Loading...
3.4. SR 07-06-1993 --\.1 -\.( ( i! -YI~ , E ~ River ITEM 3.4. TO: MAYOR AND CITY COUNCIL FROM: STEPHEN ROHLF, BUILDING & ZONING ADMINISTRATOR DATE: JUNE 29, 1993:)~ SUBJECT: PARK DEDICATION FOR THE PLAT OF MISSISSIPPI OAKS At their June 9, 1993, meeting the Elk River Park and Recreation Commission reconsidered park dedication for the plat of Mississippi Oaks. The new recommendation is as follows: TRAIL 1. A 20 FOOT WIDE TRAIL CORRIDOR FROM THE TRAIL IN THE SOUTHEAST CORNER OF THE PLAT OF HERITAGE LANDING TO THE RIGHT-OF-WAY OF RIVERVIEW DRIVE IN PALMERS 1ST ADDITION IS DEDICATED IN THE 1ST PHASE OF MISSISSIPPI OAKS. 2. THIS TRAIL WILL CONTINUE IN MISSISSIPPI OAKS VIA A 20 RIVERVIEW DRIVE EASTWARD TO THE FUTURE CONCORD STREET. FUTURE PHASES FOOT WIDE TRAIL RIGHT-OF-WAY OF OF FROM THE e 3. FROM THERE, THIS TRAIL WILL CONTINUE NORTHEASTERLY TO INTERSECT COUNTY ROAD 30, CONSTRUCTED WITHIN A 70 FOOT WIDE RIGHT-OF-WAY DEDICATED FOR CONCORD STREET IN FUTURE PHASES. 4. A 20 FOOT WIDE TRAIL EXTENSION FROM CONCORD STREET WOULD PASS BETWEEN LOTS IN A FUTURE PHASE TO INTERSECT THE EASTERN BOUNDARY OF THE MOLDENHAURER PROPERTY IN THE LOCATION OF THE NORTHERN FLOODPLAIN AREA INCLUDED IN THE PLAT. PARK 1. ONE ACRE OF THE NORTHERN PORTION OF THE FLOODPLAIN INCLUDED IN THE PLAT BE DEDICATED AS PARK IN A FUTURE PHASE, IF A SEDIMENTATION POND IS NOT SITUATED IN THIS LOCATION. 2. LOTS 1, 2, 3, AND 4, BLOCK 2, PHASE 2, AS IDENTIFIED ON THE PRELIMINARY PLAT BE DEDICATED AS PARK DURING THE FIRST PHASE. e If the Council accepts the Park and Recreation Commission's revised recommendation, 1.29 acres of park and .12 acres of trail would be dedicated during the first phase of Mississippi Oaks, for a total of 1.41 acres. The first phase of Mississippi Oaks contains 16.9 acres. Land dedicated with the P.O. Box 490 · 13065 Orono Parkway · Elk River, MN 55330 · (612) 441-7420 · Fax: (612) 441-7425 e e e Mississippi Oaks, Park Dedication June 29, 1993 Page 2 first phase of this plat would be 83.43% of the total possible dedication. The $400.00 per lot park dedication fee would be reduced by the same percentage, down to $66.28 per lot. The total cash park dedication for the 36 additional lots created in the first phase would be $2,386.00. The developer does not wish to dedicate Lot 4, Block 2, Phase 2, as recommended by the Park and Recreation Commission. If the Council eliminates this lot from park dedication, $4,857.00 in park dedication fees for the first phase is required.