03-29-1993 CC MIN - JOINT
.
.
.
JOINT MEETING OF THE ELK RIVER CITY COUNCIL AND
THE SHERBURNE COUNTY BOARD OF COMMISSIONERS
HELD AT THE ELK RIVER CITY HALL - CONFERENCE ROOM A
MONDAY, MARCH 29, 1993
Councilmembers Present: Mayor Duitsman, Councilmembers Holmgren, Dietz,
Farber and Scheel
County Commissioners Present: Chairperson Schumacher, Engstrom, Johnson,
Smith and Friedl
City Staff Present: Pat Klaers, City Administrator; Steve Rohlf, Building
and Zoning Administrator; Mark Graham, City Engineering
Firm
County Staff Present:
Kathy Heaney, County Attorney's Office; Tom Hayes,
County Attorney; Dave Loch, County Coordinator
Also Present: Representatives of the Sherburne County Fairboard
1.
Call Meeting To Order
Pursuant to due call and notice thereof, the joint meeting of the Elk
River City Council and Sherburne County Board of Commissioners was
called to order at 7:00 p.m. by Mayor Duitsman.
2.
Consider 3/29/93 City Council Agenda
COUNCILMEMBER FARBER MOVED TO APPROVE THE 3/29/93 CITY COUNCIL AGENDA.
COUNCILMEMBER DIETZ SECONDED THE MOTION. THE MOTION CARRIED 5-0.
3. Administrative Subdivision/Gwen Petersen/Public Hearing (Continued)
Building and Zoning Administrator, Steve Rohlf, updated the City
Council on the status of this request. Steve indicated that this issue
was continued from the March 15, 1993, meeting so that perc test and
soil boring data could be obtained and evaluated. Steve reviewed his
3/22/93 memo on this administrative subdivision request. Steve
indicated that this is not a buyer beware situation and that there are
building construction limitations on this site. Steve outlined the
three City requirements that will be imposed on the property owner when
a house is constructed on this site.
COUNCILMEMBER SCHEEL MOVED TO APPROVE THE ADMINISTRATIVE SUBDIVISION
REQUEST FOR GWEN PETERSEN WITH THE FOLLOWING STIPULATIONS:
1.
SEPTIC SYSTEM BE REQUIRED TO BE A MOUND SYSTEM AND THE LOWEST
FLOOR (CRAWL SPACE OR BASEMENT FLOOR) IS ONE FOOT ABOVE MOTTLED
SOIL. FURTHER, THAT IS IS THE APPLICANT'S RESPONSIBILITY TO
ENSURE THE ONE FOOT FROM MOTTLING IS ACCOMPLISHED.
.
.
.
Joint Meeting of Elk River City Council/County Board
Monday, March 29, 1993
Page 2
2.
THE APPLICANT PAY $400.00 IN PARK DEDICATION FEES PRIOR TO THE
RECORDING OF THIS ADMINISTRATIVE SUBDIVISION.
3. SIXTY FEET OF RIGHT-OF-WAY MEASURED FROM THE CENTER LINE OF THE
COUNTY ROAD IS GRANTED TO ANOKA COUNTY. ANOKA COUNTY WILL PROVIDE
THE EASEMENT DOCUMENTS.
COUNCILMEMBER HOLMGREN SECONDED THE MOTION. THE MOTION CARRIED 5-0.
4. Joint City Council and Sherburne County Board of Commissioners Meeting
Mayor Duitsman thanked
discuss issues of mutual
attendance took place.
the County Board for coming to this meeting to
concern and introductions of everyone in
Mayor Duitsman and Chairperson Schumacher led a discussion on the
topics that were discussed at the last joint meeting held on 6/25/92
and what activities have taken place since that meeting. A 10/17/92
West Sherburne Tribune article was distributed which outlined the
County Board discussion on the options available related to the
fairgrounds assessments, expansion, and/or relocation.
4.1. Discussion on City and County Fairground Issues
Mayor Duitsman requested Mark Graham to provide some background on the
City's need for road right-of-way in the southeast corner of the
fairground property. Mark distributed two maps which showed the
general location of Orono Parkway and the two options that are being
evaluated for right-of-way from the County for this parkway to continue
to the west. Mark indicated that it is the intent of the City to have
the parkway intersect with a north/south street between Highway 10 and
County Road 30 in the vicinity of Joplin Street. Orono Parkway on the
south and Joplin Street on the west would, at this time, be proposed to
abut County property. Utilities would also be extended when the
parkway construction takes place.
General discussion took place regarding the road alignment and the need
to save trees on the Lakoduk property as a wooded area is immediately
south of the fairgrounds in the location where the road needs to be
extended. It was the general consensus of the Fairboard and the County
Board that the City should request and obtain as little property from
the County as necessary for this road extension.
A general discussion took place between the County Board and the County
Fairboard regarding the existing parking lot, expansion of the
fairgrounds to the west, access to the County fairgrounds from the
south, and the Commission that has been established to study this
situation. The major focus of this discussion was whether or not the
County should sell the City the parking lot immediately west of the
softball fields and retain use of this parking area during the County
Fair (and other County functions) and then also obtain additional land
on the west side of the fairgrounds in exchange for selling the City
this fairground parking lot. Discussion also took place regarding
future assessments to the County for street, storm sewer, lateral water
.
.
.
Joint Meeting of Elk River City Council/County Board
Monday, March 29, 1993
Page 3
and lateral sewer improvements. The City Administrator noted that it
is uncertain as to the amount of future assessments to the County
fairgrounds due to the uncertainty of the road locations, but that it
was believed that assessments would be levied against the fairgrounds
in the future. In this regard, the fairgrounds would be treated no
differently than any other property in the City.
Mayor Duitsman indicated that the City would be interested in pursuing
the purchase of the road right-of-way land and the parking lot west of
the softball fields. In exchange, the City would obtain land during
the development process west of the fairgrounds and sell this land to
the County. Mark Graham indicated that due to the construction season
and timing of improvements south of County Road 30, it was important
for the City to obtain a right of entry in this southeast corner at
this time. Discussion took place regarding the timing of these public
improvements and the County stressed that all work must be completed by
July 1 in order to prepare for the July 22-26 County Fair.
COMMISSIONER ENGSTROM MOVED TO PROVIDE THE CITY WITH A RIGHT OF ENTRY
ACROSS THE COUNTY FAIRGROUND PROPERTY IN ORDER FOR THE CITY TO ACCESS
FRESNO STREET WITH MUNICIPAL UTILITIES PROVIDED THAT ALL WORK AND
RESTORATION IS COMPLETED BY JULY 1, 1993. COMMISSIONER FRIEDL SECONDED
THE MOTION. THE MOTION CARRIED 5-0.
COUNCILMEMBER HOLMGREN MOVED TO HAVE THE CITY STAFF WORK WITH THE
COUNTY STAFF AND REPORT BACK TO THE CITY COUNCIL AND COUNTY BOARD IN
ABOUT THREE MONTHS ON THE ISSUES DISCUSSED AT THIS MEETING INCLUDING
ROAD ACCESS AND ALIGNMENT; FUTURE IMPROVEMENTS TO BE ASSESSED AGAINST
THE FAIRGROUND PROPERTY; IMPROVEMENTS TO THE PARKING LOT WEST OF THE
SOFTBALL FIELDS; AND THE POSSIBLE PURCHASE OF THIS PARKING LOT BY THE
CITY IN EXCHANGE FOR LAND WEST OF THE FAIRGROUNDS. COUNCILMEMBER
FARBER SECONDED THE MOTION. THE MOTION CARRIED 5-0.
4.2. Transportation Issues
The City request for County improvements to CSAH 11 in Elk River were
reviewed by the County Board and the City Council. This request is
outlined in City Resolution 93-4, and in a letter to the City
Administrator from the City Engineer dated 2/5/93. The City indicated
its strong desire to have this road improved to four-lane status from
where the public, improvement project ended in 1991. The four-lane
improvements along Proctor Avenue and County Road 1 ended near the
daycare facility before Meadowvale School. These improvements on this
road are desired based on the school location, the industrial park
location; and future residential development in the area. It was
indicated that the City Engineer has discussed this with the County
Engineer and that the County Engineer was in favor of this project
taking place. There was general support by the County for this
project, but the County Board indicated it would want to review this
improvement project with the new County Engineer once that individual
is hired.
A brief
planning
discussion took place
in Sherburne County
regarding the need
and in the City of
for
Elk
long range
River for
.
.
.
Joint Meeting of Elk River City Council/County Board
Monday, March 29, 1993
Page 4
transportation routes entering into the City and County on the eastern
boundary of the City at Anoka County Road 22. This Anoka County road
meets Sherburne County Road 13 in Elk River and over the next twenty
years, significantly more vehicles are anticipated on this road.
Concerns discussed included how to move these people to Highway 169 in
an orderly manner.
4.3. County Ditch System
Chairperson Schumacher briefly discussed with the City Council drainage
problems in the County and concerns regarding County Ditch 28.
Discussion took place regarding residential development in this
vicinity which the County believes has added to the drainage problems
and maintenance of this County ditch.
Mayor Duitsman discussed County Ditch 10 and the reconstruction of
Highway 101. Mayor Duitsman indicated that the City and the County
need to plan for the future and provide drainage around or through this
intersection when construction takes place.
Chairperson Schumacher discussed the
County Board member Klinzing is
year. This legislature relates to
County jurisdiction.
special legislation that former
introducing at the Legislature this
urban ditches being removed from
4.4. Solid Waste Issues
Due to the lateness of the evening and the meetings of both the City
Council and the County Board on Tuesday, no solid waste issues were
discussed.
5. Other Business/Staff Updates
No items were discussed at this time.
6. Adjournment
There being no further business, MAYOR DUITSMAN MOVED TO ADJOURN THE
MEETING. COUNCILMEMBER DIETZ SECONDED THE MOTION. THE MOTION CARRIED
5-0.
The joint meeting of the Elk River City Council and the Sherburne County
Board of Commissioners was adjourned at approximately 9:15 p.m.
Respectfully submitted,
pl:!!/1f:r
City Administrator