Loading...
5.4. SR 04-03-2006 E~ River City of Elk River REQUEST FOR COUNCIL ACTION Agenda Section Meeting Date En . eerin A ril3, 2006 Item Description Highland Road Reconstruction Improvement-Public Hearing · Resolution Ordering Improvement and Preparation of Plans and S ecifications Introduction The public hearing for the reconstruction of Highland Road between Proctor Road and Jackson Street is scheduled for April 3, 2006. Published notice has been placed in the Star News and individual notices mailed to the affected property owners according to State Statute. The City Council is asked to bring along the feasibility study for this project which was included with the March 6, 2006 City Council packet. Discussion The feasibility study proposes to reconstruct Highland Road from Proctor Road to Jackson Street to a narrower urban standard, including concrete curb and gutter with pedestrian facilities located on both sides of the roadway. The existing right-of-way is 80 feet in width and is sufficient for the proposed improvements. Watermain already has been extended by the Elk River Municipal Utilities across Highland Road. The proposal is to have minor modifications made to the existing watermain so that the newly constructed Highland Road will not need to be excavated in the future to get to the watermain. It is proposed to have sanitary sewer extended underneath the newly constructed Highland Road and funded by the Sewer Fund. Financial Impact The reconstruction of Highland Road is proposed to be assessed at $6,500 per unit following past City practices for reconstruction projects. The remaining street cost estimated at $584,500 would be eligible for Municipal State Aid Funding. The Elk River Municipal Utilities are being asked to pay $95,000 for modifications to the existing watermain. The City Sewer Fund is proposed to pay $280,000 for the extension of sanitary sewer under Highland Road for future use. Attachments . Resolution Ordering the Improvement and the Preparation of Plans and Specifications in the Matter of the Highland Road Improvement of 2006 (since this is a City-initiated project, this resolution requires 4/5 vote for adoption). Action Requested After the close of the public hearing, the City Council is asked to consider adoption of the attached Resolution Ordering the Project and the Preparation of Plans and Specifications. Council Action Motion by _ Second by _ Vote Follow Up RESOLUTION 06 -_ A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION ORDERING THE IMPROVEMENT AND PREPARATION OF PLANS AND SPECIFICATIONS IN THE MATTER OF THE HIGHlAND ROAD RECONSTRUCTION IMPROVEMENT OF 2006 WHEREAS a public hearing relating to the Highland Road Reconstruction improvement was held before the Elk River City Council after ten days mailed notice and two weeks published notice of the hearing was given; and WHEREAS the City Council has duly considered the Feasibility Report and those matter presented at the public hearing by those person desiring to be heard on the matter; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota: 1. The Highland Road Reconstruction improvement is hereby ordered as recommended in the Feasibility Report dated February 27, 2006. 2. T eny J. Maurer, City Engineer is hereby designated as Project Engineer for this improvement. The Project Engineer is directed to prepare plans and specifications for the making of the improvement and the solicitation of competitive bids. Passed and adopted this 3rd day of April, 2006. Stephanie A. Klinzing, Mayor ArrEST: Joan M. Schmidt, City derk S:\EngineerImprovProj\2006 Improvement Projects \Highland Road\Res order impr-prep plans&specs.doc