Loading...
8.2 SR 07-07-2025The Elk River Vision A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and community engagement that encourages and inspires prosperity Request for Action To City Council Item Number 8.2 Meeting Date July 7, 2025 Prepared By Justin Femrite, Public Works Director/Chief Engineer Item Description Agreement 25-16: Cost Sharing for the TH 10 and 165th Avenue Intersection Improvements with Capstone Reviewed by Justin Femrite Cal Portner Tina Allard Action Requested Approve, by motion, Agreement 25-16 Capstone Homes, agreeing to 50% of the costs associated with engineering services for the preliminary and final design of the proposed improvements. Approve, by motion, the execution of a professional services contract with Bolton & Menk, Inc. for $258,751 for engineering services associated with the work detailed in the cost share agreement. Background/Discussion As discussed over the last several months in the planning process for the Oakwater Ridge development along TH 10, the city has been provided the opportunity to participate in safety improvements along the TH 10/169 corridor at the intersection of 165th Avenue. The State of Minnesota continues to apply its funding resources to other priorities and is not in a position to participate. As part of the needs for the development on the west side of the highway, the developer has proposed a 50% cost split for the full improvement costs, asking for consideration by the city to cover the costs of the current city-owned intersection leg at 165th Avenue. It is intended to enter into the agreement at this time, ahead of an executed Development Agreement, to allow for the design work to begin in anticipation of construction beginning in late 2026. Financial Impact Funding commitments associated with the current actions would obligate the City to $137,500 in professional services costs. Added costs for construction would be considered and obligated under future approvals upon bidding for the construction work. Funding would come from our State Aid construction account. Mission/Policy/Goal Meet Changing Needs - Agile Attachments 1. Elk River - Capstone Cost Share for Hwy 10 improvements - Capstone Signed Page 252 of 309 2. Bolton & Menk Proposal Page 253 of 309 Page 254 of 309 Page 255 of 309 Page 256 of 309 Page 257 of 309 Page 258 of 309 7533 Sunwood Drive NW Suite 206 Ramsey, MN 55303 Phone: (763) 433-2851 Bolton-Menk.com May 15, 2025 Justin Femrite, P.E. Public Works Director/Chief Engineer City of Elk River 13065 Orono Parkway Elk River, MN 55330 RE: Proposal for TH 10/169 and 165th Avenue J-Turn Improvements Dear Justin: We understand the City of Elk River has been working with Capstone Homes on a large development along TH 10/169 and have had a Traffic Impact Study completed by S2 Traffic Solutions. This study determined a ¾ J-Turn with signals added at the 165th Avenue intersection and at the south U-turn could be a feasible intersection improvement for the future development traffic loads. It was identified that these signals will impact corridor mobility on TH 10/169 and recommended an Intersection Control Evaluation (ICE) report be completed to verify the specific improvements needed. This proposal is to take the J-Turn from concept to final construction. To have this project delivered in an efficient and timely way, you will need a team of engineers that have a history of completing this type of work and has relationships with the interested parties. We understand what needs to be accomplished for the successful completion of this J-Turn project. Proven and Experienced Team – Our Bolton & Menk team is a collaborative group of industry experts. We have experience in completing ICE reports and delivering J-Turn projects that meet MnDOT requirements. We have an extensive history of applying our expertise in traffic engineering, preliminary and final design, and construction related projects like this. I recently led a team in working with MnDOT District 3 to complete the TH 65 & Cajima J-Turn in Isanti under an aggressive schedule. Understanding of Project Constraints – We’ve done our homework and understand the primary challenges of this project, including the desire to complete this J-Turn in 2026 and evaluate the need for the addition of signals. Our initial understanding of design challenges and understanding of the MnDOT approval process will help keep project costs down and save you valuable time and resources. We will lead the City through the study and design, listening to stakeholder concerns and incorporating their ideas while pushing for a fast project delivery. Responsive and Transparent Communication – Active project communication is key to ensure all parties agree, unexpected changes are addressed early, and budget and scope is managed effectively. We will strive to achieve a shared project vision by the end of the ICE report development which will be essential for efficiency moving forward. Our project communication approach will set expectations early in the project and allow us to keep vested parties informed. In continued service to the City of Elk River, we are excited at the opportunity to complete this J-Turn project. I will serve as your lead client contact and project manager. Please contact me at 763-200-2444 or Jason.Cook@bolton-menk.com if you have any questions regarding our proposal. Respectfully submitted, Bolton & Menk, Inc. Jason Cook, P.E. Principal Engineer Page 259 of 309 U S 1 0 & 1 6 5 th J -T u r n I m p r o v e m e n t s | E l k R i v e r B O L T O N & M E N K | 1 SCOPE OF SERVICES Bolton & Menk, Inc. will complete the following scope of work: Task 1: Project Management One of the most significant project components is establishing a strong project management process to ensure all work is coordinated with the City and MnDOT. We will schedule all meetings, complete all agendas, maintain meeting records, and offer regular updates on next steps and upcoming study and design requirements. 1.1 Quality Control Bolton & Menk has developed and implemented a comprehensive quality assurance and quality control (QA/QC) program that systematically and dramatically reduces the potential for issues. Routine product reviews are an integral part of the quality control process, which effectively target concepts, constructability, environmental impact, public impact, and economic engineering issues. Task 1 Deliverables: Regular communication with project partners, schedule and updates, QA/QC review, schedule meetings Task 2: Public and Agency Involvement Our team will develop and lead an effective and appropriately scaled public engagement plan. An effective public process develops an understanding of values, expectations, and desired outcomes of the public, while incorporating those elements into the project. Effective communication with stakeholders will ensure public expectations align with agency responsibilities and actions. 2.1 Agency Coordination Meetings Bolton & Menk will lead up to two agency coordination meetings. Feedback gathered at these meetings will help us understand individual agency perspectives at key milestones and ensure the city and MnDOT are informed on all decisions related to the J-Turn design and ICE study. 2.2 Public Meeting Bolton & Menk will work with city staff on the public involvement plan and attend informational meetings to identify key project issues and concerns from adjacent property owners and stakeholders. This information will be incorporated into the design. We plan to provide resources for the following meetings: • Two city council meetings • Two neighborhood meetings Task 2 Deliverables: Meeting attendance, agendas and minutes, public meeting summary, displays, graphics, presentations Phase 1: ICE Study and Preliminary Design Task 3: ICE Study Bolton & Menk will complete an ICE study to review intersection alternatives for the intersection of TH 10/169 & 165th Avenue intersection. The initial Traffic Impact Study completed the initial evaluation of the intersection. We will focus on confirming the recommendation of a ¾ J-Turn with a signal needed at the 165th Avenue intersection as well as a signal at the south U-turn. We will try and identify variations that best accommodate traffic, all while keeping a close eye on project costs. If signals are found to be needed, we will attempt to determine if they would be needed initially, or if they could be installed in the future once the Level of Service reaches unacceptable levels. We will also verify with MnDOT that these signals would be allowed. Considering the addition of signals is a significant project cost add, we have separated our fees to only include the addition of signals if they are required with the initial installation. Bolton & Menk will study a variety of improvements with consideration of design vehicle wheel paths, private accesses, environmental impacts, and queue lengths. The ICE study will be completed to meet MnDOT requirements for approval. Task 3 Deliverables: ICE study report, high-level conceptual alternatives, cost estimates Page 260 of 309 U S 1 0 & 1 6 5 th J -T u r n I m p r o v e m e n t s | E l k R i v e r B O L T O N & M E N K | 2 Task 4: Preliminary Design 4.1 Finalize Concept Development We will expand upon and finalize the recommended concept established within the ICE study. Our team will review the general footprint, operations, capacity, property impacts, and access conditions. We will balance efforts to accommodate the appropriate design vehicle based on direction from MnDOT with the need to minimize impacts and project costs. Our team will also complete an iterative design process to finalize construction limits. 4.2 Preliminary Drainage Design Our team will assess existing surface water management features. Drainage areas and inplace facilities will be mapped to understand patterns. We will determine surface water drainage, ponding, and erosion control measures needed with modifications to the existing environment. We will create the required drainage report to meet State Aid requirements verifying spread and pipe capacity are met. The project is not anticipated to create more than 1 acre of impervious so it shouldn’t require treatment per the City’s MS4 or State standards. If MnDOT requires additional permitting or rate control, these additional services could be determined based on any added requirements. 4.3 Evaluate Potential Construction Staging/Traffic Control Plan During the preliminary design process, our team will analyze how to best construct this J-Turn. We will estimate project working days, create staging concepts, and identify potential traffic control concepts. We will also work with the project team to reach a decision on staging. 4.4 Topographic Survey We will perform field control survey and create a base map identifying existing above and below ground infrastructure features in electronic format. This base map will be used as the basis and background for final design. We will also fly a drone over the site which will produce a georeferenced orthomosaic image. 4.5 Prepare Geometric Layout Once the concept development process is finalized, we will develop a Level 1 Geometric Layout (30% design level), including plan, profile, cross sections, and construction limits for review and approval by MnDOT and the City. 4.6 Prepare Environmental Documents Once the concept development process is finalized, we believe an ENM Summary table will be needed. This is following the MnDOT TPDP Environmental Document Decision Tree. The environmental document will begin with the submittal of the early notification memo to MnDOT function groups for their review. If they determine a programmatic Catex is needed, we would complete that as additional services. 4.7 Identify Right-of-Way Needs Based on the geometric layout and staging analysis, we will determine if any additional right-of-way or easements are needs. 4.8 Cost Estimates We will prepare an engineer’s cost estimate with the final geometric layout. Our preliminary estimate for the construction cost of a J-Turn without signals is approximately $700,000. If the ICE report confirms the TIS recommendation that signals are needed at the 165th intersection as well as the south U-Turn we estimate that would add approximately $1,250,000 to the construction cost for a total of $1,9- 2,000,000. Task 4 Deliverables: Final concept, preliminary design, cross sections, profiles, typical sections, preliminary drainage plan, cost estimates, construction limits, Level 1 Geometric Layout, ENM summary table Phase 2: Final Design and Delivery Task 5: Final Design We will complete the detailed design of the proposed improvements consistent with City and MnDOT state aid design requirements, and in accordance with all state laws, rules, and regulations. Page 261 of 309 U S 1 0 & 1 6 5 th J -T u r n I m p r o v e m e n t s | E l k R i v e r B O L T O N & M E N K | 3 5.1 Final Design Plans Bolton & Menk will produce detailed comprehensive construction plans that are legible and constructible. Construction plans will be prepared to meet MnDOT state aid requirements. This task includes preparation of applicable plan sections such as • Title sheet • General layout • Statement of estimated quantities • Tabulations • Typical sections/construction details • Existing conditions and utilities plans • Removal plans • Construction and grading plans • Intersection details • Drainage plans • Traffic control plans • Turf establishment and erosion control plans • Signing and striping plans • Lighting plans • Cross sections 5.2 Plan Submittals (60%, 95%, 100%) We will submit final design plans and other documents for review at the following stages of completion: 60% Plan Review—Submittal to include topography, utility plans, profiles, alignments, intersection layouts, drainage plans, typical cross sections, preliminary utility relocations, and engineer’s estimate 95% Plan Review—Submittal to include complete plan set, specifications, and engineer’s estimate Final Plan Approval—Submittal of final design plans, specifications, and engineer’s estimate for approval and signatures 5.3 Cost Estimates (60%, 95%, 100%) Bolton & Menk will prepare a detailed engineer’s cost estimate at each plan submittal. Quantities and costs will be split by project areas, participating/non-participating items, and funding sources. 5.4 Specifications and Bidding Documentation We will prepare and assemble bidding documents including project specifications, instructions to bidders, bid proposal form, labor/wage requirements, and MnDOT state aid attachments. Task 5 Deliverables: 60% plans, 95% plans, 100% plans, specifications, cost estimates, advertisement for bid Task 6: Utility Coordination 6.1 Gopher State One Call Coordination Gopher State One Call coordination will be completed to confirm utility owners and locations provided in the topographical survey. Any maps and private utility information we receive will be shared with the City. 6.2 Utility Coordination Our team will identify all private/public utility locations, and any necessary relocations or adjustments for the project. We will follow the MnDOT utility coordination process. Task 6 Deliverables: Private utility relocation plans, utility tabulations, utility meetings Phase 3: Construction Task 7: Construction Services We will complete the construction services needed for the proposed improvements consistent with City and MnDOT state aid requirements, and in accordance with all state laws, rules, and regulations. 7.1 Construction Administration The project manager will perform the following construction administration responsibilities: • Run preconstruction meeting • Perform on-site review pertaining to work and progress as needed • Run weekly progress meetings as needed • Prepare change orders and written directives • Review shop drawings, material lists, and suppliers • Review and approve pay requests Page 262 of 309 U S 1 0 & 1 6 5 th J -T u r n I m p r o v e m e n t s | E l k R i v e r B O L T O N & M E N K | 4 7.2 Field Staking Survey crews will complete field staking on the following features: • Construction limits • Grading • City utilities • Curb and gutter • Signage • Storm Sewer • Miscellaneous infrastructure features • Street lighting 7.3 Construction Observation The CPR will be on-site full time during the various stages of construction to observe and review the quality of work. Our proposed CPR, will be MnDOT certified and has extensive training and experience performing construction observation on similar projects. The CPR will perform the following tasks: • Provide day-to-day construction observation and coordination between contractor, city, and affected businesses and property owners • Maintain daily construction logs • Prepare monthly pay requests Task 7 Deliverables: Copies of meeting notes, change orders, shop drawings, materials lists, supplier's lists, and pay requests, field stakes and documentation of all survey points installed, Inspection notes, photos, and other field records. Task 8: Project Close-Out 8.1 Final Project Review We will walk the site with project stakeholders and identify any punchlist items that need to be addressed. Punchlist items will be reviewed until acceptable by the city. 8.2 Record Drawings Bolton & Menk will combine a record plan survey and all field information prepared by the city's construction observer, contractor, and subcontractors for use in preparing record drawings. This information will be used to edit the design drawings used for project construction. Task 8 Deliverables: Punch List, The record drawings will be provided in electronic (Adobe PDF) format for printing (if necessary) and archiving. One 11”x17” final hardcopy set will also be provided. Task 9: Alternate Services 9.1 Signal Addition If the ICE Report finds signals are needed at the 165th Avenue intersection as well as the south U-Turn, and MnDOT approves the installation of these signals on US 10/169, we will complete the addition of these signal designs into the Level 1 Layout, Designs, and final construction. Geotechnical Testing Services Soil Borings Bolton & Menk will work with the City selected geotechnical firm coordinating soil borings and a geotechnical report for pavement and utility design. Field Testing Services Materials testing will be performed by the geotechnical consultant retained by the City in accordance with the MnDOT Schedule for Materials Control. Deliverables: Geotechnical Report, Material testing reports, laboratory analyses, and required documentation to fulfill state aid construction testing requirements. Page 263 of 309 U S 1 0 & 1 6 5 th J -T u r n I m p r o v e m e n t s | E l k R i v e r B O L T O N & M E N K | 5 PROJECT EXPERIENCE TH 65 & Cajima Street RCUT Improvements City of Isanti, Minnesota The intersection of TH 65 and Cajima Street NE in Isanti met many conditions that warrant a change in traffic control. Ten crashes were recorded at this intersection between 2013 and 2015. The westbound left turn operated at a Level of Service F. The delay was anticipated to increase from below 90 seconds to more than 1,100 seconds per vehicle over the next 20 years with the current stop control in the AM and PM peak hours. Through discussions with MnDOT and completion of an ICE report at this intersection, an RCUT was determined to be the optimal improvement at this intersection. It was found to have the greatest reduction in crashes while reducing delay times significantly. We were able to secure funding through the MnDOT Local Partnership Program (LPP) which required a Level 1 Layout be completed and approved by MnDOT District 3 and Central Office. We were assigned a state project number and completed plans and specifications to meet LPP funding requirements. The project moved along seamlessly from preliminary report to approval of final plans and was completed in 2019. TH 53 Intersection and Passing Lane Improvements MnDOT District 1 TH 53 runs through District 1 with significant regional, state-wide, and interstate connectivity. Bolton & Menk led the preliminary and final design, including detailed roadway design. This project introduced a reduced conflict intersection on TH 53 at TH 1 (south junction) to address a traffic safety issues and an offset tee intersection on TH 53 at TH 1 (north junction). For the south junction, we worked with KGM contractors. We applied their 119-foot-long mobile asphalt plant hauler as a control vehicle for the geometric design of the RCI. Along with intersection improvements, this project created passing lanes in four different areas between Cook and International Falls. To remain with the existing shoulder PI to PI footprint, existing shoulder width was reduced, and through lanes were moved out from the existing centerline. We designed mainline mill and overlay and shoulder reconstruction in the passing lane areas. Due to reduced shoulder width, we performed clear zone calculations at all culvert locations. This ensured standards were met and identified the need for new guardrail placement. The project also included an EAW and CATEX under an extremely aggressive timeline. TH 169/CR 28 Intersection Improvements, Le Sueur County, Minnesota Utilities and improvements were brought to the north part of Le Sueur where industrial lot development was planned. Access improvements were needed at TH 169, which serves as the basis of future roadway extensions to support development. Plans for an interchange were in the works for over a decade. Bolton & Menk helped refine access needs through this area and determined potential locations. Funding was unsuccessful due to the high price coupled with limited benefits. A more cost-effective solution was developed that included Reduced Conflict U-Turn Intersection (RCUT) treatments. With RCUT design, left turning movements onto the mainline are performed with a right turn, followed by a U-turn to the desired travel direction. This eliminates the need to find gaps in both directions to make the left turn, particularly important for trucks too large to use the center median area as a refuge. Our solution was fundable and supported by all project partners. It also closed or combined multiple access points, safely facilitates traffic movements, serves heavy truck traffic volumes, and has allowed industrial development to begin. Page 264 of 309 U S 1 0 & 1 6 5 th J -T u r n I m p r o v e m e n t s | E l k R i v e r B O L T O N & M E N K | 6 TH 61 - River Oaks RCUT City of Cottage Grove, Minnesota As Cottage Grove experienced increased regional traffic volumes, local residents and business owners raised concerns regarding the challenges of crossing the high-volume, high-speed four-lane expressway. The proximity to a nearby school led to a significant surge of vehicles during dismissal times, particularly when accessing TH 61 from the southern leg of the intersection. Improvements were necessary for the configuration at TH 61 and Point Douglass Road. Various alternatives were evaluated, including All- Way Stop Control (AWSC), traffic signals, roundabouts, and a Reduced Conflict U-Turn (RCUT) with and without a ¾ left turn access. After considering factors such as safety, traffic flow maintenance, and cost-effective side street access, an RCUT without a ¾ left turn was determined to be the optimal solution. Through an efficient design process, Bolton & Menk and the City of Cottage Grove provided its residents and business owners with an upgraded intersection. The median was removed and replaced with J-turn movements. These enhancements improved safety by reducing intersecting points between different traffic paths and improving visibility through better lighting. All of this was accomplished while maintaining, if not enhancing, the existing mobility for interregional travel on TH 61 at the intersection of Point Douglas Road. Bolton & Menk designed multiple roadway improvements across Minnesota, including the TH 53 intersections and passing lanes project, TH 169/CR 28 intersection improvements, and the TH 61 River Oaks RCUT in Cottage Grove. These projects addressed traffic safety issues, refined access needs, and improved traffic flow and safety while accommodating heavy truck traffic and industrial development. Each solution was tailored to meet specific regional needs and supported by project partners. Page 265 of 309 U S 1 0 & 1 6 5 th J -T u r n I m p r o v e m e n t s | E l k R i v e r B O L T O N & M E N K | 7 TEAM Jason Cook, PE Jason will serve as your primary point of contact. He has the qualifications, experience, motivation, and work ethic to effectively manage and coordinate each project phase. Jason will provide close coordination with the City of Elk River, Sherburne County, MnDOT, and project partners. He will be responsible for overall team management and all schedule, cost, public outreach, and scope management processes. Kasey Burns, PE Kasey is a transportation senior project engineer at Bolton & Menk where he has been a vital contributor since 2018. With a passion for water resources engineering, Kasey specializes in transportation drainage projects, municipal improvement projects, and comprehensive studies. As the drainage lead on various projects, he uses his expertise in hydraulics, hydrology, and permitting to develop sustainable solutions that address the complexities of water management. Water plays a central role in people's lives, and he is dedicated to ensuring that it is managed effectively and responsibly. Justin Schmidt, PE, LSIT Justin is a transportation project manager who began his profession in 2005. He takes pride in the work he does and the fact that each of our projects improves the communities where we live and work. Justin is experienced with detailed roadway design, plan production, grading and drainage design, quantity computation, and utility coordination. He leads the transportation work group's CAD standards team ensuring the group is using and trained in the most recent standards and Bentley software. Zach Schopf, EIT Zach is a transportation design engineer whose professional career began in 2018. He is responsible for preliminary roadway and intersection design layouts, performing traffic operations and safety analysis, preparing construction cost estimates and construction plans and specifications, and performing construction observation. Zach is passionate about his work because of the impact it has on the safety, sustainability, and aesthetics of the communities he works in. Mike Larson, PE, PTOE, RSP1 Mike is a transportation senior project engineer who began his career in 2016 and has worked alongside Jake since day one. He is a jack-of-all-trades engineer with deep knowledge of all things traffic, from microsimulation, signal timing, signing and striping design, staging and traffic control, to safety analysis and multimodal performance and safety. Mike is our traffic practice area leader, and his fingerprints are on many of the traffic study work that comes through Bolton & Menk. He is passionate about finding right- sized solutions that can actually be implemented and make an immediate difference in people’s lives. Derek Arens, PE Derek is passionate about serving the public and takes pride in enhancing the safety and quality of the communities he serves. As a transportation senior project engineer, he is responsible for preliminary and final roadway design layouts, cost estimates, specifications, and assembling construction plans. Derek began his career in 2011 and has all-around experience from concept design to construction delivery. His design knowledge spans from retaining walls to trails to access management. He specializes in roundabout design and has a history of geotechnical experience. Derek enjoys bringing our clients’ visions to life with the 3D design aspect of roadway design technology. He is an expert in software such as MicroStation/GEOPAK, OpenRoads, and Site/Corridor Modeler. Page 266 of 309 U S 1 0 & 1 6 5 th J -T u r n I m p r o v e m e n t s | E l k R i v e r B O L T O N & M E N K | 8 SCHEDULE We have developed a schedule detailing the anticipated work tasks, task relationships, critical path timeline, deliverable due dates, and completion dates. This schedule is based on our review of the project background, description, and scope of services included in the Request for Proposals and our experience on other similar projects. Upon selection, Bolton & Menk will work with City staff and other project partners to revise and update this schedule as needed to ensure successful delivery of this project. This schedule is very aggressive with best case review times and no land acquisition needs. Given the anticipated review process from MnDOT we have built in the State Aid level of plans and submittal review process. If state aid funds are not used, we do not anticipate more than a week or two of reduced schedule timeline that will not change the anticipated completion date for this project. This schedule is also based on the assumption signals will not be added to the J-Turn as part of this project. If signals are required, coordination with MnDOT and pole and electrical work lead times will likely extend the project into the spring of 2027. Should any of these reviews take longer than anticipated, or additional environmental or land acquisitions are needed, the construction phase will likely occur in 2027. Should Federal funds be used on this project, the schedule is anticipated to extend to bidding in the winter or spring of 2027 with an anticipated project completion in the fall of 2027. J A S O N D J F M A M J J A S O N D Public and Agency Involvement PMT Meetings 4.0 Preliminary Design 7.0 Construction 5.3 5.4 Utility Coordination6.0 Cost Estimates (60%, 95%, 100%) Specifications and Bidding Documentation 5.1 2.3 Public Meetings Plan Submittals (60%, 95%, 100%) Final Design Final Design Plans 5.2 3.2 5.0 3.4 Cost Estimates 2026 ICE Study Tasks 1.0 Project Management 2.0 4.1 Finalize Concept Development 4.2 Preliminary Drainage Design 4.3 Evaluate Potential Construction Staging/Detour 4.5 Prepare Geometric Layout 4.6 Prepare Environmental Documents 4.7 Cost Estimates 2025 X 3.3 3.0 2.2 Agency Coordination Meeting ICE Study Report Concept Development 2.1 X X X X X X X X XX X 30% Plans100% PS&E Submittal95% Plans60% PlansProject Bid OpeningPage 267 of 309 U S 1 0 & 1 6 5 th J -T u r n I m p r o v e m e n t s | E l k R i v e r B O L T O N & M E N K | 9 FEES Bolton & Menk, Inc.’s proposed fees to provide the described work will be billed hourly based on the enclosed fee schedule with the total estimated cost to be: These rates include labor, general business and other normal and customary expenses associated with operating a professional business. The above rates include vehicle and personal expenses, mileage, telephone, survey equipment, survey stakes and routine expendable supplies; and no separate charges will be made for these activities and materials. Accepted by: Print Name/Title Date City of Elk River, MN US 10 and 165th Avenue J-Turn Improvements Task No.Work Task Description Project ManagerSurvey CoordinatorTraffic LeadDesign LeadGraduate EngineerEngineering TechSurvey CrewClericalTotal Hours Total Cost Phase I: ICE Study and Preliminary Design 1.0 Project Management 18 0 4 0 0 0 0 4 26 $5,066 2.0 Public and Agency Involvement 8 0 8 2 0 4 0 6 28 $4,906 3.0 ICE Study 4 0 36 2 126 2 0 4 174 $28,512 4.0 Preliminary Design & Level 1 Layout 12 8 11 36 136 22 32 6 263 $44,365 Phase I: ICE Study and Preliminary Design Subtotal:$82,849 Phase II: Final Design and Delivery 1.0 Project Management 36 0 0 4 0 0 0 6 46 $9,104 2.0 Public and Agency Involvement 6 0 0 6 0 0 0 0 12 $2,400 5.0 Final Design 48 0 28 120 166 46 0 6 414 $71,602 6.0 Utility Coordination 4 0 0 14 0 4 0 2 24 $4,290 Phase II: Final Design and Delivery Subtotal:$87,396 Phase III: Construction 1.0 Project Management 16 4 0 4 0 0 0 8 32 $5,792 2.0 Public and Agency Involvement 19 0 0 5 0 0 0 2 26 $5,218 7.0 Construction Services 40 20 4 2 4 290 52 4 416 $70,646 8.0 Project Closeout 4 0 0 2 0 28 4 4 42 $6,850 Phase III: Construction Subtotal:$88,506 Alternate Services 9.0 Signal Addition 40 4 40 120 160 120 10 4 498 $85,506 Alternate Subtotal:$85,506 $258,751TOTAL NOT-TO-EXCEED FEE BOLTON & MENK, INC. Page 268 of 309