06-23-2026 PC MIN
Meeting of the Planning Commission
Held at the Elk River City Hall
Tuesday, June 23, 2026
Members Present: Chair Perry Beise, Commissioner Eric Johnson, Commissioner Dennis Booth,
Commissioner Dornan Bland, Commissioner Anthony Kaba, Commissioner James
Lang, Councilmember Jennifer Wagner
Members Absent: Commissioner Robert Rydberg
Staff Present: Community Development Director Zack Carlton, Senior Planner Chris
Leeseberg, and Recording Secretary Katie Porath
Others Present: City Attorney Sharda Enslin
1. CALL MEETING TO ORDER
Pursuant to due call and notice thereof, the meeting was called to order at 6:30 p.m.
2. PLEDGE OF ALLEGIANCE
The Pledge of Allegiance was recited.
3. CONSIDER AGENDA
Moved by Commissioner Johnson and seconded by Commissioner Booth to approve the
agenda. Motion carried 6-0.
4. CONSIDER MINUTES
Moved by Commissioner Johnson and seconded by Commissioner Booth to approve the
following consent items as outlined in their respective staff reports. Motion carried 6-0.
4.1 DRAFT Minutes - May 26, 2026
5. PUBLIC HEARINGS
5.1 Conditional Use Permit: Bluff Impacts within the Shoreland Management District, Randall Tesdahl -
16892 Yale St NW
The staff report was presented.
Chair Beise opened the public hearing.
Kari Ziebell, 16864 Yale St NW, asked if there were restrictions on hours of the day the path could
be used. She had concerns with neighbor privacy, trucks driving at night and shining headlights in her
windows, damage that has already done to the bluff, the use of pesticides in the applicant's garden, and
Planning Commission Minutes
June 23, 2026
---------
Page 2 of 9
the applicant hunting in his backyard or shooting guns.
Mr. Leeseberg stated the request was for a pedestrian pathway and the intent was not for vehicles. He
stated the path would need to be professionally designed as narrow as possible. Concerns about
hunting or gun use should be directed to the Police department. The application does not address the
use of garden pesticides. Mr. Leeseberg stated there is a cross-access easement for neighboring
properties.
Ms. Ziebell added that there was not a cross-access easement and the applicant had lost that after suing
the neighbors.
Commissioner Johnson asked if the trail could be limited in size or if there was a minimum width. Mr.
Leeseberg stated the condition stated the trail should be as narrow as possible, and it was expected not
to be wide enough for a truck. He stated the Commission could restrain the width of the trail but they
could not limit hours of operation.
Ms. Ziebell added that the applicant shines vehicle headlights into their homes at night and that garbage
from his property floats into their yards. Mr. Leeseberg suggested she contact the Code Enforcement
Official with concerns about garbage.
Ms. Ziebell asked if there would be a soil and engineering report for neighbors concerned about
erosion.
Commissioner Johnson stated the site would need to be professionally engineered. He recommended
the city environmental department review any approved plans.
Commissioner Kaba asked if there was a percentage of vegetation the applicant was allowed to remove.
Mr. Leeseberg stated that the amount has not been quantified. Commissioner Lang asked if it was up to
the construction company to determine the width or how it could be determined. Mr. Leeseberg
suggested a condition stating that the width should support an Americans with Disabilities Act (ADA)
apparatus.
Randall Tesdahl,16892 Yale St, applicant, stated he has lived at the property for 12 years. There is
a pathway that starts two properties south of his and goes through the entire neighborhood with an
easement. He stated he is not able to use this easement. He went to court to try to gain access to the
easement but lost the case. He stated he has Parkinson's disease and will eventually have reduced
mobility. He wants access to the lower part of the property.
Chair Beise asked Mr. Tesdahl how wide of a trail he was proposing. Mr. Tesdahl stated it would not be
wide enough for a truck.
Chair Beise closed the public hearing.
The Commission felt it was a reasonable request with the modification of two conditions.
Commissioner Johnson suggested that Condition 9 be modified to state that finalized plans need
approval by the city environmental department as well as adding ADA requirements to Condition 2.
Moved by Commissioner Johnson and seconded by Commissioner Lang to recommend
Planning Commission Minutes
June 23, 2026
---------
Page 3 of 9
approval of the Conditional Use Permit with the following conditions to satisfy the
standards set forth in Section 30-654:
1. The pathway shall be professionally engineered and designed to ensure long-term
slope stability and minimize erosion potential.
2. The pathway width shall be limited to the minimum width necessary to
accommodate safe access without encumbering ADA mobility requirements.
3. The pathway shall be designed with the flattest practical grade to reduce erosion
and improve accessibility.
4. Existing vegetation shall be preserved to the greatest extent practicable, with only
selective removal permitted as necessary for construction.
5. Appropriate erosion and sediment control measures shall be installed and
maintained during construction.
6. A grading permit shall be obtained prior to commencement of any land-disturbing
activities.
7. Any retaining wall exceeding four (4) feet in height shall require a separate building
permit and shall be designed by a Minnesota-licensed structural engineer.
8. The applicant shall comply with all recommendations and requirements of the
Minnesota Department of Natural Resources, if applicable.
9. Any plans, once finalized, shall be reviewed and approved by the City
Environmental Department.
10. The Conditional Use Permit shall remain subject to all applicable City Code
requirements and permit conditions.
Motion carried 6-0.
5.2 Conditional Use Permit: Auto Repair, Uval Butuc - 18332 Joplin St NW
The staff report was presented.
Councilmember Wagner arrived at 6:52 p.m.
Commissioner Booth asked if the applicant was considering painting. Mr. Leeseberg stated the applicant
has not asked for a paint booth at this time.
Chair Beise opened the public hearing.
Theresa Hoernemann, 18239 Kent St NW, stated that the back of her home faces the area. She
has noticed an uptick in noise from the JonnyPops facility. She also noted there was a recent dumpster
fire in the parking lot of the applicant's building and the area has looked junky in the past, although it
looks clean at the moment. She asked about the hours of operation and stated some of the current
tenants sometimes work on weekends.
Commissioner Johnson stated the application lists hours of operation as 9:00 a.m. to 5:00 p.m. Mr.
Leeseberg stated there was not a condition addressing hours but a condition stating the garage door
had to be closed could reduce the noise.
Mr. Leeseberg added that the city could review if the debris was on this property or on the JonnyPops
facility property.
Planning Commission Minutes
June 23, 2026
---------
Page 4 of 9
Lois George, 18276 Kent St NW, stated that when JonnyPops went in, the neighbors were told
there would be no noise. However, there is noise well into the evening. She asked if painting would be
done on the site and expressed concern about the smell, security of her property, and noise.
Chair Beise closed the public hearing.
Commissioner Johnson asked about the term "body work". Mr. Leeseberg stated the applicant had
indicated they were performing "cosmetic work." Commissioner Johnson asked if excess noise,
chemicals, and fumes would be addressed through the building permit process. Mr. Leeseberg stated
noise would not be regulated through a building permit, but the site could be required to add sound
"baffles" to reduce noise.
Commissioner Johnson suggested amending Condition 2 to state that the garage door should remain
closed.
Moved by Commissioner Johnson and seconded by Commissioner Booth to recommend
approval of the Conditional Use Permit with the following conditions to satisfy the
standards set forth in Section 30-654:
1. The Conditional Use Permit shall authorize only vehicle body work and no
mechanical repair work, including engine, transmission, drivetrain, exhaust, or
similar vehicle repairs, shall be conducted on the property.
2. All repair activities shall occur entirely within the enclosed building and all openings
in the building envelope shall be closed when repair activities are occurring.
3. The north side of back parking lot shall be screened, as shown on the staff exhibit,
by a six-foot high 100 percent opaque fence constructed of factory finished metal or
vinyl material.
4. The outdoor storage of operable vehicles shall be allowed only in the screened in
area.
5. The outdoor storage of inoperable or abandoned vehicles, vehicle parts, equipment,
materials, or repair-related items is prohibited.
6. This approval does not authorize motor vehicle sales, vehicle display for sale, or any
other use not specifically approved herein.
7. The parking lots shall be striped.
8. The applicant and/or property owner must apply for all required commercial
building, electrical, plumbing, and/or mechanical permits before any associated
activities can occur.
Motion carried 6-0.
5.3 Ordinance Amendment and Conditional Use Permit: Data Center, Michael Margulies - 19178
Industrial Blvd NW
The staff report was presented.
Commissioner Booth clarified that annual noise monitoring would be paid for by the applicant. Mr.
Carlton stated the applicant would pay for and provide the results to the city. If any issues were noted,
they would need to be resolved within six months.
Planning Commission Minutes
June 23, 2026
---------
Page 5 of 9
Commissioner Bland asked if there was any legal obligation to approve the Ordinance Amendment. Mr.
Carlton stated there was not. If the Ordinance Amendment was denied, the related Conditional Use
Permit would need to be denied as well. However, the Planning Commission would still need to act on
it.
Commissioner Johnson asked if setbacks could be established for industrial or commercial properties.
Mr. Carlton stated a certain amount of noise was expected in an industrial area and Minnesota Pollution
Control Agency (MPCA) noise standards would need to be met. The Commission could choose to add
setback requirements.
Commissioner Bland asked if there was any data to support the 500 and 750 foot setbacks. Mr. Carlton
stated the amounts had been garnered from peer communities.
Commissioner Bland asked why the 35 MW limitation had been determined. Mr. Carlton stated that
amount was determined based on capacity discussions with Elk River Municipal Utilities (ERMU).
Commissioner Bland clarified that the noise study had to be estimated and was theoretical. Mr. Carlton
confirmed and stated there would also need to be a post construction noise evaluation with
remediation as needed.
Commissioner Johnson asked about noise mitigation if noise thresholds were exceeded. Mr. Carlton
stated some potential mitigation could include higher walls or acoustic paneling.
Commissioner Lang asked which type of glycol would be used and if there was a plan for chemical spills.
He also asked about backup batteries for the generators and if the city was equipped to respond to a
large-scale lithium fire. Mr. Carlton stated the applicant would need to follow industrial chemical use
standards and the battery backup was not addressed in the proposed Ordinance Amendment.
Mr. Carlton explained that the applicant would still need to go through the building permit process if
their Conditional Use Permit was approved. Part of the approval would be a review by the fire
marshal.
Commissioner Lang asked if there was an option to create a Planned Unit Development (PUD) or
other specialty zoning versus an Ordinance Amendment. Mr. Carlton stated a PUD could be an option.
Commissioner Bland confirmed that, if the ordinance is passed and a data center meets the
requirements, the city is legally obligated to allow it. Mr. Carlton stated that was true. Mr. Carlton
added that the city would have more discretion in approving a PUD rather than a CUP.
Ryan Skoug, ESI Engineering Noise Engineer, reviewed the noise study results. He reiterated
that the city cannot be more restrictive than the MPCA guidelines on noise. He stated that measuring
ambient noise helps to determine if noise from a developer is exceeding the noise standards or if it is
already existing. He stated the report measured the noise from one generator running at 100%
capacity.
Mr. Skoug commented that the draft ordinance was unclear about measurements versus calculations.
He added that C and Z weighted frequencies do not have MPCA standards yet.
Planning Commission Minutes
June 23, 2026
---------
Page 6 of 9
Mr. Carlton stated that the ordinance asked for C and Z weighted measurements, but the City could
not deny a request based on these standards because the MPCA does not provide criteria to meet. Any
application denied has to be based on legal facts and standards.
Chair Beise asked if the state eventually regulates C and Z weighted standards; would that be covered
by this ordinance? Would existing data centers need to update to the new requirements or would they
be grandfathered in? Mr. Carlton would need to research if the city was allowed to retroactively
request pre-existing applicants abide by new standards.
Commissioner Booth asked if the city could establish C and Z weighted standards since the MPCA does
not have them. City Attorney Enslin stated that is not how the current draft ordinance is set up. The
current draft ordinance is more vague.
Commissioner Bland asked what standards the Commission is allowed to set for limits on noise. City
Attorney Enslin stated the city cannot be more restrictive than the state as to A-level frequencies. Mr.
Carlton added that any business in Minnesota has to abide by the MPCA noise standards.
Commissioner Lang asked for more information on the purchase of power.
Mark Hansen, General Manager of Elk River Municipal Utilities (ERMU), explained that
power was purchased through Minnesota Municipal Power Agency (MMPA) and requests are analyzed
on a case-by-case basis. The amount of 33 MW was arrived at after the developer approached ERMU to
verify that amount of power was available and ERMU determined the proposed site was in a relatively
fully developed area.
Commissioner Lang asked if ERMU would have capacity for additional data centers. Mr. Hansen
explained that future data center applicants would need to check with ERMU to see if there was
available capacity. Mr. Carlton explained that, just as some development sites need soil testing to
determine if they can support structure, in the same way, power needs would need to be evaluated per
site rather than mandated.
Commissioners Lang and Bland commented that the ordinance seemed to be written for this specific
data center based on the 35 MW limit being proposed in the Ordinance Amendment.
Commissioner Lang asked for more information on the estimated $600,000-$800,000 revenue transfer
between ERMU and the City. Mr. Hansen explained that the current citywide load for electricity is
approximately 60–65 MW. The applicant would be asking for 33 MW but would require fewer switches
and fewer miles of feeder distribution system than the current 14,000 electrical customers. This could
create a stabilizing effect on the rates.
Commissioner Bland felt it was hard to see the benefits without more precise facts. Mr. Hansen stated
this one customer could provide millions of dollars of profits which may combat future rate increases,
avoid future bonding, and increase reserve funding.
Chair Beise opened the public hearing.
Tim Jones, owner of Aegir Brewing, 19050 Industrial Blvd NW, stated that the MPCA noise
levels in an industrial area were at a level to cause hearing loss if exposed over an eight-hour period. He
asked if the city could have a vote, whether official or not, to get citizen input. He also asked if the city
Planning Commission Minutes
June 23, 2026
---------
Page 7 of 9
would be held accountable for any harm a data center could cause to the community.
Jesse Lang, 19371 Upland St NW, questioned the backup power, the background noise of the noise
study, and the setback amounts. He asked about a scenario where all 10 backup generators would be
running with a power outage. He asked that the city consider a moratorium and the formation of a task
force with broad representation to produce comprehensive guidance on how modern data centers
affect communities.
Rebecca Reule, 19551 Vernon St NW, asked that the city put a moratorium in place. She was
concerned about home values.
Ian Rolshouse, 12542 194th Ln NW, asked if the data center could be heard from his house.
Jessica Rolshouse, 12542 194th Ln NW, stated the MPCA guidelines were established in 1976
before data centers were a consideration. She stated that vibrations should not be felt for more than
three minutes. She asked if low level frequencies violate the existing city code.
Rochelle Muellenberg, 13432 Meadowvale Rd NW, asked if land could be annexed into Elk River,
rezoned as I-1 or I-2, and allowed to develop a larger data center. What prevents data centers from
getting out of control?
Anna Wagner 12616 3rd Ave S, Zimmerman, stated her biggest concern was with "infrasound".
She asked if the City was willing to exchange residents' health for money. She asked the City to "take a
pause" on the issue.
Cynthia Remick, 18384 Xerxes St NW, asked how diesel is being stored on the property. Chair
Beise stated the State regulates the storage of diesel. Ms. Remick stated that 500 feet is very close to
residential homes and living close to diesel is hazardous. She urged the City to look into how many
Minnesota cities have set a moratorium on data centers.
Chair Beise closed the public hearing.
Mr. Carlton addressed some of the questions and comments. Public vote on the issues is not allowed
on the ballot but an informal poll could be conducted on social media. Mr. Carlton stated a moratorium
was an option if the Commission was interested. Mr. Carlton stated that land annexation was a
complex process but, theoretically, it could be turned into industrial land and used for a data center. He
added that testing could be updated to require all generators and chillers be tested for noise running
simultaneously.
Commissioner Lang was interested in more information on a moratorium. Mr. Carlton explained that, if
a moratorium was passed, any active application still has to be processed. If the Commission was
interested in a PUD rather than an Ordinance Amendment, the current Ordinance Amendment would
need to be denied.
Commissioner Bland stated he was not comfortable with a 500-750 foot setback and those numbers
felt arbitrary. He added that the proposed limit of 35 MW was due to one specific application.
The Commission was in favor of a PUD and a six-month moratorium. They also suggested a public poll.
Planning Commission Minutes
June 23, 2026
---------
Page 8 of 9
Moved by Commissioner Eric Johnson and seconded by Commissioner Dennis Booth to
recommend denial of the requested ordinance amendment due to concerns with
amending the entire I-1 and I-2 zoning districts. Motion carried 6-0.
Moved by Commissioner Eric Johnson and seconded by Commissioner Dennis Booth to
continue the hearing for the Conditional Use Permit Application to July 28, 2026. Motion
carried 6-0.
6. GENERAL BUSINESS
There was no general business.
7. COUNCIL LIAISON UPDATES
Councilmember Wagner asked if Mr. Carlton could explain what a PUD was for the meeting attendees.
Mr. Carlton explained a Planned Unit Development process could give the Planning Commission and
City Council more discretion in reviewing future data center applications.
Mr. Carlton explained that the Planning Commission was a recommending body and the City Council
would have the final decision on the Ordinance Amendment for the data center.
Councilmember Wagner stated, at the June 15, 2026 meeting, the City Council added "recreation" use
as an Interim Use Permit in the Business Park (BP) zone.
8. MOTION TO ADJOURN REGULAR MEETING
Moved by Commissioner Johnson and seconded by Commissioner Booth to adjourn the
meeting. Motion carried 6-0.
Councilmember Wagner left at 9:15 p.m.
The regular meeting adjourned at 9:15 p.m. Chair Beise called the work session to order at 9:21 p.m.
9. WORK SESSION
9.1 Roles and Responsibilities of the Planning Commission
Mr. Carlton asked the Planning Commission if they wanted to continue with Item 9.1 or add it to a
future meeting.
Moved by Commissioner Johnson and seconded by Commissioner Bland to continue Item
9.1 Roles and Responsibilities of the Planning Commission to a future meeting. Motion
carried 6-0.
10. MOTION TO ADJOURN
Moved by Commissioner Johnson and seconded by Commissioner Booth to adjourn the
meeting. Motion carried 6-0.
The meeting adjourned at 9:22 p.m.
Planning Commission Minutes
June 23, 2026
---------
Page 9 of 9
Minutes prepared by Katie Porath.
__________________
Perry Beise, Chair ______________________
Justin Dunford, City Clerk