Loading...
6.1e ERMUSR 07-08-2025______________________________________________________________________________ Page 1 of 1 UTILITIES COMMISSION MEETING TO: ERMU Commission FROM: Thomas Geiser – Operations Director MEETING DATE: July 8, 2025 AGENDA ITEM NUMBER: 6.1e SUBJECT: Staff Update ACTION REQUESTED: None DISCUSSION: • Working through the second round of maps for the new GIS mapping system that we plan to move forward with in the future. Maps 1 through 71 are complete. • Still working through the lack of communication and action regarding the reclosers that were recalled. We continue to wait for our 30 units to be repaired. • Staff and I are working through ERMU’s Disaster Recovery Plan. • Staff and I are working through ERMU’s spill prevention plan at all substation locations with DGR Engineering. • Staff and I are working on ERMU’s substation and well security measures. • Working with Minnesota Municipal Power Agency on their landfill gas project. • Working through future development plans. • Working with Altec on Digger #9 and Bucket #5 drawings. • Working with an electrician and DGR Engineering on Jonny Pops upgrade needs. • Working with Leidos on Comcast and Verizon pole attachment reviews. 85