4.8. SR 10-18-1993 r I --'\) ( )j IY~ ITEM 4.8. FROM: MAYOR & CITY COUNCIL PAT KLAERS, CITY ADMI~~TOR OCTOBER 14, 1993 \Ilf' TO: DATE: SUBJECT: FRESNO STREET CHANGE ORDER A change order needs to be considered in order to reconstruct a driveway along the Fresno Street project. This driveway is for the Paul Bell residence. All Councilmembers are encouraged to drive Fresno Street before the City Council meeting in order to become familiar with the issues involved in this request. Staff is recommending that no change the reconstruction of driveways improvement project. order along be the authorized for Fresno Street e In addition to recommending no change orders taking place for driveways that are already reconstructed along Fresno Street, staff also recommends no change in our existing policy or past practices for reconstruction of driveways along improvement projects. The past practice has been that the Engineer makes decisions during the project as to what is a reasonable reconstruction of the driveways. Most of the time the reconstruction takes place within the right-of-way, but if the slope is not acceptable, then, within budget constraints, the work extends back on to private property outside of the public right-of-way. Please see the attached material from the City Engineer on the Paul Bell issue, and on the larger reconstruction of driveways issue. e P.O. Box 490 · 13065 Orono Parkway · Elk River, MN 55330 · (612) 441-7420 · Fax: (612) 441-7425 CONSULTING R~G1NEERS e 13t6 Energy ParIi Drive St. Paul. }I~ 55108-520"2 61t-614-4389 e Fax: 6It-~H-9446 9SOO SbeIanI Parkll'ilY, Ste. 100 Minneapolis, UN 55441.6451 G1H4U432 Fa.!: 612.544.6.398 October 11, 1993 File: 230-159-30 Mr. Pat Klaers City Administrator City of Elk River 13065 Orono Parkway Elk River, MN 55330 RE: BELL nRIVEWA Y ON FRESNO STREET Dear Mr. Klaers: As requested by Council Member Holmgren, I have contacted Paul Bell, who lives at the north end of Fresno Street, concerning the status of his driveway. As you recall, at the Assessment Hearing Mr. Bell raised issues as to the increase in grade in his driveway after construction versus the condition it was in prior to construction. Due to the lack of storm drainage in the whole Orono Lake 3rd Addition, the grade of Fresno Street was dropped to facilitate drainage on Fresno and the side streets when they are reconstructed. This caused us to increase the slope slightly on some of the driveways. Mr. Bell's driveway appears to be about the worst in the area where a relatively flat driveway prior to construction now has a grade of approximately 6 % for the first 15 to 20 feet. The remainder of the driveway is currently flat and is not impacted by construction. As you are aware, the City's ordinance strives to keep all driveways under 10% grade. Six percent falls well within this range. In discussing this issue with Mr. Bell, he feels that the condition of his driveway is unacceptable, primarily because he states that he can no longer back his boat into the driveway without worrying about the motor hitting the ground. He would like the City to reconstruct his driveway from his garage slab all the way to the street. This would provide for one uniform grade along the entire length of the driveway which would average out the maximum of 6% and the minimum of a virtually flat driveway, probably providing a driveway somewhere in the 2 % to 4 % grade. I indicated to Mr. Bell that I would present his request back through City Hall and look for direction as to how to proceed. We clearly could replace his driveway as part of the construction since the contractor has additional work to do on the driveways in the spring of 1994. However, I feel that I need direction from City Council to expend monies to redo the driveway since the way that we have restored the driveway already is the same as we have used on all projects in existing areas. To spend additional money to redo the entire driveway would be above and beyond anything we have done on other properties. Mr. Pat Klaers October 11, 1993 Page Two Please let me know how you want me to proceed with this issue or if you need any additional information to make the decision. Sincerely, MSA, CONSULTING ENGINEERS .~~~ljJ Terry J. ~urer, P .E. TJM:tp 159-1204.oct e e e e 1326 Energy Pari.; Dril'e St. Panl. ~I\ 551OS-521f.! 612-644-4389 .iI: 612-644-9446 9800 ShelanI ParliIl'ilJ', Sle, 102 Minneapolis, M\ 55141-6451 612-546-ll-132 fiLt 612.544-6398 October 11, 1993 File: 230-159-30 Mr. Pat Klaers City Administrator City of Elk River 13065 Orono Parkway Elk River, MN 55330 RE: DRIVEWAY RESTORATION, FRESNO STREET Dear Mr. Klaers: Under separate cover, I have sent you a letter concerning my discussions with Mr. Paul Bell on the restoration of his driveway on Fresno Street. Essentially, Mr. Bell would like to have his entire driveway removed all the way back to the garage and reconstructed at the expense of the City. His contention is that by taking a driveway that is relatively flat and providing a portion in the right-of-way that now has a slope of about 6% on it has detrimentally affected the use of his property. Our concern is that if we redo the Bell driveway all the way back to the garage, we need to make the same offer to all other property owners on this project and future projects in existing areas. Any time a street is reconstructed in an existing area, there are driveways that are affected and the grades could change slightly in either direction. We have always maintained that the driveways are restored back within a reasonable range. As you know, currently the City ordinance does not allow for driveways in excess of 10%. We generally apply an even stricter standard on these reconstruction projects and would not take a driveway that is at, say 1 %, and allow it to go all the way up to 10%. In cases like that, we would cut the driveway back even further and make some reasonable increase to 5 % or 6 %. If the City is going to direct me to rebuild the Bell driveway all the way back to the garage slab, I would also request direction as to how to deal with all other neighbors on this particular project who may also request additional work be done to their driveways. In a broader sense, then I believe that the City would need to establish some type of policy as to how to adequately restore driveways on reconstruction projects so that we are not put in the position of trying to decide how to balance the issue of adequately restoring driveways while not expending excessive amounts of the City's money outside of the public right-of-way. Mr. Pat Klaers October 11, 1993 Page Two I fear that this could turn into a very controversial issue if we do it for one individual and do not set up a policy which treats all property owners equitably. Please let me know how you would like us to proceed on this issue or if you need any additional information from us. Sincerely, MSA, CONSULTING ENGINEERS ~/Jl?'ktueJ Terry J. Maurer, P.E. TJM:tp lS9-120S.oct . e e