6.1. SR 02-01-1993
ITEM 6. 1.
SUBJECT:
MAYOR AND CITY COUNCIL - )
~V
JANELLE SCHMITZ, ZONING ASSIST~._../~l
JANUARY 27, 1993 l-/~
CONDITIONAL USE PERMIT REQUEST BY
STEVEN SHOEMAKER/PUBLIC HEARING,
CASE NO. CU 92-025
TO:
FROM:
DATE:
APPLICANT
The applicant, Steven Shoemaker (11106-190th Avenue NW) is
requesting a conditional use permit to excavate a wetland area
to create an open water pond in Royal Oaks Ridge.
BACKGROUND
The Planning Commission originally reviewed this item at the
December 22, 1992, meeting and it was continued to January 26,
1993, allowing the applicant to address several concerns
(including traffic, size of the pond, duration of the project,
and comments from the DNR). For details, I have attached a
copy of the memo dated December 16, 1992, the December 22,
1992, and the January 26, 1993, Planning Commission Minutes.
.
TRUCK TRAFFIC
The app~icant has obtained permission from property owners
Larry Morrell and George Deschenes to route truck traffic
through their property to County Road 13, south of the affected
property. The trucks would enter onto County Road 13,
approximately 1/4 mile from its intersection with 5th Street.
Staff spoke with Harvey Richner, Sherburne County Highway
Department, regarding access to the County Road. Mr. Richner
stated although no access permit would be required, the County
would like to see the area "signed" to inform traffic of trucks
entering and exiting in this location. Also, the applicant
will need to comply with weight restrictions placed on County
roads. It appears that a field road exists in this location,
however, the applicant has indicated fill may need to be
brought in to support the weight of the trucks.
REVISED SITE PLAN
.
I have included a copy of the revised site plan for your
review. Although the surface area of the pond would remain
approximately 3 acres, Mr. Shoemaker has revised the site plan
to reduce the estimated amount of excavated fill from 31,250
cubic yards of fill to 19,000. This was done by reducing the
slopes and depth of the pond. The north 1/2 of the pond would
maintain 5:1 slopes and would have an average depth of 4-5
feet. The homeowners would like to keep the area surrounding
the front of the pond manicured; natural vegetation would not
720 Dodge Avenue N.W., Elk River, Minnesota 55330 (612) 441-7420
.
.
.
CUP, Steven Shoemaker
January 27, 1993
Page 2
be planted. The applicant chose to implement the DNR's
recommendation of a 10:1 slope on the back portion of the
pond. This area would have an average depth of 3-4 feet. An
unexcavated island is planned in the middle of the south 1/2 of
the pond. Staff has enclosed a brochure from the DNR regarding
excavation of ponds for water fowl which gives recommendations
on how to properly construct wildlife ponds.
DRAINAGE
At the December meeting, a few neighbors were present to
express their concerns with the proposed project including what
affect this excavation would have on drainage in the area,
traffic concerns, noise and other disruptions to a residential
area. Staff feels this proposed excavation should not have an
affect on drainage in the area if certain precautions are
taken. City engineer, Terry Maurer, indicated if the City
Council approves a general concept for the proposed excavation,
the City should require more detailed plans before excavation
begins (i.e., elevations of lowest floors in the area, and
existing and proposed topography). These details are necessary
to ensure the drainage will not be affected and to properly
inspect the work in progress. Mr. Maurer's comments are
available in the attached letter dated January 20, 1993. Mr.
Shoemaker is considering a clay liner on the east side to
ensure the pond retains water. This may be considered fill in
a wetland which would not be allowed.
NOISE
The City ordinance regarding excavation (Section 720) places
standards on these types of activities. Hours of operation are
limited from 7 a.m. to 7 p.m., Monday through Saturday.
Maximum noise levels shall comply with the limits established
by the MPCA and the EPA. Because this excavation is in a
residential area, more restrictive standards may be desired.
The Planning Commission is recommending work commence no
earlier than 8 a.m.
SAFETY
The issue of safety should be addressed in an
liability. The applicant has slightly altered
depth to a safer level. Staff is recommending
of 3-4 feet for safety reasons.
effort to limit
the slope and
a maximum depth
FUTURE EXCAVATIONS
Staff recommends the City take a look at the bigger picture
regarding excavation of wetlands. A study of wetlands should
be conducted to determine which ones should remain untouched
and which ones the City would allow to be altered. For
background information, I have attached an article from the
January 3, 1993, Minneapolis Star Tribune regarding wetlands in
the Metropolitan area.
CUP, Steven Shoemaker
January 27, 1993
Page 3
.
PROPERTY VALUES
A couple of neighbors present at the January 26 Planning
Commission meeting were concerned the pond may actually cause
their property values to increase and thereby raise their taxes.
RECOMMENDATION
Staff is recommending approval of the general concept of this
request for a conditional use permit to excavate an estimated
19,000 cubic yards of fill in a Type 3 wetland in Royal Oaks
Ridge subdivision. Staff feels the concerns raised at the
December Planning Commission meeting regarding traffic, safety,
and neighborhood disruption have been sufficiently addressed.
Should the City Council approve this request, Staff does
recommend a detailed grading plan be provided by the applicant
for review by Staff so details regarding drainage can be
addressed. In recommending approval, Staff would like to
emphasize that this is a residential area and particular
attention should be given to protecting the residential nature
of the area throughout the excavation project. At the January
26, 1993 meeting, the Planning Commission recommended approval
of the general concept of this request with the following
stipulations:
.
.
1.
TRUCKS ENTER AND EXIT THE SITE VIA THE MORRELL AND
DESCHENES PROPERTY TO THE SOUTH, ONTO COUNTY ROAD
13. WRITTEN PERMISSION IN A FORMAT APPROVED BY CITY
STAFF FROM MORRELL AND DESCHENES TO USE THEIR
PROPERTY BE PROVIDED TO THE CITY TO ENSURE THAT
TRUCKS WILL NOT BE ROUTED THROUGH RESIDENTIAL
STREETS. FURTHER, THE APPLICANT COMPLY WITH THE
COUNTY REQUEST TO HAVE THE AREA "SIGNED" TO INFORM
TRAFFIC OF TRUCKS ENTERING AND EXITING AND COMPLY
WITH THE WEIGHT RESTRICTIONS.
2. FOR SAFETY AS WELL AS WILDLIFE PURPOSES, SLOPES SHALL
NOT EXCEED 5:1 AND THE DEPTH SHALL NOT EXCEED 3-4
FEET OF WATER. THE DNR GUIDELINES OF 10:1 SLOPES,
2-3 FOOT AVERAGE DEPTH OF WATER, NATURAL VEGETATION
ALONG THE PERIMETER OF THE POND, AND IRREGULAR
SHORELINE SHALL BE MAINTAINED IN THE SOUTH 1/2 OF THE
POND.
3.
NO FILL SHALL BE PLACED BACK INTO THE
BOUNDARY.
WETLAND
4.
SLOPES ARE STABILIZED AND PLANTED WITH GROUND
SUFFICIENT TO CONTAIN THE SOIL. SUCH GROUND
SHALL BE TENDED AS NECESSARY UNTIL IT IS
SUSTAINING.
COVER
COVER
SELF
5.
THE EXCAVATION SHOULD NOT DISRUPT
DRAINAGE PATTERN FOR THE AREA.
THE
OVERALL
.
.
.
CUP, Steven Shoemaker
January 27, 1993
Page 4
6.
THE APPLICANT PROVIDE THE CITY WITH A DETAILED
GRADING PLAN AS OUTLINED IN TERRY MAURER'S LETTER
DATED JANUARY 20, 1993.
7. THE APPLICANT REIMBURSE THE CITY FOR THE COST OF
REVIEWING AND INSPECTING THE EXCAVATION PROJECT.
8. THE APPLICANT OBTAIN THE SIGNATURES OF THE PROPERTY
OWNERS FOR LOTS 8 AND 9, BLOCK 4, ROYAL OAKS RIDGE OR
THESE LOTS SHALL BE EXCLUDED FROM THE REQUEST.
9. THE HOURS OF OPERATION BE RESTRICTED FROM 8 A.M. TO 7
P.M., MONDAY THROUGH SATURDAY.
10. EXCAVATION ACTIVITY SHALL BE COMPLETED WITHIN 2 YEARS
OF THE DATE OF THE APPROVAL.
11. STOCKPILING OF EXCAVATED DIRT SHALL BE APPROVED BY
CITY STAFF.
"
.
.
.
'1--7.
Elk River Planning Commission
December 22, 1992
Page 5
6.
Consider Conditional Use Permit Request by Larry Leitschuh/Public
Hearing
Janelle Schmitz, Zoning Assistant, explained the applicant, Larry
Leitschuh, 9110-83rd Avenue N, Brooklyn Park, MN, is requesting a
conditional use permit to operate a health facility (aerobic studio) in
the Elk River Mall. The owner of the proposed facility is Janelle
Swanson of Monticello.
Ms. Schmitz continued: Janelle Swanson is interested in locating a
health facility in the Elk River Mall at 692 Freeport Avenue. The
facility would primarily be used for aerobic exercise classes.
According to the Elk River Plaza PUD agreement, commercial recreational
uses such as this are considered a conditional use, therefore, a
conditional use permit is required. The site plan shows a new sound
wall will be placed along the perimeter of the site. The proposed
hours of operation are 8 a.m. to 8 p.m. Because the facility is
located within a shopping center, the parking requirement does not need
to be addressed with this request.
Staff is recommending approval of
operate a health facility in
following stipulation be added to
proofed.
the conditional use permit request to
the Elk River Mall and recommends the
this approval: The space be sound
Chairman Nadeau opened the public hearing.
There being no comments from the public, Chairman Nadeau closed the
public hearing.
Commissioner Spotts questioned why the planning commission had to
review this request if staff could make the appropriate decision.
Janelle Schmitz informed the planning commission that due to the
conditional use status in this POD, planning commission action is
required. Further, staff plans to work with the City attorney and the
developer regarding this PUD in an effort to make it more flexible.
COMMISSIONER MINTON MOVED TO RECOMMEND APPROVAL OF THE CONDITIONAL USE
PERMIT TO OPERATE A HEALTH FACILITY (AEROBIC STUDIO) IN THE ELK RIVER
MALL, CASE NO. 92-026, CITING STAFF'S MEMO DATED DECEMBER 15, 1992,
SUBJECT TO THE FOLLOWING STIPULATION:
1. THE SPACE BE SOUND PROOFED.
COMMISSIONER SPOTTS SECONDED THE MOTION. THE MOTION CARRIED 5-0.
Consider A Conditional Use Permit Request. by St...n s~alcer/hbU..
~.i.g
Commissioner Spotts stated he is a property owner within the affected
area and would abstain from discussion and voting on this item due to
the perception of conflict of interest.
Elk River Planning Commission
December 22, 1992
Page 6
-
Janelle Schmitz, Zoning Assistant, explained the applicant, Steven .
Shoemaker, 11106-190th Avenue NW, is requesting a conditional use
permit to excavate roughly 31,250 cubic yards of black dirt from a Type
3 wetland to construct an open water pond for wildlife viewing.
The Soil and Water Conservation District, the Board of Water and Soil
Resources, and the Army Corps of Engineers reviewed this request and
reported no problems with the request. Although the proposal will not
affect any public water wetlands and approval of the DNR is not
required, Dale Homuth, DNR Area Hydrologist, commented that the
proposed alteration should not be viewed as a wildlife habitat
improvement and suggested modifications.
Ms. Schmitz expressed staff's concerns with the amount of traffic
generated with this proposal. Considering the amount of fill being
removed, the truck traffic in a residential neighborhood would be
extensive. The applicant is researching alternative routes. Ms.
Schmitz reminded the planning commission of Terry Maurer's letter
suggesting the streets be inspected before beginning the proposed
project. Staff believes the traffic issue and related road condition
issues are the primary concerns with this request.
Ed Stoutenburg, 19032 Yale Circle NW, asked if the pond would alter
current drainage patterns. Ms. Schmitz responded as per the City
engineer, it will not improve drainage in the area however, it should
not have a detrimental affect either.
.
Ms. Schmitz indicated staff is recommending denial of the request for a
conditional use permit to excavate 31,250 cubic yards of black dirt in
a Type 3 wetland. Further, staff feels this request does not meet the
seven standards for a conditional use permit. Ms. Schmitz stated staff
is particularly concerned with the traffic generated by the proposed
use and the affect the use would have on the residential area. If the
applicant were to find an alternative route for trucks to use and the
plan was altered to comply with the DNR recommendations, staff would be
more supportive of the request.
Chairman Nadeau opened the public hearing.
Stephen Hartman, 19075 Xavier Street NW, asked if this pond would
affect the normal drainage flow in the area when it is constructed and
several years from now. Further, can a drainage study be done to
eliminate concerns of this nature. Stephen Rohlf explained the current
drainage pattern of the area and replied the City engineer and the Soil
and Water Conservation District did not have any particular concerns
regarding drainage patterns. Ms. Schmitz recommended the planning
commission and the City require soil boring tests prior to the proposed
excavation. In conclusion, Mr. Hartman stated his concern regarding
the traffic in his neighborhood and that he is against the proposed
wetland excavation.
After extensive discussion and given
excavation, the planning commission
until questions can be resolved and
the complexity of the proposed
recommended continuing this item
presented more clearly. Ms.
.
-
.
.
.
1
Elk River Planning Commission
December 22, 1992
Page 7
Schmitz recommended Steven Shoemaker return to the commission with a
new site plan with several issues resolved (truck access/alternative
routes, design, and amount of fill being removed). Ms. Schmitz also
requested the applicant show the gas lines on the revised site plan.
COMMISSIONER JOHNSON MOVED TO CONTINUE THE PUBLIC HEARING FOR A
CONDITIONAL USE PERMIT REQUEST BY STEVEN SHOEMAKER, CASE NO. CU 92-025,
TO THE JANUARY 26, 1993, PLANNING COMMISSION MEETING TO BE HELD AT THE
ELK RIVER PUBLIC LIBRARY. COMMISSIONER TVEITE SECONDED THE MOTION.
THE MOTION CARRIED 5-0.
8. Farmers Market/Bill Kennedy (Informational Item)
Janelle Schmitz, Zoning Assistant, briefed the planning commission
regarding a proposed Farmers Market by Bill Kennedy. The Farmers
Market has been approved as a non-profit organization. The Kennedy's
hope to begin operating on May 1, 1993 and remain open through the end
of October. Two sites have been tentatively chosen from which to
operate the Farmers Market: the downtown parking lot behind Johnson's
Department Store and the Cenex location on Highway 10 and Hudson Street.
The Cenex site is zoned C3 and allows produce markets, however, the
downtown site is zoned C1 and does not. Also, signage issues need to
be resolved: the Kennedy's indicated they wish to have a permanent sign
as well as a banner at each location which would remain throughout the
entire season. The Kennedy's also indicated they would like to have
several off-premise directional signs. Issues related to parking
should be addressed prior to the Farmers Market opening. More
information regarding the layout of the proposed Farmers Market is
needed.
It was the
would be
supportive
consensus of the planning commission that a Farmers Market
an appropriate use in the downtown area, and they would be
of an ordinance amendment to allow such a use.
9. OTHER BUSINESS
Commissioner Spotts reported the City Council requested a joint City
Council and Planning Commission meeting, possibly in February, 1993.
Commissioner
wetlands and
commission.
Johnson
ponds
requested staff
in residential
review City liability regarding
areas and report back to the
Commissioner Spotts indicated he would not be attending the Annual
Meeting in January, 1993.
Stephen Rohlf informed the planning commission of a recent
Elk River Associates regarding a meeting January 7, 1993.
will be a public meeting presenting the project to the
receiving input from concerned parties. The location of
will be published in the local newspaper. A copy of the
given to each planning commissioner.
letter from
The meeting
public and
the meeting
letter was
ITEM 7
FROM:
~''';
PLAIIllING COMMISSION t<<Jlf'}' J
JANELLE SCHMITZ, ZONING ~S~T0()l'Y
DECEMBER 16, 1992 ~\\
TO:
DATE:
SUBJECT:
CONDITIONAL USE PERMIT REQUEST BY
STEVEN SHOEMAKER "EXCAVATION OF A
WETLAND"/PUBLIC HEARING, CU 92-025
APPLICANT
Steven Shoemaker, 11106-190th Avenue NW, Elk River. Property
owners: Steven and Susan Shoemaker, lll06-190th Avenue NW (Lot
6, Block 4); Jack and Sharon Ellis, l1094-190th Avenue NW (Lot
7, Block 4); Dean and Joann Desmith, 11058-l90th Avenue NW (Lot
10, Block 4); Dennis and Barb Mitchell, ll042-l90th Avenue NW
(Lot 11, Block 4). Lot 8 and 9, Block 4, are vacant, however,
they are included with this request.
1.
REQUESTED ACTION
The applicant is requesting a conditional use permit to
excavate roughly 31,250 cubic yards of black dirt from a Type 3
wetland to construct an open water pond for wildlife viewing.
~ SITE ZONING/LAND USE
Rlc, single family residential/MR, medium density residential.
SURROUNDING ZONING/LAND USE
All directions: Rlc, single family residential/MR,
density residential.
medium
CITY SERVICES
These lots are served by City sewer and water.
LEGAL DESCRIPTION
Lots 6, 7, 8, 9, 10, and 11, Block 4, Royal Oaks Ridge. A map
is attached which shows the location of the affected property.
BACKGROUND
~
The applicant is requesting a conditional use permit which
would allow him to excavate roughly 31,250 cubic yards of black
dirt from an existing wetland located in Royal Oaks Ridge. The
black dirt generated would be removed from the premise and sold
by the contractor. It is unclear at this time whether the
black dirt would be stock piled on site until it was sold or if
it would be removed immediately and sold elsewhere. The
proposed pond would measure approximately 450' x 390',
720 Dodge Avenue N.W., Elk River, Minnesota 55330 (612) 441-7420
regular tandem truck can carry approximately 10 cubic yards of
fill, this proposed project would involve 3,125 trucks entering
and leaving Royal Oaks Ridge subdivision through residential
streets. The applicant has reviewed alternative routes such as .
the Morrell property (to the south), however, these may not be
viable options. Staff firmly believes that in addition to the
normal construction activity in Royal Oaks Ridge subdivision,
3,125 trucks in a residential area would place an undue
hardship on neighboring residential properties and would
ultimately affect the use and enjoYment of their property.
The planning commission should also consider some of the
affects of additional truck traffic on residential streets.
Mr. Maurer states that the City should inspect the streets
prior to the excavation project and require a cash surety in
the event that the roads need repair after the project is
completed. Mr. Maurer also recommended the applicant should be
responsible for regular cleaning of the streets to avoid
sediment entering the storm water system.
Staff believes the traffic issue and related road condition
issue are the primary concerns with this request. This project
is not considered an ongoing mining operation according to the
City ordinance, however, it is intended to last about two
years. Staff feels that subjecting residents of Royal Oaks
Ridge to two years of heavy truck traffic would not be
appropriate.
DRAINAGE
Terry Maurer has reviewed drainage with this request. It is
his opinion that although the project will not improve drainage
in the area, it should not have a detrimental affect on it
either.
.
SAFETY
Dale Homuth, DNR, addressed several changes which he would like
to see implemented if this request is approved. One of those
changes involved reducing the slope to 10:1. This would make
the pond safer for children playing around the pond as well as
fulfill the needs of wildlife in the area. Mr. Homuth also
recommended that the depth be decreased to 2-3 feet.
WILDLIFE
The applicant has indicated he wishes to construct an open
water pond for wildlife viewing. Mr. Homuth's letter states
that this type of excavation should not be considered an
enhancement for wildlife purposes as many of the features of
this pond are contrary to the needs of wildlife, particularly
the depth and slope. Mr. Homuth states that an irregular
shoreline, variable contours along the bottom of the pond, and
natural vegetation along the edges of the pond should be
maintained in order to make the pond useful to wildlife. .
COMPREHENSIVE PLAN
create traffic beyond what should be expected in a
residential area.
.
Subparaqraph 5: Staff feels the use will be detrimental
to people because of excess traffic and noise, and
possibly smoke, fumes, and dust. It would be unfair to
subject people in a residential area to this type of use
for a period of two years.
Subparaqraph 6: If the request were approved, a natural
feature (the wetland) would be altered but not destroyed.
Staff is not aware of other scenic or historic features in
this area.
Subparaqraph 7: If approved, the use would be subject to
other codes including hours of operation for construction
activities, soil erosion standards, slopes, etc. A
mineral excavation license would not be required as the
use is proposed to be completed within a 2 year time frame.
RECOMMENDATION
.
Staff is recommending denial of the request for a conditional
use permit to excavate 31,250 cubic yards of black dirt in a
Type 3 wetland in the Royal Oaks Ridge subdivision. Staff
feels this request does not meet the seven standards for a
conditional use permit. Staff is particularly concerned with
the traffic generated by the proposed use and the affect that
the use would have on the residential area due to the magnitude
and duration of the project.
If the applicant were to find an alternative route for trucks
to use and if the plan were altered to comply with the DNR
recommendations which would downsize the pond and thus reduce
the length of time it would take to complete the project, staff
would be more supportive of the request. These changes would
alleviate the concerns regarding traffic and other disruption
to the residential area. Further, staff would recommend the
following stipulations:
1.
THE TRUCKS
ALTERNATIVE
STREETS.
ENTER AND EXIT THE SITE FROM AN
ROUTE, NOT THROUGH THE RESIDENTIAL
2.
FOR SAFETY, AS WELL AS WILDLIFE PURPOSES, THE
MEET THE DNR RECOMMENDATIONS OF 10 TO 1 SLOPES,
AVERAGE DEPTH, MAINTAIN NATURAL VEGETATION ALONG
EDGE, AND IRREGULAR SHORELINE.
POND
2-3'
THE
3. NO FILL BE PLACED WITHIN THE WETLAND BOUNDARY.
4. APPROVAL IS CONTINGENT ON BWSR AND SWDC COMMENTS.
.
5.
THE PROJECT BE DOWNSIZED IN DURATION AND SIZE TO
MINIMIZE THE AFFECT OF THE OPERATION ON THE
RESIDENTIAL AREA.
::
i
:
8
-.
'.
...1..--..
co .. NO II
i
I"~ ave.
f
.
i
t
-
.Of"t ....
.
~~TrnT~@tr~
~DEPARTMENT OF NATURAL RESOURCES
PHONE NO. DMSION OF WATERS, P.O. BOX 370, ST. CLOUD, MN 56302 FILENO
(612) 255-4278
December 8, 1992
I~'~~', V ~U DEe 9 tin
City of Elk River
Janelle Szklarski, Zoning Assist.
720 Dodge Ave. NW
Elk River, MN 55330
Dear Janelle;
COMMENTS ON STEVEN SHOEMAKER WETLAND EXCA V A TION PROPOSAL
Thank you for sending me the plan and hearing notice for the proposed 31,000 cubic yard wetland excavation located
in Royal Oaks Ridge and proposed by Steven Shoemaker. If excavated, the resulting pond would be roughly 3 acres
in area and averaging five feet in depth.
This proposal will not affect any public water wetlands. Therefore, approval of the DNR is not required for this
project.
.
However, as I have noted in previous discussions with city officials. the DNR is not always in favor of this type of
project. The U.S. Fish & Wildlife Service's National Wetland Inventory indicates that a type 3 wetland already exists
at this location. Excavation of this wetland may not benefit wildlife in the area. A heavily vegetated wetland often
provides more habitat for various species of wildlife than does open water. Also, the vegetated wetland often provides
for better fIltration of run-off than does an open water pond. While I do not necessarily oppose this particular project,
I feel that it should not be considered a wildlife habitat improvement. The real purpose of the project appears to be
to either provide black dirt for the contractor or to create an open water view for several home owners.
If the City decides to approve this project. I would suggest some modifications to the proposal. The shoreline slope
should be made more gradual. A 10 to 1 slope is recommended by wildlife managers because it allows for a wider band
of emergent aquatic vegetation and it is considered safer for children playing around the pond. The proposed 5 foot
depth is excessive for wildlife habitat and much too shallow for fish habitat. More than 12 foot depths are required
to have a chance of supporting fish through a Minnesota winter: Even then, aeration will probably still be required.
Depths more than 2 to 3 feet are considered unnecessary for most waterfowl species. It is recommended that the pond
have variable depths (see attached brochure). Finally, irregularly shaped ponds provide more attractive wildlife habitat.
The shape proposed for "phase 1" is preferred. Adding the "phase 2" area will not enhance the quality of this wetland.
Thank you for your consideration of these comments. Please feel free to contact me if you have any questions.
Sincerely;
O-vC/~
Dale E. Homuth
Area Hydrologist
ENCLOSURE
.
cc: Dave Hills, Regional Hydrologist
Dale Ebel, Area Conservation Officer
AN EQUAL OPPORTUNITY EMPLOYER
~" r.!' \-', \l F i) DEe 4.1m
~~ I., " ~. ~.....
_ / f ~ ~ ~ ~ CONSULTING ENGINEERS
IfIIiIr'WI Maier Stewart & Associates Inc.
.
December 3, 1992
File: 230~OOO~OO
Ms. Janelle Szklarski
Zoning Assistant
City of Elk River
720 Dod~e Avenue NW
Elk River, MN 55330
RE: STEVEN SHOEMAKE
WETLAND EXCA V A TION
Dear Ms. Szklarski:
As requested, we have reviewed the information you provided relative to the Steven Shoemake
request to excavate a wetland in the Royal Oaks Ridge subdivision. Based on our review, we
offer the following comments:
.
1. The area in question appears on the National Wetlands Inventory; therefore, it is likely
a permit from the Corps of Engineers is necessary.
2.
The proposal indicates approximately 31,000 cubic yards of excavated material is to be
removed from the site. Assuming the typical load would be 10 cubic yards, this means
there would be 3,100 truck trips in and out of a residential neighborhood.
3.
The ~nnIk~tj0.f! ~n~it:~t.es. the ex('.av:t.t~d !r!2.terial would be sold as black dirt and would
.& " . . . .
be removed over a two year period. This leads to the question of whether it ~il1 be
removed and stockpiled then sold, or only removed once it is sold. If the material is
planned to be sold prior to removal, the question is where is the market for 31,000 cubic
yards of black dirt the next two years.
4.
If this operation is allowed, we would recommend the City inspect the roads prior to it
beginning, then require a cash surety be placed to cover any damage to the roads in the
area. Also, operations should not be allowed during the spring when roads are more
susceptible to damage from heavy loads. Hours and days of operation should also be
limited.
.
1959 SLOAN PLACE, SUITE 200, Sf. PAUL, MINNESOTA 55117 612-n4-6021
9800 SHELARO PARKWAY, SUITE 102, MINNEAPOLIS. MINNESOTA 55441 612-546-0432 . Equal Opportunity Employer
.
.
.
_ / P ~ ~ ~ ~ CONSULTING ~NGINEEAS
IfIIIIIr"WI Maier Stewart & Associates Inc.
January 20, 1993
File: 230-000-00
Ms. Janelle Schmitz
City of Elk River
720 Dodge Avenue NW
Elk River, MN 55330
RE: STEVEN SHOEMAKER
WETLAND EXCAVATION
Dear Ms. Schmitz:
As requested, we have prepared this memo detailing issues we believe need to be addressed
if the proposed wetland excavation is approved. We understand Mr. Shoemaker proposes to
not use the City streets to remove the excavated material; therefore, the issue of damage to
local streets is no longer relative. We also understand Mr. Shoemaker proposes to line a
portion of the excavated pond with clay to ensure it retains water. If the proposal is approved,
we would recommend the following items be required to be submitted, reviewed, and
approved by staff prior to work commencing:
1. A detailed grading plan with one foot contours based on actual mean sea level datum,
which details the proposed limits of excavation and grading work and also meets the
requirements set in the approval process.
2. A calculation, based on the grading plan, of the total amount of material to be excavated
which is within reasonable range of the requested 19,000 cubic yard amount.
3. Survey information, based on the same datum as the grading plan, which details the
lowest floor elevations of all homes adjacent to the proposed pond and the elevation at
the limits of the drainage easement.
4. Details of an adequate overflow structure to the pond which is a minimum of two feet
below the lowest house elevation or one foot below the lowest elevation at the limits of
the drainage easement, whichever is lower.
1959 SLOAN PLACE, SUITE 200, ST. PAUL, MINNESOTA 55117 612-n4-6021
9800 SHELARD PARKWAY, SUITE 102, MINNEAPOLIS, MINNESOTA 55441 612-546-0432 . Equal Opportunity Employer
Ms. Janelle Schmitz
January 20, 1993
Page Two
5. Written proof of the ability to access the excavation site without the use of local streets.
If you have any questions regarding these issues, please call.
Sincerely,
MAIER STEWART & ASSOCIATES, INC.
c;::,fl11t, .
~//'la~~J
Terry J. Maurer, P.E.
TJM:tp
000-2102.jan
.
.
.
5-/ SLope
~ev ~.sed
I Q-, .>J JJ l LpttCl:.. :OJ
~o r e f./1-'13
.
.
\ I
'0
/
/
/
\ I
\!
, /
'P
/
I
/
'\ /
'~
o"rnl
I
yJ~Is1~
9
o e 511 1'1/1'5
10
\ ~
\~
~\;'v
7
'\
'\ e ,
'!J to P A(l.eA '
" ~" I ".,\.
"
'"'.
"
.
...s
!
~
6
5'
-'.
.
2. b eflnl
/'1/-rcll ELL '.5
\ l
Si
\.l)
~
~
~
~
,
'\..
I .......
J.l5...~ '\
,. '\
'\
. .....
~. 0
0'--. - - - .- - -
.......--(l) .
CF3./'I"fE.~ ~t?fA /tll~ox /&,000 cu y1)5"
!JNI<. ,4~eA A(JP~6X 'DO C_IA. ytlS
SRb;?-€. To 5' ,Aefiil ,AfJl'~x lit;O ~u Yj)5
A P'~oX 'C:Z 000 c:u yiJS
't;:
~::;
.;; o~
. '2:
ij) 0...
. <> 0
0
0
0 .,.
0
'" !"'
... ~
10
'"
ll)
'2:
?
...
"J
..
~
I
,
,
"
"
,
i1~'~V
II':U.V-#
.
1
1
,
,
?
",
N.~
i
[""--/35.(
lie
I:... -
101 .
L_~g':!9J
r-c;/35.C
1~:8 I\)
iS~
L_~!~5.~
.
a
w
135,C
r
:~ ~
IS
L 95.(
r
110
l!=l 01
IS
L 135.(
rIll
110 ll)
0)
<0 XAVIER
.364,69 ".
STREET N. W.
..
0,
..."J_
!S'
*-
-
-
''f<-
~
..
~
,'f.
r-----;j r-----' r------,'
I 85.00 :1 I 95.00 I I 115.00 .:
1 II I I
I" I'''' 1 I", C.
'iJ;,o;~ ; Ill) 1 Ill)
,'ro <0.:: iiil 110 I 110
. ,'.. 01 1 . I I ·
It: ":v 01 (..j (..j
" 4"~ ':'1 Ill). II I:. _
/' . II"" - Ill) W
I - I !ll): ~ 111ft'
l._ 01 I ,1ft II
-- -__ \ I I
----j ~
NAG E E Ai S
~ I<.- ~
lJ' ...
E MEN
(..j
I\)
lJ'
r-~
~I.23
I 3E
10."/7-
: Ca,,]
I'"
Ill)
110
1'---
,lI:
I"'" *'
Ill)
11ft'
I
l(..j
'1-
'V
t4<-
'"
~
~
.
----
\. ~
'0 ~
,. 95.00 1/5.00
S 1325.81
EAST l.INE OF THE SW'''4 OF THE SW'''4 OF SEe.1t6
..... ...<'\ ;~ ::t'"l '"1'"1"'" :.-0........ 0"'''1<'\111
:.- 10:'- .. :.- ~, :.- 0 '-I .. c: 'b :.- ~1I,,0'-l
.., ~~ .. .. ~ .. "''''c:::>. '<l .. 'b .. ... 'b <:;:b.
'" :.- '" '4 ~ '" ... ::':'-1 ;:)o"',..~::t" b' .. ::.: "I
'b 'Il C '"I'" 0: ~. 'b It:'- ""ll<i
'tI ., III ~~IOO(; .. ll. ., :,., ~"'-:
~Ift 'll. 'I) 01) ') ':> " It .. .. 'll .. 0 0
.. ~ ... ..... "0">1 III ;':'-0- ... .,0">1
.." .. .. .. "'Ill ">1 ll."" "'1)'Il">1
.. .. .. 'Il 'Q ::t ..0- III ., 'Q
.. "l ;, II '<I 0 ~ ... 00:'- o III C
'" 'll ll. .. .... 1.0 :u <:: c: c: '1 ...to.. ...
., 'to: 0: ~ ;::, .... ~ tr " ;, ... 'll - .~r f
.... '" .. .. .. ,.., 1.Q <<:'~ ~ "ll.ll.IIl .,
0". .. tr " .. '. Ito ~lt) .. .. .. :'-\t b' ~
... '1:l " 9 ., '-I'.:) ll."" .. 'll;' ~ ~
..." 'tI '. (, " 'll ., ... " " ll. '" ... Cl .. ~ .. .,
0 ., ~' ..... 'b .. \I.=> :b '.Q .., "'c: ft0. It
., .. I) ..' '1:1 "'1:1 III ... :r 0" '" ~ III
1I :>- ~ ti f:') '1:l .... "'!'J r--~ 'Q ... '" Cl ., ".. ( ..
.. 'll .. " ., .. ., =>.. 0 .. ~ ~~,
.. .. Cl. ., ....1 " '.0 () :, r: .. " 0 .. ::r 0
r, "
:::.
c
.
Excavated Ponds
for
Waterfowl
(.
Landowners frequently ask natural resource agencies
how they can improve their land for waterfowl. Specifi-
cally, many people wonder if excavating ponds will help.
This brochure will outline when and where dug ponds,
or "dugouts", can be beneficial, and provides construc-
tion guidelines for optimum waterfowl benefit. Refer to
our" Ecology ofW etlands" brochure for more informa-
tion.
SHOULD YOU CONSIDER A DUGOUT FOR
YOUR PROPERTY?
Dugouts should be considered only where other wetland
management options are not possible. Before you
decide to excavate a pond, you should survey the site to
determine if other options, such as ditch plugs, tile
breaks, or dikes would work. Wetlands restored by
(. .educing drainage are always preferable to dugouts.
In general, dugouts should only be co~structed if there
are other open-water wetlands within one-half mile.
.. .------.
---::'
---...-- .~
---:':.I~ -...,=-~.
~~.
Waterfowl use dugouts primarily for courtShip and
territorial sites, and must have other wetlands to
fulfill feeding and brood-rearing needs. Small dug-
outs (less than one-half acre) are used mostly in
spring or fall migration, less so in summer. Larger
dugouts will get more summer use, if they're the
right depth (1.5 - 3 feet).
You should not excavate a dugout in an existing
wetland, especially one with open water. This can
destroy the existing wetland by draining surface
water off. Excavations should be outside the edge of
the wetland, where the water table is still adequately
high. Cattail-choked wetlands are an exception w
this rule, where vegetation covers the entire surface
of the wetland, and surface water is rarely present. In
these cases, it may be acceptable to dig in the wetland
basin, but you should still stay close to the edge. For
. these projects, you will need to observe permit
requirements described below and should talk to the
local D NR Wildlife Manager.
CONSTRUCTION GUIDELINES
1. PERMITS. Wedands are protected by several laws,
and a permit may be required for your project. Four
government agencies regulate wedands, and should be
contacted if you will be working in an existing wet-
land. These agencies are: U.S. Army Corps ofEngi-
neers, USDA - Agricultural Stabilization and Conser-
vation Service (ASCS), the DNR Division of Waters,
and your city or county zoning office or local water-
shed district. Phone numbers for the first 3 agencies
are given at the end of this brochure; check your local
directory for the number of your local office.
2. DEPTH AND SLOPES. Waterfowl need shallow
water. When filled with water, your dugout should be
no more than 5 feet deep. In mid-summer, much of
your dugout should be less than 3 feet in, depth. Your
pond should generally have the following depths
when it is full (as in spring):
PCt. of Pond
Water Depth at this Depth Likely Result
o to 1 foot
5to15
Cattails! emergent
vegetation, usually
drv bv Julv.
,. .
1 to 3 teet
40 to 70
Mixed emergent
vegetation and
open water, dry in
drought.
3 to 5 feet
25 to 40
Mosdyopen
water, dry in
severe drought.
If you are constructing a dugout in cattail-choked
wetlands, you will not be able to achieve the above
depths. In these cases, the slopes of your dugout will
have to be fairly steep. This is okay as these dugouts
will function mosdy as territorial sites, and may not be
heavily used for feeding. Maximum depth stili should
not exceed 5 feet. In mineral soils, steep slopes prohibit
growth of desirable vegetation, encourage erosion, and
reduce waterfowl use. As much as possible, grade the
slopes of your basin at a 3: 1 (steep) to 10: 1 (flat) ratio.
Flatter slopes are better, which is not the same as a flat
bottom.
..11/,
_"', _'U' . ..111. .11"
..",.: .."..... .h. "."'1. ,.1 ~" ..t"
..\1.. \1., _\\11" ..011,.
,'H,.
'\\"-,
\1., .1';::. _.1,.
.."..
..1/.
,"'" ,,,,''.
. .,\1...
..1/.. .
.~.,u.
.
.If, ,,"',,_
_,II,., ..,H,..
"'\"'.
.!t. ,U,
.,.1I... .'
.\11,.
,.i/,
'\\/'"
,.\1.,
."'... ..'
,I', .,all,
I"'"
.. "",.. :..,\1.... .,,\'\
. .
'\"" ..
. ,I ~ ~,'" ,"\ I,.
\\Il,
':', -'\'.
.,\1
Figure 1. Topographic diagram of a good basin design;
. this design emphasizes shallow slopes and depths {each line
represents one foot of depth}, and good shoreline features.
Adjacent uplands are seeded to native grasses.
.
A pond bottom with variable depths (i.e., an undulat-
ing bottom) is very desirable. This allows an intersper-
sion of vegetation and open water which is very
attractive to waterfowl. Some biologists prefer to
construct dugouts with one deep side to ensure water
availability and allow for viewing ofwaterfowl. Figure
1 shows an example of a good basin design ftom the
perspective of slopes and depths.
3. SIZE. Waterfowl use all sizes of wedand, but
usually, bigger is better. In building your pond for
waterfowl you should consider a minimum size of
2500 square feet (equal to a square with 50 foot long
sides). Larger, irregularly shaped ponds are preferred,
however costs get quite high.
4. SHORELINE FEATURES. A pond with a shore-
line which is irregular, and has many points and bays; ~
is more attractive to waterfowl than a dugout with a .
straight shoreline. Plan your dugout to have as much
shoreline as possible, as in figure 1.
(
.
5. NUMBERAND DISTRIBUTION. Ascxpbined
above, your dugout should be near an existing shallow
marsh for brood-rearing purposes. If you have ad-
equate space and funding, you can consider digging
more than one dugout. In general, two closely-spaced
small dugouts will receive more use than one larger
dugour. If you construct more than one pond, space
them about 100 to 300 feet apart. Ponds can be closer
if tall vegetation screens the ponds from each other
(breeding ducks are territorial and won't tolerate oth-
ers of the same species if they can see them).
6. ISLANDS. Dugouts less than twO acres are too
small to include an island. As an alternative you can
use nest baskets, boxes or floating rafts for nesting. A
floating log, anchored in place, provides an excellent
site for waterfowl and turtle loafing. See our brochure
entitled "Artificial Structures for Waterfowl."
(
.
7. SPOIL. Excavating a pond means you end up with
a lot of soil removed from the dugout; this is called
"spoil." Spoil must be carefully dealt with to optimize
waterfowl use. In peat soils and cattail-choked wet-
lands, you should remove the spoil from the wetland
if at all possible. Again, check with the apptopriate
agencies (see list at end) to determine if you need a
permit.
In mineral soils, the top 6"-12" will probably be black
topsoil, high in organic matter. This should be saved
separately for later spreading over the excavated bot-
tom. The underlying nonorganic soils (clays, sands,
etc.) should be moved to an upland site and spread
evenly. It is important that this material be removed
from the wetland basin and not piled adjacent the
dugout. The edge of the dugout should not have a
discernible "rim"; that is, the slope should be continu-
ous below and above the water surface, as showp in the
cross-section in figure 2.
Finally, all disturbed uplands and spread spoil should
be seeded to native grasses for a minimum of 150 feet
around the dugout. This will provide waterfowl cover,
minimize weed growth, and prevent sedimentation
within the basin. Providing 4 acres of upland nesting
cover for each acre of wetland is best for duck produc-
tion. Do not plant trees near your dugout; these serve
as predator perches and dens, and will reduce water-
fowl use. Use nest boxes to attract wood ducks.
Remember to get any necessary permits before you
starr digging!
8. FINAL TREATMENT. The clay and sand under-
lying most mineral soils are very sterile and won't
support plant growth. In order to establish a food
chain in your dugout, you must provide :10 organic
base. This can be accomplished by spreading 4" -6" of
black topsoil over the eneire excavated area. This can
be the topsoil you originally removed (and stockpiled)
from the site when you starred digging. Another
technique is to spread 2"-6" of clean upland hay over
the excavated surface (wild hay can spread noxious
weeds). Both can be used simultaneously. Once
covered with water, either of these bases will quickly
allow vegetation and insects to grow, providing the
building blocks for a desirable marsh. Don't worry
about planting aquatic planes in your basin - they will
establish themselves naturally in time, given a suitable
Site.
I , 'I
Feet , I. i [',
~2:~Q~:'~<(..j" . .,+'o<;:;;~(J.~Dp~'6?:o~~
4 rOlYo..ooc>"~'c.<..;; ....'o.oOc,.,o.\:;oc::::. .. .o~.
: Ilili&'I~lftq~~~~tllii~~rl.<>~".d\$k%I~,Y~jI~ilf!~1
I I I I I I
~ 0 10 20 30 40 50
Feet
Figure 2. Cross-section of pond bottom showing smooth,
shallow grade at waterline, and undulating bottom contours.
SOME OTHER CONSIDERATIONS
In general, a bulldozer or scraper is best capable of
constructing ponds as they can be fairly precise in
"sculpting" the landscape. A backhoe (power
shovel) or excavaror can do a good job, and a
dragline can produce fair resulrs. The nature of your
project will likely determine ro a large degree exacdy
which equipment is used. If you have a dry site, use
a dozer, scraper, or backhoe. If it's a wet site, a
backhoe or dragline must be used. Minimize the
disturbance ro existing vegetation around your dug-
out or you will encourage undesirable weed
growth. Blastingwith dynamite or ammonium
nitrate gives unsatisfactory results, is dangerous,
and should not be used.
ADDITIONAL ASSISTANCE
Most resource agencies discourage the use of dug ponds
for waterfowl because of their high cost. However, YOll
may be able to get some further technical or financial
assistance. Some couney ASCS offices will cost-share
construction cost~ through the Agricultural Conserva-
tion Practices (ACP) program. Local SCS or Soil and
Water Conservation District offices may be able ro
provide further technical advice. The DNR Section of
Wildlife can give general advice for your area, and should
be checked for permit requirements. In forested.areas of
the state, your DNRforester may be able to provide cost-
sharing through the Forest Stewardship Program. Fi-
nally, local and statewide dubs may offer cost-share
assistance; check with them for specifics.
AGENCIES WHICH REGULATE WETLANDS OR PROVIDE TECHNICAL OR FINANCIAL
ASSISTANCE FOR WETLAND PROJECTS
AGENCY
FUNCTION
PHONE NUMBER
Agricultural Stabilization
and Conservation Service
Regulatory &
financial assistance
(612) 290-3651
Army Corps of Engineers
Regulatory
DNR - Forestry
(612) 220-0375
Technical &
financial assistance
(612) 296-4491
DNR - Wildlife
Technical assistance
(612) 296-3344
DNR - Waters
Regulatory
Soil Conservation Service
(612) 296-4800
Technical assistance
(612) 290-3675
Ill" 1992, S=ofMio_., ~,.fN...... .....=.
Printed on recycled paper. @
ft
I.
I
I
.
Cf)
ill
:J l-
t)
Z
~
I-
ill
I
I-
u...
0
a:
ill
a..
<t:
a..
Cf)
~
ill
Z
. . .
.
(")
en
en
..-
.......
(")
>-
...
co
:J
C
co
...,
)::
~
Z
::J
U)!
. ,'j
. ., .f
~'.
-.11
.':1 ~
_. .;:~ 1
'--'~
~ .~-..
/- ~
. '" ..
iii
~
ca
C/l
't:l
e
~
Ql
~
ca
C/l
ca
~
-
III
:
>-
Ql
C/l
E
ca
a:
.5
~
'in
C
ell
E
c.
0
Q)
>
Ql
"C
01
e
e .;
Q) ::l
-. Cl 0
0 .J::
i:D Cll
~ <Il -;
~, -\ 2 E
m .J::
.J:: Q)
f ~ <.J ....
>- ttl
~ .Q >-
0 .J::
>., -0 "Iii
.J:: <.J
a. C/l
iii a:
z
U5 c
CJ
z
>-
a:
'0'
. .
,.
:;:.- . ..
..:;
....::i.
~ot-:r
.......~J...'r.
-;:f.
..: ~
'.
.....:
~I Q)
..- "0
---.. -. en CO Q) (/)
._' .,;...A CI) ..-
~:~ ---.;...........-: Q) "0 (/) (/) > (/)
-,-"1'/ .....;;._~lS '- Q) 0 Q)
?' - --~ CO C C Q) '-
'.c: ~,...~~ ~ C Q) :U Cll c
f-' ~ en :::: 0 > Q) Q)
".')~ Q) Q) 0 0) 0 >
~- " ~~. ,.. :~ 3: > .;::;
> ._~ () C "0 C'CS ()
C c ..c 0)
c: CO 0 -
~ E -
~ 3: ..- -.:= 0)
en C'CS Q) '-
~ 0 2: ..c Q)
-
Q) "0 Q) Q) ..c
..c (/) > -
- C'CS c
C (/) 0)
(/) -= 0 :c
.0 -
() -0 ," C'CS
'- C'CS C
::J c: Q)
.0 '0) >< C 0
::J Q) :::
.0 (/)
(/) ~ Q)
0)
(/) '- ::J ::J
<( C'CS (/)
I -c
.;: C'; e
, c:. :!;;i~ u.!! <
N
.;;; >.- .. U N
~.= :::"'::1- 0
>0 = 0 c....o = E ~ ~
C';
?; =tn = C'; ;; C';
C'; e.J';;)_ ~-= (5 .. Co
~1 C;c:':~$(_~ u c
;;U5-; ;;'"0
E~ 0
~ ~.~ > ""B 't:l
~u c~z2::;: c< U
u ..; ::l
o ?; :;~u~~ .:: .:
-'- ~.~-=.; 0.. 0 u C
u 0 ~.~
::l '" (.J >-'"':j:;- 0
c..:.: :::I-C-- C';.. U
C en..2: ::s :: E. '" Co ...
C ::l ~ ~ ~.: c: 't:l '" "Cl
0":: C::l C
UU v,::: u.- C'; 0 .!!!
"'u .~~j = w; -=:.0 ~
t:S 1o..0\'-UC: u::l
u ~ c:.,""oU~ ~'t:l ....
,
C ,
85'"
u ..: > C C';
.~.~ ;;:'~ "B
~r;:5~
u ~ -= .. ~
C'::.J_C':-;,
-0 a3'= ~ U
e.J '- &II ... I-
-"":J'",=
C':-'-~ .
~ ~ U._ &II
t>c::: :=
'" _gu u
;::~o::: ~
-;> "'--.
",OO?;u.
;..\'-r""-,-> en
- c.QN' C) -
Uc.... _ ~'" %
..: C ::l C ~~
'oJ-O_u_
= .~ ~ 0 > u
!.:=<uu~
. ~~
~;;o:; ?;
(",lI-=~":O
c.o~; U CJ -= ...:
c~--c.!:,.....
.-.... <: <: ;> 0
o.'t:l _ 0 ::: 0_
Co C ~ QIl- C :::
2cECo;-ci-'t:u
"in ~.r; -= ~ 5.5
-g ~'"~ cn'"~ ~ ~
~ ~~ ] fj .:: -=
':oJ .-.- C': c: --;j
"'''::o-uoc
....~,...i:i'O~..::
5'O;~O~;j
UC't:l'--O~
=<coc:;c:;_
o <: . >0--
~~~.:"'?o.~.
~~~..2~~.e
~ ~ .,
'- '"; ~ ~ -s'"e'
o ::::.- ~ co c.
gE:=~c
:: t ~;.:-o y
.!:Jc:..c:oc:=
'': _ '" ell eJ C.
1- c.= ~.~. 0
\i.,. r=.: 0 (J..'!i
~-=uuo.>
tnC) "'Ou
'->> ~ .=-=u~
-= g c'~ ;"; ~
>0 \.0 . QIl'O -=
.Q =] =-5.:t
~ ;.: - E'- 0
.~ -=.: <: ~ ~
:>CJ .",
U\,;,,-oClO.~.,;
\i.,.O~QQu....
< - ::l C-._ 0
c"'->_
"'O..!..
0.... u U
_ 0 - ~
u>'t:l~'-
:- ,.;:::: u 0
~r:-o.",
-c.,t:"'-c
~",,,..CJ-
'::cuCoC;
=.C':'::: B ;
;-e ~ -0 :=
.~ .5.: ;; =
~ ~ vi -;. 0
E ~.~:;.a
u'-'u- 0 U
.c"O .'--0
':::cgc
o c.:~..:: ;::
"::><1---
UU ?;.=
::l~C)o-
:E -= -= Qo'i
-C)
on _
c.E-= lit
.- u ...
utc(,J>......
'Oucco::l
C u._ ;- In
.!!:~:.~ ~
u>c<:E
?; <':l ... ~_ .
,-..::Eg~E
o <: 0.._ u U
~~~~~-=
'- ca >._ '- _
u:;u~'O~
CO._ 't:l U C -
. '0.: c'C III e
...Uco..;~c.
'B.=-e~ ~ S
":l:::lo- "'_
-gl-.g-~;
::suClt!!:::su
:t:S.!!SE
'"
....
l(':l
> ~
<<>,..
....co
..E .-
.c
'C'C
.!:!c
ceo
'"
eu
UE
~o
u.c
>E
"0
..c....
",=
'C DO
ec
.....-
_..c
'Uc
~u
~~:..
..
...
.c.
.0.
=..
NQ
==:
;:.:::....
... 5'E
~~~
~Zl::
>. "l:I eG
_c...
-lIItn
12A ..
A~~ '
,,\I ~ 0 R Y I N G
""Jilt, UP
etlands
Continued from page lA
..permit was issued so Anoka could
i,9uild a gazebo. In Plymouth, the Sil-
ver Buckle Saddle Club destroyed
wetlands to create a horse pasture
and track.
T.oday, wetlands are no longer
Viewed as swamps and marshes to be
!: ,bull~ozed wholesale. Most projects
that Involve filling wetlands are lim-
it~d to a few acres or less. Gradually,
. .~etlands have become recognized as
lfI,lportant ecosystems that contribute
,to wildlife, water purity and floodwa-
ter storage.
Some suburbs have enacted strict
controls on development and com-
piled their own inventory of wet-
lands. And a tough new state law is
. designed to force even the most re-
. calcitrant suburb to ensure that wet-
lands taken by development are
r~placed.
Totaling the loss of wetlands is all
'impossible because federal and
e wetland regulators haven't
cked it. Only in the past few
. mo~ths has the U.S. Army Corps of
, EngIneers. which regulates wetlands
under federal jurisdiction, kept accu-
rate records of what's been lost. In
.fact. the federal count that puts the
nl;1l!lber of wetland acres in the Twin
Cities area at 270,000, released in
!'fovember. is based on data collected
In the early 1980s.
Furthermore. wetland draining isn't
even r.egulated by federal law, and
only since early 1992 has it been
covered by a new Minnesota law.
~nd the~e still isn't a federal report-
Ing requirement for most wetland
projects tilling less than an acre.
Some attempts have been made to
quantify the loss. One study by the
state Department of Natural Re-
sources (DNR). which examined a
selected nu~ber of proposed devel-
opment proJects, shows a projected
ne,t loss of 58 1 wetland acres from
mld-1988 to early last fall in the
seven metro counties of Anoka, Car-
ver, Dakota. Hennepin, Ramsey,
Scott and Washington. The losses
ranged from 27 acres in Ramsey
ety to 410 acres in Anoka Coun-
nly Dakota County did not
show a projected loss.
Sunday/January 3/1993/Star Tribune
In 1~89, th.e U.S. Fish and Wildlife'
Service estlmated that more than half
of the wetlands in the Twin Cities
a:ea had been lost to development
Stnce tbe area was settled. Since then
hundreds of perm its allowing wet-
~nds to be filled have been issued
adding to tbose losses. Beth Kunkcl,
,,~tlands consultant who frequently
w.,?rks for Twin Cities developers,
~l~, "The 'no-net-Ioss' policy isn't a
no-till policy. .. . We can't reason-
ably believe that we can stop filling
wetlands." .
The loss is compounded by other
problems, from developers who try
to cut comers to suburbs and town-
ships now charged with protecting
wetlands while seeking development
ventures that could endanger them.
Another wild card is "mitigation," a
federal requirement designed to re-
place wetlands lost to development
with new, man-made wetlands. But
sucb a requirement, which usually
applies only to projects that fill more
than an acre of wetland, doesn't guar-
antee good results. Duplicating na-
ture is an imperfect science, followup
checks are spotty :J.nd enforcement
penalties are rarel" meted out. Often
mitigation has resulted in the scoop-'
in'g ofa hole out of the ground-
wetland in name only.
Some city officials and developers
charge that wetlands are overregulat-
e~, and that too many marginal, un-
Sightly wetlands are being preserved
at the expense of development. Thev
argue that some net loss is inevitable
and generally favor a policy that
would save only larger wetlands.
Meanwhile, the debate that pits wet-
lands against growth rages on from
the White House and Congre~s to
A.noka County and the Rice Creek
Watershed District.
Wetlands under pressure
A.i~st-completed federal mapping of
the seven-county metropolitan area
shows that 14 percent of its total
~creage is wetlands. In rapidly grow-
mg Anoka County, 28 percent The
pressure to develop wetlands in the
Twin Cities area is so intense that the
Corps of Engineers spends one-third
of its time regulating metro projects,
even though the Twin Cities ac-
co~nts for only 4 percent of the
st~te's total land acreage.
Some projects that fill wetlands are
driven by public purpose: A highway
b3/-pass in Shako pee, a new middle
~~~Iln Fa~ington, a hospital op-
erating room 10 St. Louis Park. Oth-
ers 'are more questionable. Wetlands
were filled to create a ballfield in
Maple Grove, which by the city's
count already had 39 ballfields. .
Even projects deemed a success can
have.serious side effects. Wal-Man,
the glant Arkansas-based retailer is
building a new store in Fridley ·
w"ere it filled 2.6 acres ofwetl~nds
and agreed to create S.7 acres of new
wetlands. City officials were elated.
B~lt Wal-Mart's new wetlands, along
WIth. storm water runoff from its
parking lot, will flow into the nearby
Sprin~ Brook Nature Center. Wal-
Mart IS the latest offour new major
developments that, within the past
year, have surrounded the city-
owned nature center and its wetland I
network. Siah S1. Clair, director of .
the nature center, said storm water
~n~ff already causes a 3- to 4-foot
nse In the wetlands' water levels and
floods nesting areas for waterfowl. I
Much wetland fill, such as the Wal-
Man pr?ject, is driven by growth and
economics. In 1987, Mills Fleet Farm
wanted to build in Oakdale and fill
5.3 acres of wetlands. The store
pr~!TIis~d to replace the loss through
mltJ~t1o.n, and the city's community
sen'lce director urged federal officials
to grant the permit because of "the
financial benefits that would accrue
to th.e city." The permit eventually
was Issued, the mitigation was com-
pleted and the store was built.
Still other projects compound dam-
age caused by earlier wetlands loss.
In a subdivision in Washington
County, the Corps of Engineers is-
su~d a permit to fill wetland for two
dnveways. The Fish and Wildlife
Service, trying unsuccessfullv to stop
the permit, said the wetland 'was "es-
~ntial to maintaining the water qual-
Ity of Clear ~ke. . . [which has)
already been Impacted by residential
development. "
Monitoring compliance
Wetlands protection in Minnesota
involves a dizzying maze of overlap-
ping jurisdictions and evolving regu-
lations. Although a host of watershed
districts and cities regulate the filling
of wetlands, two agencies - the
Corps of Engineers and the DNR-
wield the most power.
The DNR oversees large waterlogged
marshes and open-water wetlands.
The Corps of Engineers regulates all
metro-area wetlands, but generally
acts only on those that fall outside
the DNR's pun.jew. Because most of
the small wetlands targeted for devel-
opment fall outside the state'sjuris-
diction, the Corps of Engineers issues
the bulk of wetland fill permits,
Corps officials concede that there has
been a net loss of wetland acreage
despite the no-net-Ioss policy. In
awarding permits, the Corps consid-
ers more than just the environment;
it also takes into account the need for
roads, houses, utility lines and the
economic benefits that come from
development. Corps officials also say
that they lack the resources to regu-
late the smallest wetlands.
Many developers have found the ar-
rangement confusing. "Vou don't
kno~ ifit's going to be the Corps of
Engineers, the DNR, forl the water-
shed district," said James Schilling, a
Forest Lake developer who's often
clashed with the agencies over
E~sd:~eated even more co:::-
sy is a federal procedure that grants
blanket approval to most projects
that fill less than an acre of wetlands,
and requires no mitigation for de-
stroyed wetlands. The streamlined
procedure is designed to remove red
tape that might entangle smaIl devel-
opments. But critics have dubbed it
the "I-acre-giveaway." Ted Rock-
well, director of Minnesota opera-
tions for the U.S. Environmental
Protection Agency. said, "I don't un-
derstand how vou can have a 20al of
"no net loss' and at the same time
have this hole in the program."
The DNR and the Minnesota PoIlu-
tion Control Agency (MPCA), in a
letter to the Corps of Engineers last
year, charged that the procedure "un-
dermines our state directive and the
federal directives to comply with a
no-net-Ioss policy." Recently, the
Corps of Engineers has tentatively
agreed to decrease the maximum
acreage it covers from I acre to one-
half acre.
Further complicating matters is the
state's Wetland Conservation Act of
.91. Its purpose is to fill in the gap
the federal law by ensuring that no
wetland. no matter how small. can be
fiIled without mitigation.
Loopholes in the laws
But the law aIlows plentv of excep-
tions. For instance, projeCts ap-
proved during the five years up to the
law's effective date ofJan. I, 1992,
are exempt. Other exemptions are
marred by loopholes, said Barbara
Ohman of the state Board of Water
and Soil Resources, the law's overall
administrator. She said some devel-
opers are already taking advantage of
poorly worded agricultural land ex-
emptions to avoid the mitigation
requirements.
Another concern is that the new state
law ~s being a~ministered by cities,
pu~tJng them m the position ofregu-
lat~ng the very development they're
trymg to attract. Not surprisingly,
~th as. m~ny ~s nine different agen-
C1:S weIghmg m on a single wetland,
thmgs have often gone awry. -
Da~ Utecht was in a hurry to build a
spht-Ievel home in Linwood Town-
ship in Anoka County on 7.7 acres of
.d. More than half was wetland. \
e Anoka Conservation District
d the township that Utecht could '
have a temporary permit, even I
though details on how Utecht would
mitigate weren't complete. The prob-
lems multiplied, the district said,
when Utecht was issued a perma-
nent, not a temporary, permit. Ai-'
though things were finally resolved,
the process left Utecht angry about
what he says is government incompe-
tence: "We w~nt to pull a building
permIt and thIS was dropped on us."
Another complaint is that many .
farmed-over wetlands are of such
poor q~ality that they don't deserve
~rotecuon. There are two classifica-
tion systems for wetlands in Minne-
sota identifying at least eight wet-
lands types. Some often lack standing
water. Many already have been de-
graded by farming and road-building.
"What I'm observing in the hundreds
of wetlands I've seen over the years is
that the quality has deteriorated sub-
stantially," said Franklin Svoboda a
w<<:t1a~ds consultant and wildlife biol-
OgIst m the Twin Cities area.
Indeed, many wetlands simplv don't
look the part, which can add to the
confusion for developers who don't
know how to spot them. In Blaine,
for example, three different experts
all looked at the same wetland and
came away with three different esti-
mates of how big it was.
The only wetlands that are universal-
ly recognized. are what Ben Wopat,
regulatory chief of the Corps ofEngi-
n~' S1. Paul District, called "Joe-
Six-Pack" ~etlands: water-logged and
crowded WIth geese and cattails.
PrC?blems with developers
WhIle. some developers are sophisti-
cated In approaching wetlands, oth-
ers have less experience. An industri-
al park that was being developed bv
Cu~ Leibel and Lenny Dupree near
Whue Bear Lake was 'temporarily
halted by the Corps of Engineers be.
ca~se "somebody reported us," com-
pl31ned Leibel. Bill Short, a White
Bear Township official, said the proj-
ect drained into Bald Eagle Lake and
tJ:te two men had little experience
either as developers or with wetlands.
SchilI~ng, the Forest Lake developer.
was gIven an after-the-fact permit in
1988 when regulators found he had
alreadyfiIled wetland. Now, he's .
back again at a new location. This ~
time, said the Army Corps ofEngi- .
n~rs, he'd filled 5 acres of wetland. .
WIthout a permit as part of a new h
industrial park in Chisago County. .
Earlier this year, Savage city oftic~s
approved the filling of more than' U
acre of wetland in the northwest pan
of the city without having a Corps.of
Engineers permit. Savage city admm-
, istrator Mark McNeill argued that :
II the city, which had applied for a..~
permit, had to proceed with the fi1J..i
because streets in the adjoining con-
strUction area were already tom UP.I'
A~, ~ere were still new foads .;;cL.
utllny hnes to put in before winter ..
shut down the construction ~_i
When tbe Corps of Engineers 's~
o~ the permit, the city went ahead
WI~ the work anyway, The Corps 0{
Enl?neers tben issued a cease and "
deSist order. No decision has been ..
made. yet on whether to issue the ' :
perynn aft~r the fact. or take puniti'o.'c
action agamst the city.
M~ny developers complain that the:.
strtcter wetland laws have drastically
undercut propeny values. Ed Engler
I ofTowle Real ~sute is trying to sell it
2.2-acre parcel m Crysul in which I
half the land IS wetlands. EniUer said
he hopes he can lure a fast-food res.
taurant to thl: site.
Bu.t the propcny. despite being zoned
I neighborhood commercial, ma\' o.nlv
fetch S 1.1 0 a square foot. far It>Ss .
th.an the $3 to $4 it would bring;
wnhout wetlands. said Engler. Ironi-
call}:. the first call Engler said he
received about the property was frora
a man who wanted to get rid of some
fill by dumping it on the wetland. .
Suburbs get involved .
As anI:\\' sensiti\'ity toward wetlands
emerges. many Twin Cities suburbs'
have begun to pay more attention to.
. them. A few ha\'e adopted specific
I wetl~nd ordinances. even if it means
buckmg dl:velopers.
Wetland protection has been forced'
~n cities such as Maple Gro\'e, whicb
IS lad.en with wetlands and is now .
openmg ItS remaining vacant land to
deve~o~rs. When Highpointe HiIl. a
subdmslOn with jO single-family
homes. was proposed. citizens com- ,
plained it would destroy too many .
wetlands. That led the cit\' to form a
wetlands task force. -
!
A few suburbs. such as Mahtomedi
and <;hanhassen, ha\'e been more ag~
gresslve. Mahtomedi adopted a wet-
land ordinance last Januar\' and John
Olinger. the citv administrator. said
he personally ~ent out and counted..
the city's wetlands. The total: 125. '
varying from one-quaner acre to 17 ,
acres. The new ordinance requires. I
both a 75-foot setback from the edge
of a wetland for new construction
and a permit for any building ....ithin'
that area. ,.',;
Despite these effons. the debate ove;'.
what takes precedence, wetlands or , I)
development. is expected to continue.
as suburbs develop farther out, and
the demand grows for housing, road~)
shopping centers and parks. . :'.'.:
'*"ll
"There's really no land a developer.:....
can buy on which you don't have to...
deal with wetlands in one way or ';Ii~
another," Svoboda said. "It's tough,;...
to miss them all, and if you do miss,.;
them all, you've got fewer houses.'~:.~~
, ,r:.;,'
I,
:r
Slar Tribunel Sunday/January 311993
.13A
..
~DRYING
- -~~, UP
~Wetlands-rich Anoka County in the
thick of constant clashes'
By Mike Kaszuba
"StafTWriter
The bulldozers came rumbling
through the wetlands in the city of
~Ramsey one morning last August,
and developers Gilbert Menkveld
llnd his son. Jack, had embarked on
two idyllic-sounding subdivisions
.,rknown as Ramsey Meadows and
Sunny Ponds,
-~:."
Even though ~linnesota's new wet-
;Ii-rands conservation act was in place,
". both projects had gone through the
Itity Council without raising an eye-
'~brow. And the city's engineer, Steve
';'Jankowski, hadn't gone to any of the
training sessions on how cities were
to enforce the new law.
:.s isn't a great tragedy." Jan.
kowski said of the 1.3 acres of wet-
lands filled in the Menkvelds' two
projects.
Throughout Anoka County. old hab-
its, development pressures and a
wariness toward wetlands protection
'are clashing daily with the move to
preserve wetlands. Of the seven
;counties in the metropolitan area,
Anoka has not on Iv the most wet-
;'.}ands acreage but also the highest
percentage of wetlands - 27.5 per-
cent of its total land.
Sometimes the attitude toward wet-
lands in Anoka County is bluntly
-:Stated. When the state Department of
Natural Resources (DNR) an-
nounced that Andover couldn't ex-
tend Eldorado 5t. across a wetland, a
local newspaper announced the deci-
-sion in October with the headline,
," Wetland Threatens Street Project."
',-
'.
fOne DNR studv said that Anoka
Countv had 4 t d of the 581 acres of I
~\M etlan'ds slated to be lost to develOP_j
ment in the metro area from mid-
.}988 to early last fall.
fI' :
.er DNR survey of the most
e natural arC:lS in Anoka
County showed th:lt between 1985
and 1990 dozens of wetlands sites
Were harmed by draining. housing
developments and even ofT-road
vehicles.
The contlict is likely to escalate as
cities in the county'simultaneouslv
try to attract economic development
and enforce new wetlands laws.
"Have vou ever driven around Ano-
ka Cou~tv?" asked Pat McGuire of
the DNR: "Nothing but wetlands. . . .
We're going to have real problems
there as development happens:'
Much of the county'S land is flat and
sandy, so few wetlands have distinc- ,
tive boundaries or lie in more tradi-
tional bowl-shaped low spots. That,
however. does not make them any
less worthy to preservationists.
"It's time we put our Iimitcd natural
resources before the monetary ~ins
ofland dc\dopcrs," s;ud Carol Del-
monico. one of 27 ICller .....riters
against a recent proposal to fill ~et-
lands in Coon Rapids for
development.
The skirmishing over the county's
wetlands has at times overwhelmed
regulators. Cathy Brehm, a state con-
servation official working in the
county, wrote at least seven cease-
and-desist orders against developers
building in .....etlands in a four-month
period ending in November. "Thank
God. everything's freezing up." she
said as cold .....eather heralded the
annual slowdown in construction.
Building permits have jumped in Co-
lumbus Township as homeowners
push north into a township whcre
. nearfy 50 percent of all property is
wetlands.
.
But the new state law. which focuses i
on preserving or replacing wctlands
ofless than an acre, has left home-
owners such as Robert Jeukens c1ear- :
Iy frustrated. He's trying to sell a 5- I
acre property with two wetlands and
says the law has scared ofTbuvers
and will probably force him to reduce!
his price.
"They're going oyerboard:' he savs
of wetlands protection. .
In Coon Rapids. one of the most
controvcrsial cases bt:fore the L.S.
Army Corps of Engineers involves a
permit requcst by dcveloper William
Cooley to put a 100-room hotel. res-
taurant and stores on a 26-acre plot.
14 of which are wetlands. Coole\'.
who once co-owned the Mall or"
America land in Bloomington. is
mum on what he'll do if the Corps of
Engineers denies a permit.
"I think they really struggle with it:'
Tim Fcll of the Corps of Engineers
said of Anoka County's overall ap-
proach to wetlands protection. "They
want to attract development. . .. It's
close to downtown Minneapolis and
St, Paul. . . [but] it's gOt a lot of
wetlands. "
The county consistentlv ranked third
in building permits. behind Dakota
and Hennepin counties, from 1987
through 1990 before being nudged
into fourth by Washington County
last year. Since 1989, Coon Rapids
has ranked either first or second
among 132 municipalities in the met-
ro area in the number of housing
units built.
Filling wetlands has been an issue in
many of Anoka County's splashier
projects, such as the National SportS
Center in Blaine, which obtained a
permit to fill about an acre of wet-
land in 1988.
But the more mundane projects have
taken the larger toll over time. Per-
mits have been matter-of-facth' is-
sued to fill wetlands to make room
for everything from a driveway in
Coon Rapids to the upgrading of 2nd
Av. in Lino Lakes to handle more
traffic,
Although all projects, at least on pa- Ii
per, call for creating new wetlands to
replace what's being destroyed, many
projects don't have a happy ending.
And often the smaller projects lead to I
the biggest headaches.
.
~
. f
~"._ "__"n, _.
,I
;"1.
t, ~,
t" j
i
,.
,.;.l~',( ~ '
", !fI'; .
"'~~''-. I': i
~, .,t' ,: ':t., ../"/
i.~r ;- ~'"~!' .~;~~ "'. .a.
""~- _ - t" '..' . ~ ;
':.........':...'J ~.~r~ . L I
:t.%'T'....,._
~,:f:.;': .
I"
Staff Photo by John Croft
Some wetlands were filled in to make way for the new Wal-Mart store in Fridley.
.
Last year. for example, the Anoka
Conservation District gave Gerald
and Marge Sygulla permission to
build a 300-foot driveway through a
wetland to their new home in Colum-
bus Township - provided the drive-
way was onlv 24 feet wide. "I'm
dri~ing by later. and instead of a
driveway. he's got a runway through
it:' savs the conservation district's
Chris Lord. The Sygullas complain
that the township is against develop-
ment and that the wetlands laws are
too rigid.
Before long, six conservation officers
were involved. Old aerial photos
were studied to trv to determine the
wetlands' originaI"boundary. When
Woods told them to stay otTthe
propeny. the county attorney was
asked for a legal opinion on whether
conseJ'"\'ation officials could go and
inspect the damage. Making matters
more complicated. the suspected wet-
land was a unique variety that loqked
more like a forest than a wetland. .
.
Larger homebuilders are even more
frustrated. "A l2-by-12 [foot) puddle
of water with a little bit of canary
gras,s around it . . . is not wonh [pro-
tecting):' Anoka County builder Phil
Tetrault said. "It'U dry up anyway.:'
Eyen the smallest cases can have .,
unheard-of complications. In 1991,
Charles Mears wanted to dig out a'
pond on his propeny and stock it .
with trout. He got an agreement from
a neighbor to pUT pan of the din on
her propeny to t:reate a berm. But
when she began divorce proceedings,
her husband, Michael Woods, said
the agreement was void and drove'a
bulldozer through the berm. .'
Woods' bulldozer also cut through'
what officials suspected was a . "
wetland. "
The case finally ended a few months
ago with Woods being ordered to '
remove a single pile of brush. "The.
area atTected here is a few hund'red
square feet," said John Raetz,
Woods' attorney. ..It's not that
much."
As the new state law takes hold. it's'
getter harder to find supponers of .
saving every wetland in Anoka .
County. "A tiny. tiny wetland. . .~
doesn't make any sense to preserve:'
said Ron Henrickson, Blaine's plan-.
ning and economic development
director.
Henrickson has an allv in Gilben
Menkveld, the develoPer in Ramsey'
who in the end reworked his new'"
subdivision to accommodate wet- .
lands when nearby residents com- ,,'
plained. "Actually," said Menkveld:
"they're overdoing the wetlands deal
where we are - they're so ,-
unreasonable." .. .
.Acre-made-for-an-acre-Iost
~. .
requirement doesn't hold water I
.
'By Norman Draper
.6taffWriter
Birch Run Station is where both wet-
lands and the law got dumped on.
Three-and-a-half acres of wetlands
were destroyed when the strip mall
was built in Maplewood in 1989.
Despite assurances from the develop-
ers that they would replace what they
had paved over. that was never done,
And because of an oversight by wet-
lands regulators. a $75.000 line of
credit set up to hold the developers
to their promises ex.pired without
anyone getting a penny of it.
The mall, formerly called Maple-
wood Crossing, is one of the Twin
Cities' most tarnished monuments to
mitigation, the federal requirement
lthat for every acre of wetland tilled, a
new or improved one must be creat-
ed nearby.
It shows that despite a raft of state
and federal wetlands laws and regula-
\ions, developers have sometimes
ed too free a hand to do as they
eased. It also shows that regulators
. sometimes don't pay enough
attention.
1n addition, those in charge of moni-
toring mitigation compliance in the
Twin Cities area do not know how
manv efforts have failed. worked
well: or not been done at all.
.'
Mitigation sites can range from a
small lake anchoring a housing devel-
opment in Oakdale to a pond inside
a'freeway ramp at the Interstate
Hwy. 394-Hwy. 100 interchange.
Some have been carefully ex.cavated
and landscaped. Others were de-
sIgned with too little attention paid
to replacing the proper soils and veg-
etation. Some are merely scooped-
out holes in the earth that fill with
water. Occasionally, as with Birch
Run Station, the mitigation isn't
done.
"
Projects that destroy sizable amounts
of wetlands are required by the U.S.
Army Corps of Engineers and the
state Department of Natural Re-
sources (DNR) to include mitigation
plans, Since the late I 980s, dozens of
tiojects that have involved filling
etro area wetlands for roads,
uses, golf courses and other pur-
poses have done so only on the con-
dition that they replace what they've
destroyed.
As a result. state and federal regula-
tors can boast that new or better
wetlands should have been created in
the wake of big projects that collec-
tively devoured hundreds of acres of
We~lands.
Studies to tind out how mitigation is
working are underway. The Environ-
mental Protection Agency (EPA).
which can veto Corps of Engineers
wetlands permits. recently awarded
the Minnesota office of the National
Audubon Society a grant to perform
one such study. It will take four
years.
[~iust don't know what's going on,"
said Ted Rockwell. EPA's director of
Minnesota operations. "I'm con-
cerned that not enough followup is
being done."
the Corps of Engineers and the DNR
rarelv resort to them, preferring in-
stead to negotiate a developer into
compliance.
Mitigation was basic and generic in
its earlv davs. It often entailed noth-
ing mo're than a big hole being
, scooped out of the ground. But Corps
of Engineers officials and private
consultants say those days are gone.
Thev contend that miti211tion can
succeed if the site is properly graded
and the right soils and plants are
used. Regulators and wildlife biolo-
gists who work with developers say
they are trying harder to tailor the
mitigation to the type of wetland lost.
"We dug a lot of duck ponds back in
the '80s," said Steve Eggers, an ecolo-
gist with the Corps of Engineers' St.
Paul district. "That didn't take into
account the specific functions and
values of the ditTerl'nt wetlands being
lost."
But unofficial observations reveal
that there are plenty of problems
with mitigation.
Paul Burke, a wildlife biologist with
the Twin Cities field office of the
U.S. Fish and Wildlife Service. has
viewed as many as 100 mitigation
sites in the Twin Cities in the past
five years. He said about one-quarter
of the etTorts were poor or nonexis-
tent, and another quarter were good.
The remaining half were somewhere
in between. he said.
Wetlands were never re-created at
Birch Run. northwest of the intersec-
tion of Kennard St. and Beam Av.
The Corps of Engineers issued a wet-
land fill permit to the maWs develop-
er, Michigan-based Maplewood
Crossing Limited Partnership. with
the understanding that a mitigation
plan would be fonhcoming.
When the partnership's parent com-
pany. Weatherford/Walker Develop-
ments Inc.. was slow in developing
an acceptable mitigation plan. the
Corps of Engineers agreed to give the
company more time. Eventually, and
despite a warning from a federal
wildlife official that the amount was
too low to ensure compliance, the
Corps of Engineers accepted a
$75,000 letter of credit issued by the
Bank of Michigan on behalf of the
developer to ensure compliance with
mitigation requirements. .. .~":
, ""
And mitigation remains unproven,
more art than science. The idea that
humans can duplicate nature's handi-
work in less than a fraction of na-
ture's time has created plenty of
skepticism about mitigation's value.
even among federal and state
officials.
"It's like asking an engineering team
to design the Columbia shuttle. and
saying, 'Oh. by the way, you've got a
month to do it: .. Rockwell said.
Federal mitigation evolved informal-
Iv after 1977 amendments to the
Clean Water Act provided for the
protection of the nation's wetlands. It
became more common after 1986.
when mitigation regulations were
first spelled out. For projects that fill
more than an acre of wetland, the
Corps of Engineers requires at least
an acre of mitigation for every acre of
wetland filled. State mitigation re-
quirements, which are less specific,
date from the early 1970s.
Although both state and federal law I
provide for fines and jail sentences,
But beset by financial hardships, the-;
partnership and WeatherfordfWalker
collapsed before doing the required"' ~
mitiltlltion. The mall went into fore~".
closure and is now run by an Edele~
Prairie propeny manager who knows
nothing about any wetlands mitiga:' J.
tion plan. The deadline for the line'of
credit expired two years ago. .':"
..f.
"Our attorney has basically said
we're screwed," said Tim Fell, the "T'
Corps of Engineers' environmental. ,
speciali.st charged with monitoring '~
the proJect. "Pan of the problem is' :'
mine. I didn't bird-dog it enough." :~
"'A.
taff Photo by John Croft
his wetland mitigation site was created by the Transportation Department under a ramp at the Interstate Hwy. 394-Hwy. 10~ interchange:
.
Elsewhere. Twin Cities mitigation' ,
sites can look strikingly different. '"
In the shadow of a newly constructed
entry ramp from Hwy. 100 onto 1-"
394. for instance. is an improved ,"
wetland with open water. mallards, .
islands sprouting cattails. silt fences"
to prevent erosion and a carpet of '"
rocks carefully placed along the slope
rising beneath the concrete ramp. '
The site. engineered by the State De.
panment of Transponation. is pan
of the mitiltation for the 12112 acres of
wetlands filled during the 1.394
project.
In Oakdale. a 12-acre storm water
holding pond that serves as Olson
Lake Estates. centerpiece is more ~,'.
man-made lake than wetland. having
inundated the 3-acre wetland once '
located at the south end of the pond.'
The site designer. Carl W. Peterson "
and Associates Inc.. agreed to design.
changes to make the pond more wet-
lands-like. The firm also used the";'
pond as mitigation for some fill at ' ,
the south end of the wetlands. and' af
another site.
Company president Carl Peterson
said what happened at Olson Lake'.'
Estates is beyond his control. He said
he was requ{red by Oakdale and the' ,
Yallev Branch watershed district to '
store storm water runoff from Olson '
Lake Estates somewhere on the de- '
velopment site. Also. because of ob- '
jections from nearby pro pert): o",:'n- ,
ers. Oakdale and watershed dlstnct ,
officials haven't been able to find a ,
route to siphon off excess water from
the lake. As a result. the lake's outlet
culven has been plugged up for sev~.
eral years. with no relief in sight. _"
"The wav it's done now is the way i(
was approved:' Peterson said. "~e
understand the water level now IS
higher than it would normally be. . " ',:
[but] it's no fault of ours," , ,
Such a mix of results aside. a ques- "
tion remains: Can a man-made wet: .
land ever make up for the natural '..~:.
one it's replacing? '-,II
, Said Rockwell: ..)t's like saying thai ..
because there are prosthetic deviCCSj
for amputated limbs, we Cln lose 3S
many arms a~ we want" to
.
But Molly Shodeen. the DNR's hy~'~
drologist for Washington and Anoka:
counties. calls the site nothing more"
than "a flooded hole." . I.:
Twin Cities wetlands
.
Wetlands as percent
of county's total acreage
c::J 0.10% (Dakota andWaslunglon)
c:J 10.15 ", (Ramsey and Hennepm)
c::::::J 15.20", (Carver and Scolll
c::::::J 20'..lnore (Anoka)
WHAT'S A
WETLAND?
Wetlands have
proven 10 be very
hard 10 define and
frequently (jjfficullto
spOt. Even expens
have been unable 10
see a wetland when
they stand in the
middle 01 one. Congress has dispalched the
National Academy of Sciences to evaluate
how wellands are defined.
v~ ~
':,t.'}J..
/, i'l
1.1
!.
That question should help solve the other
major issue regarding wellands. namely.
how many should be saved. During the
1988 presidential campaign. George Bush
pledged Ihat "all e.isting wetlands. no
matter how small. Should be preselVed:
Bush evenrually backed away from that. and
recenlly. the adminlstrauon dropped plans to
loosen the definitIon of a wetland to e.c!ude
marginal wetlands - leaving the
controversy to PreSldenr Bill Clinton.
.
1,1 Minnesota. where the state recognizes
eight dil1erenr types of wetlands. the con.
fusion is no dlllerent. Officials have only
vague ideas 01 how much of each type
exists in the Twin Cities. Here's a guide to
the eight types:
07.251 ~:.
....
",
~f"..
"
CARVER
COUNlf
SCOTT
COUNTY
Sourc.: US. Fish and Wildl_'. S<<w:a
3. SHALLOW MARSH WETLANDS
One of the mOSf common of Twin Cilies
wellands. they oft~n are cover~ wllh up to 6
inches of water. Vegetafion indudes bulrushes
and canal/s. As wrth Type 4 and 5 wetlands.
Type 3 wetlands a.. common in recently
develop~ suburbs suen as Oakdale.
Woodbury. Plymouth and Maple Grove.
71,m
6. SHRUB SWAMPS
Another of the most common Twin Cities
wetlandS. shrub swamps are otten waterlogged
with a few inches 0' waf!!t and occur in shrubby
or wooded areas. This rype of wetland occurs
'reQuenUy along the Minnesola River and In
parts of the nortl1em metro area.
1. BASIN/FLAT AREA WETLANDS
These are waterlogged only at cet1ain times 01
Ihe year. Th"ey exist 11'1 h~tds. woods and
farmland. Along with Ihe Type 2 variety. Type 1
wetlands dot the landscape In less.dev~oped
parts of the Twin Cities -Indeoendence.
northern Brooklyn Park and Minnetnst3,tor
example.
4. DEEP MARSH WETLANDS
These are usually filled with from 6 Inches to 3
feet of water. Among the easiesl tyr.s of
weUands torecogniz!. these marshes otten fill
shallow lake baSins and border open waler.
7. WOODED SWAMPS
These are uncommon in the Twin Cilies. The
ground is often covered wilh a thin layer of
waler. The trees that grow In such swamps
indude tamarack. spruce. balsam and ash.
Such a wetland mIght be lound in the Scandia
and Forest Lake area of northern Washingron
County.
2. MEADOW WETLANDS
ihese ohen border marshes and occur in
farmland sloughs. Although the ground IS often
dry, !his weUand IS usually wa1enogged within a
few inches of the surface.
.
S. OPEN.WATER WETLANDS
As muc!l ponds as wetlands. these are as easy
to Spol as the deep marsh variety. Waler mighl
be as deep as 10 leel. and vegetation includes
walemlies. canalls and pondweeds.
_ Souree: Mmnesota Oep~nt of NabJrai Resourees and U.S. Atmy Coros of e"~S
~~"i~~"i r.~(~.~;;'~~~{~:f.11
:A:l ~~\.l" n'I""~ .~~r. 'i
'.)~:.~i~~,-:~..~~ -
i~;:~~~f~'~~:f~~~
8. BOGS
Perhaos the rarest kind Of w~lIand in the metro
area. bogs are usually walerfogged and
covered wllh mosses. Other vegetatIOn includes
shnlbs and Stunled trees. Type B wetlands
occur in the East Bethel and Linwood township
areas aI northern Anoka County.
.
Well-meaning development can end up suffocating
\
By !\1ike Kaszuba
SiafTWriter
The seven homes in Welter's Way
Sixth Addition in Eden Prairie have
been heralded by the city and the
developer as an example of how to
build a subdivision around a wet-
land without destroying the
wetland.
The Peter Andrea Co., the subdivi-
sion's owner, says the homes were
built at least 100 feet from the edge
of the water-filled wetland. John
Shaw, the real-estatc agent who
marketed some of the lots, says
they'll "be the most attractive sites
in that neighborhood." The homes
have sold for up to S800,000.
.
But Welter's Way. wetland suppon-
ers say. has instead become an ex-
ample of how subdivisions across
the Twin Cities encircle and even-
tually choke wetlands.
The lots in Welter's Way that back
up to the wetland divide it up like a
pie, making the homeowners wet-
land owners as well. Homeowners
can put in lawns up to the water's
edge because there are no setback
regulations in Eden Prairie. That
means grass can be mowed to the
water line and lawn fenilizers prob-
ably will drain into the wetland.
One home in the subdivision that
complied with a voluntary lOO-foot
setback began settling into the peat.
II
"It was a house that set against the
pond. but it was set back from the
pond," said Jim Ostenson, the
managing panner for Welter's Way
Sixth Addition. "It was a real
quirk."
The wetland was drasticallv altered
in the 1970s as pan of a storm-
sewer project tied to increasing
nearby development. Once just a
grassy low spot. the wetland was
dug out. That project created an
open-water pond that Welter's Way
Sixth was eventually built around,
and in efTect changed the wetland
into a basin that primarily collects
storm water.
Welter's Way doesn't appear to be
an exception. The University of
Minnesota targeted 48 wetland sites
in the Twin Cities from 1988 to
1991 and found 39 had been afTect-
ed by development, erosion from
nearby development or highway
construction, or had been conven-
ed to storm water ponds.
"You can drive around the metro
area and see all kinds of dead wet-
lands, where storm water was
dumped directly into them," said
Gary Obem, a senior environmen-
tal planner with the Metropolitan
Council. "In the long run, that's
going to kill them ofT. . . . There are
a lot of cities that misunderstand
that whole concept."