Loading...
11.1 Trail Safety InformationTrail Safety Discussion Goals Discuss signage and identify locations Determine if there is need/want to stripe trails within the city •Identify trails to be striped •Identify rough estimate of costs Identify a timeline for any work needed Information None of our current partners on the GNT have plans to stripe or paint their portion of the trail Cost of striping is $0.50 per linear foot Paint has approximately 1-3 year life expectancy For example: •Approximately 4.75 miles of the GNT are in Elk River •Equates to approximately 25,080 feet •Cost to stripe = $12,540.00