ITEM 3.4.
TO:
MAYOR AND CITY COUNCIL
FROM:
STEPHEN ROHLF, BUILDING & ZONING
ADMINISTRATOR
DATE: JUNE 29, 1993:)~
SUBJECT: PARK DEDICATION FOR THE PLAT OF
MISSISSIPPI OAKS
At their June 9, 1993, meeting the Elk River Park and
Recreation Commission reconsidered park dedication for the plat
of Mississippi Oaks. The new recommendation is as follows:
TRAIL
1. A 20 FOOT WIDE TRAIL CORRIDOR FROM THE TRAIL IN THE
SOUTHEAST CORNER OF THE PLAT OF HERITAGE LANDING TO
THE RIGHT-OF-WAY OF RIVERVIEW DRIVE IN PALMERS 1ST
ADDITION IS DEDICATED IN THE 1ST PHASE OF MISSISSIPPI
OAKS.
2.
THIS TRAIL WILL CONTINUE IN
MISSISSIPPI OAKS VIA A 20
RIVERVIEW DRIVE EASTWARD TO THE
FUTURE CONCORD STREET.
FUTURE PHASES
FOOT WIDE TRAIL
RIGHT-OF-WAY OF
OF
FROM
THE
e
3. FROM THERE, THIS TRAIL WILL CONTINUE NORTHEASTERLY TO
INTERSECT COUNTY ROAD 30, CONSTRUCTED WITHIN A 70
FOOT WIDE RIGHT-OF-WAY DEDICATED FOR CONCORD STREET
IN FUTURE PHASES.
4. A 20 FOOT WIDE TRAIL EXTENSION FROM CONCORD STREET
WOULD PASS BETWEEN LOTS IN A FUTURE PHASE TO
INTERSECT THE EASTERN BOUNDARY OF THE MOLDENHAURER
PROPERTY IN THE LOCATION OF THE NORTHERN FLOODPLAIN
AREA INCLUDED IN THE PLAT.
PARK
1. ONE ACRE OF THE NORTHERN PORTION OF THE FLOODPLAIN
INCLUDED IN THE PLAT BE DEDICATED AS PARK IN A FUTURE
PHASE, IF A SEDIMENTATION POND IS NOT SITUATED IN
THIS LOCATION.
2. LOTS 1, 2, 3, AND 4, BLOCK 2, PHASE 2, AS IDENTIFIED
ON THE PRELIMINARY PLAT BE DEDICATED AS PARK DURING
THE FIRST PHASE.
e
If the Council accepts the Park and Recreation Commission's
revised recommendation, 1.29 acres of park and .12 acres of
trail would be dedicated during the first phase of Mississippi
Oaks, for a total of 1.41 acres. The first phase of
Mississippi Oaks contains 16.9 acres. Land dedicated with the
P.O. Box 490 · 13065 Orono Parkway · Elk River, MN 55330 · (612) 441-7420 · Fax: (612) 441-7425
e
e
e
Mississippi Oaks, Park Dedication
June 29, 1993
Page 2
first phase of this plat would be 83.43% of the total possible
dedication. The $400.00 per lot park dedication fee would be
reduced by the same percentage, down to $66.28 per lot. The
total cash park dedication for the 36 additional lots created
in the first phase would be $2,386.00.
The developer does not wish to dedicate Lot 4, Block 2, Phase
2, as recommended by the Park and Recreation Commission. If
the Council eliminates this lot from park dedication, $4,857.00
in park dedication fees for the first phase is required.