Downtown DiscussionCity of j ElkJ, River General Questions ■ Concrete: Do we want to maintain a consistent look with standard brushed concrete, or explore opportunities to incorporate colors, textures, or other decorative finishes in select areas of downtown? ■ Limits abutting structures on the property line: A concrete ribbon fronts most older downtown buildings. We anticipate leaving it in place adjacent to structures to avoid potential foundation impacts and provide a consistent project boundary. Where it extends through green space and can be safely removed, we anticipate removing it. ■ ADA Accessibility: We will make practical efforts to improve accessibility to downtown businesses, but varying entrance elevations make full ADA compliance at every doorway infeasible. We should discuss whether improvements should remain within the public right-of-way or, where practical, extend onto private property through temporary access agreements. ■ Electrical: In meeting with ERMU, we determined that reusing the existing lights could save approximately $200,000-$300,000. ERMU would remove, store, and clean the lights during construction, then reinstall them on new bases near project completion. New underground wiring would be required through the project. Further, would we like to install electrical outlets on every raised bed? Location Specific Questions -See attachments 1 Are there any visions for the 7' strip added from the parking lot improvements? Turf, mulch/shrubs, concrete with tree grates, etc.? 2 How about for the raised islands areas within the parking lot? Trees are anticipated, but what fills the space around the trees is yet to be determined. 3 With the change to parallel the east side gets much better access, and we also gain more room for larger planters/benches, as well as clear walk zone free of any obstacles like light poles. 4 Reconstruction limits end just west of Parrish. We plan to mill/overlay old pavement between Parrish/TH10. ver 5 Paver limits —Although some of these pavers extend outside our scope area, we plan to remove and replace with concrete. 6 In the Downtown Master Plan, there was a concept for a turnaround. Is this worth exploring? 7 Hatch this area like how it is now? No parking would be allowed, but delivery/move-in trucks frequently utilize it. Otherwise, curb line could be pushed north making this area inaccessible. 8 Paver limits proposed at red line. All pavers south of this line and into Rivers Edge Park would remain. 9 In the Downtown Master Plan, there was a concept for a mini roundabout. Is this worth exploring? M�fstDM i C]rtira�dvnti[s l v d `:e/4 d i 10 Pavers north of the red line are on private property and we are proposing leaving them in place. K zm �z OE JW Mau ME a 1MNMV 9NIH Il 1 Wd SE�LZ�I 9Z0!'9ZBF "�I "I35tl9 .i[ »wi�s��w��[jICL][ v]�•JL�/[�f g1�f5�K C m 2 U a 1 r; Al� - - -- a III�II , I - lit ii Z-----------I I ~ �J — 13nUAV 9NIN oz J W OE ad 11 ife - h ❑M LO r-4 rCD onj to Q ❑ pARISN AVENUE a -_ Ifll Q = fJ I ��� IN/f/jp ■ --- � 2 V I I � � I I I Wd SV:SLI 9ZOL/9