Loading...
4.2. SR 08-02-1993 e ITEM 4.2. _ / f ~ ~ ~ _'" J.. CONSULTING ENGINEERS .",W_ Maier Stewart & Associates Inc. July 26, 1993 jUl 2 7 1993 File: 230-190-20 Mr. Pat Klaers City Administrator City of Elk River P.o. Box 490 13065 Orono Parkway Elk River, MN 55330 RE: TRUNK WATERMAIN IMPROVEMENT NEW WATER IDWER SITE Dear Mr. Klaers: e As you are aware, the Elk River Municipal Utilities have awarded the contract for the new 500,000 gallon water tower to be built in the area northeast of Hillside Estates Phase I. The Utilities have also authorized the preparation of plans and specifications for a deep well and water treatment facility at this same location. We anticipate that water tower construction will begin within the next 30 to 60 days, with the tower being fully erected sometime late this year, but not painted until June of 1994. We also expect that the well construction will begin sometime late this year and be completed in 1993, such that by spring of 1994 the contract for the water treatment facility could be awarded and the construction of that take place during 1994. As you know, the City's role in this improvement project is to provide watermain to the tower and well location. This watermain would be a trunk facility extended from Hillside Estates Phase I along an alignment for the future phases of Hillside Estates to the water tower site. Mr. Rick Foster, the developer of this property, has provided the City with an easement for this improvement. ""e would recommend that the City Council consider the attached resolution authorizing preparation of plans and specifications for these watermain improvements at this time. This will allow the preparation of plans and specifications, bidding, and actual construction to begin in 1993, and be completed in early 1994, such that water is available at the time that the tower needs to be filled for testing purposes. It is anticipated that the cost of these watermain improvements will be assessed to the benefitting area as a trunk improvement. They will also provide lateral benefit to the future phases of Hillside Estates abutting them. However, it may not be possible to assess the watermain against these properties until such time that trunk sewer is also made available, so that the property can be developed. e 1959 SLOAN PLACE, SUITE 200, ST. PAUL, MINNESOTA 55117 612-774-6021 9800 SHELARD PARKWAY, SUITE 102, MINNEAPOLIS, MINNESOTA 55441 612-546-0432 . Equal Opportunity Employer e e . Mr. Pat Klaers July 26, 1993 Page Two If you have any questions or comments regarding this request, please call. Sincerely, MAIER STEWART & ASSOCIATES, INC. ~~ Terry J. Maurer, P.E. TJM:tp Attachment 190-2606.jul . e e RESOLUTION 93 - A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION ORDERING THE IMPROVEMENT AND PREPARATION OF PLANS AND SPECIFICATIONS IN THE MATTER OF THE NORTHEAST AREA TRUNK WATER IMPROVEMENT OF 1993 WHEREAS, a Feasibility Report was prepared in February 1992 which addressed sanitary sewer and water improvements in the Northeast Area of the City; and WHEREAS, the Elk River Municipal Utilities have authorized the construction of the elevated water tower recommended in the Feasibility Report; and WHEREAS, a trunk water extension is necessary to complete the water tower project and put it into operation; and WHEREAS, the City Council has duly considered the Feasibility Report; NOW, THEREFORE, BE IT RFSOLVED by the City Council of the City of Elk River, Minnesota: . 1. The Northeast Area 'Iiunk Water improvement is hereby ordered. as recommended in the Feasibility Report dated February 28, 1992. 2. Maier Stewart & Associates, Inc., is hereby designated as Project Engineer for this improvement. The Project Engineer is directed to prepare plans and specifications for the making of the improvement and the solicitation of competitive bids. Passed and adopted this _ day of August, 1993. Henry A. Duitsman, Mayor ATTEST: Sandra A. Thackeray, City Clerk 190-2607.jul