5.3. SR 04-05-1993
ITEM 5.3.
TO: MAYOR & CITY COUNCIL
FROM: PAT KLAERS, CITY ADMINISTRATOR
DATE: APRIL 2, 1993
SUBJECT: ISTEA GRANT/PARK TRAIL
Attached for your review is the draft ISTEA Grant proposal from
Phil Hals. This Grant proposal discusses improvements to the
railroad trail from the Community Education site to County Road
33. The proposal calls for bituminous and crushed rock trails
side by side. Staff is still evaluating the 20% match
requirement. The Grant application shows a larger match based
on using City manpower and equipment. This larger match should
increase our odds of receiving approval. However, if the ISTEA
20% match requirement must be in cash, then our match
requirement will be adjusted. More information on the City
match requirement should be available by the 4/12 joint
meeting. The application must be received in St. Paul on or
before 4/15/93.
.
.
720 Dodge Avenue N.W., Elk River, Minnesota 55330 (612) 441-7420
DRAFT
Project Description
~ The City of Elk River owns an abandon north/south railway
corridor in the central park of the City, and wishes to develop
it into a pedestrian/bicycle trail that would connect two
Junior High School campuses, an elementary school, an athletic
complex, a City park, and several residential areas.
On February 18, 1993,
from the Department
develop an entrance
hiking/biking trails
railroad trail.
the City received a $50,000 grant award
of Trade and Economic Development to
road, parking area, and hard surfaced
within the park that borders the abandon
The connection of these two recreation areas will
usage of each by providing a route to the
destination for the railroad trail.
Qualifyinq Criteria
multiply the
park and a
1.
Projects which are
defined in 1991
Efficiency Act.
eligible for enhancements funds as
Intermodal Surface Transportation
Minnesota Group Number 3:
~
Preservation of an
conversion and use
trails.
abandon railway corridor and
these for pedestrian and bicycle
2.
Projects with an assured local match of
percent of the estimated total costs of
project.
at least 20
the proposed
The proposed development of the railway corridor into
a pedestrian/bicycle pathway includes 17,000 lineal
feet of a 12 foot wide bituminous paved biking trail
and 14,000 lineal feet of a paralleling trail, also
12 feet wide, made of Class 2 crushed rock, for use
by hikers and horseback riders in the summer and
cross-country skiers in the winter.
The total development costs include:
~
Cleaning and grubbing of trees and brush
Rough Grading
Fine Grading $.25/Square Yard
Class Five Gravel Base 4" thick 5,000
ton @ $6.00/ton
Bituminous Paving 2" Thick 2,500 ton
@ $27.50/ton
Class Two Crushed Rock 4" Thick 4,100
ton @ $14.00/ton
Total Cost
$ 2,500
10,000
5,675
30,000
68,750
57,400
$174,325
. Of this total cost, the city of Elk River would
contribute labor, equipment and money in the
following amounts:
Cleaning and grubbing $ 2,500
Fine Grading 5,675
Install Class 5 20,000
Install Bituminous 15,000
Install Class-2 16,400
Total $ 59,575
The City requests a grant of $114,750 or 66 percent of the
project cost, and agrees to furnish 34% of the project
cost by doing a major portion of the construction with
City labor and equipment. The railway corridor is
currently owned by the City and the City staff is certain
that the trail construction could be completed by the fall
of 1994.
3.
Projects for which the proposer assures it will operate
and maintain the property and facility for the useful life
of the improvement.
.
Maintenance for this trail system include costs for
sweeping, trail side mowing, herbicides, sign repairs, and
an asphalt sealcoat every seven years. The inclusion of
the seal coat costs on an annual basis would amount to an
annual expense of $4,500. The 1993 park budget is $74,300
so this increase would amount to about six percent.
The City of Elk River has experienced a five percent per
year populations growth and a five percent per year
increase in the park budget. The City's commitment to
parks is evident in the maintenance of our present park
system.
4. Project submitted by cities over 5,000 population.
The City of Elk River has a population of 11,000 and has
worked with MnDOT division of state aid on many projects.
5. Projects with an estimated cost of at least $50,000. The
proposed improvement of a railway corridor to a
pedestrian/bike pathway would cost an estimated $174,325
with the City providing $59,575 so the requested grant
amount would be $114,750.
6.
Projects with
transportation.
a
demonstrated
relationship
to
.
In 1991, the City of Elk River completed a Master Park
Plan that envisions a community wide trail system that
could link up to neighboring communities in the future.
.
.
.
The railway corridor provides the western side of the
primary trail loop as well as the future connection to our
neighbors to the north.
serve as the
and would allow
the remainder
The proposed trail improvement will
cornerstone of the community trail system
for an interesting form of recreation while
of the trail system develops.
7. Projects which are normally part of the mitigation of a
transportation project are not eligible.
The proposed trail development would be a stand alone
project, that is it while it connects to other park areas,
it is not mitigating any other project. There will be
very limited environmental impact because the proposed
grading will not alter any drainage patterns and due to
the relatively level terrain, erosion will be easily
controlled.
Construction will be controlled and every effort made to
preserve the stands of native prairie grasses that now
exist along the railway corridor.
.
.
.
PRIORITY CRITERIA
1. The degree to which the proposed project fulfills the
intent of ISTEA.
The development of a pedestrian and biking trail will
provide a very interesting recreation facility while
preserving the abandoned railway corridor. The purchase
of the railway right-of-way by the City of Elk River
showed a great amount of foresight. As plans move forward
to develop a pedestrian and biking trail, there is an ever
increasing local interest in this type of recreation as
well as concern for preserving this historic
transportation route.
2. Projects with components which have already been funded or
implemented from other sources.
The City has purchased the property and has funded the
planning and engineering costs to develop a trail on the
railroad right-of-way. This project would not be a
completing link, but a first step in a City wide
pedestrian and biking trail system.
3.
Projects which qualify in two or more categories.
The proposed project falls under category numbers 1,
"Provision of Facilities for Pedestrians and Bicycles",
and 7, "Preservation of Abandoned Railway Corridors". The
Minnesota grouping would be Number 3, "Pedestrian and
Bicycle Facilities and Preservation of Abandoned Railway
Corridors".
4. Projects which have already gone through a statewide or
regional project priority setting process.
The City has submitted a grant application to the
Minnesota Department of Trade and Economic Development for
improvements to a hiking/biking trail on the abandoned
railway corridor and an application for park improvements
to Woodland Trails Park which borders the railway trail.
The City was awarded %50,000 in grant monies to be matched
with City equipment, labor, materials, and cash to build
an entrance road, parking lot, bituminous trail, crushed
rock trail, and street lighting.
Securing grant monies for development of the pedestrian
and bicycle trails on the railway corridor will expand the
usage of the park trails by offering another access point
as well as creating an interesting side trip for hikers or
bikers using the railway trail. The two projects
compliment each other nicely.
.
5.
Projects which demonstrate more than local impact or
benefit.
Development of the railway corridor as herein proposed is
the first phase of a three phase trail development that
will run from the core City of Elk River to the north City
limits with the possibility of future connections to
Zimmerman and Princeton. The City of Elk River Park and
Recreation Commission is encouraging Sherburne County to
become involved with this railway corridor development
north of the City of Elk River.
6. Projects which can be completed and open to the public for
the use intended by the end of the calendar year 1994.
The City of Elk
specifications
construction by
grading would
surfacing to be
River is prepared to have plans and
available by 8/1/93 and start actual
9/3/93. Clearing, rough grading, and fine
be completed in 1993, with the actual trail
completed in 1994.
.
The City would provide the engineering required and the
Street and Park Department has the necessary equipment and
expertise to do the entire project. By keeping the entire
project "in house", the City will be able to eliminate
delays in preparing plans and specs, bid letting, and
contractor schedules and keep a construction supervisor on
the project.
The City of Elk River Street/Park Department has completed
at least seven various park developments in the last nine
years, with the largest being Lion's Park; totaling
$246,258. Lion's Park was funded by a 50% LAWCON Grant in
1985 and was a very successful project so we feel
confident that we could complete the railroad trail system.
7. Projects with an assured local match in excess of 20%.
The City of Elk River Street and Park Department has all
of the major equipment required to construct and pave a
pedestrian/bicycle pathway except a dozer, but that is
available to lease with a City operator. The City would
do the survey, plans and specs, the clearing of brush and
small trees, the rough grading with a leased dozer and
City operator, the fine grading with a City grader,
hauling and laying the Class 5 base with City dump trucks
and grader, hauling and laying bituminous paving with City
trucks and paver, and laying Class 2 aggregate surface
with the City paver.
.
The total City contribution will be $59,575 in equipment and
labor, or about 34%.
.
.
.
The Grant monies of $114,750 will be used to purchase the Class
5 base, Class 2 surface material, bituminous paving materials
and the dozer lease.
As City staff, we feel that we have a project that is ready,
accomplishable, competitive, and would like the opportunity to
build it.