Loading...
6.1g ERMUSR 07-08-2025______________________________________________________________________________ Page 1 of 1 UTILITIES COMMISSION MEETING TO: ERMU Commission FROM: Mike Tietz - Technical Services Superintendent MEETING DATE: July 8, 2025 AGENDA ITEM NUMBER: 6.1g SUBJECT: Staff Update ACTION REQUESTED: None DISCUSSION: • In June, the locators processed 540 locate tickets. These consisted of 450 normal tickets, 2 emergency tickets, 60 updated tickets, 9 meetings, 2 planning, 4 boundary surveys, and 13 cancellations. This resulted in a 4.6% decrease in tickets from the previous month and a 25.9% increase from the prior June. • In June, the electrical technicians completed 467 service order tasks, updated the power bill, addressed customer meter issues and any off-peak concerns. • The AMI residential water meters and residential electric meters continue to be installed in new services. The electrical technicians have been busy changing out AMR meters to AMI meters for small non-demand commercial customers. We did receive some of our RMA/Warranty meters back from Sensus. We have approximately 5,532 (97%) water meters and 12,441 (88%) electric meters that are installed within the system. Overall, the AMI project is approximately 91% completed. • Review of foundation drawings for East substation have been completed and contract documents for concrete work has been released for bids. The fencing contractor will begin installation in August and will return to complete the remaining fence work after the foundations have been poured. • We have been working with WEG on the East transformer’s Load Tap Changer (LTC) to make sure it matches the Otsego transformer. Conduit and ground grid installation will take place early this winter, with assembly of the structures being built over the winter by ERMU staff. Commissioning of the substation should be completed by September 1. • Our monthly peak was 66.15 MW on June 22, at 4:50pm. 87