Loading...
11-24-1980 PC MIN EU( RIVLR PLP~NING CO~Th1ISSION I~ETING HELD AT THE EhK RIVER PUBLIC LIBRA-BY NOVE~ffiER 24, 1980 Members Present: Commissioners Hinkle, Tracy, Busch, Driessen, and Kreuser Also Present: Herbert S. Adolphson, Cow_munity Development Director 1. Meeting Called to Order The meeting was called to order by Chairman Hinkle at 7:40 p.m. 2. ~.unutes Approval of the minutes of the October 27, 1980 meeting was tabled until the next meeting. 3. Agenda Gary Santvrire, proposed phasing plan was added to the Agenda. 4. Neil Larson, Conditional Use Permit and Zone Change t~. Larson was present for this request. He said he vTould propose to upgrade the present Mobile Gas Station at 3rd and Jackson to include a car wash. A new front would be put on the building and some building defects from roof to foundation corrected. Also the property vTould be upgraded from present condition. The gas pumps would stay, and the car wash (a two minute process) viould be coin operated. The polishing portion would be a 20-minute process (approximately costing $20-$30). There would be a lounge for these customers and also a bathroom. He said there would be a minQmum of two employees, one cashier and one customer service. Commissioner Tracy asked about how much water \fould be used. He said he did not know, but it would be a cold water operation. COITI.1nissioner Hinkle asked if a study had been made of the traffic problems that might be created with stacking when a train came through. ~ITe Larson said he had not, but, the gas station now PQmps 30 to 40 thousand gallons per month and he expects an increase of 25%. Cow~issioner Driessen asked about the hours of operation. I~. Larson said it would be from approx- imately 7 a.m. to 9 or 10 p.m. There was discussion on changing the zone from C2 to C3 and the consequences. CO~~~ISSIOIillR DRIESSEN MOVED TO RECOr~lliND TO Th~ CITY COUNCIL SPOT ZONING A CHANGE FROM C2 TO C3 FOR THIS PP~TICUh~R PROPERTY. CO~IT~SSIONER BUSCH SECONDED THE MOTION. MOTION CARRIED 3-1. ONE ABSTENTION (TRACY). COt~4ISSIONER DRIESSEN RECOr@lliNDED TO THE CITY COu~CIL THE GRANTING OF A CONDITIONAL USE PERMIT FOR A CAR WASH IN THAT AREA. CO~ID1ISSIONER BUSCH SECONDED THE MOTION. MOTION CARRIED 4-0. 5. Gary Santwire, Proposed Phasing Plan ~rre Santwire presented his proposed phasing plan for his F.U.D. tie has a separate Developer's ft~reement, drawn up by the City, the City Attorney, and himself in which he is to submit a phasing plan to the Planning Commission. He said the City and he agreed the cOID~ercial would be done within 1-5 years as an individual cownercial site phase. Before any commercial site could be constructed, he \vould have to submit his plans to the Planning Co~mission for site and landscaping plan, building plan, and architectural review. He would have to have approval from the Planning COID~ission and City Council for the final phasing plan before proceeding. Com~issioner Hinkle asked why it 1fas decided the Planning Co~mission would have the final word. ~IT. Santwire said Page n'TO November 24, 1980 it \.Tas discussed 1'rith Bob Ivlidda-tlgh, Zack Johnson, and the City- Attorney; and also he did not want to have to deal with a four-step process each time. He said the phasing plan shows the phases he intends to use to develop the P.U.D. He also presented drawings of the types of architecture and floor plans of the buildings for Phase 1. They are two typical townhouses -- one tuck-under garage and one garage out front. Co~missioner Driessen asked how these units would be heated. vrr. Santwire said either by natural gas (probably the new furnace type with the pipe out the side) or with heat pumps. Fire places are an option constructed of wood to match the exterior. The Commission asked about the homeovmer's agreement. ~tr. Santwire said under the Developer's P~reement there would have to be an agreement drawn up before a building permit was issued. Membership in the association would be mandatory (no building cannot belong) and would provide for property and street maintenance. They would pick their own board of directors who would then hire a maintenance firm or hire a firm to manage this for them. Commissioner Busch asked what would happen if no one wanted the responsibility. ~rr. Santwire said he thought this was very unlikely and that the City would probably have the right to do the snow removal, etc., with their properties being assessed for the charges. Co~missioner Driessen asked about the limita- tions placed on how many cars, junk cars, or repair work in garages. r~. Santwire said they had thought of limiting to two vehicles or the amount of garage space they owned and also limiting types of swingsets, etc. Co~_missioner Tracy felt the Commission should have a copy of the Developer's Agreement. r~. Adolphson said he 1vould get copies for the COID~ission members when they are signed. COr@ITSSIONER TRACY MOVED TO ft~PROVE THE GENERAL CONCEPT AS PROPOSED. CO!~~ISSIONER KREUSER SECONDED THE MOTION. MOTION CARRIED 4-0. COW4ISSIONER BUSCH MOVED TO APPROVE THE BUILDING LAYOu~S IN PHASE 1. COD~1ISSIONER TRACY SECONDED THE MOTION. MOTION CARRIED 4-0. 6. Orono Dam Slides ~tr. Adolphson presented slides showing the Cow~ission the extent of the work done on the Dam. 7 . ..4.dj ournment The meeting was adjourned at 9:40 p.m. Respectfully Submitted~ /~--// / ~//~~/ / //)4-f;r; ?;~4~~ Herbert S. Adolphson Community Development Director DD:po