Loading...
INFORMATION #2 10-04-1993 INFORMATION e CONSTRUCTION FOR THE JACKSON SQUARE PARKING LOT AND RAILROAD PARKING LOT FF~: I DAY :1.0/B/9:::;; Close Jackson Square for the day. Street Dept. will remove the 2 large elm trees. MONDf'~Y TO t',lED. 10/1LICjl3 to 10/ 13/cjl:::;; CIO!5e the lot. A.N. Johnson Construction Co. - Remove stumps and install storm sewer lines and 2 catch basins. Street Dept. - Remove existing bituminous, Main Street driveway entrance, posts, etc. and grade. Move a telephone pedestal, install conduits for street light wires and irrigation equipment. ~'JED.. .1.0/1::;/~T) Street Dept. will close the parking lot between Highway 10 and the railroad tracks, remove the posts, cable,and fencing and grade the area for for concrete curb. THURS.I0/14/93 to FR IDA',!" 10/15/93 e Schmidt Concrete will pour the concrete curbing on both lots. MONDAY 10/18/93 to TUES. 10/19/9::::' Street Dept. will install Class 5 base in Jackson Square parking lot. WED. 10/20/93 to Street Dept. will install Class 5 base in Jackson Square parking lot and patch up to curb on railroad par-king lot. FRI n 1()/2~,2/':;)3 "ION. 10/2::,/r1:~; Paint stripe the lot and reopen it for public use.. e