run as well. I don't want to see us los e more businesses to neighboring c ities. 8/5/2024 9:20 PM 157 I lov e downt own but walk ing and bik ing across highway 10 is an abs olute no! More restaurants and unique s hops would be perfec t as this area c ould easily be a great destination t own!! 8/5/2024 9:08 PM 158 More retail businesses would be wonderf ul. A park ing ramp would be nic e as well.8/5/2024 9:01 PM 159 Would lov e to see a round about or three way s top at main s tart and Parris h. That is a terrible intersection. 8/5/2024 8:14 PM 160 Continuing to hav e a place that feels warm, welcoming, uplifting, a plac e people say they want to go to, more activ ities that can bring people to our downtown, mak ing our downt own a hallmark village. 8/5/2024 7:55 PM 161 No one park s ac ros s highway 10, it’s not s afe walking ac ros s the highway.8/5/2024 6:56 PM 162 The ease of ac c es s to businesses on Jackson Av e need improv ement 8/5/2024 5:44 PM 163 I lov e liv ing in the downtown area. But los ing the drug st ore was really diffic ult. We NEED someplac e to buy a pop, a newspaper, a doz en eggs , et c. We could really use a market of some s ort. I think it would complete the feel of this area. 8/4/2024 1:44 PM 164 I would lov e to s ee a c onv enienc e s tore or grocery s tore that s ells basic hous ehold essentials, fresh produce, and other items that y ou normally have to drive to get. 8/2/2024 1:15 PM 165 The way t he rail interacts with the t est of the infrastruc ture c auses lots of problems . This causes downtown to feel dis jointed from the rest of elk River. Liv ing downtown we drive into the nearby neighborhood jus t to avoid the lots on 10 whic h are controlled by the rail sinc e the cycle times can get ex c essiv e at times . It would be ex pensiv e but grade s eparating the rail would eliminate most of the issues 8/2/2024 1:03 PM 166 It would be nice to hav e more of a walk ing path near the riv er. The riv ers edge park offers a nic e view, but that's really the only plac e you can enjoy the river. 7/30/2024 10:35 AM 167 I like that the downt own has a high enough volume of businesses and events (farmers market) to make it fun to walk around. I do think pedest rians are diffic ult to see with cars park ed directly next to crosswalks and there are "dead zones " like by the new bookstore that are harder to get to and feel is olated which mak es them less appealing to walk to (the area around them is only pavement with a road next to it ). I think having refuge is lands would help. May be more green s pace in the median? If there was an easier way to get t o downtown f rom the Hwy 10 s ide that would improve life. 7/29/2024 11:23 AM 168 Main Street and Paris h intersec tion needs to be safer/ easier to nav igat e.7/27/2024 3:34 PM 169 Keep t he historic buildings, get the downtown original buildings or bloc k s on the Nat ional His toric Regis ter. 7/27/2024 1:33 PM 170 Don't need any more hous ing built 7/27/2024 12:45 PM 171 I’m looking forward to some of the riv erfront businesses t urning over (ex the funeral home..) and being dev eloped into entertainment spac es / restaurants that utilize the riv erfront view. 7/25/2024 8:05 PM 172 Italian res taurant would be nice. Something other than bar food. Eras e t he s top lights on highway ten. 7/25/2024 4:44 PM Page 166 of 247 Elk River Downtown Area Plan - Community Survey 64 / 68 7.48%27 92.52%334 Q12 Do you currently live in Downtown? Answered: 361 Sk ipped: 1 TOTAL 361 0%10%20%30%40%50%60%70%80%90%1 00% Yes No ANSWER CHOICES RESPONSES Yes No Page 167 of 247 Elk River Downtown Area Plan - Community Survey 65 / 68 11.08%40 88.92%321 Q13 Do you currently work in Downtown? Answered: 361 Sk ipped: 1 TOTAL 361 0%10%20%30%40%50%60%70%80%90%1 00% Yes No ANSWER CHOICES RESPONSES Yes No Page 168 of 247 Elk River Downtown Area Plan - Community Survey 66 / 68 6.39%23 93.61%337 Q14 Do you own a business or property in Downtown? Answered: 360 Sk ipped: 2 TOTAL 360 0%10%20%30%40%50%60%70%80%90%1 00% Yes No ANSWER CHOICES RESPONSES Yes No Page 169 of 247 Elk River Downtown Area Plan - Community Survey 67 / 68 0.29%1 30.84%107 42.07%146 23.34%81 3.46%12 Q15 What is your age (optional)? Answered: 347 Sk ipped: 15 TOTAL 347 0%10%20%30%40%50%60%70%80%90%1 00% 0-18 1 9-36 37-54 55-72 72+ ANSWER CHOICES RESPONSES 0-18 19-36 37-54 55-72 72+ Page 170 of 247 Elk River Downtown Area Plan - Community Survey 68 / 68 0.60%2 1.19%4 1.19%4 0.60%2 0.00%0 92.24%309 0.60%2 3.58%12 Q16 How do you identify (optional)? Answered: 335 Sk ipped: 27 TOTAL 335 0%10%20%30%40%50%60%70%80%90%1 00% Bl ack Hispanic Latino/a Asian Pacific Islander White Native American Other ANSWER CHOICES RESPONSES Blac k His panic Latino/a Asian Pacific Islander Whit e Nativ e Americ an Other Page 171 of 247 610 SW Alder Street, Suite 1200, Portland, Oregon 97205 | 503.222.1600 Elk River Downtown Recommendations & Implementation Strategies Case Studies Downtown Stillwater – Stillwater, MN Categories: Hotel, riverfront revitalization, placemaking Major Outcomes: New construction, including multiple hotels, spurred by the creation of a new bridge and conversion of the old bridge into part of a pedestrian and bike network. Description: Stillwater is a small tourism-driven town in the bluff country of eastern Minnesota. Prior to the closure of the 87-year- old lift bridge in 2017, 18,000 cars crossed the aging bridge daily, bringing visitors to the city’s shopping and dining establishments downtown. The bridge closure came on the heels of the opening of the St. Croix Crossing south of downtown. In 2018, two new hotels opened in downtown Stillwater and a third hotel broke ground on an expansion. The new hotels include Hotel Crosby (55 rooms) and the Lora hotel (40 rooms). In addition to new hotel construction, owners of retail stores downtown embarked on façade improvements of 19 th century buildings and in 2019 Wolf Development broke ground on the adaptive reuse of the town’s historic armory, which was converted into apartments and commercial space (Fieldhouse 34). These investments reflected the strong economic climate as well as the increased ease of pedestrian access to downtown due to the bridge closure. Figure 1. Stillwater’s Historic Lift Bridge, Now Part of St. Croix Crossing Loop Trail Source: Twin Cities Outdoors. APPENDIX B Page 172 of 247 www.lelandconsulting.com Page 2 Figure 2. The Lora Hotel Source: Lora Hotel. Figure 3. Interior of Fieldhouse 34 in the Historic Armory Building Source: Historic Fieldhouse 34. Page 173 of 247 www.lelandconsulting.com Page 3 Figure 4. Rooftop Patio Overlooking the River at Brick and Bourbon in Downtown Stillwater Source: Discover Stillwater. Artists on Main Street – Willmar, MN Categories: Placemaking, Events Major Outcomes: Increased visits to Downtown throughout the year; community-building Description: Artists on Main Street is a program operated by local organizations, Rethos and Springboard for the Arts. The organizations work with cities to bring art and art -related events downtown, focusing on small and rural cities. Member cities rfeceive funding and resources for the creation of art -based physical, economic, and social solutions for downtown. One of the current participating cities is Willmar, MN, located in Kandiyohi County southwest of St. Cloud. The City’s approach to using the resources provided by the program involves having “small and many” events to attract a wide variety of residents downtown throughout the year with a goal of creating community. In its first year, Willmar received $20,000 from the program, which funded 13 projects. These included murals, seating areas, art workshops, and a community picnic. In its second year, the City aimed to utilize the program to bolster public outreach for its Comprehensive Plan update. City Planner Sarah Swedburg emphasized that in bringing people downtown for events throughout the year, it built downtown’s identity as a place to meet friends and take part in community. Page 174 of 247 www.lelandconsulting.com Page 4 Figure 5. “Wilmar…What Comes to Your Mind” Art Event in 2019 Source: Rethos. Figure 6. Residents Helping to Paint the Collaborative Downtown Mural Medallion in 2019 Source: Rethos. Grain District Downtown Redevelopment Plan – Bondurant, IA Categories: Hotel, Placemaking Major Outcomes: Public-private partnership for redevelopment and adaptive reuse of a historic grain silo; public investment in infrastructure, placemaking, and events. Page 175 of 247 www.lelandconsulting.com Page 5 Description: Bondurant, a city of just over 7,000 residents located outside of Des Moines, adopted a plan in 2024 to redevelop the Grain District, an area adjacent to its downtown. The district was previously home to the Landus Cooperative and features a 140-foot tall grain silo. In 2024, the City released a plan for the grain district that includes townhomes, mixed- use (residential over retail), a park with a sculpture garden and stormwater retention ponds, a recreation center, and a repurposed railroad trail. The local buyer of the Grain District site, The 101 LLC, approached the City with the idea of sharing the cost of the plan adoption and creation process. The centerpiece of the plan is the redevelopment of the grain silo into a mixed-use building with a hotel, condos, and retail space. Planned public investments to support the development of the site include an extension of the Chichaqua Valley Trail, realignment and extension of Lincoln Street NE, construction of a public gathering space and an arboretum, implementation of public art and creative placemaking, repurposing of a city Emergency Services facility into a public Parks and Recreation Center, and new public parking. Following adoption of the plan, the City entered into a Memorandum of Understanding (MOU) with the developer. In addition to the infrastructure investments planned by the City, the project is eligible for the City’s tax abatement program, and TIF funds could be allocated to the silo redevelopment if it includes hotel and condo uses. Figure 7. Adopted Plan for the Grain District in Bondurant Source: City of Bondurant. Page 176 of 247 www.lelandconsulting.com Page 6 Figure 8. Conceptual Plan for Grain Silo Redevelopment Source: City of Bondurant. Independence Landing – Independence, OR Categories: Hotel, Riverfront Revitalization, Events Major Outcomes: New housing, hotel, and park adjacent to the historic downtown Description: Independence Landing is a suburb of Salem, Oregon that has in recent years branded itself as a gateway to the Willamette Valley wine country. The City had spent approximately 15 years prior to forming a development partnership revitalizing its downtown through investments in streetscape and a new park along the river featuring an outdoor amphitheater similar to Elk River’s. In 2009, the City’s 2020 Vision Plan identified an 18-acre site on the river adjacent to downtown as a key development opportunity. The City used a State transportation grant to fund concept plans for the site, which it ultimately purchased in 2015. In 2017, the City entered into a development agreement with Tokola Properties, which built a park, apartments, townhomes, and the first hotel in the city on the riverfront. Page 177 of 247 www.lelandconsulting.com Page 7 Figure 9. Independence Hotel Source: Tokola Properties. Figure 10. Independence Landing Source: Tokola Properties. Page 178 of 247 www.lelandconsulting.com Page 8 Downtown Walla Walla – Walla Walla, WA Categories: Hotel, Placemaking Major Outcomes: Repositioning of Walla Walla as a “boutique destination,” new hotel development, pedestrian plaza. Description: The city of Walla Walla in southeastern Washington has a population of just over 30,000 residents that since the 1970s has been working to establish itself as a wine destination. The Walla Walla Main Street Foundation (now the Downtown Walla Walla Foundation) was formed in the 1980s, focusing initially on downtown events like the Italian Heritage Festa and Main Street Fair. In 1987, the foundation partnered with banks on a façade improvement program to revitalize downtown’s aging buildings. In 1991, the City approved a Local Improvement District to fund downtown improvements. In 2003, the City embarked on creating a 20-year downtown Master Plan to guide the future of the district. The Master Plan process created a community vision for the area that the City used as a basis for its urban design framework. The plan identified key public amenities and planned for wayfinding and circulation. Between 2000 and 2014, the City’s downtown won a number of accolades, including Washington Main Street’s Excellence on Main award and the American Planning Association’s Top Ten Great Neighborhood award. In 2019, the City gained its newest hotel, the FINCH, on the former site of a Red Lion. The 80-room hotel showcases regional amenities by featuring local art and furnishings sourced from the Northwest, as well as through the use of tour guides to suggest activities to guests. Columbia Hospitality, which manages the FINCH, told the Whitman Wire that Walla Walla stands out for its “vibrant, unique, and authentic community.” In 2023, the City made a temporary street closure into a permanent gathering space called Walawala Plaza. Figure 11. Walawala Plaza in Downtown Walla Walla Source: Oregon Wine Press. Page 179 of 247 www.lelandconsulting.com Page 9 Figure 12. Downtown Walla Walla \ Source: Visit Walla Walla. Figure 13. The FINCH Hotel in Walla Walla Source: Visit Walla Walla. Page 180 of 247 www.lelandconsulting.com Page 10 City-Owned Lot: Key Considerations City Investment In order to spur development of the City-owned lot, the City will likely need to subsidize the project. Because of current challenges in the development market nationwide, the quicker the City wants to see the lot developed, the more money it will likely need to put into it. Subsidies that can help attract development include: • Free or reduced-price land transfer • Equity in the project • Infrastructure development • Tax subsidies or deferrments • Reduced development or impact fees • Preliminary environmental or other due diligence studies Partnership Structures & Development Agreement The Steering Committee has identified redevelopment of the city-owned lot as a top priority for Downtown Elk River. To facilitate the development of this site, the city should conduct developer outreach, embark on a formal RFQ/RFP process to select a developer, and negotiate a development agreement that ensures development on the site is in alignment with the community vision. Key considerations for this agreement include: • Land: the City should determine whether it intends to retain ownership of all or part of the land. Typically, developers prefer to own the development site outright. The City could determine alternative ownership structures, such as a 99-year land lease, but these are complicated arrangements that may not be appropriate for this site. The City could alternatively retain ownership of any parts of the site that are intended for public benefit or that will be developed at a future time. • Public Benefit: Through the development agreement, the City could choose to require the developer to provide some public benefit in exchange for public subsidy (as discussed above). This could include park space, parking, or some other amenity that would benefit the community. However, the City should ensure that the public benefit is not so costly that the agreement falls apart. • Timing: If the City chooses to give the land for free to the developer, it should consider including a provision within the development agreement that causes the land to revert to City ownership if development is not completed within a specified time. This will ensure that the City does not give up control of a key downtown site if the developer is unable to deliver. Page 181 of 247 www.lelandconsulting.com Page 11 Key Actions for Downtown Plan Implementation Hotel Attraction Attracting a hotel could be somewhat challenging for Elk River, as it is not yet a tourism destination and few small boutique hotels have been built in the area in recent years. However, as the City implements improvements that address connectivity challenges and emphasize Downtown’s connection to the river, the prospects for a new hotel development will improve. Strategies the City should consider to attract hotel development include: • Financial incentives such as tax abatements, infrastructure improvements, and/or shared planning costs. • Increasing visits to Downtown Elk River through branding, high -quality placemaking, and events that draw visitors from throughout the region and provide a reason to stay overnight. • Identification of key sites, preferably along the river, that are suitable for hotel development and zoned appropriately to allow for an urban, boutique-style hotel. This can include sites suitable for both ground-up development and adaptive reuse. • Building and maintaining relationships with developers and key property owners to identify potential opportunities for partnerships. Grocery Attraction Attracting a grocery store to the Uptown neighborhood will be challenging, especially because there are few small - format grocery chains operating in the US. The most likely type of grocery store to locate in this area will be a cooperative. Strategies that cities can use to attract grocery stores include: • Financial incentives like land, infrastructure improvements, and /or tax credits • Regulatory incentives like zoning changes or modifications, design concessions, and expedited permitting • Alerting the local tenant broker community to a potential grocery location in Uptown • Attending local ICSC events to network and spread the word about the opportunity Housing The current development environment nationwide is challenging due to high interest rates as well as rising material and labor costs. Attracting significant housing development may be somewhat challenging in the near term, but the City can use this opportunity to prepare for longer-term investment, especially in the Uptown neighborhood. Actions the City can take to attract housing development include: • Zoning the Uptown area for a variety of housing types, including townhomes, garden -style apartments, and mixed-use development. • Ensuring that neighborhood commercial uses, potentially including a grocery store, are allowed and that parking requirements are appropriate for the scale of development. • Conducting an environmental assessment of the site and potentially mitigating any significant environmental hazards on site that would limit housing development. • Building relationships with developers who are active in the region and working with them to better understand the opportunities and challenges in this area. • Providing funding for infrastructure development that will benefit the general public, such as new sidewalks. Page 182 of 247 6w Reply Hide Edited Cour tney Janke Yall building a parking ramp too?! Whelp, looks like it time to start looking at moving away. Like 4 6w Reply Hide Brandon WK Cour tney Janke that was my thought also. Time to move away from people and high taxes Like 2 Reply to Courtney Janke 6w Reply Hide Monty Tor per Something to consider when people say, the community doesn't want this. I think people should consider the age and conditions of alot of the older buildings downtown. Change is inevitable, the biggest question is when. That's what alot of these discussions are about, getting the community together, to come up with a great gam eplan that's best for downtown and the future. Like 8 6w Reply Hide Linde Hilyar Monty Tor per only fix what needs fixing. We do not need a hotel or another grocery downtown. Now if a Trader Joe’s wants in we have plenty of other locations that can fuel that. Let’s add more businesses and still try to accommodate parking.. it all looks and sounds great but in all fairness we are not and will not be a Stillwater. Like 14 The comment Christopher Borum is replying to has been deleted. 6w Reply Hide Christopher Bor um Barbara Hamlin What does "let it grow on its own" mean? Like 5w Reply Hide Edited Top fan Amy Daisy Monty Tor per Agree. The majority of downtown buildings and storefronts need updates to meet legal accessibility requirements. Improving access is essential—not only to avoid potential lawsuits, but to better serve individuals with disabilities, seniors… See more Like Reply to Monty Torper Lisa Collins Niemela Where’s the parking???? Page 183 of 247 6w Reply HideLike 7 5w Reply Hide Jeremy Collins Lisa Collins Niemela did you hear how the narrator pronounced Lowell? If this is for the next 15 years you would think the parking garage would be number one priority. Like Reply to Lisa Collins Niemela 6w Reply Hide Stephanie Schultz Elk River City Gover nment is there an opportunity to virtually log in? The timing makes it complicated and I would like to contribute Like 2 6w Reply Commented on by Starr Sorheim Edited Author Elk River City Gover nment Stephanie Schultz Unfortunately, we do not have a virtual option for this specific open house. You are able to submit a written letter or email on behalf of this plan that city staff , commissions, and City Council can review. You may also be able to at… See more Like 6w Reply Hide Stephanie Schultz Elk River City Gover nment pending the type of questions and feedback received, will these plans and costs be open for discussion or is this a done deal with no room for change? Like 4 6w Reply Hide Stephanie Schultz Elk River City Gover nment furthermore will govt officials be taking into consideration questions and opinions on social media? Like 4 6w Reply Author Elk River City Gover nment Stephanie Schultz No plans or costs have been solidified or considered by the City Council. Additionally, social media comments will most likely be shown to officials, but written email or letter will be guaranteed recorded and read. Like Reply to Elk River Cit… Reply to Stephanie Schultz Page 184 of 247 5w Reply Hide Top fan Amy Daisy Downtown would benefit from more accessible building entrances, ramps, parking, and sidewalks that meet disability requirements. These improvements also support seniors, parents with strollers, and others who navigate mobility challenges. Like 5w Reply Hide Sandra Margaret Please plan for much more parking. I often have to circle the “blocks” 3 times to find a parking space to go to my favorite shop! Like 5w Reply Hide Christine Cor nelius We will be at the meeting on Tuesday. Because I’d guess that as downtown small business owners whose property taxes increased 75% this year, we might be funding these sorts of plans. The video mentions that feedback from downtown business owners has been taken into consideration, but we were never asked anything  And you better believe we have questions. Like 7 5w Reply Hide Heidi Wilson Christine Cor nelius good luck. Like 5w Reply Hide Top fan Amy Daisy Christine Cor nelius The majority of downtown buildings and storefronts need updates to meet legal accessibility requirements. Improving access is essential—not only to avoid potential lawsuits, but to better serve individuals with disabilities, seniors, and parents with strollers, ultimately benefiting business owners and the community as a whole. Like Reply to Christine Cornelius 6w Reply Hide Linde Hilyar Dumb Like 2 6w Reply Hide Cher yl Miller Linde Hilyar agree 100% Like 6w Reply Hide John Jordan How is something "dumb" before actually seeing it? Seems to me THAT is dumb. Like Page 185 of 247 5w Reply Hide Linde Hilyar John Jordan ooh I don’t need to see it. They keep dumping money into this old down town. Take a drive and look at the rest of ER that needs help. Peace out.  Like Reply to John Jordan Reply to Linde Hilyar 6w Reply Hide Katie Brison I like it! Like 2 6w Reply Hide Julie Wor thington Elk River City Gover nment when will the information about tax increases come into the conversation? Our taxes are already very high. Like 11 6w Reply Hide Mark Lea How much extra will it cost us? Taxes are high enough already Like 23 5w Reply Hide Wendy Brown Let us vote!!! Like 6w Reply Hide Dan Stor m Keep on improving! The River front looks great Like 6w Reply Hide Darlene Schr upp Olson Really  Like 6w Reply Hide Michelle Tur ner No. A parking garage? Not interested in this overall. Sorry Like 4 Paul Fischer I would like to find a way for the City, County and State work to connect a bike/multi use trail along 169 to the trail in Ramsey ends just west of rest stop. It could be paved or packed similar to the Luce Line in west metro. It would be extra cool to be along the river but I understand this is valuable property. I would just like a safe way to bike to Anoka. From Anoka you can connect to nearly every trail system. Page 186 of 247 5w Reply HideLike 6w Reply Hide Minda Mae St. Claire I hope areas that incorporate the historic aspects of downtown will be used as good examples. Anoka has done well with their social district, and they avoided harming existing businesses during their changes. Like 5 6w Reply Hide Paul Pederson elk river getting taxed too much Like 2 6w Reply Hide Jackie Benson We don’t need it!! Like 10 6w Reply Hide John Jordan Jackie Benson You don't even know what you don't need because the plan isn't out yet. Like Reply to Jackie Benson 6w Reply Hide Patrick Anderson Post office will never move and sell. So uptown is gonna be stuck with an aging post office in the middle Like 6w Reply Hide Top fan Jeff Taylor Pass Like 5w Reply Hide Linda Berger Anderson Leave downtown alone. Like 2 6w Reply Hide Matt Stevens Let's get rid of most of the parking downtown to build a building then wonder why the commercial space is empty. Quit trying to suckup to the met council cars and parking are necessary out here Like 8 Page 187 of 247 5w Reply Hide Zach Uphus Well this is why voting matters. You keep voting the people in that like spending. They will in retur n just keep spending. Your tax dollars and increase means nothing to them. The taxes in the city have gone up significantly and they will just take more blood. We pay 3 1/2 months just to the federal government. Most people another month or two for property taxes. Now you want us to even spend more. It's always easy spending other people's money. Like 2 6w Reply Hide Ashley Hor ton Dustin Hor ton Like 6w Reply Hide Edited Jessica Hackenmueller This would up our taxes? Your community can barely afford the taxes as it is. Pushing people out. It’s beautiful but can your community afford it???? Elk River City Gover nment, do you even understand how much our taxes are and how hard it is for people right now?! I don’t think you do Like 49 6w Reply Hide Kate Elizabeth Jessica Hackenmueller we would definitely be pushed out. They'd build a string of apartments where we live now. Nice to have a heads up. Like 5w Reply Hide David Sanders Jessica Hackenmueller Looks to me they are building homes to collect more taxes at the cost of destroying the historic site. Like Reply to Jessica Hackenmu… 6w Reply Hide Dustin Dahlheimer Get rid of the farmers market in down town. People don’t know how to park, drive, or walk, and that whole intersection from Parrish/Main to Jackson is a backed up mess. Fair grounds has plenty of space and parking Like 46 5w Reply Hide Stacy Hildreth Dustin Dahlheimer and the fairgrounds are up for sale too. They could definitely do something there Like Reply to Dustin Dahlheimer Page 188 of 247 6w Reply Hide Heidi Wilson No, and I'm tired of paying such high taxes. Like 21 6w Reply Hide Br uce Quammen Heidi Wilson, take Trumple-thin-skin's unit out of your mouth. Like 2 6w Reply Hide Edited Christopher Bor um Heidi Wilson Do you earn more than $400k per year? If not, your taxes are about to explode anyway. Might as well use some of that to improve areas you use every day. Like Reply to Heidi Wilson 6w Reply Hide Kati Grabrick Where are people going to park downtown? If you want to bring people in to enjoy the downtown area you need to think about where they are going to park. This plan has NOTHING to allow Parking for people to enjoy downtown. The Current parking situation doesn't allow enough parking for all the current events they have. Like 19 6w Reply Hide Kasandra MN Kati Grabrick the multi level parking was mentioned with the city owned lot where the farmers market currently takes place. This would be paid for by the city budget-aka taxes Like 4 6w Reply Hide Randine N Kar nitz Kasandra MN didnt they deny someone to do this years ago and got denied? Whats the change of heart? Like 3 Reply to Kasandra MN Reply to Kati Grabrick 6w Reply Hide Nik Anderson Nobody wants this. Like 21 6w Reply Hide Christopher Bor um Nik Anderson Speak for yourself Like 2 Page 189 of 247 5w Reply Hide Nik Anderson Christopher Bor um I did. Like Reply to Christopher … Reply to Nik Anderson 6w Reply Hide Heather Opay There’s not any good parking, I understand the need to upkeep the older buildings. Give the money to the older buildings to help fix them up. Parish/ main/10 need to be addressed. Thur night is hell going through town, by 10 or main. We are not a tourist town. Build something out west of town, besides kwik trip Like 14 6w Reply Hide Charlene Phillips Heather Opay shouldn’t the owners of those older buildings take care of that? That’s part of ownership. Like 7 6w Reply Hide Heather Opay Charlene Phillips I think that too, but the city could offer loans/grants to the owners to help fix them instead of tearing down and building Like 4 Reply to Charlene Phil… Reply to Heather Opay 6w Reply Hide Jenn Marie I really hope you are in conversation with the school district. There are conversations regarding a hefty referendum in 2026 for 2 schools so if you expect this to be funded by tax payers as well it's all too much. Like 9 6w Reply Hide Jessica Hackenmueller Jenn Marie exactly Like Tiffanie Thibodeau Jenn Marie and those of us in Zimmerman are paying for this too because we are in the school district. I pay $6000 in taxes. They increased by $3000 in 7 years and for what? We don’t live in elk river Page 190 of 247 6w Reply HideLike 5 6w Reply Hide Jenn Marie Tiffanie Thibodeau yep, the school ref erendum will be district wide, and it will be a big one. I really hope people start paying attention because this is all being talked about now. Like 2 Reply to Tiffanie Thib… 5w Reply Hide Dawn Boje Hofteig Jenn Marie crazy thought, stop blowing tax payers money on stuff the school “needs”! My son goes to Spectrum and these stupid referendums do not put any money towards that school! This city is getting crazy! Like 2 5w Reply Hide Jenn Marie Dawn Boje Hofteig especially since one of their ideas is around 18 million to build a level 4 school and have possible open enrollment to it, when we have less than 50 kids district wide that need a level 4 school. So essentially this would drop our property values , and increase our property taxes, and the majority of kids that need this space will come from outside the district where those residents won't have an increase in taxes from it  it's wild. They are gonna taxes us right out of our homes it seems. Like 2 Reply to Dawn Boje H… Reply to Jenn Marie 6w Reply Hide Rhonda Rognstad-Taylor This is not needed. Listen to the taxpayers, taxes are way too high already. Like 7 6w Reply Hide Christopher Bor um Rhonda Rognstad-Taylor I'm a taxpayer and I want the city to continue to grow and improve. Like Page 191 of 247 5w Reply Hide Chad Robb Christopher Bor um Rhonda's right, this will be a disaster. Get ready for your property taxes to go up about $1000/year. In the end it will be a 10+ year project where downtown will not even be visited by anyone during all of this construction. Many of the current businesses will go under and when it's done most businesses will struggle to pay the leases on the new buildings. Get ready for a ghost town and your property taxes to go up by more than a grand per year. There's nothing wrong with what we have. Encourage new businesses to move in, and if they want to renovate or build, take their plans into consideration. Do not take an axe to the downtown area and rebuild it in a 10+ year project. Like 2 Reply to Christopher … 5w Reply Hide Top fan Amy Daisy Rhonda Rognstad-Taylor Most downtown buildings, roads, & parking need accessibility updates to meet the law. These changes support people & help protect and grow local businesses. Like Reply to Rhonda Rognstad-… 6w Reply Hide Susan Bergstrom the people seem to be against it. won't matter, they will do what they want to do, make us pay for it. they put this "we want to hear from you" on to make them look good. it's probably a done deal. Like 10 6w Reply Commented on by Starr Sorheim Edited Author Elk River City Gover nment Susan Bergstrom Hi Susan, this plan has not yet been reviewed by City Council and is not currently approved. We encourage residents and business owners to attend our upcoming open house to ensure their voices and feedback are heard prior to any finalization. Like 6w Reply Hide Jessica Hackenmueller Elk River City Gover nment maybe we should all Be able to VOTE on this before the city counsels has any say on this!!!!! WE DON’T WANT THIS because we can’t afford this!!!!!!!!!! Listen to your city Like 12 Page 192 of 247 6w Reply Hide Susan Bergstrom Maybe we can not all come out to your meeting! You asked the question on this site so we COULD give you our feed back. perhaps you should consider this our voice and say "oh no one objected at our meeting so let's do it!"! Like 3 6w Reply Hide Christopher Bor um Jessica Hackenmueller You did vote for it. In a representative democracy, we elect members of a body to make decisions and if we don't like those decisions, the remedy is to vote for someone else next time. This is classical Greece. Like 2 6w Reply Hide Jessica Hackenmueller Christopher Bor um no that’s not enough of a vote to let’s this go through. We need a ballet type vote Like 2 6w Reply Hide Christopher Bor um Jessica Hackenmueller We can't just put every decision on a ballot question. That's the point of having a city council. I don't know, but I assume the state and city have guidelines on what could go on the ballot. Maybe this qualifies, but I doubt it. I'm pretty sure statewide it can only be things that alter the state constitution. Like 2 5w Reply Hide Jessica Hackenmueller Christopher Bor um this is a pretty big dollar amount to add to our taxes. We should be able to vote on something like this! Doesn’t need to be an official ballot. We all should be mailed something and we fill out and retur n. Idk Like Reply to Elk River Cit… 6w Reply Hide Kate Elizabeth Susan Bergstrom yep. They don't care. Like Reply to Susan Bergstrom 6w Reply Hide Jim Lang The uptown area looks like you would demolish the current neighborhoods. Not a fan. Like 9 Page 193 of 247 6w Reply Hide Edited Alyssa Zwilling As someone who owns a business in downtown. Holding events near there only impacts the businesses negatively. My employees have to alter their schedules on Thursday after noons because there is no where for their clients to park. Like 23 5w Reply Hide Top fan Amy Daisy Alyssa Zwilling The focus of downtown improvements should be accessibility. Without updates, businesses risk lawsuits. Like Reply to Alyssa Zwilling 5w Reply Hide Kimmy Abeln Schroeder Who created that? Waste of time & money. Like 5w Reply Hide Jason Olson If it's going to raise taxes we don't want it Like 5w Reply Hide Jon Person Idk.. seems downtown is fine. Sunshine depot is nice local bar. We got multiple antique stores. Tipsy Chicken is down there now. Like 4 5w Reply Hide Edited Heather Sumstad Ditschler I really wish they wouldn't have already messed up downtown. If they would have left it alone 40 years ago,it could have become a tourist area like Stillwater and brought money in. Like 5w Reply Hide Jenny Sorensen I agree with the vast majority of previous comments. Our taxes are already WAY too high! The city should look at how they can limit waste and not raise taxes further instead of making plans with money they don't have. The good residents of Elk River need a long break from all these massive tax increases! Like 4 6w Reply Hide Edited Jessica Hackenmueller The people need to vote on this, not only the city counsel members Like 6 Charlene Phillips There goes our taxes! Is this really needed????  Page 194 of 247 6w Reply HideLike 8 5w Reply Hide Jazmin Sheree 15 years is crazy Like 5w Reply Hide Sande Diebel Forster Keep the historic buildings! Like 5w Reply Hide Kelly Thomas 80 comments and all are negative. This city has consistently done poor city planning; I have lived here 31 years and have not been impressed. Subcommittees are formed and their hard considered recommendations are tossed out - repeatedly. Current downtown looks terrible and utterly boring because the city council caved into the developers excuses and manipulations. New development at the Specht property is horrible; the traffic situation will results in numerous collisions and likely deaths. The city "park land" there is all underwater. Good job City. Like 5w Reply Hide Jazmin Sheree Elk river don’t even have a down town there’s literally nothing down there & it’s small Like 5w Reply Hide Timothy Richard Jazmin Sheree don’t go there then Like 5w Reply Hide Jazmin Sheree Timothy Richard I don’t I hate it here Like 5w Reply Hide Timothy Richard Jazmin Sheree then head out Like 5w Reply Hide Jazmin Sheree Timothy Richard you gone pay for it? Oh okay then Like Reply to Timothy Rich… Reply to Jazmin Sheree Page 195 of 247 Jaki Heigl Perr y Tricia Heigl well F this... Page 196 of 247 The Elk River Vision A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and community engagement that encourages and inspires prosperity Request for Action To City Council Item Number 8.3 Meeting Date June 2, 2025 Prepared By Zack Carlton, Community Development Director Item Description Select Consultant for the Jackson Street Water Tower Historic Park Agreement 2025-10 Reviewed by Cal Portner Tina Allard Action Requested Approve, by motion, the selection of Mend Collaborative to prepare the plans for the Jackson Street Water Tower Historic Park Agreement 2025-10. Select a council member to serve on the project team for the project. Background/Discussion The 2025 CIP includes funding for a consultant to prepare plans for an interpretive park at the site of the historic Jackson Street Water Tower. The project's goal is to create a place where residents and visitors can go to learn about the history of Elk River. It is expected that the park will include a series of interpretive signs or kiosks that tell different parts of the city's story. The consultant will also solicit community feedback to inform the design of the site. The city received seven qualified proposals ranging in cost from $24,700 to $25,000, all of them at or below the $25,000 budgeted in the CIP. Multiple staff members and the Heritage Preservation Commission (HPC) reviewed the proposals and narrowed the field down to two top candidates. City staff and two HPC representatives then interviewed the two candidates to better understand their proposed deliverables, public participation process, and overall scope. After reviewing the proposals and conducting the interview, the staff recommends Mend Collaborative as their proposals closely align with the city's goals for the project. Mend proposed a not-to-exceed cost of $24,750 and their proposed timeline will deliver the final product at the end of October. City staff would also like the City Council to select a Council representative to serve on the project team along with two members of the HPC and city staff. Financial Impact The not-to-exceed cost of the proposal is $24,750, which is within the CIP budget for this project. Mission/Policy/Goal Timeless. Reflect the culture of citizens and what is important. Page 197 of 247 Attachments 1. Mend Collaborative Water Tower Historic Park Proposal 2. Professional Services Contract Page 198 of 247 for the City of Elk River Image Source: Earl C. Leatherberry May 6th, 2025 Water Tower Historic Park Jackson Street Page 199 of 247 2 City of Elk River Table of Contents General Information ....................................................................................................3 Project Understanding ...............................................................................................5 Project Approach .........................................................................................................7 Project Team Experience ...........................................................................................9 Schedule ........................................................................................................................11 Additional Considerations ......................................................................................13 Consultant Costs .......................................................................................................15 Page 200 of 247 General Information Introduction to Mend Collaborative Page 201 of 247 4 City of Elk River Mend Collaborative, founded in 2022 with roots in Minneapolis and Austin, is the evolution of years of collaboration between our founding partners—designers, planners, and advocates who believe that the health of our environments and the well-being of our communities are inseparable. We are a design and planning firm that views every project as part of a larger ecological and cultural narrative. At Mend, we see our work as an act of listening and storytelling. Through deep engagement with communities, we co-create spaces and strategies that restore balance, elevate local voices, and reflect the unique rhythms of a place. Our work is grounded in the belief that meaningful change begins with the community. We create participatory processes that center community insight and lived experience—because inclusive design leads to more resilient, equitable outcomes. We are committed to weaving together social, ecological, and historic/cultural systems in ways that heal, empower, and endure. At Mend Collaborative, we are dedicated to advancing the field of design through our unwavering passion and commitment to excellence. Our firm is driven by a shared vision of creating vibrant, sustainable, and equitable communities. We continually challenge ourselves to push boundaries, embrace new technologies and approaches, and stay at the forefront of community needs. Whether it’s shaping landscapes, reconnecting neighborhoods with their cultural and ecological roots, or guiding sustainable development, Mend Collaborative delivers transformative, community-driven solutions that honor local stories and create lasting impacts. Meet Mend Legal Name of Firm: Mend Collaborative, Inc. Location of Office: 2744 Lyndale Avenue South, Minneapolis, MN 55408 Person Authorized to bind the Offeror: Sandy Meulners-ComstockPartner/Project Managersandy@mendcollaborative.com763.218.6999 Legal Business Description: S-Corporation Date of Firm Formation: June 13th, 2022 Certifications: Women-owned Business Enterprise in Texas and Minnesota Website:www.mendcollaborative.com Sandy Meulners-Comstock, PLA Founding Partner, Mend Collaborative 763.218.6999 This proposal is to remain valid for 90 days from the date of submittal. Page 202 of 247 5Water Tower Historic Park Project Understanding Jackson Street Water Tower Historic Park Image Source: ElkRiverCommunications Page 203 of 247 6 City of Elk River The City of Elk River is seeking a design partner to help envision the future of Water Tower Historic Park—an iconic site listed on the National Register of Historic Places. This project represents a unique opportunity to honor Elk River’s rich history while creating a vibrant, accessible, and sustainable public space for future generations. Mend Collaborative understands that the heart of this project lies in community and history of Elk River. Meaningful public engagement will kick off our project understanding process, ensuring the voices of residents, business owners, elected officials, and city staff help shape the vision for this important space. We will lead a thoughtful, inclusive and fun community outreach effort to gather insight, ideas, and aspirations that reflect the highest hopes for the park. The design of Water Tower Historic Park must be historically sensitive—not only to the structure itself, but to the broader heritage of Elk River. We recognize the importance of preserving and celebrating this character while enhancing the site’s functionality and relevance for today’s users. Mend will prioritize the City’s “Powered by Nature” identity by incorporating native plantings, passive recreation areas, and green infrastructure strategies that reflect a commitment to sustainability. Equally important is the integration of universal design principles that ensure the park is welcoming and accessible to people of all ages and abilities. Comfortable and attractive hardscape features will provide opportunities to walk, sit, and gather—designed in a way that complements nearby River’s Edge Commons Park and reinforces the visual language of downtown. Throughout the process, Mend will also assist in identifying and supporting grant funding opportunities to help realize the vision for Water Tower Historic Park. We are excited about the potential of this project to blend heritage, nature, and community into a beloved and enduring destination. Project Understanding Bottom: Multiple scenes, Elk River Minnesota, 1908. Image Source: LakesnWoods.com Top: Postcard Greetings from Elk River Minnesota Sunset Image Source: Suburban Granola General Store Page 204 of 247 7Water Tower Historic Park Project Approach We will Engage, Envision, and Act Quakertown Park | Denton, TX Page 205 of 247 8 City of Elk River Our approach to the Water Tower Historic Park project is grounded in a clear understanding of the project scope, the distinct historical significance of the site, and the broader context of Elk River. We’ve designed our process and deliverables to support the City’s goals while ensuring that each step of the project is purposeful, inclusive, and well-managed. At the outset, we will present a detailed Project Management Plan that outlines expectations, deliverables, deadlines, and team roles. This plan serves as a shared road-map for transparency and accountability. We propose meeting twice monthly to review progress, address emerging needs, and stay on schedule—ensuring the project remains responsive and on track. We’re particularly energized by projects like this— where history, place, and community intersect. Water Tower Historic Park presents a unique opportunity to explore the layers of Elk River’s past and express them through thoughtful design and interpretation. Our team is committed to a deep exploration of the site’s history, including oral histories and community narratives, while also inviting future-focused thinking that reflects the city’s evolving identity. Our approach is organized into three core phases: Understand, Envision, and Act. Each phase is guided by distinct goals, timelines, and deliverables. Phase 1 - Understand Timeline: June - July 2025 Goal: Evaluate the quality and condition of the existing park, determine community preferences, and identify opportunities to be explored in Phase 2. Tasks: 1.1 Project Kick Off Meeting & Site Tour An in-person kick off meeting and site tour will set the tone for the project, outline goals, and set a level of scope understanding 1.2 Project Management Plan A clear outline of communication and deliverable expectations 1.3 Engagement Plan We will work with you to identify key stakeholders, demographic outreach goals, and engagement strategies 1.4 Bi-Weekly Project Meetings Twice-monthly meetings with the project team to keep things on track and moving forward 1.5 Data Request & Analysis We will collect all relevant data to build our base materials and understanding of the site including historical data including historical, GIS, maintenance and utility data 1.6 Existing Site Analysis Inventory and assessment of the existing site and connections to adjacent sites 1.7 Base Map & Graphic Standards Development of our base map and graphic styling that will be used throughout the project process 1.8 Online Survey and Mapping (1) Virtual opportunity for the community to provide insight and input on the early stages of the design process Deliverables: 1. Project Management Plan 2. Project Engagement Plan 3. Project Website 4. Site Analysis Plan 5. Base Map Project Approach Park visualization for the Lincoln and Londonderry Area in Edina, Minnesota. Image Source: Mend Collaborative Page 206 of 247 9Water Tower Historic Park The Uplands Community Farmers Market. Image Source: Mend Collaborative Phase 2 - Envision Timeline: August - September 2025 Goal: Create, evaluate, and present alternative park concepts that reveal a feasible and inspiring vision— one that enhances historic storytelling, delivers meaningful community benefits, and promotes environmental resilience. Conduct cost analysis and identify potential grant funding opportunities to support implementation. Tasks: 2.1 Bi-Weekly Project Meetings Twice-monthly meetings with the project team to keep things on track and moving forward 2.2 Concept Alternatives (2) Two preliminary, conceptual alternatives for park improvements will be developed and tested against the priorities, goals, opportunities, and constraints identified in Phase 1. Concepts to schematically represent plant, hardscape and historical interpretation. 2.3 Concept Cost Estimates Each Concept Alternative will have a cost estimate to accompany it 2.4 Community Workshop (1) In-person workshop where community members will be encouraged to provide input and feedback on the two concepts 2.5 Preferred Concept Development A singular preferred concept will be refined based on the feedback and input from community members, City staff, and stakeholders 2.6 Grant Funding Opportunity Research & Planning Create a list of opportunities and deadlines for grant opportunities that relate to proposed park improvements Deliverables: 1. Two (2) Conceptual Park Plans 2. Two (2) Conceptual Opinions of Probably Cost 3. Community Engagement Summary 4. Preferred Concept Project Approach Phase 3 - Act Timeline: October 2025 Goal: Develop a realistic, achievable, community- supported park plan at a design development level. Tasks: 3.1 Bi-Weekly Project Meetings Twice-monthly meetings with the project team to keep things on track and moving forward 3.2 Final Recommended Park Plan and Visuals Final plan drawings that includes a detailed site plan, two park renderings, plant and hardscape material selections and a historical interpretation plan 3.3 Market-Based Cost Estimation Final cost estimation for the park vision to provide City staff a reference point for future budgeting and grant writing Deliverables: 1. Final Water Tower Historic Park Plan 2. Cost Estimation 3. Grant Funding Plan Page 207 of 247 10 City of Elk River At Mend Collaborative, public engagement is at the heart of what we do. We believe that a participatory process should be both meaningful and enjoyable, creating space for authentic input while building excitement about what’s to come. Our approach centers on elevating diverse voices and asking thoughtful, intentional questions that guide a project forward with community insight at the core. To kick off this project, we plan to launch a project website—a digital hub where community members can stay informed about the park design process and contribute feedback throughout the project’s duration. We also look for opportunities to meet people where they already are. By aligning with existing city events—like the June–October Farmers Market, Riverfront Concerts, or Elk River Fest— we can engage residents in familiar, lively settings. These touchpoints help us connect with a broader audience and ensure the process reflects the spirit and energy of the community. Meaningful & Fun Engagement Visit engage.mendcollaborative.com/eastside2035 or scan the QR code to stay up to date on opportunities to share your ideas and review plan progress. TELL US YOUR VISION FOR THE FUTURE OF EASTSIDE! Project-branded postcards are a great way to get the word out about new projects in town! Jazz Festival Pop-up in Denton, Texas Folwell Park Pop-up in Minneapolis Upper Cougar Creek ecological explorations Heartland Trail Open House Page 208 of 247 11Water Tower Historic Park At Mend Collaborative, we pride ourselves on guiding projects from vision to implementation— on time, within budget, and with a strong emphasis on feasibility. Our team is deeply committed to delivering plans that don’t just sit on a shelf, but are ready to come to life. A recent example of this is our work with the City of Denton, Texas. We partnered with Cameron Robertson to develop both the City’s Downtown Plan and the Quakertown Park Master Plan. This comprehensive effort was delivered on time and within budget, and culminated in unanimous approval by City Council. Please see Cameron’s contact information under “References” for more on their experience working with our team. Implementation is a key part of our planning process. We actively support our clients in identifying funding sources and strategic partnerships to move their projects forward. At the Northrup King Building in Minneapolis, for instance, we helped secure $750,000 in grant funding from the Mississippi Watershed Management Organization to support innovative stormwater infrastructure and play features. This project is currently under construction! This success exemplifies our team’s ability to not only design great spaces, but also ensure they are financially supported and built. Commitment from Start to Finish Welcome to the Sunset Valley Savanna Trail (Upper Cougar Creek) from plan to construction to reality! Page 209 of 247 12 City of Elk River We are committed to strengthening connections between people, place, and history. Northrup King Building | Minneapolis, MN Project Team Experience Page 210 of 247 13Water Tower Historic Park Landscape Architect Minnesota PLA #59779 Areas of Expertise Landscape Architecture & Design Project Management Implementation and Implementation Strategy Urban Design & Planning Education Master of Landscape Architecture, University of Minnesota Twin Cities Bachelor of Environmental Design, University of Minnesota Twin Cities Experience Mend..................2022-Present Asakura Robinson...2021-2022 Confluence..............2019-2022 Topo........................2016-2019 LHB........................2014-2016 Sandy Meulners-Comstock, PLA is the lead member of the project team who will be the primary contact and have full responsibility for the project. Sandy Meulners-Comstock, PLA Project Manager | Founding Partner As a licensed Landscape Architect in multiple states, Sandy is passionate about applying her experience and skill toward projects that have positive and lasting impacts on communities and the environment. She works at all scales of design, and her work has spanned from large-scale to site-scale planning and implementation. With part of her background coming from design/build, Sandy has a keen eye for details and how things come together, believing in applying sustainability-based practices to the built environment throughout all phases of construction. Sandy also believes in building teams that will support the best project outcomes, and ensuring robust community involvement drives her public space work. She holds a Bachelor of Environmental Design and Master of Landscape Architecture degree from the University of Minnesota Twin Cities, and is a registered Landscape Architect in the state of Minnesota. Fun Fact: Sandy grew up in the area, and has many family members in Elk River! Project Experience Jennifer Lane Park, Quarry Lake Park, Scenic Heights Park, and Windermere Parks* City of Shakopee, MN | Project Designer................................2023-2024 The Uplands City of Sunset Valley | Principal-in-Charge..............................2023-2024 River’s Bend Park Improvements City of Ramsey | Principal-in-Charge..................................2025-Present Folwell Park Implementation City of Minneapolis | Project Manager...................................2023-2024 FAIR School Crystal Schoolyard Crystal, MN | Principal-in-Charge.............................................2024-2025 Shakopee Mdewakanton Sioux Riverfront Master Plan* Shakopee, MN | Project Manager.............................................2019-2020 Cannery District Parks* Eau Claire, WI | Project Designer.......................................................2022 Fireman’s Park* Chaska, MN | Project Manager.................................................2014-2016 * Denotes previous firm experience Contact: email: sandy@mendcollaborative.com phone: 763-218-6999 Page 211 of 247 14 City of Elk River Landscape Designer Areas of Expertise Landscape Design, Planting Design, Illustration, Graphic Design, 3D Visualization Experience Mend..................2023-Present Cuningham..............2018-2023 Community Engagement Lead Areas of Expertise Urban Design, Housing, Small Business, Implementation Experience Mend..................2023-Present Asakura Robinson....2011-2022 Olivia Halsne Landscape Designer | Assistant Project Manager Olivia is an associate landscape designer with a passion for projects that amplify community voices and their connections to place. Growing up exploring and recording the rolling hills of central Wisconsin, Olivia found landscape architecture through a deep connection to the Driftless Region. Olivia is passionate about the stories that landscapes hold, and the profound connections that people have to places. She prioritizes getting to know new sites through community perspectives and voices, as well as on-site, tactile analysis such as photography, seasonal mapping, illustration, and sensory discovery. Curiosity and communication are the driving forces behind Olivia’s design work, and she aims to keep her practice creative, engaging and fun! Fun Fact: Olivia loves illustration and has a knack for bringing spaces to life with her vibrant drawings and expressive paintings! Project Experience Folwell Park Implementation Minneapolis, MN | Designer................................................2023-Present Artspace Northrup King Building Minneapolis, MN | Lead Designer.......................................2018-Present Zakcq Lockrem, AICP Community Engagement Lead | Founding Partner Zakcq Lockrem, AICP, is an urban planner and designer who loves working in the big picture, understanding how complex systems influence people’s lives, and how policy, programs, and physical projects can work together to sustain lasting impact in communities. He most enjoys working with working-class communities as they seek to build greater access to resources and opportunities for themselves and their children, and have more say in the changes that their community is experiencing. Zakcq’s projects have received more than 30 state APA and ASLA awards, and 3 national APA awards. He has lived in Berlin, Boston, Houston, Ho Chi Minh City, and Austin but is happy to have returned to his roots in south Minneapolis. Fun Fact: Zakcq just wrapped up teaching the Civic Engagement Course at the Humphrey School of Public Affairs! Project Experience Rondo Anti-Displacement and Community Investment Strategy Rondo ACDI | Project Manager.................................................2023-2024 Design Downtown Denton City of Denton | Project Manager.............................................2023-2024 Page 212 of 247 15Water Tower Historic Park Ecological Design SITES AP Areas of Expertise Parks, Open Space, Urban Ecology, Conservation Experience Mend..................2023-Present Asakura Robinson....2020-2022 Waterloo Greenway.2018-2022 Michelle Bright Ecologist, Principal In Charge | Founding Partner Michelle Bright is an ecological planner and designer with a background in landscape architecture. With over 17 years of experience with ecological, environmental, and sustainability thinking, her work focuses on inclusive, community led environmental design within the multidisciplinary group of designers, planners, and thought leaders at Mend. Michelle’s work encompasses multiple scales, from detailed plant design to ecological conservation plans to downtown plans to citywide park and open space systems plans. Michelle also engages in teaching and community involvement as an adjunct instructor at the University of Texas and serves on the board of Austin Youth River Watch. Fun Fact: Michelle is a plant and ecology fan! She just finished teaching an advanced plant design course to MLA candidates at University of Texas at Austin. Project Experience The UplandsTravis County | Sustainability Lead..................................2024-Present Travis County Land Management PlanTravis County | Project Manager.......................................2025-Present Sunset Valley Savanna TrailCity of Sunset Valley | Principal-in-Charge............................2023-2025 These client contacts are from recent projects that were delivered on time and on budget. Crystal Passi Folwell Park | Minneapolis, MN Project Manager, Minneapolis Parks Board cpassi@minneapolisparks.org (612) 271 7725 Carolyn Meredith The Uplands | Sunset Valley, TX Public Works Director cmeredith@sunsetvalley.org | (512) 891-9103 Michael Kerski Jennifer Lane Park, Quarry Lake Park, Scenic Heights Park, and Windermere Parks | Shakopee, MN Director of Planning and Development mkerski@shakopeemn.gov | (952) 233-3901 Client References Page 213 of 247 16 City of Elk River Timeframe 2023 - Present Client Minneapolis Park and Recreation Board Team Mend Collaborative, Hunger Skateparks, Loeffler, Elan, Victus The Folwell Park Implementation project, led by Mend Collaborative for the Minneapolis Park and Recreation Board, is a transformative venture in North Minneapolis. Scheduled for construction completion in fall 2024, the updated park spaces will include an all-wheel park alongside crafting inviting community gathering spaces and playgrounds. Mend has offered a myriad of services on the project through landscape architecture engagement, ecology planting, spatial, stormwater, lighting, and safety design. The project boasts a comprehensive Community Engagement process and integrates stormwater design, anticipating future enhancements in phase two. Folwell Park Design and ImplementationMinneapolis, Minnesota X EXISTING DECIDUOUSTREE TO REMAIN EXISTING CONIFEROUSTREE TO REMAIN EXISTING TREE TO BEREMOVED, SEE L1.00REMOVALS SCHEDULE EXISTING TREE TOBE PROTECTED MPRB ARBORISTID: 204290 MPRB ARBORISTID: 195324 MPRB ARBORISTID: 204324 MPRB ARBORISTID: 252035 MPRB ARBORISTID: 204326 MPRB ARBORISTID: 204329 MPRB ARBORISTID: 204330 MPRB ARBORISTID: 195248 MPRB ARBORISTID: 272733 MPRB ARBORISTID: 204327 MPRB ARBORISTID: 204446 MPRB ARBORISTID: 204445 MPRB ARBORISTID: 204425 MPRB ARBORISTID: 204426 MPRB ARBORISTID: 204260 MPRB ARBORISTID: 204427 MPRB ARBORISTID: 204428 MPRB ARBORISTID: 204424 MPRB ARBORISTID: 204422 MPRB ARBORISTID: 204423 MPRB ARBORISTID: 195214 MPRB ARBORISTID: 195215 MPRB ARBORISTID: NO ID MPRB ARBORISTID: 252036 MPRB ARBORISTID: 252068 MPRB ARBORISTID: 195325 MPRB ARBORISTID: 195190 MPRB ARBORISTID: 194990 MPRB ARBORISTID: 195323 MPRB ARBORISTID: 195320 MPRB ARBORISTID: 204444 MPRB ARBORISTID: 204432 MPRB ARBORISTID: 195327 MPRB ARBORISTID: 204421 MPRB ARBORISTID: 195213 MPRB ARBORISTID: 195212 MPRB ARBORISTID: 204430 MPRB ARBORISTID: 204431 MPRB ARBORISTID: 195247 MPRB ARBORISTID: 195243 MPRB ARBORISTID: 195240 MPRB ARBORISTID: 195241 MPRB ARBORISTID: 195242 MPRB ARBORISTID: 195244 MPRB ARBORISTID: 195245 MPRB ARBORISTID: 195246 MPRB ARBORISTID: 204267 MPRB ARBORISTID: 204268 MPRB ARBORISTID: 204266 MPRB ARBORISTID: 204270 MPRB ARBORISTID: 204271 MPRB ARBORISTID: 204269 MPRB ARBORISTID: 204208 MPRB ARBORISTID: 194995MPRB ARBORISTID: 194993 MPRB ARBORISTID: 194994 MPRB ARBORISTID: 194992 MPRB ARBORISTID: 194989MPRB ARBORISTID: 204288 MPRB ARBORISTID: 194988 MPRB ARBORISTID: 204294 MPRB ARBORISTID: 204295 MPRB ARBORISTID: 194985 MPRB ARBORISTID: 195183 MPRB ARBORISTID: 204292 MPRB ARBORISTID: 204206 MPRB ARBORISTID: 204207 X X X X X X X X X X X X XX XXXXXX X X HUNGER SKATEPARKS7438 E LAMPKINS RIDGE RDBLOOMINGTON, IN 47401(812) 322.8044WWW.HUNGERSKATEPARKS.COM ELAN DESIGN LAB310 4TH AVE S, SUITE 1006MINNEAPOLIS, MN 55415(612) 260.7980WWW.ELANLAB.COM VICTUS ENGINEERING2327 WYCLIFF ST, SUITE 230ST. PAUL, MN 55114(612) 859.8299WWW.VICTUSENGINEERING.COM LOEFFLER CONSULTING COMPANY8202 202ND ST. W, SUITE 100LAKEVILLE, MN 55044(952) 955.9199WWW.LOEFFLERCONSTRUCTION.COM DRAWN BY: CHECKED BY: ISSUED FOR: ISSUE DATE: PROJECT NO: SM / OH SM 90% CD REVIEW 03.05.2024 MPRB2301 SEAL / REGISTRATION REVISION DESCRIPTION FOLWELL PARKALL-WHEEL PARK ANDSITE IMPROVEMENTS1615 N DOWLING AVEMINNEAPOLIS, MN 55412 CONSULTANTS: 2744 Lyndale Avenue SouthMinneapolis, MN 55408(763) 218-6999www.mendcollaborative.com 03/05/2024 THESE DOCUMENTS AREI N C O M P L E T E A N D F O RINTERIM REVIEW ONLY. THEYARE NOT TO BE USED FORREGULATORY APPROVAL,P E R M I T T I N G O RC O N S T R U C T I O N .SANDRAMEULNERS-COMSTOCK, RLA REGISTRATIONNO. 59779 NOT FO R CONSTR U C TI O N (CLEAR FOR CITY OF MINNEAPOLISELECTRONIC APPROVAL STAMP) TREE PROTECTION& REMOVALS - SITEL101 1" = 20'-0"0 20'40'1 TREE PROTECTION AND REMOVALS LEGEND : LIMITS OF CONSTRUCTION LIMITS OF CONSTRUCTION LIMITS OF CONSTRUCTION LIMITS OF CONSTRUCTION TREE PRESERVATION AND REMOVALS SCHEDULE: NOTE: SEE TREE PROTECTION AND REMOVALS NOTES AND DETAILS ON SHEET L102P = PRESERVEREMOVE = REMOVE TREE AND STUMP NOTE: TREERELOCATIONS PENDING Youth Engagement Leveraging the MPRB’s partnership with Juxtaposition Arts’ Environmental Lab, Mend and Juxtaposition Arts held a theming workshop where youth participants created an artistic theme for the overall park, “The Wetland Returns”. Construction Documentation The park improvements are to be constructed in summer and fall 2024. Mend led the construction document process, providing a complex dual-bid package that included landscape, the skatepark, civil engineering, and electrical engineering. This project was delivered on-time and on-budget. Tree Preservation and Relocation Thoughtful tree preservation and relocation allowed the project to maintain tree canopy cover, reduce project cost, and limit embodied carbon emissions. Community co-creation and collaboration. Under construction! Page 214 of 247 17Water Tower Historic Park Implementation plan with a cohesive community vision! Timeframe 2024 - Present Client City of Sunset Valley Team Mend Collaborative The Uplands in Sunset Valley, Texas, is rooted in the preservation and celebration of place. Located on a remnant oak savanna, the site is home to a rich ecological history and now serves as a vibrant community gathering space. The Uplands hosts weekly farmers market, and the space is designed to support both the rhythms of this event and the quieter, everyday moments of community life. With flexible gathering areas, shaded seating, and thoughtful circulation, the project balances ecological stewardship with the practical needs of a growing community. It’s a space where local culture, economy, and environment intersect—offering a place to gather, grow, and connect. Final Design and Renderings To help build momentum and gather community and stakeholder support for Uplands, Mend Collaborative produced a series of perspective illustrations and plan renderings that brought the vision for the site to life. These graphics played a critical role in communicating the design intent and securing enthusiasm and buy-in from city officials, local vendors, and residents. Community Workshop The community has a deep investment in this space, and by listening closely and responding with clarity— both through design and the visual tools we created— Mend Collaborative was able to shape a plan that honored the site’s existing role while envisioning its potential as a more resilient and welcoming community space. The Uplands City of Sunset Valley, TX Page 215 of 247 18 City of Elk River Jennifer Lane Park, Quarry Lake Park, Scenic Heights Park, and Windermere Parks* Shakopee, MN Timeframe 2021 Client City of Shakopee Team Confluence Sandy Meulners-Comstock served as the project manager for these park projects, sucessfully delivering them on-budget and on-schedule. Quarry Lake Park and Scenic Heights Park in Shakopee, MN were revisioned play spaces of existing parks, while Jennifer Lane and Windermere Parks allowed for new parks added to the system to set a tone of new playspace typologies in the City, including extensive inclusive play and pathways for play, as well as new amenities within the system, including an edible landscape, scenic viewing tower, and linked greenspaces. * Planning and design work completed while Sandy Meulners-Comstock was employed at Confluence. Pathways for Play Windermere Parks provide for a looped trail system that features play pods along the trail. Each pod has a different play theme: climbing, art, music, water, etc., providing for educational, recreational, and artistic play throughout the development. Inclusive Play Jennifer Lane Park features a new to the system Bankshot court, which allows for inclusive, all- abilities, and communal hoop shooting that provides for a variety of hoop skills challenges for kids. Exciting Additions Multi-generational and exciting ways to interact and observe our natural environment was introduced to the Shakopee park system with an overlook tower in the Windermere Park system at the top of a hill, the skyline of Downtown Shakopee and Downtown Minneapolis as the focus. Experience working with a city of similar size! Page 216 of 247 19Water Tower Historic Park Schedule Eastside Community Gathering | Wilmington, DE Page 217 of 247 20 City of Elk River AugustOctoberSeptemberJulyJune*denotes in-person site visit or community engagement Project Schedule Phase 1 - Understand 1.1 Project Kick Off Meeting & Site Tour* 1.2 Project Management Plan 1.3 Engagement Plan 1.4 Bi-Weekly Project Meetings 1.5 Data Request & Analysis 1.6 Existing Site Analysis 1.7 Base Map & Graphic Standards 1.8 Online Survey and Mapping (1) Phase 2 - Envision 2.1 Bi-Weekly Project Meetings 2.2 Concept Alternatives (2) 2.3 Concept Cost Estimates (2) 2.4 Community Workshop (1)* 2.5 Preferred Concept Development (1) 2.6 Grant Funding Opportunity Research & Planning Phase 3 - Act 3.1 Bi-Weekly Project Meetings 3.2 Final Recommended Park Plan and Visuals 3.3 Market-Based Cost Estimation Page 218 of 247 21Water Tower Historic Park Consultant Cost Fireside Park | Chaska, MN Page 219 of 247 22 City of Elk River Experience Meeting Project Budgets Mend Collaborative has consistently demonstrated a strong track record in managing project budgets effectively within landscape architecture, exemplified by our leadership on the Folwell Park Design and Implementation project in Minneapolis. Serving as the prime consultant for the Minneapolis Park and Recreation Board (MPRB), Mend oversaw a multifaceted team— including specialists in skate park design, civil and electrical engineering, and cost consulting— to deliver a dual-bid construction document package. Our strategic approach emphasized cost efficiency through sustainable design choices, such as reusing on-site materials like concrete slabs and logs, and preserving existing tree canopies to reduce both expenses and environmental impact. These measures not only aligned with the project’s $1.34 million budget but also enhanced its sustainability. Mend’s ability to balance complex design requirements with fiscal responsibility underscores our expertise in delivering high-quality, budget- conscious landscape architecture projects. Project Budget Approach to Budgeting and Bidding Mend Collaborative takes a proactive, detail-oriented approach to budgeting and bidding, grounded in transparency, collaboration, and real-world construction knowledge. From the earliest phases of design, our team develops clear cost frameworks that are regularly updated as the project evolves, allowing clients to make informed decisions that balance vision and budget. We work closely with cost estimators and engineering partners to identify opportunities for cost savings through material reuse, phasing strategies, and efficient detailing—while preserving design integrity and long-term durability. During the bidding phase, we prioritize clarity and constructability in our documents, which helps contractors provide accurate bids and minimizes surprises during construction. Our successful track record, including the Folwell Park project, demonstrates our ability to consistently deliver high-quality landscape architecture within budget, even in complex urban contexts. Page 220 of 247 23Water Tower Historic Park Proposed Project Budget - Not to Exceed Phase 1 1.1 Project Kick Off Meeting & Site Tour $1,840 1.2 Project Management Plan $590 1.3 Engagement Plan $740 1.4 Bi-Weekly Project Meetings $1,040 1.5 Data Request & Analysis $370 1.6 Existing Site Analysis $1,660 1.7 Base Map & Graphic Standards $590 1.8 Online Survey and Mapping (1)$1,110 Phase 2 2.1 Bi-Weekly Project Meetings $1,040 2.2 Concept Alternatives (2)$4,800 2.3 Concept Cost Estimates $1,180 2.4 Community Workshop (1)$2,380 2.5 Preferred Concept Development $3,140 2.6 Grant Funding Opportunity Research & Planning $590 Phase 3 3.1 Bi-Weekly Project Meetings $520 3.2 Final Recommended Park Plan and Visuals $1,920 3.3 Market-Based Cost Estimation $740 Reimbursables Community Engagement Materials $500 Total, not to exceed:$24,750 Hourly Rates Team Member Rate Sandy Meulners, Project Manager $150 Michelle Bright, Principal-in-Charge $180 Olivia Halsne, Project Designer $110 Zakcq Lockrem, Community Engagement Lead $150 Page 221 of 247 24 City of Elk River Thank you! www.MendCollaborative.com 2744 Lyndale Ave S Minneapolis, MN 55408 (763) 218-6999 Page 222 of 247 Page 1 of 9 Standard Agreement For Professional Services 13065 Orono Parkway Elk River, MN 55330 STANDARD AGREEMENT FOR PROFESSIONAL SERVICES THIS AGREEMENT (“Agreement”) is made this 2nd day of June, 2025, between the City of Elk River, Minnesota (“City”), whose business address is 13065 Orono Parkway, Elk River, MN 55330 and Mend Collaborative (“Consultant”) whose business address is 2744 Lyndale Ave S, Minneapolis, MN 55408. PRELIMINARY STATEMENT The City has adopted a policy regarding the selection and hiring of consultants to provide a variety of professional services for City projects. That policy requires that persons, firms, or corporations providing such services enter into written agreements with the City. The purpose of this agreement is to set forth the terms and conditions for the professional services Consultant will provide in connection with the Jackson Street Water Tower Historic Park herein referred to as the “Work”. The City and Consultant agree as follows: 1.Work. The Consultant agrees to provide the professional services described in Exhibit A attached hereto (the “Work”). 2.Time for Performance of Services. The Consultant shall perform the services described in Exhibit A according to the schedule attached as Exhibit B, hereto. 3.Compensation for Services. City agrees to pay the Consultant $24,750 for the Work. Any changes in the scope of the Work which may result in additional compensation due to the Consultant shall require prior written approval by an authorized representative of the City or by the City Council. The City will not pay additional compensation for services that do not have prior written authorization. 4. The City agrees to provide the Consultant with the information required to complete the Work. 5.Method of Payment. The Consultant shall submit itemized bills for professional services performed under this Agreement on a monthly basis. Bills submitted shall be paid in the same manner as other claims made to the City. Page 223 of 247 Page 2 of 9 Standard Agreement For Professional Services 6.Project Manager and Staffing. The Consultant has designated the individual identified in Exhibit C as the Project Manager to serve on the Project. The Project Manager shall be assisted by other staff members as necessary to facilitate the completion of the Project in accordance with the terms established herein. Consultant may not remove or replace the Project Manager without the approval of the City. 7.Standard of Care. Standard of Care. Consultant shall exercise the same degree of care, skill and diligence in the performance of the Work as is ordinarily exercised by members of the profession under similar circumstances in Minnesota. Consultant shall be liable to the fullest extent permitted under applicable law, without limitation, for any injuries, loss, or damages proximately caused by Consultant’s breach of this standard of care. Consultant shall put forth reasonable efforts to complete its duties in a timely manner. Consultant shall not be responsible for delays caused by factors beyond its control or that could not be reasonably foreseen at the time of execution of this Agreement. Consultant shall be responsible for costs or damages arising from unreasonable delays in the completion of the Work. 8.Audit Disclosure. The Consultant shall allow the City or its duly authorized agents reasonable access to such of the Consultant’s books and records as are pertinent to the work performed under this Agreement. Any reports, information, data, etc. given to, or prepared or assembled by, the Consultant under this Agreement which the City requests to be kept confidential shall not be made available to any individual or organization without the City’s prior written approval. All finished or unfinished documents, data, studies, surveys, drawings, maps, models, photographs, and reports prepared by the Consultant shall become the property of the City upon termination of this Agreement, but Consultant may retain copies of such documents as records of the services provided. 9.Term. The term of the Agreement shall be from June 2, 2025, through December 31, 2025, the date of signature by the parties notwithstanding. This Agreement may be extended upon the written mutual consent of the parties for such additional period as they deem appropriate, and upon the terms and conditions as herein stated. 10.Termination. This Agreement may be terminated by the Consultant effective upon sixty (60) days’ written notice delivered to the City at the address written above. The City may terminate this Agreement effective immediately, upon notice to the consultant. Upon termination under this provision, the Consultant shall be paid for services rendered and reimbursable expenses until the effective date of termination. Upon termination, the City may retain another consultant to undertake or complete the Work. 11.Independent Consultant. At all times and for all purposes herein, the Consultant is an independent contractor and not an employee of the City. No statement herein shall be construed so as to find the Consultant an employee of the City. Page 224 of 247 Page 3 of 9 Standard Agreement For Professional Services 12.Non-Discrimination. During the performance of this Agreement, the Consultant shall not discriminate against any employee or applicant for employment because of race, color, creed, religion, national origin, sex, marital status, status with regard to public assistance, disability, or age. The Consultant shall post in places available to employees and applicants for employment, notices setting forth the provision of this non-discrimination clause and stating that all qualified applicants will receive consideration for employment. The Consultant shall incorporate the foregoing requirements of this paragraph in all of its subcontracts for program work, and will require all of its subcontractors for such work to incorporate such requirements in all subcontracts for program work. 13.Assignment. Neither party shall assign this Agreement, nor any interest arising herein, without the prior written consent of the other party. 14.Services Not Provided For. No claim for services furnished by the Consultant not specifically provided for in Exhibit A shall be honored by the City. 15.Severability. The provisions of this Agreement are severable. If any portion hereof is, for any reason, held by a court of competent jurisdiction to be contrary to law, such decision shall not affect the remaining provisions of this Agreement. 16.Entire Agreement. The entire agreement of the parties is contained herein. This Agreement supersedes all oral agreements and negotiations between the parties relating to the subject matter hereof as well as any previous agreements presently in effect between the parties relating to the subject matter hereof. Any alterations, amendments, deletions, or waivers of the provisions of this Agreement shall be valid only when expressed in writing and duly signed by the parties, unless otherwise provided herein. 17.Compliance with Laws and Regulations. In providing services hereunder, the Consultant shall abide by all statutes, ordinances, rules and regulations pertaining to the provisions of services to be provided. The Consultant and City, together with their respective agents and employees, agree to abide by the provisions of the Minnesota Data Practices Act, Minnesota Statutes Section 13, as amended, and Minnesota Rules promulgated pursuant to Chapter 13. Any violation of statutes, ordinances, rules and regulations pertaining to the services to be provided shall constitute a material breach of this Agreement and entitle the City to immediately terminate this Agreement. 18.Waiver. Any waiver by either party of a breach of any provision of this Agreement shall not affect, in any respect, the validity of the remainder of this Agreement. 19.Indemnification. Consultant agrees to defend, indemnify and hold harmless the City and its officials, employees and agents from any liability, claims, damages, costs, losses judgments, or expenses, including reasonable attorney’s fees, to the extent resulting from a negligent act or omission (including without limitation professional errors or omissions) of the Consultant, its agents, employees, or subcontractors in the performance of the services provided by this Agreement and against all losses by Page 225 of 247 Page 4 of 9 Standard Agreement For Professional Services reason of the failure of said Consultant fully to perform, in any respect, all obligations under this Agreement. 19. Insurance. Commercial General Liability. Consultant shall obtain the following minimum insurance coverage by a single policy or a combination of policies (including umbrella policies) and maintain it at all times throughout the life of the Contract, with the City endorsed as an additional insured: Bodily Injury: $2,000,000 each occurrence $2,000,000 aggregate, products and completed operations Property Damage: $2,000,000 each occurrence $2,000,000 aggregate Business Automobile Liability (owned, non-owned, hired): Bodily Injury & Property Damage: $2,000,000 each occurrence $2,000,000 each accident OR $2,000,000 Combined single limit The Additional Insured coverage must be primary and non-contributory. Consultant shall continue to provide evidence of such coverage to City on an annual basis during the aforementioned period; or if any reason Consultant’s work ceases before final payment, for a minimum period of three (3) years from the date Consultant ceases work. Coverages must be equivalent to that provided by ISO Forms CG 20 10 04 13 and CG 20 37 04 13. Consultant shall submit a Certificate of Insurance to the City showing proof of the above- required insurance prior to doing any work. The City retains the right to revise the insurance requirements depending on the size and risk of the project. 20.Records Access. The Consultant shall provide the City access to any books, documents, papers, and records which are directly pertinent to the specific contract, for the purpose of making audit, examination, excerpts, and transcriptions, for three years after final payments and all other pending matters related to this contract are closed. Page 226 of 247 Page 5 of 9 Standard Agreement For Professional Services 21.Ownership of Documents. All plans, diagrams, analyses, reports, maps, digital files, and information generated in connection with the performance of the Agreement (“Information”) shall become the property of the City. The City may use the Information for its purposes and the Consultant also may use the Information for its purposes. Reuse of the Information for the purposes of the project contemplated by this Agreement (“Project”) does not relieve any liability on the part of the Consultant, but any reuse of the Information by the City or the Consultant beyond the scope of the Project is without liability to the other, and the party reusing the Information agrees to defend and indemnify the other from any claims or liability resulting therefrom. Final Documents shall be submitted in PDF format. Notwithstanding the foregoing, Consultant retains all title and interest in all its standard details, plans, specifications, and engineering computation documents (“Previously Created Works and Documents”), whether in written or electronic form, which have been incorporated into the deliverables and documents provided to City, but which were developed by Consultant independent of this Agreement. Consultant issues to City a royalty-free, non-exclusive, and irrevocable license to use the Previously Created Works and Documents for the Project. 22.Subcontractor. The Consultant shall not enter into subcontracts for services provided under this Agreement except as noted in Exhibit A, without the express written consent of the City. The Consultant shall pay any subcontractor involved in the performance of this Agreement within the ten (10) days of the Consultant’s receipt of payment by the City for undisputed services provided by the subcontractor. If the Consultant fails within that time to pay the subcontractor any undisputed amount for which the Consultant has received payment by the City, the Consultant shall pay interest to the subcontractor on the unpaid amount at the rate of 1.5 percent per month or any part of a month. The minimum monthly interest penalty payment for an unpaid balance of $100 or more is $10. For an unpaid balance of less than $100, the Consultant shall pay the actual interest penalty due to the subcontractor. A subcontractor who prevails in a civil action to collect interest penalties from the Consultant shall be awarded its costs and disbursements, including attorney’s fees, incurred in bringing the action. In addition, no subcontractor can file a lien against the City. 23.Dispute Resolution/Mediation. Each dispute, claim or controversy arising from or related to this Agreement or the relationships which result from this Agreement shall be subject to mediation as a condition precedent to initiating arbitration or legal or equitable actions by either party. Unless the parties agree otherwise, the mediation shall be in accordance with the Commercial Mediation Procedures of the American Arbitration Association then currently in effect. A request for mediation shall be filed in writing with the American Arbitration Association and the other party. No arbitration or legal or equitable action may be instituted for a period of ninety (90) days from the filing of the request for mediation unless a longer period of time is provided by agreement of the parties. Cost of mediation shall be shared equally between the parties. Mediation shall be held in the City of Elk River unless another location is mutually agreed upon by the parties. The parties shall Page 227 of 247 Page 6 of 9 Standard Agreement For Professional Services memorialize any agreement resulting from the mediation in a Mediated Settlement Agreement, which Agreement shall be enforceable as a settlement in any court having jurisdiction thereof. 24.Conflicts. No salaried officer or employee of the City and no member of the City Council of the City shall have a financial interest, direct or indirect, in this Agreement. The violation of this provision renders the Agreement void. Any federal regulations and applicable state statutes shall not be violated. 25.Counterparts. This Agreement may be executed in multiple counterparts, each of which shall be considered an original. 26.Governing Law. This Agreement shall be controlled by laws of the State of Minnesota. Executed as of the day and year first written above. City of Elk River Company ______________________________ By:_________________________________ Mayor ______________________________ Its:_________________________________ City Clerk Page 228 of 247 Page 7 of 9 Standard Agreement For Professional Services Exhibit A Page 229 of 247 Page 8 of 9 Standard Agreement For Professional Services Exhibit B Page 230 of 247 Page 9 of 9 Standard Agreement For Professional Services Exhibit C Project Manager Sandy Muelners-Comstock, PLA Mend Collaborative Phone: 763-218-6999 Email: sandy@mendcollaborative.com Page 231 of 247 The Elk River Vision A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and community engagement that encourages and inspires prosperity Request for Action To City Council Item Number 8.4 Meeting Date June 2, 2025 Prepared By Joe Stremcha, Business Services Director/Assistant City Administrator Item Description Appoint Community Event Center Commissioners Reviewed by Katie Harstad Cal Portner Tina Allard Action Requested Approve, by motion, the following appointments: (1) Jim Hecker as a city resident and member in good standing of the Elk River senior center with a term ending 2/28/27. (2) Councilmember Beyer as a sitting member of the city council with a term ending 12/31/28. (3a) Mike Westgaard as an at-large resident representative with a term ending 2/28/26. (3b) Jeb Kotzian or Kara Walker as an at-large non-resident as a non-business owner or worker (full-time) within the city limits representative with a term ending 2/28/26. (3c) Advertise as a vacancy - at-large resident or non-resident as a business owner or worker (full-time) within the city limits representative with a term ending 2/29/28. Background/Discussion The City Council established the following at their May 19 Regular Meeting. The commission shall consist of five members appointed by the Council, to include: (1) A city resident and member in good standing of the Elk River senior center. (2) A sitting member of the City Council. (3) Three at-large residents of the community with preference given to city residents, but residency by itself shall not be disqualified. Up to two representatives do not need to be residents of the City of Elk River, but at least one of them must own a business or work (full-time) within the city limits while serving on the commission at any one time. Financial Impact None. Mission/Policy/Goal Appropriately govern in an ever-changing environment. Page 232 of 247 Attachments None Page 233 of 247 The Elk River Vision A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and community engagement that encourages and inspires prosperity Request for Action To City Council Item Number 8.5 Meeting Date June 2, 2025 Prepared By Jolene Richter, Deputy Clerk Item Description Liquor License Renewal: The Confluence LLC dba Edge Bar & Boutique Reviewed by Cal Portner Tina Allard Action Requested Approve, by motion, the 2025-2026 liquor license renewal of an On-Sale 3.2% License with strong beer permission and a Wine License to The Confluence LLC dba Edge Bar & Boutique valid through June 30, 2026. Background/Discussion Liquor licenses run July 1 through June 30. Financial Impact N/A Mission/Policy/Goal Elk River Mission Attachments None Page 234 of 247 The Elk River Vision A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and community engagement that encourages and inspires prosperity Request for Action To City Council Item Number 8.6 Meeting Date June 2, 2025 Prepared By Item Description Pinewood Contract for Deed Amendment, Agreement 2025-11 Reviewed by Cal Portner Tina Allard Action Requested Approve, by motion, an amendment to the Pinewood Golf Course Contract For Deed Agreement 2025-11. Background/Discussion The City of Elk River sold Pinewood Golf Course to Baer Necessities, LLC in a Contract for Deed in 2021 with a 15-year repayment schedule at 4% interest. In early April, Pinewood was severely damaged by vandalism, and the owner, Jennifer Abrahamson, has been unable to get the course into playing condition, creating a significant loss of revenue. Mayor Dietz proposed, and the Council consented to amend the contract to delay her 2025 principal payment. The city attorney's office drafted an amendment that provides for an interest-only payment in 2025, with the principal payment moved to the end of the contract, adding a sixteenth payment. Three full payments have been made, with the interest due on August 1, 2025, and the final payment on August 1, 2037. Financial Impact There is no financial impact except for the deferred principal payment. Mission/Policy/Goal Elk River Mission Statement Attachments 1. 6-2-25 Pinewood Revised Contract for Deed 2. J. Abrahamson Request Letter 3. DOCS-#235855-v2-Amendment_to_Contract_for_Deed_Baer_Necessities__LLC Page 235 of 247 Purchase Price $420,000.00 Down Payment 100,000.00 Principal Balance 320,000.00 Annual Interest 4.00%Fund 225 Term (years)15 Payment 28,781.15 Beginning Principal Annual Date Balance Principal Interest Payment Paid August 1, 2022 $320,000.00 $15,981.15 $12,800.00 $28,781.15 8/10/22 August 1, 2023 304,018.85 $16,620.40 12,160.75 $28,781.15 9/13/23 August 1, 2024 287,398.45 $17,285.21 11,495.94 $28,781.15 8/8/24 August 1, 2025 270,113.24 $0.00 10,804.53 $28,781.15 August 1, 2026 270,113.24 $17,976.62 10,804.53 $28,781.15 August 1, 2027 252,136.62 $18,695.69 10,085.46 $28,781.15 August 1, 2028 233,440.93 $19,443.51 9,337.64 $28,781.15 August 1, 2029 213,997.42 $20,221.25 8,559.90 $28,781.15 August 1, 2030 193,776.17 $21,030.10 7,751.05 $28,781.15 August 1, 2031 172,746.07 $21,871.31 6,909.84 $28,781.15 August 1, 2032 150,874.76 $22,746.16 6,034.99 $28,781.15 August 1, 2033 128,128.60 $23,656.01 5,125.14 $28,781.15 August 1, 2034 104,472.59 $24,602.25 4,178.90 $28,781.15 August 1, 2035 79,870.34 $25,586.34 3,194.81 $28,781.15 August 1, 2036 54,284.00 $26,609.82 2,171.33 $28,781.15 August 1, 2037 27,674.18 $27,674.18 1,106.94 $28,781.12 August 1, 2038 (0.00) Total All Payments $320,000.00 $122,521.75 $460,498.37 Contract for Deed Pinewood Golf Course Page 236 of 247 Page 237 of 247 1 235855v2 AMENDMENT TO CONTRACT FOR DEED THIS AMENDMENT TO CONTRACT FOR DEED (“Amendment”) is made as of __________, 2025, by City of Elk River, a Minnesota municipal corporation (“Seller”) and Baer Necessities, LLC, a Minnesota limited liability company (“Purchaser”). Recitals A. Seller and Purchaser entered into that certain Contract for Deed dated August 9, 2021, and recorded August 19, 2021, as Document No. 59537 in the Office of the Registrar of Titles for Sherburne County, Minnesota (the “Contract”). B. Seller and Purchaser desire to amend the terms of the Contract. Terms 1. Revised payment schedule. The parties agree to amend the Contract by substituting the following for section 4 of the Contract: 4. Purchase Price. Purchaser shall pay to Seller at City of Elk River, 13065 Orono Parkway, Elk River Minnesota 55330, Attn: City Administrator, the sum of Four Hundred Twenty Thousand and 00/100 ($420,000.00) as and for the purchase price (the “Purchase Price”) for the Property, payable as follows: Seller acknowledges that, as of the date of this Amendment, Seller has received a total of $186,343.45 in payments from Seller, including $149,886.76 in principal and $36,456.69 as interest. Purchaser agrees to pay the remaining balance of $270,113.24, together with accrued interest in the amount of four (4%) per annum over twelve (12) years as follows: Page 238 of 247 2 235855v2 (i) Purchaser shall make an interest-only payment of $10,804.53 to Seller on or before August 1, 2025. (ii) The principal balance and accrued interest shall be paid according to an amortized schedule. The annual payment of principal and interest shall be divided in twelve (12) equal installments and each installment shall be paid by Purchaser to Seller on August 1 of each year beginning in 2026. (iii) The entire principal balance of the Contract for Deed, together with all accrued interest thereon and less any payments previously made, shall be due and payable in full on August 1, 2038. (iv) Interest shall first be deducted from each payment and the balance of the payment shall be applied to reduce the principal balance of this Contract for Deed. (v) If any payment is not received by Sellers when due, Purchasers shall pay a late fee in the amount of Ten and no/100 ($10.00) Dollars per day until the delinquent payment is paid in full. 2. Not residential property. Seller and Purchaser agree that the property described in the Contract is not residential property within the meaning of Minn. Stat. § 559A.01. 3. Contract Reaffirmed. Except as expressly amended by this Amendment, the Contract remains in full force and effect. [signature pages follow] Page 239 of 247 3 235855v2 Purchaser Signature Page Purchaser Baer Necessities, LLC, a Minnesota limited liability company By Jennifer J. Abrahamson Its: Chief Manager STATE OF MINNESOTA ) ) SS. COUNTY OF __________ ) This instrument was acknowledged before me on _____________, 2025, by Jennifer J. Abrahamson, as Chief Manager of Baer Necessities, LLC, a Minnesota limited liability company, on behalf of the company. (Stamp) Notary Public My commission expires: Page 240 of 247 4 235855v2 Seller Signature Page Seller City of Elk River, a Minnesota municipal corporation By John Dietz Its: Mayor By Tina Allard Its: City Clerk STATE OF MINNESOTA ) ) SS. COUNTY OF SHERBURNE) This instrument was acknowledged before me on _____________, 2025, by John Dietz and Tina Allard, as mayor and city clerk, respectively, of the City of Elk River, a Minnesota municipal corporation, on behalf of the corporation. (Stamp) Notary Public My commission expires: THIS INSTRUMENT DRAFTED BY: Campbell Knutson, P.A. 860 Blue Gentian Road, Suite 290 Eagan, Minnesota 55121 Page 241 of 247 The Elk River Vision A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and community engagement that encourages and inspires prosperity Request for Action To City Council Item Number 8.7 Meeting Date June 2, 2025 Prepared By Jolene Richter, Deputy Clerk Item Description Discuss Work Session Items Reviewed by Cal Portner Tina Allard Action Requested Review work session items listed below and identify future work session topics. Background/Discussion Work sessions will be added to the end of regular meetings on the first and third Mondays as needed. At the first Council meeting of each month, staff will present a list of future work session topics for Council review. The proposed work session topics are as follows: ▪ Fire Station 1 Facility Funding (after legislative session) ▪ Public Safety Grant Expenditure update ▪ Review of zoning north of 197th Ave and the gravel mining area following Highway 169 construction ▪ Update of traffic light timing along Highway 169 ▪ City Mission and Vision Review Financial Impact N/A Mission/Policy/Goal Responsibly grow, meet changing needs (agile), and ethical, efficient, and responsible. Attachments None Page 242 of 247 The Elk River Vision A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and community engagement that encourages and inspires prosperity Request for Action To City Council Item Number 9.1 Meeting Date June 2, 2025 Prepared By Jolene Richter, Deputy Clerk Item Description Council Liaison Updates Reviewed by Cal Portner Tina Allard Action Requested Councilmembers to provide liaison updates. Background/Discussion The Mayor and Councilmembers serve as liaisons to multiple committees and commissions. The first meeting of the month provides an opportunity for the Council to provide updates on the work of those committees and commissions. ▪ Community Event Center Commission – CM Beyer ▪ Heritage Preservation Commission – CM Calva ▪ Parks and Recreation Commission – CM Grupa ▪ Planning Commission – CM Wagner ▪ Housing and Redevelopment Authority - Mayor Dietz ▪ Utilities Commission – Mayor Dietz ▪ Region 7W – Mayor Dietz Other Committees, Commissions, etc. Financial Impact None Mission/Policy/Goal Elk River Mission Attachments None Page 243 of 247 The Elk River Vision A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and community engagement that encourages and inspires prosperity Request for Action To City Council Item Number 11.1 Meeting Date June 2, 2025 Prepared By Justin Femrite, Public Works Director/Chief Engineer Item Description 165th Avenue and Trunk Highway 10 Access Improvements Reviewed by Cal Portner Tina Allard Action Requested Discuss Proposed Cost Share Agreement Background/Discussion We have been unsuccessful in finding outside funding for the required modifications at the intersection of TH 10/169 and 165th Avenue to support the access needs for the proposed Oakwater Ridge development. Discussion will surround the proposed cost split as put forth by Capstone in the attached memo. Financial Impact NA Mission/Policy/Goal Responsibly Grow Attachments 1. Capstone and Elk River - 165th Cost Share Proposal Page 244 of 247 Re: Cost Share 165th and Specht Farm Road Access History: The City of Elk River, representatives of MNDOT District 3 and Metro, SSTS traffic engineers and Capstone Homes, held several meetings to address access concerns to Highway 10 and solutions for improvements to the access at 165th. A formal traffic study was concluded and submitted to MNDOT and the City of Elk River on March 19th, 2025. Attached as Exhibit A to this letter you will find the draft design for 165th, Specht Farm Road and Highway 10 as a result of the early 2025 meetings. Exhibit B is the Intersection Control Evaluation (ICE) letter that was prepared with MNDOT as a response to the Traffic Impact Study which was also submitted in March. The formal recommendation for the access to 165th and Specht Farm Road is to install a “interim access for the residential development” which includes converting the “existing side street (165th) stop control intersection to a Reduced Conflict Intersection (RCI) with mainline left turns allowed.” Highway Safety Improvement Project 2027: MNDOT Metro District, with funding from the federal safety improvement fund, is planning to reconstruct all the remaining Highway 10 crossings from the Armstrong overpass Ramsey up through Jarvis in Elk River. These improvements will mean that 165th and Specht Farm Road will be the last remaining crossing that will not be improved. Capstone and City of Elk River met with MNDOT representatives and Senator Lucero at the State Senate building to discuss options through the legislative bodies that would include 165th/Specht Farm Road in this improvement. We were not successful in finding either funds or a willingness to add 165th/Specht Farm Road to the project. In addition to our efforts with MNDOT and the local Legislatures, with the support of the City of Elk River, a submission was made to the Federal House Legislature to receive grant funding through the 2025/26 appropriations bill. We received notice on May 16th that the application was not selected for this year’s bill . All State and Federal funding resources that we are aware of have been exhausted which means we will need to redirect our efforts to the local level to meet the improvement requirements for both 165th and Specht Farm Road, with the goal of completion in 2026. Proposal Summary: Capstone and City of Elk River staff have begun the process of finding alternative solutions to fund and improving the existing 165th access in addition to the Specht Farm Road access. Capstone has agreed to increase our contribution to 50% of the cost of the improvement, which covers the new developments portion of improvements. This will remove the city’s concern of contribution to development, leaving the improvement costs for the existing 165th access as the only focus of the city. As the City and Capstone continue working on this access, any funds sourced outside of the city funds should be redirected to equally offset the overall cost of the Safety Improvements. The table below illustrates the Cost Share using current proposals received by the City of Elk River on May 15th. Engineering Improvement Total Investment City of Elk River (50%) $137,500 $500,000 $637,500 Capstone Homes Inc. (50%) $137,500 $500,000 $637,500 Total Project Cost $275,000 $1,000,000 $1,275,000 Page 245 of 247 Exhibit A Page 246 of 247 Exhibit B Page 247 of 247