Loading...
Historic Context StudyTHE CITY OF ELK RIVER REQUEST FOR PROPOSALS HISTORIC CONTEXT STUDY AND RESOURCES SURVEY PROTECT SCOPE The City of Elk River, through its Heritage Preservation Commission (HPC), is seeking a. qualified consultant to assist in preparing a historic context study of the city and a focused historic resources survey (Phase 1) of its downtown area. Boundaries of the focused resource survey area are shown on the attached Exhibit A. These defined limits of the focused resource survey contain approximately 210 properties within an approximate 122 acre land area. This portion of the project will result in a comprehensive inventory and report of historic sites within the focused study area relating to the historic contexts identified for the city, as well as recommendations for the eligibility of properties based on both the eight standards found in Section 900.10 (21) (C) of the Elk River Code of Ordinances for rezoning to Heritage Preservation Overlay Zoning District (attached Exhibit B) and the four criteria for determining eligibility for the National Register. Additionally, the city is requesting a scope of work and budget to conduct a Phase 2 evaluation for up to ten properties within the study area. The consultant selected for the project will meet Secretary of Interior Professional Qualification Standards (Federal Register, September 29,1983) and will utilize the Minnesota State Historic Preservation Office document entitled Guidelines for SHPO Architecture/History Projects (July 1991) as a guide in completing the project. All work to be completed under this project will conform to the Secretary of Interior's Standards for Archaeology and Historic Preservation (September 29,1983). Both City staff and volunteers from the Heritage Preservation Commission will contribute to the project by assisting the consultant with research and by reviewing drafts of the report. The project will be carried out in conformance with the timeline as found on Exhibit C In completing the project, the consultant will be required to: A. Work with the HPC and city staff. B. Prepare a historic context study of the city. C. Conduct specific research design following the Secretary of Interior's Guidelines for Identification (Federal Register, September 29, 1983). Develop survey forms. D. Conduct a reconnaissance survey (Phase 1) of approximately 210 properties within a defined approximate 122 acre survey area. E. Conduct a Phase 2 evaluation for up to ten properties, at the discretion of the HPC. R Prepare individual file folders for each site to include one to two (35 MM) black and white photos, survey forms, location maps, and other site documentation. Forms for each site shall be numbered according to the recommended SHPO numbering system. G. Assign survey properties to appropriate historic contexts. SAB&Z \STEVER\CONTEXT H. Initiate and maintain a comprehensive filing system for the HPC, incorporating all information collected on survey sites. This system shall be designed for expansion as new information is collected or added. I. Provide periodic written reports to, and meet with, the Heritage Preservation Commission and Housing and Redevelopment Authority (HRA) for the City of Elk River. J. Submit a draft final report to the Heritage Preservation Commission for review. Said report to include a minimum of the following: • Project introduction • Project objectives and methodology .. • Description of project components • Inventory list of all sites surveyed • Development of historic contexts identifying significant themes in Elk River History • The assignment of survey sited to appropriate context(s) K. Prepare a final narrative report (8 1/ " x 11" format), which conforms to the Secretary of Interior Standards and Guidelines for reports identification results (Federal Register, September 29, 1983, pages 44711 through 44723). L. Provide file folders with labels and other supplies as required to complete the project. M. Provide electronic media in the format of choice. N. Present final reports to the HRA. The City will provide: A. Project administration and supervision. B. Elk River Heritage Preservation Commission participation. C. Publicity and required hearing notices will be provided by Elk River Heritage Preservation Commission, if required. D. Sherburne County Historic Society assistance to advise consultant (where needed) relative to survey and context work. All proposals shall include the following information: A. Resumes of key personnel who will participate in completing the project. It is emphasized that at least one of these shall meet Secretary of Interior Professional Qualification Standards. B. A brief statement, which identifies key personnel experiences with and knowledge of Secretary of Interior Planning Standards. C. A preliminary outline explaining the proposed process to be followed in completing the project and to what extent local support services will be used. Additionally, a graphic flow chart reflecting the timing/completion of project elements shall be included. D. Hourly rate structure and description of scope of services, which can be provided for $12,000. -r . Portfolios and references are strongly encouraged. S:\B&Z \STEVER\CONTEXT The project will be financed by the City of Elk River. Proposals by qualified persons to complete the survey project for the City of Elk River are required to be at Elk River City Hall on or before November 15, 2001. Proposals are to be sealed and clearly marked PROPOSAL - HISTORIC CONTEXT AND RESOURCES SURVEY and be submitted to: Stephen Rohlf, Building and Zoning Administrator City of Elk River 13065 Orono Parkway NW PO Box 490 Elk River, MN 55330 The City of Elk River will consider all proposals received and will award a contract on the basis of qualifications; quality of the proposals in relation to the identified needs expressed by the City; proposed study approach; extent of local resource utilization; and proposed project bid. The City of Elk River reserves the right to reject any and all proposals and to award the contract to other than the lowest bidder, if in its discretion the interests of the city will be best served. Questions relative to this request may be direct to Stephen Rohlf, (763) 441-4904. SAB&Z \STEVER\CONTEXT I L —:J M MI FA-7-FIT77 I)l WAKIC EXHIBIT B C. Standards The Heritage Preservation Commission shall recommend to the Planning Commission that an area, building district, or object be rezoned to the Heritage Preservation Site Overlay Zoning District upon determining that such site meets one or more of the following criteria: i. It has character, interest, or value as part of the development, heritage or cultural characteristics of the City of Elk River, State of Minnesota, or the United States; ii. Its location is the site of a significant historic event; iii. It has yielded, or is likely to yield, information important in pre -history or history; iv. It is associated with a person or persons who significantly contributed to the culture and development of the City; V. It embodies distinctive characteristics of an architectural style, period, form, or treatment; vi. It represents the work of an architect or master builder whose individual work has influenced the development of the City of Elk River; vii. It embodies elements of architectural design, detail, materials, or craftsmanship which represent a significant architectural innovation; or viii. Its unique location or singular physical characteristics represents an established and familiar visual feature of a neighborhood, community, or the City of Elk River. SAB&Z \STEVER\CONTEXT EXHIBIT C TIMELINE CITY OF ELK RIVER HISTORIC CONTEXT AND RESOURCES SURVEY TASK COMPLETION DATE Consultant - prepare specific research design 12-13-01 and survey forms, purchase supplies and set up information and filing systems, and initial meeting with HPC. Consultant submits progress report HPC. 01-10-02 Consultant submits draft context study and Phase 1 02-14-02 inventory to HPC. HPC determines which properties involved in Phase 2. Consultant submits draft Phase 2 report for H.P.C. review.03-14-02 Consultant submits final report to HPC. 04-11-02 .i Consultant meet with HRA and submit final report 04-22-02 Project closeout and submission of final documentation 05-03-02 to SHPO SAB&Z \STEVER\CONTEXT 1 Eli: River 13065 Orono Pyrhnvay, Box �90 Elk River, li1�i ( 5>;30 Date: 11 L/o Pages: 13065 Grano Park ay PO Eox 490 Elk River MN 5Z320 Phone: 7631441-74210 Fax: 763/441-7425 To: 'r v /UA Fax: From: 4914 lone: Dept: � � 7i — Re: ❑ Urgent ❑ For Review ❑ Please Comment ❑ Please Reply ❑ Please Recycle Af! Gi ? 6 D v = v �ARol GC, of E11 1P P/� f I 11 b 0/L) /VA Ei )(08 13065 Ornnc Parkway PC) BOX 490 Elk River MN 553-Jd Phone: 7631441-7420 Fax: 763/441 -7425 Late: / lot Pages: To: QQ L r L L 'E Fax: From: (R6 HLF Phone: fS Dept: 1 - Re: ❑ Urgent 9 For Review ❑ Please Comment Q Please Reply Q Please Recycle 0 LC c w ry A LK�/✓e, M j ve 9 Ot C Z 0 tear CONSULTANT CONTRACT Historic Contexts Study and Phase I and II Inventory This agreement is made by and between the Elk River Housing and Redevelopment Authority (referred to elsewhere in this document as the "HRA") and Carole Zellie of Landscape Research (referred to as "consultant.") WHEREAS, the work program includes the preparation of an historic contexts study and Phase I and Phase II inventory forms for up to ten properties; WHEREAS, Carole Zellie of Landscape Research is capable of providing the professional assistance required and is willing to make those services available; NOW THEREFORE, the parties hereto mutually agree as follows: I. Scope of Services The scope of services covered by the contract shall include the following: The consultant will conduct research and prepare an historic contexts study and Phase I and II inventory forms for up to ten properties for a total cost of $12,000. As described in the attached proposal, the consultant will prepare drafts for review and submit them to the HRA and Heritage Preservation Commission. The consultant will supply three copies of the final report; subsequent printing is the responsibility of the HRA. II. Time of Performance The services of Carole Zellie of Landscape Research shall commence on the signing of this agreement and shall be completed so that all final products are accepted by the HRA by June 15, 2002. III. Compensation and Method of Payment Commencement payment $2,500 January 2002 with contract signing First monthly billing $2,500 January 15, 2002 Second monthly billing $2,500 March 15, 2002 (First report draft) Third monthly billing $2,500 April 15, 2002 (Final report draft) Final submittal of approved report $2,000 June 1, 2002 Payment of the above shall be made to Carole Zellie of Landscape Research after submission of an invoice to the HRA. Payment shall be made within 30 days. Invoices shall specify the tasks performed and the work product completed. If this contract is terminated under the provisions of articles VIII-IX below. Carole Zellie of Landscape Research shall be compensated for all services performed and expenses incurred up to the date of termination. IV. Changes The Elk River HRA may, from time to time, request changes in the scope of services to be performed hereunder. Such changes, including any increase or decrease in the amount of Carole Zellie of Landscape Research's compensation, which are mutually agreed by and between the HRA and Carole Zellie of Landscape Research shall be incorporated into written amendments to this agreement. V. Compliance with Federal, State and Local Laws Carole Zellie of Landscape Research shall comply with all federal and state laws and regulations concerning equal opportunity, affirmative active and fair employment opportunities. Carole Zellie of Landscape Research further agrees to comply with all applicable regulations, laws, ordinances and codes to the State and local government and policies, guidelines and any requirements of this federal grant program. VI. Interest of the Consultant The consultant covenants that it now has no personal interest, direct or indirect, in any property of business of any kind, and shall not acquire any such interest which would conflict in any manner or degree with the performance of services under this contract. VII. Indemnification Carole Zellie of Landscape Research agrees to indemnify, defend and hold harmless the HRA and its agents, the City of Elk River, from and against all loss or expense (including costs and attorney's fees) by reason of any claim or suit arising out of the acts or omissions of Carole Zellie of Landscape Research, her employees, agents, or assigns; or Carole Zellie of Landscape Research from liability imposed by law upon Carole Zellie of Landscape Research or its agents or employees for damages because of bodily injury, including death at any time resulting from, sustained by any person or persons or on any account of damages to property, including loss of use thereof, whether caused by or contributed to by Carole Zellie of Landscape Research or its agents or employees. VIII. Termination of Contract for Cause If, through any cause, Carole Zellie of Landscape Research shall fail to fulfill in timely and proper manner its obligations under this contract, or if Carole Zellie of Landscape Research shall violate any of the covenants, agreements or stipulations of the Agreement, then the HRA shall thereupon have the right to terminate this contact by giving notice to Carole Zellie of Landscape Research of such termination and specifying the effective 2 date of such termination. In such event, all finished or unfinished documents, data, studies, reports, or other materials prepared by Carole Zellie of Landscape Research under this contract shall at the option of the City of Elk River become the property of the HRA and Carole Zellie of Landscape Research shall be entitled to receive just and equitable compensation for any work satisfactorily completed hereunder. IX. Termination to Contract for Convenience The HRA or Carole Zellie of Landscape Research may terminate this agreement at any time by giving at least twenty (20) days notice in writing to the other party. If the contract is terminated as provided herein, Carole Zellie of Landscape Research will be paid for the time and expenses incurred up to the termination date. If this contract is terminated due to the fault of Carole Zellie of Landsca e Research, Article VII hereof relative to termination shall apply. X. Record of Audits Carole Zellie of Landscape Research shall maintain records, adequate to identify and account for all costs pertaining to this contract and such other records as may be deemed necessary to assure proper accounting for all project funds. These records will be made available for audit purposes to the City of Elk River or any authorized representative, and will be retained for four (4) years after the expiration of this contract. XI. Worker's Compensation As between the City of Elk River and Carole Zellie of Landscape Research, this is intended as and is an independent contract. Carole Zellie of Landscape Research and no partner or employee of if Carole Zellie of Landscape Research shall, by reason of this contract, become an employee of the City of Elk River. XII. Equal Opportunity and Affirmative Action In performance of services under this contract, if Carole Zellie of Landscape Research agrees not to discriminate against any employee or applicant because of sex, race, color, handicap, religion, national origin age or marital status to the person maintaining the household, lawful source of income, age or ancestry. Carole Zellie of Landscape Research will take affirmative action to ensure that applicants are employed, and that employees are treated during employment without regard to their race, creed, sex, age, color or national origin. Such action shall include, but not be limited to the following: employment, upgrading, demotion or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. Carole Zellie of Landscape Research agrees to post in conspicuous places, available to employees and applicants for employment, notices setting forth the provisions of this non-discrimination clause. XIII. Findings Property of Elk River Housing and Redevelopment Autority All of the reports, information, data, etc. prepared or assembled by Carole Zellie of Landscape Research under this contract are the property of the Elk River HRA and Carole Zellie of Landscape Research agrees that they shall not be made available to any individual or organization at any time without prior written approval. XIV. Severability It is mutually agreed that, in case any provision of the contract is determined by a Court of law to be unconstitutional, illegal or unenforceable, it is the intention of the parties that all other provisions of the contract remain in full force. IN WITNESS THEREOF, parties hereto have caused this agreement to be executed the year and date written below by their proper officers and representatives. Carole Zellie Landscape Research or the HRA Date /'j D1 Date 4 Elk River Municipal Utilities [Village Hall] Abstracts Village Council Minutes (Elk River) 1928 June 4t": Discussion of constructing a village hall. The question as to the economy of erecting a building on the lot donated to the Village by Mr. Houlton for the purpose of the Fire Apparatus was discussed favorably as the Village is paying about $500.00 yearly rent. It was thought better to pay that much interest and erect a building more suitable for the village purposes and combine library, council room and engine house. The matter will receive the early attention of the council. August 6`": Call for a special election to bond $7000 for the construction of a Library/Council Room, Engine House and Jail. August 10: Approved resolution to bond $7500 for erection of first Village Hall, election to be September 1928. September 10: [Approval of bonds] Clerk read notice of Special Election held September 5, 1928 to authorize State of Minnesota Bonds for a Village Hall. 134 for, 32 against. Need to remove 213 yards of dirt to bring it down to grade. Clerk instructed to advertise for bids. Building Committee assigned: C. H. Bade, Thomas E. Beck, W. F. Chadbourne September 22: Bids and Specifications were prepared by W. F. Chadbourne Bids for constructions, not including healing plant or jail cells, or vault. The three bids were: Isle Building Co. $9875 Bock Building Co. (Milaca) $8800 Cavanaugh Bros. (Robbinsdale) $8269 All three bids were over the bonded amount, $7500. The bids were rejected. Contractors were notified that a change would be made in the plans and be resubmitted to them at an early date. September 29: Bid for construction was awarded to lowest bidder, Cavanaugh Brothers of Robbinsdale. [Amount not in minutes, but the higher bidder was Bock Building Col for $7200]. Company owner John F. Cavanaugh agrees to begin immediately and push to complete at "an early date". October 1: Bills submitted for tree removal and grading at the Village Hall Constract with Cavanaugh Bros. Signed and excavation had begun October 9: Consideration of bids for heating building. Caley (Harold) Hardware is awarded bid of $540 for system of hot air heating. November 4: Approved purchase of cells for the jail. Double cell with two bunds in each cell for men, and single cell with two bunks, approved for $708. Approved purchase of vault door Approved resolution recommended by The League of Minnesota Municipalities: . That the Council of the Village of Elk river Minnesota approve legislation advocated by the League of Minnesota Municipalities which would amend the present zoning law applying to first class cities in order to permit all other cities and villages to pass zoning ordinances. That the Council of the Village of Elk river Minnesota approve legislation advocated by the League of Minnesota Municipalities to permit all cities and villages to pass ordinances creating planning commissions. Bills paid: Caley Hardware for Heating Plant at Village Hall for $546.02 Elk River Lumber Company for well curbing and material at Village Hall for $70.40 Approved tiling in vestibule in place of cement. Beck [Thomas E. Beck President of Council) agreeing to have it done. Approved painting of walls of engine room with two coats. Mr. Patenaude agreed to do it for $25. Approved plastering of jail at a cost of $60. Clerk ordered to purchase new 5x& hydrant [for Village Hall?] Agreed that council unite with commercial club in putting on a celebration of the completion of the Village Hall. 1929 January 7 [First Meeting at Village Hall] : Bills paid: Frank E. Beck for laying tile vestibule at Village Hall - $10.00 Reed & Sherwood: Millwork at Village Hall - $149.70 W. A. Patenaude: Painting Walls, etc. - $52.25 H. R. Caley Company — Extra Heating Jail $135.28 Raymond Brothers Frate [Freight] on vault door - $1.75 Diebold Safe and Lock for Vault Door - $119.25 Drake Marble Co. for tile for vestibule - $16.80 February 4 Mrs. George Tyler, Mrs. [T.?] H. Daly, and Mrs. Joseph Huseth, representing the Community Club of Elk River, ask for the privilege of using the Building for their meetings and also for holding special meetings and entertainments for the good of the order. Their request was granted by a unanimous vote. The Council stating that the new building was built for the use of the people for any legitimate purpose in the interest of the Village. Bills paid: Charles Roggatz coal for Village Hall - $54.71 Dare Furniture Co. furniture for Council - $85.00 Fred Ayer Janitor and other labor - $12 March 3 No Bills for March April 1 It was voted to lower the sidewalk on the south side of Depot St. from the Post Office to Quincy St. in order to connect with walk to the new Village Hall. (Lowering sidewalk). Also to raise the walk from the Bishop Meat Market to Quincy St. and build a sidewalk on Quincy Street to connect same with the streets mentioned. Village of Elk River Elected Officials: March 13,1928 to March 17, 1929: Thomas E. Beck, President George Cornelius, Trustee L.L. Bishop, Trustee E. E. Scott, Trustee W. F. Chadbourne, Clerk T.H. Daley, Treasurer J. M. Plank, Assessor C. E. Broch [sp?], Justice of the Peace LANDSCRPE RESEARCH PHONE No. : 6126445553 Nov.15 2001 2:06PM P01 F AX: $ PAGES INCLUDING COVER November 15, 2001 TO: Stoplien Rohlf, Building and Zoning Administrator FROM: Carole Zellie, Landscape Reseatrcli (651)611-1230 RE: Elk River Historic Contexts Study A copy of our proposal is attached. A hard copy will be in the snail, and will contain resumes and ot.hcr information. 1 was vague about the survey component. to allow us to discuss the area in more. detail. From :,LANDSCAPE RESEARCH PHONE No. : 6126445553 Nov.15 2001 2:07PM P02 Tilk River Historic Resources Study A Proposal to the City of Elk River From Landscape Research St. Paul, Minnesota November 15, 2001 As the Mk River community continues to grow and develop, the role of historic resources will continually be evaluated through environmental review activities (conducted for transportation projects), housing improvement, and downtown development. The proposed historic contexts study and downtown survey will provide the city with comprehensive information about the history and significance of its resources. Historic Contexts The proposed study will develop historic contexts for Elk River, providing a comprehensive narrative and analysis of the development of the city from settlement to the Ptv&E-.,lt. The contexts will describe Elk River's relationship to early Sherburne County and the Mississippi ]liver, and its rural, suburban, and urban landscapes. It will also analyze the. development of agriculture, commercial, and residential development. Downtown Survey The study will also conduct a limited Phase I survey of the downtown area. The final details of the scope of this survey will be discussed with City staff before the project commences. nits project will be conducted within the Guideli-nes for Pre-seruatforc Planrr.ir�g established by the Secretary of the. Interior and will be compatible with databases rt'►ainlained by [lie State Historic Preservation Offices. The study will also provide recomint-TIJAivr14 for further survey and evaluation of historic properties, sites, and landscapes, and determination of eligibility for National Register listing for some properties It will also assist the city In planning for historic e and cultural resources. The final report willcombine text and many illustrations in, a useful and interesting format. It will be supplied in hard copy and on disk. Landscape Research will provide a quantity of reports for immediate use, with additiorad printing to be determined by the client. As requested, we will present the findings of the study al staff meetings. Firm Qualifications Landscape Research has worked with communities raid planning agencies in the Midwest and New England on a great variety of researeh e)nd preservation planning Elk River Historic Context Study Landscape fzesearch Novefnber 15, 2001 From : LANDSCAPE RESEARCH PHDNE No. : 6126445553 Nov.15 2001 2:07PM P03 projects. in Minnesota, we have had extensive experience with historical research and planning projects throughout Hennepin, Ramsey, Washington, Dakota, and Rice counties. We have successfully completed many preservation plans and context studies, including those for the University of Minnesota, and cities such as Minneapolis, Hastings, St. Cloud, Lanesboro, and Northfield. Our National Register work has involved the development of historic contexts for various aspects of Minnesota agriculture and historic landscapes. Carole Zellie is an architcctural historian and urban planner. She founded Landscape Research, now a three -person firm, in 1976 and has served as project director and principal investigator for many of the firm's past projects. Ms. Zcllie holds degrees in architectural history (B.A. ,' M.A. ) from the University of Minnesota and an M.S. in historical geography from the University of Wisconsin -Madison. For the proposed project Ms. Zellie will serve as Principal investigator. In addition to the preparation of historic context studies and architectural and culttural resource surveys and all aspect,, of the National Register and local designation studies, Landscape Researe.1i also) wurks with couunw-diles to develop the research and documentation phases of their projects. Preservation plans, guidelines for new desig1l and rehabilitation, Jand use plans, procedures manuals, training programs, and a variety of tours and other public education programs have resulted. Our projects have conformed to the guidelines developed by the: ^>L cCTetary of the Interior and have. been coordinated with the State Historic Preservation Office. Work Program Overview Tasks: To begin the project, the Corksultvlt will sleet with city staff to discuss the project outline And objectives. The consultant will review a variety of inventory data held by the Minnesota State Historic. Prr servatkin Office, Elk River, and Sherburne County. This includes archaeological inventories, cultural resource surveys, tend enviroiunental review reports, Published and unpublished research sources will lie analyzed. Sources include steate, county, and local histories, archaeological reports, newt;papers, land use and other historic maps, real estate records, photographs and historical views, and other archival materials found in local collections and at the Minnesota Historical Society. All previous architectural survey data will be reviewed in light of current. Deldwork. and research. At the beginning of the project, the consultant will present a detailed research plan to the client. The consultant will inform staff of progress to date during the first month of the study, and first drafts of the study will be available for review and revision prior to submission of the final report. Elk River Historic Context Study Lander.M2c Research. Noveynber 75, 2001 From :=LANDSCAPE RESEARCH PHONE No. : 6126445553 Nov.15 2001 2:08PM PO4 The consultant will work with city staff to develop goals and objectives for preservation planning and recommendations for future survey and evaluation of historic properties, sites, and landscapes. The consultant will also work with staff to prepare for a final presentation_ Timeframe Summary A final timeline will be developed after consultation with city staff. The project will cornmence in December 2001 and be completed in approximately six months. Budget We propose a $12,000 budget to develop a research plan, conduct and analyze the research and survey, and prepare the lustcrric: context drafts and final reports. The fee include; all rriectings wifll city staff. Travel and other expenses are included. The project fcc is based on a rate of $65 per hour and includes production of the fiscal reports References John Grossman City Planner/HRA 1..3irector City Hall I•iastings, MN (651) 437-4127 Susan Roth National Register Historian State HiRtoric. Preservation Office Minnesota Historical Soriety (651) 296-54,34 Work Samples Context Studies North Minnc'apvlzs Histvric Ccrrttfszt Study (1998; Minneapolis 1 leritage Preservation Comtnission) Northeast Minneapolis Historic Context Study (1998; Minneapolis Heritage Preservation Commission) An Inventonj of Minnesota's Geographic Pcratures of Historic ratid Cultural Signiftca►ice (1989; State Historic )"reservation Office, Minmesota Historical Society) Ok River Historic Context Study L nd.scape Rti'enrch Novrntber 15, 2001 From : LANDSCAPE RESEARCH PHONE No. : 6126445553 Nov.15 2001 2:08PM P05 Context Studies / Preservation Plans The Univer,^.ity of Minnesota Preservation. Plan (1996, completed for the University of Mim-tesota) based on seven historic contexts. Rccirricnt of Preservation Award, Minneapolis I Ieritage I`reservation Commission (1998).- CUE Award (1998). The Northfield Heritage Preservation Plan (1992; Northfield Heritage Preservation Commission). Incorporated multi -year ;architectural survey, contexts study, and preservation }clan in one vohima_ Design Guidelines / Publication Projects The Dayton's Bluff Historic District Handbook (1992; St. Paul Planning and Economic Development Department). Recipient of 1993 Preservation Award, St. Paul Heritage Preservation Commission. At Hoine. in Northfield brochture series and Northfield. The. History and Architecture of a Community (1999) Built. in Milwaukee (1981; Department of City Development, Milwaukee, Wisc.). Recipient of 1982 Merit Award, Statc Historical Society of Wisconsi,t. Rik River Historic Context `study 4 Landscal)e Research November 75, 2001