Loading...
01-29-1973 PC MIN Village Planning Commission~-Jan. 29th, 1973. The question of a traffic study was brought up and it was stated that there are funds available to get help ~ from the Highway Dept. It was suggested that we Inake application for such help. Pat Dwyer appeared for theBank of Elk River concerning a Change of Zoning for a tract of land under option at the corner of Main and Evans. A tenative date for a hearing was set for Feb. 26th, but consideration of the drainage and of sub-soil moisture at the site were to be considered further before notice of hearing was to be published. The area is drained by a branch of County Ditch No. lO, and difficulties are antisipated concerning the upgrading of the ditch to provide better run-off. Paul Carton appeared concerning two lots zoned R-2 on Proctor. The lots are too small for R-2 and thetalk was concerning a change of zoning and the building of a 4 unit appartment on the site. A preliminary plat of Meadow Park (South of Main street and East of Evans was discussed. The same talk about the Branch of County Ditch No. 10 was brought up and it was decided to have the plat changed to eliminate of low land as a park and also to require the lots to EE meet the minimum width standard of 85 feet De-Bart Addition. The preliminary approval of the plat was considered. Dischssion brought out that the plat was within the 2 mile limit of the village if the park on the west side of lake Orono had been incorporated into the village. No notice of such an addition to the village limits had reached the Register of Deeds but the Mayor of Elk River says that a resolution annexing the park to the Vill~ge had been passed about 3 years ago. It was Moved~Seconded and Carried that the plat be approved as presented. THE VILLAGE COUNCIL HAS AUTHORIZED AND ADDITIONAL $2000 FOR THE PLANNING COMMISSION. THIS IS ADDED TO THE $400.00 that wasset aside for the use of the planning commission about 2 years ago. THE PLANNING COMMISSION WAS INFORMED THAT THE VILLAGE COUNCIL HAD RE AFFIRMED THEIR POLICY THAT THEY WOULD NOT RUN SEWER AND?OR WATER OUTSIDE THE VILLAGE LIMITS --THUS REQUIRING ANNEXATIONNBEFORE THE EXTENSION WOULD BE CONSIDERED. POST OFFICE Pat Donohue appeared with a building permit application which had been rejected by the building enspector, because ihe site plan wid not provide the minimum off-street parking for Customers, Paytorns and Employees. The location was also discussed concerning traffic pattern. The mater of accquisition of additional property was also discussed to provide for compliance with the off-street parking regulations.