02-24-2026 PC MIN
Meeting of the Planning Commission
Held at the Elk River City Hall
Tuesday, February 24, 2026
Members Present: Chair Perry Beise, Commissioner Eric Johnson, Commissioner Robert Rydberg,
Commissioner Dennis Booth, Commissioner Dornan Bland
Members Absent: Commissioner Anthony Kaba, Councilmember Jennifer Wagner
Staff Present: Community Development Director Zack Carlton, Senior Planner Chris
Leeseberg, and Recording Secretary Katie Porath
1. CALL MEETING TO ORDER
Pursuant to due call and notice thereof, the meeting was called to order at 6:30 p.m.
2. PLEDGE OF ALLEGIANCE
The Pledge of Allegiance was recited.
3. CONSIDER AGENDA
Moved by Commissioner Johnson and seconded by Commissioner Booth to approve the
agenda. Motion carried 6-0.
4. CONSIDER MINUTES
Moved by Commissioner Johnson and seconded by Commissioner Booth to approve the
following consent items as outlined in their respective staff reports. Motion carried 6-0.
4.1 DRAFT Minutes - January 27, 2026
5. PUBLIC HEARINGS
5.1 Conditional Use Permit: Mineral Extraction Boundary Expansion, Knife River - 11650 225th Ave
NW
Mr. Leeseberg presented the staff report.
Commissioner Johnson asked if the City has received negative comments. Mr. Leeseberg responded
there have been some complaints of debris brought onto the road and dust from sweeping the road.
Mr. Carlton added that the City's street department has visited the site in the past and recommended
clean-up, particularly during wet weather.
Planning Commission Minutes
February 24, 2026
---------
Page 2 of 8
Commissioner Johnson pointed out that the condition of the CUP was to sweep daily. Mr. Carlton
suggested requiring a sweeping log.
Chair Beise opened the public hearing.
Luci Snowden, Central Minnesota Environmental Manager for Knife River, asked if the
language of Condition 23 could be modified to clarify if sweeping must be done daily or only if there is
an existence of debris.
Commissioner Johnson asked if daily sweeping is occurring. Ms. Snowden responded she could verify
with Knife River staff.
Commissioner Bland asked about adding an additional cattle grate. Ms. Snowden stated that was an
option or extending the paved area may be another option.
Commissioner Rydberg asked about the process of communicating to drivers about no right turns. Ms.
Snowden stated drivers are informed not to take right turns. She added that these requirements are
communicated to private contractors but there is no way to enforce them.
Commissioner Bland asked if Ms. Snowden directly received complaints from the community. Ms.
Snowden responded that she has only heard concerns from the city, not directly from the public. All
concerns have been regarding debris on the road.
Chair Beise closed the public hearing.
Chair Beise stated it would be helpful to have documented inspections of the roadway and the applicant
could sweep as necessary as opposed to sweeping every day.
Commissioner Johnson asked staff if they had a preference between an additional cattle grate versus
extending the pavement or on the idea of a daily sweeping log. Mr. Leeseberg responded staff would
check with the environmental department on their preference. Mr. Carlton responded that a daily
sweeping log would be a good solution and could be reviewed during a city inspection or in the case of
complaints.
Moved by Commissioner Johnson and seconded by Commissioner Booth to recommend
approval of the Conditional Use Permit with the following conditions:
1. This Conditional Use Permit authorizes mineral excavation (gravel) and the
operation of a washing plant.
2. All mineral excavation and processing operations on the property shall comply with
the City’s Mineral Excavation, Zoning and other applicable ordinances; with the
terms of this Conditional Use Permit agreement and the license agreement to be
executed by the City and Operator; with the City of Elk River’s Environmental
Impact Statement on Mineral Excavation; and with the application materials and
plans submitted by the Operator, which plans and materials are the basis for the
City’s approval of the Conditional Use Permit.
3. The Operator shall orally notify the City of any violations of this permit within 24
hours and follow this with notification in writing within four (4) working days of the
violation. The Operator shall notify the City annually in writing of the total area
Planning Commission Minutes
February 24, 2026
---------
Page 3 of 8
and amount of material mined and projected estimates of area and amount of
material to be mined in the following year. This is to be done at the time of license
renewal.
4. The license shall be renewed annually and shall run from June 1st through May
31st. The annual license fee is that which is specified by the Elk River City Council at
the time of renewal. This license fee is not in lieu of gravel tax collected by the
County, a portion of which the City receives.
5. Violations of this Conditional Use Permit may result in suspension or revocation.
6. The City Environmental Administrator and/or his/her agents shall be permitted to
inspect the Operation for compliance with the conditions of this permit during
normal hours of operation.
7. The City’s approval of this Conditional Use Permit is subject to the approval of
appropriate permits by other governmental agencies.
8. No explosives shall be allowed for this operation.
9. Reclamation:
a. Reclamation shall be implemented on an annual basis pursuant to the
reclamation plans submitted by the Operator.
b. Each year a plan for that year’s reclamation shall be approved by the
Environmental Administrator prior to issuance of the annual mineral
excavation license.
c. The reclamation shall include topsoil from the site being preserved and put
back into place after mining.
d. Re-vegetation of the property shall include seeding with a mixture approved
by city staff accompanied by a nurse crop or approved mulch. The vegetation
established for the reclamation must be maintained until it is self-sufficient.
e. Contours, finished grades, details of erosion control methods, and settling
ponds, shall comply with the plans submitted and the City ordinance at the
time of reclamation. Additional measures as determined by city staff may be
required.
10. Traffic:
a. Except for localized jobs, traffic through Elk River associated with the
Operation shall be limited to U.S. Highway 10 and 169. The Operator will
route traffic from the Operation to 225th Ave NW west to the Highway 169
interchange as directed by the Minnesota Department of Transportation or
the City of Elk River.
b. The number of trucks per day is limited to 35 unless prior approval is given by
the Environmental Administrator for special cases.
c. As deemed necessary by the Minnesota Department of Transportation and
the City of Elk River, any required improvements to the highway intersection
must be constructed prior to the operation of the HMA.
d. As deemed necessary by the City of Elk River, any required improvements to
225th Ave NW must be constructed prior to the operation of the HMA.
11. Dust Control:
a. A permit from MPCA regarding air emissions shall be obtained when
required and particulate emission standards shall be met by the
operation. This permit and all other correspondence between the Operator
and MPCA shall be copied to the City.
Planning Commission Minutes
February 24, 2026
---------
Page 4 of 8
b. All equipment shall be located as to reduce dust to adjacent properties.
c. A water truck shall be on site at all times when mining activities are taking
place to control dust as necessary. Chemicals shall not be used for dust
control.
d. A minimum of 100 feet must be paved from 225th Ave NW into the pit.
e. The City reserves the right to require additional measures to be taken, if
warranted by dust problems, including but not limited to reducing stockpile
heights.
12. All mineral excavation, processing, and sales activities shall be conducted between
the normal hours of 7:00 a.m. and 7:00 p.m., Monday through Saturday.
13. Noise:
a. As deemed necessary by city staff, noise from screening and crushing
associated with this operation shall be controlled by equipment location on
site, the erection of sound barriers, the placement of stockpiles, and the type
of equipment used.
b. Noise levels associated with this operation shall at no time exceed State
standards.
c. The City reserves the right to require additional measures be taken, if
warranted by noise.
14. Lighting from the Operation shall be directed away from adjacent residential
property. Glare, whether directed or reflected as different from general
illumination, shall not be visible beyond the limits of the immediate site. All sources
of artificial light shall be so fixed, directed, designed, or sized that the minimum
subtotal of their illumination shall not increase the level of the illumination on
nearby residential property by more than .1 foot candles in or within twenty-five
(25) feet of a dwelling, or more than 0.5 foot candles on any part of the adjacent
property.
15. The piling, storing, or keeping of old machinery, junk, debris, or abandoned motor
vehicles, shall be prohibited on this site, with the exception that reusable parts may
be stored on the mineral excavation site provided that it is in a location that cannot
be viewed from adjacent properties or is totally screened.
16. Mining activities shall not cause excessive vibration off site. If excessive vibration
becomes an issue, the City reserves the right to take appropriate measures to
alleviate the problem.
17. Groundwater protection measures shall include:
a. The Operator shall file with the City an Emergency Spill Prevention and
Counter Control Plan and a Storm Water Pollution Prevention Plan as may
be required by other governmental entities. The Operator shall adhere to
these plans in the event there is a spill.
b. The Operator shall provide the Fire Department with a copy of their
flammable or hazardous materials.
c. Fuel tanks shall be above ground, properly diked (if required by law), and
registered with MPCA.
d. All incidences that have the potential to adversely affect groundwater,
including but not limited to spills, shall be verbally reported to the City within
24 hours. This verbal notification shall be followed up in writing within four
(4) working days.
Planning Commission Minutes
February 24, 2026
---------
Page 5 of 8
e. The appropriate storm water permits (NPDES) shall be obtained by the
Operator from MPCA and copied to the City.
f. Stockpiles of recycled asphalt must not be placed in surface water and run-off
from these stockpiles shall be directed away from surface waters. Further,
the size of the stockpiles is limited to the amount of material that can be used
in one year, but need not necessarily be used in one year and can be stored
over winter.
g. The wells located at the site shall be monitored once a year for diesel range
organics (DRO). Mining activities shall not take place closer to groundwater
levels than indicated in the plans submitted without amending this
conditional use permit. However, if mining is proposed to occur below the
water table in the future, the above-referenced wells shall be monitored for
DRO prior to excavation activities commencing and after their cessation each
year. Further, in the event of a spill, appropriate water tests (as determined
by the city) will be taken until the spill is deemed clean by the city.
h. Except for minor repairs, maintenance of vehicles and equipment shall take
place in the operator’s shop. The operator shall have an approved hazardous
waste license for this facility and properly dispose of all waste.
i. A minimum of a two-celled system to recycle water from the wash operation
shall be utilized.
j. Water usage by mining activities shall not adversely affect adjacent
wells. Mitigation measures may include, but are not limited to, curtailing of
pumping activities until water levels return.
18. Signage for the operation shall be that which is permitted for an industrial
operation in a medium industrial zone, with the exception that billboards are not
allowed.
19. The operator shall fence the entire perimeter of the site with a four (4) foot high
fence with support post every ten (10) feet.
20. Cutting of trees between April 15 and July 15 is prohibited. The Operator shall take
other measures deemed appropriate by the Sherburne County Forester to control
oakwilt, such as, but not limited to: debarking or destroying fallen diseased trees
prior to April 15th, not leaving roots exposed and avoiding mechanical damage to
remaining trees.
21. The Operator shall erect berms adjacent to 225th Ave NW as required by the City
of Elk River.
22. Other Permits:
a. The Operator shall obtain all state and federal permits appropriate to their
operation and file copies of said permits with the City.
b. All shingles must be managed in accordance with Minnesota Rules 7035.2860
– Beneficial Use of Solid Waste. Compliance documentation shall be
submitted to the City prior to continued storage or processing of such
materials.
23. Roadways must be kept free of tracked material. Tracking Best Management
Practices (BMPs) shall be adjusted as necessary to prevent debris from entering
public roadways. If any material is tracked onto the roadway, it must be removed
through daily sweeping and a log of all site inspections and sweeping activities be
maintained and made available for city review.
Planning Commission Minutes
February 24, 2026
---------
Page 6 of 8
24. A cattle grate shall be placed between the street and the security gate along with
pavement from the grate to the street.
25. If mining operations expand east of the current footprint, an updated wetland
delineation report shall be submitted for review and approval prior to further
expansion.
26. Gravel wash operations:
a. Identify and/or confirm the location of nearby groundwater wells
(groundwater receptors) and surface water receptors on and immediately
surrounding the mining and gravel washing operation and document their
proximity to the washing operations on a map.
b. Install a water table monitoring well or wells at the site and generally
between the washing operation and the nearby groundwater
receptor(s). Survey the monitoring well(s) for horizontal and vertical control
and identify their location on a site map.
c. Measure and record water elevations at the monitoring well(s) within
approximately one week of initiating pumping of water from the dug pit for
washing, mid-way during washing and within one week upon cessation of
washing operations.
d. Conduct water quality testing of samples collected from monitoring well(s)
for diesel range organics (DRO), BETX, pH (field), temperature (field) and
specific conductance (field) prior to and at the cessation of washing
operations on an annual basis.
e. In the event of a spill, washing operations should be terminated until such
time that the extent and potential impact of the spill can be determined
through testing as determined necessary by the City.
Motion carried 6-0.
6. GENERAL BUSINESS
6.1 Conditional Use Permit: Educational Institution, Good Shepherd Lutheran High School — 630
Freeport Ave NW
Mr. Carlton presented the staff report. At their January meeting, the Planning Commission had
discussed changing the application to an Interim Use Permit (IUP). Mr. Carlton explained that the City
Attorney did not recommend proceeding with an IUP and stated that a Conditional Use Permit (CUP)
is the recommended avenue for approval.
Commissioners Johnson, Booth, and Bland stated they were still in favor of an IUP unless there was a
legal obligation not to do so. Mr. Carlton stated he would confer with the City Attorney if there was a
legal obligation not to pursue the project as an IUP.
Mr. Carlton explained that if the Council agrees with the recommendation for an IUP the application
would need to submit a new application for an IUP which would delay the applicant's timeline further.
Mr. Leeseberg explained the Commission would have no input on the conditions of the CUP once it
went to the Council. Commissioner Johnson stated he had no issues with the conditions listed, only the
fact it was a CUP.
Planning Commission Minutes
February 24, 2026
---------
Page 7 of 8
Commissioner Zahler stated the Commission should separate the two issues and asked if the
Commission wants to grant a CUP in this area. Does the Commission believe the applicant meets the
conditions for approving a CUP?
The Commission agreed that their preference was for the application to change to an IUP.
Commissioner Johnson summarized that the Commission could approve the CUP with the conditions
outlined in the memo, pass it along to the City Council, and have staff confer with the City Attorney. If
there is a legal requirement for a CUP, then the City Council can review the application holistically with
all the information available to support their decision.
Moved by Commissioner Johnson and seconded by Commissioner Bland to recommend
approval of the conditional use permit allowing an Educational Institution in the MU-ERP
district, subject to the following conditions:
1. The City Council must adopt an ordinance adding Educational Institutions as a
Conditional Use in the MU-ERP zoning district.
2. Architectural plans will need to be reviewed by the MN Department of Labor and
Industry prior to submitting for city building permits.
3. The accessible route and bathroom access for suites 600 and 700 must be updated to
comply with the state building code.
4. All costs associated with potential address changes of affected tenants will be the
responsibility of the property owner and/or applicant.
5. Any expansion of the school will require an amendment to the Conditional Use Permit.
Motion carried 6-0.
7. COUNCIL LIAISON UPDATES
Mr. Carlton stated that the City Council adopted a one-year moratorium on multifamily housing
developments. An RFP has been posted for re-writing Chapter 30 of the City Code and will close on
March 9, 2026.
8. MOTION TO ADJOURN
Moved by Commissioner Johnson and seconded by Commissioner Booth to adjourn the
meeting. Motion carried 6-0.
The meeting adjourned at 7:18 p.m.
Minutes prepared by Katie Porath.
Planning Commission Minutes
February 24, 2026
---------
Page 8 of 8
___________________
Perry Beise, Chair
_________________________
Jolene Richter, Deputy City Clerk