7.4. SR 02-01-1993
ITEM 7.4.
TO:
MAYOR AND CITY COUNCIL
FROM:
PATRICK KLAERS, CITY AD~~TOR
JANUARY 28, 1993 ~
MUNICIPAL UTILITY NEEDS
DATE:
SUBJECT:
INTRODUCTION
The City Council and the Utilities Commission are partners in
planning the future growth of the community. In order for the
area around the Highway 169 and 193rd intersection to develop
in an urban manner as outlined in the City Growth Management
Plan, municipal utilities need to be provided by both the City
and the Utilities Commission.
BACKGROUND
.
When the Deerfield III subdivision pulled municipal sewer into
this vicinity, the City did not have a comprehensive plan and,
unfortunately, the sewer pipes were not sized for growth beyond
the immediate Deerfield area. Property to the north and to the
east of the Deerfield area was incorporated into the urban
development district with the adoption of the Growth Management
Plan in 1988.
A need for a water tower in this high pressure zone was
identified in the 1982 Water Comprehensive Plan. Additionally,
an area-wide feasibility study in February, 1992, for this
Highway 169/193rd Avenue vicinity indicated that a well and
water tower were required in order to have this area fully
develop in an urban manner.
This February, 1992, study also
pipes in this vicinity were
municipal sewer services and, as
had to take place in order for
manner.
stated that the existing sewer
not adequate to provide future
such, a major line extension
the area to develop in an urban
MUNICIPAL SEWER
.
According to the February, 1992, study, the sewer capacity to
service this area has to come from the incepter near School
Street/Freeport Avenue to the north and then across Highway 169
to the northeast. Providing sewer capacity requires the
extension of trunk lines and the assessment of these trunk
lines to benefitted property owners. In order to service the
Specht property on the east side of Highway 169, a trunk sewer
assessment project has to happen on the west and east sides of
Highway 169. Without this sewer extension, growth and
development in the Specht property cannot take place in an
urban manner. Extension of lines into this area can happen
720 Dodge Avenue N.W., Elk River, Minnesota 55330 (612) 441-7420
Municipal Utility Needs
January 28, 1993
Page 2
.
within one construction season. Municipal sewer service in
this area is anticipated to be needed in the near future.
MUNICIPAL WATER
The water tower and well in the high pressure zone have been a
topic of conversation for about one year, ever since the
February, 1992, feasibility study for this area was completed.
The providing of municipal water utilities in this area is more
complicated and takes more time for construction than the sewer
utilities. It appears that it is now time to begin work on a
water system (tower and well) based on the residential and
commercial development proposals that are being reviewed.
Earlier this week, the City staff had a concept review for a
residential development proposal near the MnDOT property. It
is possible that this 40 home subdivision can be provided with
municipal sewer capacity, but it was very questionable whether
or not municipal water (water pressure) is available. In 1992,
a commercial plat was denied in the southeast corner of Highway
169 and 193rd Avenue due to no municipal utilities being
available.
.
A water tower needs a m1n1mum of twelve months and may take up
to 18 months to be completed and on the system. If the City
and the Utilities do not soon move forward in planning for a
water tower, then it does not appear that any development in
this area will be able to be serviced by municipal water in
1994.
A well is less urgent at this time than a water tower because a
water tower, once completed, can have water provided through
pumping from another water source. Accordingly, the critical
utility in order to provide adequate municipal services in this
vicinity in 1994 is the water tower. The reason starting
action on a tower is critical at this time is due to the
lengthy construction time frame.
.
The financing of the well and tower are still uncertain and
must be a topic for a joint meeting. The staffs have briefly
reviewed this issue at a meeting earlier in the week. It is
anticipated that part of the expenses for a tower will be
financed by the commercial developers in the vicinity. This
concept is based on the assumption that the water tower will
have to be somewhat larger or taller in order to meet the water
needs for the commercial users. The City or the Utilities
could request an escrow from the commercial land owners in
order to move forward with the plans and specifications for a
water tower or the City or Utilities could simply put these
land owners on notice that it is anticipated that they will be
asked to pay for some the costs associated with the water tower
project. If this is the case, the water Utility (or City) will
have to pay for the water tower plans and specifications if
this moves forward at this time.
.
.
.
Municipal Utility Needs
January 28, 1993
Page 3
JOINT COUNCIL/COMMISSION MEETING
The City Council and the Utilities Commission need to get
together to discuss the need for a water tower and well in the
high pressure zone of the City and how the well and water tower
will be financed. This topic was discussed at the last joint
meeting held on June 29, 1992. There are other issues that
currently need to be discussed by the City Council and the
Utilities Commission, but the need for a well and a tower in
the high pressure zone is the most urgent and will necessitate
a meeting very soon. (A follow-up meeting will be appropriate
in order to discuss some of the other joint issues such as
garbage billing and the waste water treatment plant expansion
for urban services to the east Highway 10 area).
ACTION REQUESTED
This issue is on the agenda for discussion by the City Council
as the Utility Commission has its next meeting scheduled for
February 9, 1993. In this regard, if any action is taken by
the City Council, it can be forwarded to the Utility Commission
for its review and consideration.
The City Council could consider asking the Utilities Commission
to join them at the 6:00 p.m. February 15, 1993, CIP meeting
and have the utilities in this vicinity, and specifically the
water tower, as the first agenda topic for discussion at this
meeting. If the Council would like to first discuss
development in this area in relationship to all the other
desired capital improvements in the community, then a joing
meeting should be scheduled in the later part of February.
At this time, it may be appropriate for the City Council to
request that the Utilities Commission evaluate authorizing the
preparation of plans and specifications for a water tower.
This action, if it takes place by the Utilities Commission, may
also have to be authorized by the City Council if the City is
going to end up issuing revenue bonds for this project that
would ultimately be repaid in part with water utility revenues.