Loading...
5.5. SR 09-13-1993 ITEM 5.5. _ / f ~ ~ ~ ~ J.. CONSULTING ENGINEERS e .".,,_ Maier Stewart & Associates Inc. e e September 9, 1993 File: 230-178-20 Honorable Mayor and City Council City of Elk River 13065 Orono Parkway Elk River, MN 55330 RE: TRUNK IDGHWAY 10 LIFT STATION/SANITARY SEWER CONSTRUCTION BIDS Dear Council Members: We have tabulated the bids received on Wednesday, August 8, 1993, for the Trunk Highway 10 Lift Station and Trunk Sanitary Sewer Improvements. There were a total of four bids received. The following list provides each of the bidders and their total bid: LaTour Construction, Inc. Northdale Construction, Inc. Barbarosa & Sons, Inc. Bonine Excavating, Inc. $413,197.50 $543,727.60 $559,219.50 $563,898.57 Our preliminary estimate for this work was $350,000 to $400,000. During the preparation of plans and specifications, a portable emergency generator was added along with some trunk water main which will ultimately be needed for the East Trunk Highway 10 corridor but was immediately adjacent to some of the sanitary sewer construction. Therefore, it made sense to add this watermain construction to the project at this time to eliminate a duplication of construction activities in the same area sometime in the future. These two items added approximately $45,000 to the project cost. LaTour Construction, Inc., has successfully completed similar projects in the past. They are currently working on three projects: Heritage Landing, Mississippi Oaks, and Cherryhill Bluffs 2nd Addition in the City of Elk River. We would recommend award to LaTour Construction, Inc., as the lowest responsible bidder. Attached is a draft resolution accepting the bid and authorizing execution of a contract with LaTour Construction, Inc., for this improvement project. 1959 SLOAN PLACE, SUITE 200, ST. PAUL, MINNESOTA 55117 612-774-6021 9800 SHELARD PARKWAY, SUITE 102, MINNEAPOLIS. MINNESOTA 55441 612-546-0432 · Equal Opportunity Employer e e e Honorable Mayor and City Council September 9, 1993 Page Two If you have any questions regarding this, I will be in attendance at your September 13, 1993, City Council meeting. Sincerely, MAIER STEWART & ASSOCIATES, INC. ~Jl!~ Terry J. Maurer, P.E. TJM:tp Attachment 178-0906.sep e e e RESOLUTION 93 - A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION ACCEPTING BID AND AUTHORIZING EXECUTION OF CONTRACT IN THE MATTER OF THE TH 10 LIFT STATION AND TRUNK SANITARY SEWER IMPROVEMENT OF 1993 WHEREAS pursuant to Resolution 93-38, competitive bids were solicited and received for the TH 10 Lift Station and Trunk Sanitary Sewer improvement as set forth in the bid tabulation attached hereto and incorporated herein by this reference; and WHEREAS the City Council has considered the amount of the bids and the responsibility of the bidders and determined that LaTour Construction, Inc., is the lowest responsible bidder; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota: 1. The Mayor and City Administrator are authorized and directed to execute, on behalf of the City, such contract with LaTour Construction, Inc., as is approved by the City Attorney for the completion of the TH 10 Lift Station and Trunk Sanitary Sewer improvement according to the approved plans and specifications designated in Resolution 93-38. 2. The City Administrator is authorized and directed to forthwith return to all bidders the deposits made with their bids upon execution of the contract above specified. Passed and adopted this 13th day of September, 1993. Henry A. Duitsman, Mayor ATTEST: Sandra A. Thackeray, City Administrator 178-0908.sep 230-178-20 ~ LATCII..JR C e e e :::stt"""'- ~..~ ";;;I'~ .."-"'..... ... - - -- -~ q;l3/13 ~1. i") tlLlll.. + ,5~ S- INC. 2134 Co. Rd. 8 N. ~ · Maple Lake, MN 55358 · 963-5993 · Fax 963-6017 September 13" 1993 Mr. Terry Maurer Maier Stewart & Associates" Inc. 1959 Sloan Place, Suite 200 St. Paul, MN 55117 Dear Terry: I am writing regarding LaTour Construction"s Bid for Alternate No.2 for the Highway 10 Lift Station and Trunk Sanitary Sewer for the City of Elk River. After bids were opened on September 8" LaTOur reviewed the plans and the bid and discovered that various mistakes had been made in the bid. LaTour then contacted your office and identified two principle errors. One in the pump station price and one 1n the pipe unit price due to a factual mistake in the location of the existing sanitary sewer. In addition, other aspects of the work considered incidental were inadvertantly not included in LaTour"s bid. The fact that the bid included these material mistakes is evident because LaTour was in excess of 30% low ($130,000) compared to the other three bidders that were within $20,,000 of each other. LaTour requests that our bid be withdrawn and the bId bond returned due to the mistakes in our bid. If you have any questions, please contact me. Sincerely" LATOUR CONSTRUCTION, INC. ,~~ Gary Thompson" Estimator "1:"......, ,-,..._........_,.... ~__..__..___