ITEM 4. 12 .
October 21, 1993
File: 230-161-70
The Honorable Mayor and City Council
City of Elk River
13065 Orono Parkway
Elk River, MN 55330
RE: MnDOT Utility Coordination
Dear Council Members:
We have been working with MnDOT on an ongoing basis relative to sanitary sewer, water
and most importantly storm drainage improvements crossing the intersection of Highway
169/101/10. We had hoped to have specific information relative to these improvements
which could be provided in the Council packets. Unfortunately we are still waiting for
information from MnDOT. Therefore, I will be prepared at Monday evening's meeting to
verbally update you on the status of this coordination effort. I also hope to have some
information available relative to the cost of storm sewer pipes through this interchange vs.
the size of upstream ponding necessary. This whole issue will likely come down to an
economic decision of whether it's more cost effective to build larger pipes through the
highway interchange or commit more land upstream to future pond construction to minimize
the size of the pipes.
Sincerely,
MSA, CONSULTING ENGINEERS
~~
T~aurer,~
TJM:ds
161.2111.oct
!II ""
s
CONSULTING IlNGlNEERS
_
13'.!& Ener~ Park Drive
St.1'IIII, M 551l18-m
612-&<<-4389
_hI: 6l~.s<<.S44S
UlMnlParkway, Ste.1ft!
lliDoeapelis, M 55441-5451
612.5(5-0432
hI: 612-5.14_
1/~
---
October 25, 1993
File: 230-161-70
The Honorable Mayor and City Council
City of Elk River
13065 Orono Parkway
Elk River, MN 55330
RE: City/MnDOT Utility Coordination
Dear Council Members:
Over the. last several months, we have been working with MnDOT personnel to pursue any
opportunity the City would have to install utilities in conjunction with the MnDOT upgrade
of the TH 10/1011169 interchange. Our latest meeting was last Tuesday at MnDOT's Golden
Valley office. We met with Mr. Tim Johnson, the TH 101 project manager, and several
members of his support staff. IThe main issue we discussed was the final configuration and
construction staging for the MnDDOT project relative to the City's desire to include conduits
for future sanitary sewer and water facilities for East TH 10 and storm sewer from south of
the railroad line to the Mississippi River. The following is a brief summary of the
conclusions we reached on each of these issues.
1.
Sanitary SewerlWater Conduits
There is no opportunity for the City of Elk River to install conduits for future
extension of sanitary sewer and watermain to the East IDghway 10 corridor in
conjunction with MnDOT's project. The reason for this is MnDOT's policy does not
allow conduits through the heart of the clover leaf exit and entrance ramps of any
interchange. Utilities crossing the interchange must be routed around the exit and
entrance ramps. The MnDOT plan for the trunk highway 10/1011169 interchange
does not propose any open cutting of areas outside the immediate interchange.
Therefore, if we were to include these conduits in this project, they would have to be
jacked. This would not provide for any costs savings since in the future we will have
the opportunity to install them by the same method. We are therefore recommending
to the City of Elk River that the issue of conduits for future sanitary sewer and water
extensions be dropped at this point in time.
"
e
The Honorable Mayor and City Council
October 25, 1993
Page Two
2. Storm Sewer
As you are aware, the Comprehensive Drainage Plan calls for a 72-inch diameter
storm sewer line from the railroad line through the MnDOT interchange to the
Mississippi River. Unfortunately, MnDOT's final design of the TH 10/101/169
interchange does not provide enough elevation difference to install a 72-inch diameter
culvert. In order to get comparable capacity in a smaller size culvert, three parallel
42" diameter culverts would need to be installed. The other concern with the
MnDOT design is their traffic and construction staging plan does not allow for open
cutting of the entire length. The total distance from the Mississippi River to the north
end of the interchange project is approximately 850'. 350' of this length would
require jacking in order to maintain the integrity of the MnDOT staging and traffic
plan. The remaining 500' could be open cut.
e
Obviously, the installation of 3 parallel pipes is going to be much more costly than
the installation of 1 larger diameter pipe. We have estimated that each 42" diameter
pipe from the Mississippi River to the north end would cost approximately $175,000
to $200,000. Therefore, the installation of 3 parallel pipes would cost between
$525,000 and $600,000. It should be noted that this work does not include crossing
under the railroad tracks which would still require a 72" diameter culvert. If the City
were to decide to not install 3 42" culverts but only one to save monies on the
installation costs, the effect would be the requirement of more ponding to be
constructed upstream. We have prepared a brief analysis of the increased ponding
relative to the culvert capacity through the MnDOT interchange. These are listed in
the following table:
140 CFS
220 CFS
300 CFS
Ponding
180 AC-FI'
135 AC-FI'
110 AC-FT
Pipes
1 - 42"
2 - 42"
3 - 42"
Flow
e
It is unlikely that the DNR and the Army Corps of Engineers will allow this amount
of ponding in wetlands upstream of the railroad tracks. Therefore, it should be
assumed that ponding will utilize land which would otherwise be suitable for
development. We would recommend at this point in time that the city proceed
through MnDOT to include three 42" diameter pipes in the MnDOT project with the
option to eliminate 1 or 2 of them depending on the construction costs. This approach
would allow us to get an actual construction cost and do a much better cost-effective
analysis of the cost of culverts vs. ponding after bids are open.
.
The Honorable Mayor and City Council
October 25, 1993
Page Two
I will be in attendance at Monday evening's City Council meeting to discuss this in further
detail. I will be prepared to answer any questions you have at that time.
Sincerely,
MSA, CONSULTING ENGINEERS
~:MauuJ
Terry J. Maurer, P .E.
TJM:ds