5.2. & 5.3. SR 01-25-1993
ITEM 5.2. & 5.3
TO:
MAYOR AND CITY COUNCIL
FROM:
STEPHEN ROHLF, BUILDING AND ZONING
ADMINISTRATOR
DATE:
JANUARY 11, 1993
51C
SUBJECT: PRELIMINARY PLAT REVIEW AND
VARIANCE FOR THE PLAT OF HERITAGE
LANDING BY RICHARD KINCANON AND
DENNIS CHUBA/PUBLIC HEARING
CASE NO: P 93-001, V 92-009
Richard Kincanon, property owner, and Dennis Chuba,
builder/developer, are proposing a 76 lot single family plat
with City sewer and water. They are also requesting a variance
of the maximum length of a dead-end road associated with the
plat.
ATTACHMENTS TO THIS MEMO
1.
Staff's December 16, 1992, Memo to the Planning
Commission. Included with this memo is a map showing
the general location of the affected property, a memo
from Terry Maurer, City engineer, dated December 17,
1992, and the developers responses to the five
standards for granting a variance. We encourage the
Council to read this memo for details regarding
staff's review of the plat.
.
2. Staff's Memo to the Park and Recreation Commission,
Dated December 7, 1992. There is a proposed primary
trail loop identified by the Master Park Plan in the
general location of this plat.
3. An additional memo from Terry Maurer, dated January
18, 1993.
4. A petition from the developers requesting the
public improvements associated with the plat be done
as a City project.
5. A Resolution accepting the developers petition.
6. A letter of intent to cooperate in building a storm
water retention area from Irv Moldenhaurer to the
developers.
7. The preliminary plat.
.
720 Dodge Avenue N.W., Elk River, Minnesota 55330 (612) 441-7420
Plat/Variance, Richard Kincanon
January 11, 1993
Page 2
.
PUBLIC IMPROVEMENTS
The developers have petitioned for the public improvements
associated with this plat (sewer, water, storm drainage,)
to be done as a City project and assessed back to the
individual lots. Staff recommends the Council accepts the
petition and orders a feasibility study. In his latest
memo, Terry Maurer elaborates on the process for public
improvements to be done as a City project.
Staff recommends money is escrowed by the developers to
ensure the tax payers do not end up paying for the
feasibility study, if the project falls through. If the
project does happen, the cost of the feasibility study
would be added to the cost of the project and assessed
back against the lots. Staff also recommends monies are
escrowed to cover the cost of preparing plans and specs
when they are ordered.
.
One special note, the developers are asking
grading associated with the plat, including lot
be part of the public project and assessed.
attorney, Peter Beck, indicated this is acceptable
as the developers agree to it, which they did
their petition.
for all
grading,
City
as long
through
The feasibility study will look at the alternative routes
for getting sewer and water to the project as well as the
associated costs. The route taken should consider which
property owners, besides the developers of this project,
are looking to develop in the near future. Staff will be
meeting with the owners of undeveloped property in the
area regarding this subject.
STORM DRAINAGE
1.
During the 1990 Focus Area Study for this area, it
was recommended that storm water holding ponds be
used to retain the increase in run-off from
development, which would also allow for sedimentation
of impurities prior to release of water to the
Mississippi River. As you will note on the
preliminary plat, no holding ponds are proposed on
this site.
.
Instead, the developers are proposing a holding pond
in the flood plain of the Mississippi, on land owned
by Irv Moldenhaurer. A letter, from Mr. Moldenhaurer,
indicates his intent to cooperate with the
construction of this pond. The same pond could be
used for storm water from Mr. Moldenhaurer's
property, when he develops it. Staff hopes to meet
with Mr. Moldenhaurer and the developers prior to the
Plat/Variance, Richard Kincanon
January 11, 1993
Page 3
.
City Council preliminary plat meeting and will update
the Council on that meeting. Staff recommends that
prior to final plat approval, the City is in receipt
of easements from Mr. Mo1denhaurer so the holding
pond can be constructed as part of the public
improvements associated with Hertiage Landing. Staff
will cooperate with the DNR regarding this pond.
PARK DEDICATION
The issue of park dedication for Heritage Landing was in
front of the Park and Recreation Commission at their
January 7, 1992, meeting. Those present included, Phil
Ha1s and Stephen Rohlf representing staff, the developers,
and 2 of the Park and Recreation Commissioners. Although
there was not a quorum of Park and Recreation Commission
members, it was the consensus of those present that park
issues should be resolved during preliminary plat review
by the Council and the developers should not be delayed
due to the Park and Recreation Commission not having a
quorum at their meeting.
.
Mr. & Mrs. Hecker were also at this meeting. The Hecker's
live south of County Road 30 and east of the plat. Their
house is situated within 25 feet of the proposed trail.
They were concerned about their privacy. A rearrangement
of several lots and the proposed trail will allow a
greater distance from the Hecker's house to the trail,
without the developers losing any lots. The developers
agreed to this compromise.
The consensus of those present at the Park and Recreation
meeting regarding other park issues is reflected in the
recommendations included in this memo.
FUTURE EXTENSION OF JOPLIN STREET
Joplin Street is planned to be extended north of County
Road 30 and connect with Highway 10 in the location of the
current Orono Road/Highway 10 intersection. Terry Maurer
explains this under Item 12 of his December 17th memo.
If Joplin Street were to be extended north in its current
alignment, it would run into Sue Lakoduk's house, which is
situated just north of County Road 30. Therefore,
realignment of Joplin Street south of County Road 30 must
be considered prior to establishing the lots in Heritage
Landing. The Planning Commission is recommending against
realignment Joplin Street, south of the County Road, to
the east and consequently affecting the lots in this plat.
.
Mr. Maurer has
this situation.
land owned by
elaborated on the other alternatives to
All of these other alternatives involve
Mrs. Lakoduk. Also, Joplin would be
Plat/Variance, Richard Kincanon
January 11, 1993
Page 4
.
extended when Mrs. Lakoduk's property develops. Staff
will be meeting with her prior to the Council meeting on
Heritage Landing. We will update the Council on the
results of that meeting.
RECOMMENDATIONS FROM THE PLANNING COMMISSION
A. Preliminary Plat
1. PRELIMINARY PLAT IS CONTINGENT UPON OTHER
APPROVALS BEING GRANTED (VARIANCE FOR 180TH
AVENUE, COUNTY ACCESS PERMIT FOR GARY STREET TO
ACCESS COUNTY ROAD 30, AN MPCA PERMIT FOR AN
EXTENSION OF SEWER, A DEPARTMENT OF HEALTH PERMIT
FOR THE EXTENSION OF WATER, AND DNR APPROVAL OF A
STORM HOLDING POND, IF NECESSARY).
2. IMPROVEMENTS PROPOSED TO BE ACCEPTED BY THE CITY
ARE SECURED BY A LETTER OF CREDIT FROM THE
DEVELOPERS FOR 100% OF THEIR ESTIMATED COSTS.
3. A DEVELOPERS AGREEMENT IS ENTERED INTO REFLECTING
THE STIPULATIONS OF APPROVAL OF THIS PLAT.
.
4. THE ESTIMATED COSTS INCURRED BY THE CITY FOR
REVIEW OF THIS PLAT ARE REIMBURSED PRIOR TO CITY
COUNCIL ACTING ON FINAL PLAT.
5. THE ESTIMATED COST OF THE FIRST SEAL COATING OF
ROADS WITHIN THIS PLAT IS PAID TO THE CITY BY THE
DEVELOPER PRIOR TO RECORDING THIS PLAT.
6 .
GLEN SUNDEEN, ELK RIVER
DETERMINES THE APPROPRIATE
LIGHTS WITHIN THE PLAT.
DEVELOPER'S RESPONSIBILITY
AND THEIR INSTALLATION,
RESPONSIBILITY TO PAY FOR
THEM.
MUNICIPAL UTILITIES,
LOCATION OF STREET
FURTHER, IT IS THE
TO PAY FOR THE LIGHTS
AND THE CITY'S
THE ELECTRICITY TO RUN
7. THE LOCATION FOR THE FUTURE EXTENSION OF JOPLIN
STREET IS RESOLVED PRIOR TO FINAL PLAT APPROVAL.
IT WAS THE RECOMMENDATION OF THE PLANNING
COMMISSION THAT THE EXTENSION OF JOPLIN STREET
WOULD AFFECT THE LAYOUT OF HERITAGE LANDING.
8. THE DESIGN FOR ALL PUBLIC IMPROVEMENTS WITHIN THE
PLAT IS THE RESPONSIBILITY OF THE CITY ENGINEER.
.
9. LOTS SITUATED ON CUL-DE-SACS WITHIN THE PLAT HAVE
COMMON MAIL BOXES.
10. PRIOR TO FINAL PLAT, THE CITY IS IN RECEIPT OF AN
EASEMENT TO LOCATE A RETENTION POND WITH
.
.
.
Plat/Variance, Richard Kincanon
January 11, 1993
Page 5
ASSOCIATED STORM PIPING ON MR. MOLDENHAURER'S
PROPERTY.
11. PRIOR TO FINAL PLAT APPROVAL, THE DEVELOPERS
PROVIDE A DEVELOPMENT PLAN ACCEPTABLE TO STAFF.
12. A TEMPORARY TURN AROUND BE ESTABLISHED ON 180th
AVENUE, ON THE EAST SIDE OF THE PLAT.
13. OUTLOT A BE REMOVED FROM THE PLAT AND BE MADE
PART OF A LOT THAT WOULD INCLUDE THE KINCANON
HOMESTEAD.
14. THE FINAL PLAT DRAWING IS REVISED TO REFLECT ALL
APPROPRIATE LOTS SIZES AND FRONTAGES INCLUDING
100' FRONTAGE IN BOTH DIRECTIONS FOR CORNER LOTS.
15. THE DRAINAGE AND UTILITY EASEMENT ON THE SOUTH
SIDE OF THE PLAT IS INCREASED TO 10' WIDTH.
B.
Park Dedication
The following recommendations are not per the
Planning Commission, but reflect the consensus of
those present at the Park and Recreation Commission
meeting:
1. THE CITY ACCEPTS THE DEDICATION OF THE PROPOSED
TRAIL, LABELED OUTLOT C ON THE PLAT, WITH THE
EXCEPTION THAT THE NORTH END OF THE TRAIL BE
ADJUSTED WESTERLY TO GAIN GREATER DISTANCE FROM
AN EXISTING HOME.
2. OUTLOT B IS ELIMINATED AND 180TH AVENUE IS
INCREASED FROM 60' OF RIGHT OF WAY TO 70' TO
ACCOMMODATE A CONCRETE SIDEWALK TO ACT AS ACCESS
FROM THE PLAT TO THE PROPOSED TRAIL.
3. THE PROPOSED TRAIL IS GRADED BUT THE BITUMINOUS
SURFACE IS NOT ADDED UNTIL THE TRAIL LEADS TO
SOMEWHERE. HOWEVER, THE CONCRETE SIDEWALK MUST
BE COMPLETED AS PART OF THE PLAT IMPROVEMENTS.
4. THE PROPOSED TRAIL NORTH OF COUNTY ROAD 30 BE
ACCOMMODATED WHEN THE LAKODUK PROPERTY DEVELOPS
AND NOT RUN ALONG FRESNO STREET.
5. THIS PLAT PAY $400.00 PER LOT FOR PARK DEDICATION
WITH CREDIT BEING GIVEN FOR THE COST OF THIS LAND
FOR THE TRAIL AND THE CONCRETE SIDEWALK.
6. IT IS THE CITY'S RESPONSIBILITY TO MAINTAIN THE
NORTH/SOUTH MAIN TRIAL ADJACENT TO THIS PLAT.
.
.
.
Plat/Variance, Richard Kincanon
January 11, 1993
VARIANCE
Page 6
The Planning Commission felt the developers successfully
argued their case regarding the five standards for
granting a variance. The Planning Commission recommended
approval to allow them to construct a 683 foot dead-end
road.
Terry Maurer, City engineer, will
meeting. With his help, staff will be
on these recommendations.
be at Monday night's
glad to elaborate
ITEM 5
,.~ ....-
f ('.''w'.,
."J:~
';~.
':1
TO: PLANNING COMMISSION
FROM: STEPHEN ROHLF,
BUILDING & ZONING ADMINISTRATOR
DATE: DECEMBER 16, 1992 SX,
SUBJECT: PRELIMINARY PLAT REVIEW AND
VARIANCE FOR THE PLAT OF HERITAGE
LANDING BY RICHARD KINCANON AND
DENNIS CHUBA/PUBLIC HEARING
APPLICANTS
Richard Kincanon,
builder/developer.
property
owner,
and
Dennis
Chuba,
REQUESTED ACTION
The applicants are requesting preliminary plat review of a plat
consisting of 76 single family lots and review of a variance on
the maximum length of a dead-end road.
SITE ZONING/LAND USE
.
The southern 330' of the plat is zoned RId and the remainder of
the plat is zoned RIb. The entire plat has a land use of MR,
medium density residential.
SURROUNDING ZONING/LAND USE
South - RIc, single family residential; MR, medium density
residential.
West - RId, single family residential; MR, medium density
residential.
North - RIc, single family residential; MR, medium density
residential.
East - RIb, single family residential; MR, medium density
residential.
LEGAL DESCRIPTION
That part of Government Lot 4, Section 5, Township 32, Range
26, Sherburne County, MN, lying north of Palmer's First
Addition with some exceptions. A complete legal description is
available at City Hall. Attached is a map showing the general
location of the affected property.
I. LOT SIZE AND FRONTAGE REQUIREMENTS
A.
RId Zone
1. Lot size:
required in
lie within
14,000 square feet per lot is
the RId zone. Lots 9-21, Block 2,
this zone. All of these lots are a
(
'.
720 Dodge Avenue N.W., Elk River, Minnesota 55330 (612) 441-7420
minimum of 14,000 square feet; this will be
verified prior to final plat once lot
computations are completed.
2. Frontaqe: A minimum of 90' of width per lot is ~
required in the RId zone. Most of the lots in
this zone are situated on cul-de-sacs. There is
an exception to the width requirement where the
lot lines are not parallel lots on cul-de-sacs.
The lots within the RId zone meet the minimum 90'
width at their setback lines. This is an
acceptable layout.
B. RIb Zone
l. Lot Size: 12,000 square feet per lot is
required in the Rib zone. All lots that lie
within this zone appear to meet this
requirement. This will be verified prior to
final plat.
2. Frontaqe: 80' of width is required in the Rib
zone. All the lots in this zone meet this
requirement with the exception of those lying on
cul-de-sacs. Again, they appear to meet the
minimum width of 80' at the setback line.
II. STREETS
A.
Desiqn:
City requirements include 60' of right-of-way, which
is reflected on the plat, 7 ton, 40 mile an hour
design speed, 32' wide face of curb to face of curb,
and concrete curb and gutter. The developers may do
the design of the road if they fund the project
themselves. If improvements are done as a City
project, the city engineer would be responsible for
the design.
~
B. County Review:
Since the plat abuts County Road 30, the county
engineering department has to review it. The
developers are proposing 50' of right-of-way from the
center line of County Road 30. They are also
requesting one new access onto County Road 30 in the
location of the proposed Gary Street. Russ
Matchinsky, county engineer, has reviewed this plat
for streets and also the proposed drainage. Russ
feels it is acceptable as proposed.
(
\
C. Future Considerations:
1. 180th Avenue: The developers are proposing that
180th Avenue be a future connection to
undeveloped lands to the east of this plat. This
appears to be an appropriate location. To the
west and north, this plat is bordered by existing
streets. Land to the south of the plat is
developed. No street extensions are needed in
~
.
.
( .
these directions. 180th Avenue should be
improved to the plat's eastern boundry.
2. Future Aliqnment of Joplin Street:
Joplin Street is proposed to be extended north of
County Road 30 all the way to Highway 10. A
future extension of the current alignment of
Joplin Street would run extremely close to a
house north of County Road 30 owned by Sue
Lakoduk. Joplin Street will need to be realigned
to the east, realigned to the west, or the house
north of County Road 30 will have to be moved.
Terry Maurer, city engineer, will elaborate on
this in his review of the plat (attached).
D. Street Names:
The street names in the plat appear to be
appropriate. Staff will seek comments from the
Police Department, Fire Department, Utilities, and
the Post Office prior to final plat.
E.
Cul-de-sacs:
There are four cul-de-sacs proposed in the plat. The
fire chief indicated that as along as they are sized
appropriately, they will not impede emergency
vehicles. However, the street department raised a
concern with the number of mail boxes associated with
the cul-de-sacs and problems with snow plowing around
them. To alleviate this concern, staff is
recommending a common mailbox location for each
cul-de-sac.
III. STORM DRAINAGE
Terry Maurer will be reviewing the proposed grading and
drainage plan for this plat. His comments will be attached to
this memo. The storm drainage associated with this plat is
proposed to be picked up in catch basins and piped off-site.
Run-off will then be directed to an off-site holding pond that
will also act as a sedimentation pond.
The location of this holding/sedimentation pond will have to be
negotiated with an adjacent land owner, Erv Moldenhaurer. Mr.
Moldenhaurer appears to be cooperative since development of his
property would also require use of this pond. It is up to the
developers to negotiate an agreement. If there is no direct
outlet to the Mississippi River, this holding pond will not
need DNR approval.
IV. CITY SEWER AND WATER
It is City policy to have the city engineer design sewer and
water for projects inside the urban service district. There
are several options for the extension of services to this
plat. The city engineer will present the appropriate one to
the City council.
V. DEVELOPMENT PLAN
Bill Harju, Soil and Water Conservation District, attended the
staff Concept Review of this plat. Mr. Harju indicated that
this property had been river bottom for the Mississippi in the ~
past. The soil maps indicate what the top soils are, however,
because of sedimentation due to this property being river
bottom, he felt care should be taken in determining house
locations and lowest floor elevations.
Staff is recommending a development plan similar to FHA's, with
garage elevation, lowest floor elevation, and proposed drainage
for each lot be approved by staff prior to final plat
approval. Soil borings will be needed so this development plan
can be based on data specific to the plat.
VI. PARK
The Master Park Plan does not show any parks in the property
proposed to be developed, however, it does show a primary trail
loop in the general vicinity of this plat. This trail loop is
proposed to be a connection from Orono Park to a future area
wide park in the floodplain of the Mississippi. The developers
are proposing to accommodate this trail with a 20' wide
easement for trail purposes on the east side of the plat,
Outlot C. Outlot B is a proposed secondary trail to provide
access from the plat to this primary trail. The Park and
Recreation Commission will be giving specific recommendations
regarding this proposed trail to the City council.
VII. VARIANCE
~
The developers are requesting a variance for l80th Avenue on
the maximum 500' length of a dead-end. The 500' is measured
from the center line of the street of origin (Joplin Street) to
the end of the right-of-way. l80th Avenue is 683' long based
on how the Elk River Code determines a street to be measured.
The developer's response to the five standards for granting a
variance (Section 900.40, Elk River Code of Ordinances) are
attached to this memo.
VIII.RECOMMENDATION
Staff recommends approval of the preliminary plat of Heritage
Landing under the following conditions:
1. CONTINGENT UPON OTHER APPROVALS BEING GRANTED: a)
VARIANCE FOR l80th AVENUE; b) COUNTY ACCESS PERMIT
FOR GARY STREET ENTERING COUNTY ROAD 30; c) AN MPCA
PERMIT FOR AN EXTENSION OF SEWER; d) DEPARTMENT OF
HEALTH PERMIT FOR THE EXTENSION OF WATER.
2.
THE IMPROVEMENTS PROPOSED TO BE ACCEPTED BY THE CITY
ARE SECURED BY A LETTER OF CREDIT FROM THE DEVELOPER
FOR 100% OF THEIR ESTIMATED COST.
~
..,
3.
A DEVELOPERS AGREEMENT IS ENTERED INTO REFLECTING THE
STIPULATIONS OF APPROVAL OF THIS PLAT.
4.
THE ESTIMATED COST INCURRED BY THE CITY FOR REVIEW OF
THIS PLAT IS REIMBURSED TO THE CITY PRIOR TO THE CITY
COUNCIL ACTING ON THE FINAL PLAT.
.
5. THE ESTIMATED COSTS OF THE FIRST SEAL COATING OF THE
ROADS WITHIN THIS PLAT ARE PAID TO THE CITY BY THE
DEVELOPER PRIOR TO RECORDING THIS PLAT.
6. $400.00 PER LOT PARK DEDICATION FEES BE PAID TO THE
CITY WITH CREDIT BEING GIVEN TO LAND DEDICATED FOR
PARK OR TRAIL PURPOSES, IF DETERMINED APPROPRIATE BY
THE CITY (PAID PRIOR TO RECORDING THE PLAT).
7. GLEN SUNDEEN, ELK RIVER MUNICIPAL UTILITIES,
DETERMINES THE APPROPRIATE LOCATION OF STREET LIGHTS
WITHIN THE PLAT. FURTHER, IT IS THE DEVELOPERS
RESPONSIBILITY TO PAY FOR THE LIGHTS AND THEIR
INSTALLATION, HOWEVER, IT WOULD BE THE CITY'S
RESPONSIBILITY TO PAY FOR THE ELECTRICITY TO RUN THEM.
8. LOT SIZES AND FRONTAGES ARE VERIFIED PRIOR TO FINAL
PLAT APPROVAL.
9. THE LOCATION FOR THE FUTURE EXTENSION OF JOPLIN
STREET IS RESOLVED PRIOR TO FINAL PLAT APPROVAL.
.
10. THE FINAL DESIGN OF STREETS AND STORM DRAINAGE WITHIN
THE PLAT ARE APPROVED BY THE CITY ENGINEER.
11. THE CITY ENGINEER DESIGNS THE SEWER AND WATER FOR
THIS PLAT.
12. LOTS SITUATED ON CUL-DE-SACS WITHIN THE PLAT HAVE
COMMON MAIL BOXES.
13. AN APPROPRIATELY SIZED HOLDING POND PROTECTED BY A
DRAINAGE EASEMENT IN FAVOR OF THE CITY IS ESTABLISHED
BY THE DEVELOPERS.
14. THAT PRIOR TO FINAL PLAT APPROVAL, THE DEVELOPERS
PROVIDE A DEVELOPMENT PLAN ACCEPTABLE TO STAFF.
.
uS to I 52
._~
.....
_M
/
/
/
"-./
AFFECTED
PROPERTY _
~~pS . V
1~D'l)m.' ~J~._
~~~~~
~ ~ ~-t.9U."(. _:~-_
--
z
... oJ
... C
::l U Z
0 ctI ... ctI
C Q ...
... '" oJ
0 lL
0 C
Z
0
'" 0
'" 0
.. 0
!:! 0
...
'"
wtS$'SS,_.f A,,,,r_
0 Z Z 0 a:
a: :r. z 0 II: II: Z ... 0 ~ 0 0 Z II: 0
Z 0 ... 0 0 Z II: '" Z C Z ::l ~
0 ... Z 0 Z Z > U C lD >c: Z ... a: 0 0 Z U
0 ::.; ~ ctI >- en ... ::Ii II: ... C oJ :z:
u z ~ Z II: '" Z Z '" lD 0 ... lL ~ :l! Z 0
C Z lL Q ... ..J ::l )( ,., > lL III
0 oJ ... 0 0 ... ::l ... a:
:IE c ... .., ::l c( a: .. c N j: ::l ::l
!!: ... 0 U ... II.
oJ >c: ., :z: III ... III II: 0
- 0 0 0
0 0 0 0 -
0 0 0 0 0 0 0 0 '" 00 0 0 0
'" 0 0 0 0 0 0 .. ... ~ N 0 0
0 0 0 '" ~ 0 N
'" .. . 0 N .
'" '" N ... N ~ '" N
'" !:! '" !! <II
=
(
'.
j
~
=-:.--;.
....... ...
~I z
0
a ~
a: a:
0 ~I 0'
... :IE
)(
0
(,
(
0 ~
0 ..
N
-
..... .-...
.r~lIil..
I_IUD': - ,....
~- ~:::
_.....
....,.198~
.
.
.
_ / f ~ ~ ~,,:,/ . CONSULTING ENGINEEAS
IIfIfIIVWI Maier Stewart & Associates Inc.
December 17, 1992
File: 230-159-11
Mr. Steve Rohlf
Building and Zoning Administrator
City of Elk River
720 Dodge Avenue NW
Elk River, MN 55330
.1<.c: Hl:J<'lTAuc LANDINGS;
Dear Mr. Rohlf:
As requested, we have reviewed the submitted information for the Heritage Landings plat. Based
on our review, we would offer the follovling comments:
1.
ThlJ cubmittlld inform:ltlon inc1udlid :1 pr~1iminlry pht wd " gnding ~d dr1in:age phn
prepared by John Oliver and Associates. The documents were dated December 4, 1992.
2. 'J'be plU}JCll}' L,uII1.1:m "'-l-'!JI 1..1,\.;. lIald y :Ir, b\'.ll!..~ ,~I; \,';\'k\i :,',M 7G ]\.,t\. I'fh~ rH'\"~I.ty kA~ two
Z\j,~j)\~$. Th~ van nUl.j6rity ~f tho: pr"~rty is zoned !{lb 9in~lc family rC9idcminl. Thcre
is a narrow strip along the southern boundary that Is 7.oned P: ld slng1e famlty n:sldt:nda1.
It appears that several lots, including Lots 10, 12, 13, 19, and 20, Block 2 may be deficient
in frontage width for the RId zoning.
3. The plat will need to be reviewed by the County for road and driveway access and right-of-
way issues along CSAH 30. Also, the issue of will the exception adjacent to CSAH 30 want
to develop and, if so, would access to the County Road be granted should be considered.
Pt:rhaps a method to access this property from 180th A venue should be provided.
4. The cul-de-sacs on 180th and 179th Avenues both exceed the ordinance maximum length of
500 feet.
S. The plat provides a 20-foot wide easement along the east boundary for a future park trail.
This area should be graded to support the trail, then restored with seed so that it is ready for
future trail constnlction.
6.
The plat immediately south or Hcri~lge Uu\di,\g (P~]d1er 1st Addition) has no ~'\SCn1cnt.S
prc;wirlr.tf t11nne jr~ rt'~r lor. Ijnt~:;. C:on:;idcration :;hould be liven to haviol the Hcrita~e
Lanamg plat provIae a Wlaer easement in [nis area.
,g!ja !)LOAr.l ~L.&l'II. gUITIii 1M. \tt PJ.UL. UIPd'JC~OTJ. 'j!j'" O'2-17>1Jl1:W'
9800 SHELARO PARKWAY, SUITE 102, MINNEAPOLIS. MINNesorA 55441 e12-546-0432 . Equal Opportunity Employer
IS9-17U7.dee
,,' , .
Mr. Steve Rohlf
December 17, 1992 .
Page Two
7. Additional easements may also be required along lot lines with utilities along them, sllch as
Lot 9 Block 1 where the storm sewer cuts the corner.
8. The grading proposed adjacent to the existing home site on the north appears to create low
areas which will trap water. This area needs to be addressed to eliminate this.
9. An homes in this development should be placed a minimum of 1.0 feet above the top of curb
to the garage slab at the high side of the driveway. There are areas shown on the grading
plan which may be fJatt~r than this.
10. 180th A venue east of Gary Street flows on to the adjacent property. Provisions to pick up
the drainage before leaving the plat should be provided. Also, the storm sewer just ends at
this point. More detail, including design calculations, is needed before final approval.
11. Cut-de-sacs tcnd to be consumed with driveways, mailboxes, and fire hydrants, thus leaving
minimal area for snow storage. In an e.ffort to help this sitmltion, centrally t~1tcd banks
of mail and paper boxes should be required.
12. The alignment of Joplin Street needs to be considered. Joplin is proposed as a major north-
south roadway between CSAH 30 and TH 10. However, its alignment south of CSAH 30
is in conflict with the existing farmstead north of CSAH 30. If built on its current
alignment, the northerly extension may require an offset intersection. Other options would
be to move the alignment south of CSAH 30 to the eat or west. However, such a decision
would need to be made now. The final alternative would be the removal of the farmstead
in the future.
.
13. A review of the available sanitary sewer indicates it will be possible to serve this plat by
gravity. However, the actual alignment to access the plat still needs to be determined.
If you have any questions regarding these comments, please call.
Sincerely,
(
MAJER STEWART & ASSOCIATES, INC.
~~
Terry 1. Maurer, P.E.
TJM:tp
.
1S9-17C77.okc
. .
.
.
(,.
. "'
-
,
HERITAr.E LA~ING PLAT
REASONS FOR GRANTI~G VARIANCE TO EXTEND Cut-Dt-SAC ADDITIONAL 150'
1) Literal enforcement:
Unnecess<try and avoidable hardship to the oropertv o~mers ~.,hose driveylavs
'N'ould be enterin!;> Countv R\lad !! 3n. The more orivate drive~.,Clvs enterin~
and exitinp, the Countv Road increase the conp-estion" and chanCe~ of accident
2) Special Conditions:
The 2~ acre exceotion from the nlat in the area of the Cul-de-sac make
this Dortion of the plat different than most; is unioue to the proncrtv
and limits access to the interior lots.
3) Literal anplication:
Enforcement of the Ordinance ,,'ould necessitate creation of lots fronting
the Countv Road and hence a dangerous situation for residents and users
of the Countv Road. Longer Cul-de-Sac ~ives more parking room.
4) S~ccial conditions:
Restricted County Road acess cannot be controlled by the petitioner.
5) Not injurious:
Cul-de-sacs are desired bv the people who live on them. We want to
avoid another thru street to cut out speeders and dan~erous traffic
in a quiet residential neighborhood.
!WTE: Other COr."mun1ties Haximum cuI-dc-sac lengths are 1100 ft.
" -# .
/
SHERBURNE COUNTY ABSTRACT & TITLE CO.
'"
PAT RASMUSSON
PRESIDENT
CATHY BAILEY
SEC.ITREAS.
BONI CULLEN
MANAGER
.
December 3,1992
Based on the examination of real estate records I find the following are
property owners within 350 foot radius of the land described as:
Part of Government Lot 4 lying North of Palmers 1st Addition 5-32-26
Richard Kincanon-13375 Joplin St NW Elk River, Mn 55330
Wayne Hemerick-13296 Mississippi Rd M~ Elk River, Mn 55330
Harry Lakoduk-13407 Mississippi Rd M~ Elk River, Mn 55330
Irvin Moldenhauer-12860 Orono Rd NW Elk River, Mn 55330
Calvin Sorenson-17825 Joplin St NW Elk River, ~~ 55330
Lloyd Barthel-17801 Joplin St NW Elk River, Mn 55330
Alberto Sanudo-13416 Riverview Dr ~1J Elk River, 11n 55330
Mark Lucas-13346 Riverview Dr NW Elk River, ~~ 55330
Thomas McNair-22175 Grant Ave M~ Elk River, Mn 55330
Richard Crapser-13308 Riverview Dr ~1~ Elk River, Mn 55330
Michael Hull-13294 Riverview Dr 11~ ELk River, Mn 55330
James Simpson-13278 Riverview Dr M~ Elk River, Mn 55330
Rolland Barthel-13240 Riverview Dr NW Elk River, Mn 55330
Richard Gongoll-13386 Riverview Dr Mv Elk River, Mn 55330
E Dale Palmer-13368 Riverview Dr NW Elk River, Mn 55330
Robert Danforth-13224 Riverview Dr NW ELk River, Mn 55330
Gregory Kreuser-13385 Riverview Dr Mv Elk River, Mn 55330
Lynne Grupa-13351 Riverview Dr NW Elk River, Mn 55330
Robert Kopitzke-13335 Riverview Dr NW Elk River, Mn 55330
John Dietz-13319 Riverview Dr NW Elk River; Mn 55330
Ellsworth Dahlin-13303 Riverview Dr NW Elk River, Mn 55330
Jeffrey Weyenberg-13289 Riverview Dr NW Elk River, Mn 55330
Donald Wille-13273 Riverview Dr NW Elk River, Mn 55330
Steven Barthel-13241 Riverview Dr NW Elk River, Mn 55330
.
Boni Cullen
<:,.~j.~:!:!:",
~",::."C ',.. r.; I.: ~.,
.."" 0 :.y, \ \J...' L..E A/II,
__'':...\j6 ..." "
,i\. <I!.- "
~ ' .=-:--.-,.. ,.
1/.' ..."7. r .. (' 0 '\ -;.
. .J<I "," '_ n w ,( I': .,
~lo -I'. - "-v "".
'. I ''yo :.
- ~-
$. 'oA,. \~ -I ,..:
:; ....'" :
~ -
:;. t ::
~ '\ ,.~ (,,4::-, ~
~ 'l~<:';lrr:: t.~o"\" ~
~~., .,,~V. ~'b> ~
~ <,;'" ,'"
'. (qt. "" ...'"
.-:.~..... e of M\\\"\,'''''''
"!I:f'uH5n~"\
~.~
<--
.
\.
317 KING AVENUE - ELK RIVER. MINNESOTA 55330 . (612) 441-3280
/iE-72f/
AHiliated with American land Tit!. Association
~
\ " ~ ; t
TO: PARK & RECREATION COMMISSIONERS
FROM: STEPHEN ROHLF, BUILDING AND ZONING
ADMINISTRATOR
DATE: DECEMBER 7, 1992
SUBJECT: PLAT OF "HERITAGE LANDING," PARK
DEDICATION
"Heritage Landing" is a plat consisting of 76 single family
lots proposed by Richard Kincanon (land owner) and Dennis Chuba
(developer/builder). The Master Park Plan does not show any
parks proposed on the land included within the plat. However,
it does show a primary trail loop in this general location.
The City's Comprehensive Park System Plan Map and a map showing
the general location of the property included in the plat are
attached. Also attached is the plat drawing (note that a 20'
wide strip of land on the east side of the plat labeled Outlot
"C" is proposed to accommodate this trail).
The following are issues that need to be considered regarding
this primary trail loop:
e
A.
LOCATION
This primary trail is designed to connect Orono Park with
a future area wide park in the floodplain along the
Mississippi River.
Issue
The corridor for this trail between the softball fields
and the new City Hall site should be identified so it can
be planned for.
* * * * * * * *
The Master Park Plan shows this trail continuing south
along Fresno Street. This would allow direct access to
the trail from a 1/2 acre park in Orono Lake, Third
Addition.
Issue.
(e
Should this trail go through this
and is there enough right-of-way
construct this trail in this location
boulevard as part of their yard)?
existing neighborhood
existing (66 feet) to
(people perceive the
* * * * * * * *
720 Dodge Avenue N.W., Elk River, Minnesota 55330 (612) 441-7420
f ~,'
(
If this trail south of County Road 30 is located as .
proposed by the developers, it would run between their
plat and land owned by Erv Moldenhaurer. Mr. Moldenhaurer
has expressed interest in platting his property, however,
nothing official has been applied for. There would be a
gap between the right-of-way of County Road 30 and the
trail proposed by the developers of Heritage Landing until
Mr. Moldenhaurer plats and subsequently dedicates land for
this connection.
Issue
Should this trail system be located between these
subdivisions and, consequently, in people's back yards, or
along a road system where traffic is expected (along the
proposed Gary Street in this plat or along a future road
further east on Mr. Moldenhaurer's land)? Also, consider
whether or not Outlot B as proposed by the developers or
l80th Avenue should be the connection from Heritage
Landing to this trail system. This issue should be
specifically addressed in your recommendation to the City
Council on this plat.
* * * * * * * *
The trail as proposed accesses the west end of the future
area wide park along the Mississippi. There will be other .
accesses as well as internal trails needed in this area
wide park.
Issue
Should these internal trails connect to the downtown river
walk and, if so, how would they cross the Elk River? This
issue does not directly relate to your review of this plat.
B. OWNERSHIP
Issue
(.
Who should have fee ownership of the land underlying the
trail? There are two alternatives to who owns the land:
1) the land the trail is situated on could be made part of
the individual lots with the City having rights to use
this land as a trail through easement. Consider whether
or not it would be right to have individual lot owners
paying taxes on land and having personal liability for
land used as a public trail; 2) the trail could be
dedicated to the City through the platting process so the
City has fee ownership. Staff feels this is the most
reasonable option.
.
~! .
~ C. CREDIT ON PARK FEES FOR LAND DEDICATED
Issue
Should the land dedicated for this trail system reduce the
amount of park dedication fees paid and if so, by what
amount? Staff recommends the acreage of the land
dedicated for the trail be multiplied by the raw land
value per acre and credited against the total park
dedication fees owed to the City. This assumes the trail
is located within the boundaries of this plat.
D. IMPROVEMENT OF TRAIL
Issue
Should this trail be upgraded now? If this trail is
upgraded now it will lead to private property; currently
there is no area wide park along the Mississippi River.
If it is left unimproved, future homeowners may have the
perception that the trail is infringing on them when it is
constructed. Staff feels the Park and Recreation
Commission should consider having the trail grading
accomplished with the rest of the plat grading, leaving
the bituminous surface until the park along the
~ Mississippi is established.
E. TYPE OF TRAIL
This trail is considered a primary loop.
Issue
Should this trail be for pedestrians and bicyclists, how
wide should it be or should there be 2 separate trails?
F. MAINTENANCE
Issue
Should the City maintain this trail? It is conceivable
that an association agreement could be required through
the platting process for the maintenance of this trail.
Staff feels that this is a City wide trail for public use
and that the City should maintain it. The issue of year
round maintenance should also be considered.
G. SUMMARY
".~
Some of the issues raised in this memo go beyond what
recommendation on the plat should cover, however,
need to be considered to make sound decisions. There
also be other issues not mentioned in this memo.
your
they
may
... ,,1
,. ,
"'
Staff anticipates the Council considering this preliminary .
plat at their January 18, 1993, meeting. The Park and
Recreation Commission should consider this plat at your
January meeting so the Council can have the benefit of
your recommendation.
.
(
.
.., . "
.
.. ,.. ....
- .
t.: CS A H
NO
'30
.'. .
'~ ..::~~~..'.....~:::; . ._._ ...c. ...::
- .:: ~.. '..
. ..\~;
-1 . ".' 'I~ .
......
,., WI" _. ..-
~. .:..
,. _...~~
. ":;-331 i:
: II._..:!.. J I
-- ..-
r;--l !
~ :~ 32 ," :-
", I
i; .-- '!#.._...!... ~
", .
I '
:::
.j
Z'
:-;'."'!"'!: -
r.;
'CI'l
,
~
l.i
..
~'.
. ,
~ :
" .,
.. .
.s:s .-
....
..
,.
.;
'.
~
,)0
. -
,
c
'.
"
,
,
(e
1
C
il'l
.
~,""'::
1_ i'
. : ;!
10 . ~z
.-
INSf/SS,"" "/~€. ~I z
0
~I ..J a:: 0 ...
zl a::
... z z 0 a:: 0 a:: 0'
u 0 )- 0 :! 0 0 z z ;:, ... 0 ~I ::I'
OIl ~I OIl 0 a:: a:: z z a:: '" z ... 0 0 z u ...
c ... z Z III 0 0 ... x z .... a:: ..J ::: z 0 x
a:: c .... ::I
co. ..J Z III Z 0 0 z z > u .... ... 2 a:: III C III co. co. II) CI: 0
lL 0 0 ::i ... II) >- '" z z '" ..J :;) 0 X . > ;:) ~ >- ;:) ;:, co. (
... CI: III '" 0 0 >- III 0
... U Z Z 0 III C N a::
'0 z c Z lL 0 :;) C a:: ... 0 U ... II) (
c .... " !: '" ... III '0 ~
0 ::IE :::
..J X ... '0 0 ..
'" 0 '0 0
.... 0 '0 0 0 0 0
... 0 .. .. 0 0 0 N
~ 0 '0 '0 '0 0 0 0 .. ~ ~ 0 0 N
'0 0 0 0 ... .. .... N
.. 0 0 Gl ~ -
.... 0 0 0 ~ !:! N .::
... 0 0 0 N
.... .. ... .... N ~ .... .::
.... .... !:! .... .::
J MH_.J
-
( ~ -r.w'lil..
~ -
. - - -
-.... E-' .JM/I.le;!:
,.....,--'
- 0C1" ....
.- --
~ ........
,..-
-
.
_ / f ~ ~ ~ ~ CONS\JLTING ENGINEERS
IIfIIIIr'WI Maier Stewart & Associates Inc.
January 18, 1993
File: 230-159-10
Honorable Mayor and City Council
City of Elk River
720 Dodge Avenue NW
Elk River, MN 55330
RE: HERITAGE LANDING
FEASIBILITY STUDY
Dear Council Members:
The City has received the attached Petition for Local Improvement from Richard Kincanon
and Dennis Chuba for the proposed Heritage Landing preliminary plat. The petition requests
the extension of City sanitary sewer, water, and storm drainage facilities along with site
grading and construction of permanent urban streets. The petition has been reviewed by the
. City staff and has been determined to be adequate.
For the benefit of the new City Council members, the following is a listing of the typical steps
in a developer-driven public improvement process:
1. Developer presents proposed project to City staff at concept review meeting.
2. Completed development submittal including preliminary plat is presented to Planning
Commission.
3. Development proposal is submitted to City Council for preliminary plat approval.
4. After preliminary plat approval, the City Council can consider ordering a feasibility study
based on a petition from the developers. If a feasibility study is authorized, it is
contingent on an escrow being placed by the developers to cover the cost of the study.
5. The completed feasibility study is presented to the City Council. A public hearing is
scheduled before the City Council (developers may waive this requirement).
.
6. After the public hearing, if necessary, the City Council considers ordering the
preparation of plans and specifications for the improvements. Again, the developer is
required to place an escrow to cover the cost should the project die.
1959 SLOAN PLACE, SUITE 200, ST. PAUL, MINNESOTA 55117 612-n4-6021
9800 SHELARD PARKWAY, SUITE 102, MINNEAPOLIS, MINNESOTA 55441 612.546-0432 . Equal Opportunity Employer
159-1802.jan
.
Honorable Mayor and City Council
January 18, 1993
Page Two
7. Construction bids are received and considered by the City Council. The City Council
awards the construction contract after the developer enters into a Developer's Agreement
and places necessary surety.
8. The improvements are constructed under City supervision.
9. An assessment roll is adopted by the City Council after an Assessment Hearing, if
required.
Based on the petition received, the attached draft resolution is presented for City Council
consideration. This petition declares the adequacy of the petition and orders the feasibility
study. Preparation of the feasibility study should be contingent on the developer placing an
escrow with the City to cover its cost.
If you have any questions regarding this information, please call.
Sincerely,
. MAIER STEWART & ASSOCIATES, INC.
~fJ11!~
Terry t'Maurer, P.E.
TJM:tp
Attachment
.
159-1802.jan
..
J'AN-11-'93 MON
.
.
'.
.
.
'941 CITY OF ELK R. lER
P.02
PETITION FOR LOCAL IMPROVEMENT
City of Elk River
State of Minnesota
(.. :r 4 ,..)
, 19~
To the City Council of Elk River, Minnesota:
WE, THE UNDERSIGNED OWNERS of (all) (not less th~n 35 percent in
fro~ta~e) of the ~:al ,pro~erty desc~ibe~s_:~ '"T",,:,"~ - s~~: "'<j T"" -'l"
;,:;:: ..... ~ ~ "-..3.~ .---<'" u.~ ..:-.....
L"r-r- " 0' ~-...:.::. .~."..\ -/)/1." -'1I''''''---1M:--'4(1" .-.. ,.... -~t.ll~.- .a4vr-'Tr.. '" -A~.A 'l:J.If".u .
hereby petition. pursuant to Minnesota Statutes, Chapter 429, for the
following public improvements:
EACH OWNER FURTHER AGREES, in consideration of the City action at our
request to cause construction of the above-described improvement, to pay
such sums as may be determined by the City to be a fair and reasonable
apportionment of the COSts or said improvement.
OWNER EXPRESSLY WAIVES OBJECTION to any irregularity with regard to
the making of the improvement or assessment of the cost thereof: waives any
ciaim that the amount thereof levied against owner's property is excessive;
and waives all rights of appeal in the courts.
Date
Signature
of Owner
Description of
Property
Pri nt Name
of Owner
t{Cb~
3.
4 . (. . JhJ 91
5.
6.
7.
B.
9.
10.
<V ri?t:, 5' J~~~~ 51:'<< -l. Ix: "'"
~, ~~4. ?
~14~/~N J. t/~";/;..:t"rSJJ
Examined. checked, and found to be 1n proper form and to be signed by
the owners of the above-stated Quantity of property affected by the making
of the improvement petitioned for.
C1tY Cleric
A-S
__ . i.. .,.
.
.
.
RESOLUTION 93 -
A RESOLUTION OF THE CITY OF ELK RIVER
A RESOLUTION DECLARING THE ADEQUACY OF THE
PETITION FOR IMPROVEMENT AND ORDERING THE
PRELIMINARY FEASIBILITY REPORT IN THE MA TIER
OF THE HERITAGE LANDING IMPROVEMENT OF 1993
WHEREAS
the City has received a petition (the Petition) requesting that the City
improve certain property by extending sanitary sewer, water, storm
drainage, site grading, and permanent streets (the improvements); and
WHEREAS
the City has reviewed the Petition and identified the owner of the real
property abutting the streets named in the Petition and determined the
Petition has been duly executed by the owners of not less than 35 % in
frontage of the real property abutting on the streets named in the Petition
as the location of the improvements;
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River,
Minnesota:
1. The Petition is hereby declared to have been signed by the owners of at least 35 % of the
frontage of the real property abutting on the streets named in the petition as the location
of the improvement. This declaration is made in conformity to Minnesota Statutes,
Section 429.035.
2. This Petition is hereby referred to Maier Stewart & Associates, Inc., who is instructed
to provided to the City Council a report advising, in a preliminary way, whether the
proposed improvement is feasible and whether the improvement should thus be made as
proposed or in connection with some other improvement and the estimated cost of the
improvement as recommended.
Passed and adopted this 25th day of January, 1993.
Hank Deutsman, Mayor
ATIEST:
Sandra A. Thackeray, City Administrator
lS9-1802.jan
.
.
.
7 Jan 1993
LEITER OF CO-OPERATION
TO: City of Elk River
Planning Commission
City Council
RE: Land owner's intent to co-operate in building a storm
water retention area for use by the Heritage Landing
plat and any future platting of the Irv Moldenhauer land.
This letter will serve to notify the City of Elk River that
landowners Irvin Moldenhauer and Richard Kincanon intend to
co-operate in building a storm water retention area to be located
on the unbuildable portion of Irvin Moldenhauer's land for use
by both the proposed Heritage Landing plat and any future
platting of the Moldenhauer land.
It is the intent of the developers of the Heritage Landing
plat to design, build and pay for the direct construction
costs of this retention area.
ACCEPrANCE: ~!"\' /-r )J"-&-&t ~'~'=---Ir
Irvin Moldenhauer
(2J;c'->. D l!~ CC/"-"----
Richard Kincanon
Subscriged and sworn to before Ire
this ~/;tj'\.. day of January, 1993.
/'\ r ':-+' 'vf /11/1 .
LJ'L.-u...;,wV\.O / " ( Cl/cffi-
Signature of Notary Public
Notarial stamp or seal below
~-............._......_.....................-.:- 7
: 8 CHRISTINE M. MAROS ~
! :v NOTARY PU6Uc.MINNESOTA !
! SHERBURNE COUNTY J
; My Comm. Expires Nov. 19, 1998 j
..-...............................................r.~ . - .......1'"