DISCUSSION:
• Working through the second round of maps for the new GIS mapping system that we
plan to move forward with in the future. Maps 1 through 71 are complete.
• Still working through the lack of communication and action regarding the reclosers that
were recalled. We continue to wait for our 30 units to be repaired.
• Staff and I are working through ERMU’s Disaster Recovery Plan.
• Staff and I are working through ERMU’s spill prevention plan at all substation locations
with DGR Engineering.
• Staff and I are working on ERMU’s substation and well security measures.
• Working with Minnesota Municipal Power Agency on their landfill gas project.
• Working through future development plans.
• Working with Altec on Digger #9 and Bucket #5 drawings.
• Working with an electrician and DGR Engineering on Jonny Pops upgrade needs.
• Working with Leidos on Comcast and Verizon pole attachment reviews.