Loading...
4.7. SR 10-18-1993 e 132G Energy Pad Drive SL Pul. UN 5SllIS-S202 Gl2-544.4389 filar. 612-544.9446 9800 SheIanI ParkWilY, Ste.llI2 Minneapolis, HN 55441-6451 612-54&-8432 Far. 612-544.6398 OCT - 7 19S3 ITEM 4.7. October 6, 1993 File: 230-137-30 Mr. Pat Klaers City Administrator City of Elk River 13065 Orono Parkway Elk River, MN 55330 RE: WASTEWATER TREATMENT PLANT U.V. BUILDING Dear Mr. Klaers: On September 23, 1993, we opened bids for the proposed disinfection building at the wastewater treatment plant. We received bids from Gridor Construction ($202,900.00) and Barbarossa Construction ($263,000.00). The low bid was approximately twice what we had anticipated for the project. Due to the high bid, we contacted Gridor Construction to determine the basis for their bid. They provided a breakdown of the major material suppliers and subcontractors which accounted for about half of their total bid. In several cases, Gridor, as the General Contractor, received only one.quote for a particular work item. This lack of competition likely increased the cost. In addition, the project is rather small relative to typical projects of this type so there was a limited amount of interest by general and subcontractors. We have met with Darrell Mack and discussed the possible options available. In general, we feel that the low bid is too high and it would be possible to break the project down into smaller workable tasks. In effect, the City would act as their own general contractor and hire subcontractors to complete the various work items. Based on our discussion with Darrell, he is comfortable with this approach and we would be available to assist him in obtaining quotes, staking, inspection, and negotiations with suppliers and subcontractors. We would recommend rejection of the current bids and return of the bid bonds to the two contractors. We would also recommend that the project be turned over the City staff to complete in a timely fashion with recognition of the June 30, 1994, operational deadline. e Mr. Pat Klaers October 6, 1993 Page Two If you have any questions or need additional information, please let us know. Sincerely, MSA, CONSULTING ENGINEERS Ste~fl:#~ Terry J. l"faurer,. P .E. TJM:tp cc: Darrell Mack 137-0604.oct e e