7.0. SR 11-15-1993 rll ---'\j ( )j IIi{ Item 7. TO: MAYOR & CITY COUNCIL FROM: SUBJECT: PAT KLAERS, CITY ADMINIST~ NOVEMBER 19, 1993 ~~O' ELK PARK CENTER WORKSESS~ DATE: The November 22, 1993, City Council agenda is light and it is believed that it would be a good time for the City Council and staff to have a worksession on the Elk Park Center proposal. Specifically, City Engineer, Terry Maurer, needs to know if the issues that he has identified are consistent with what the City Council feels is needed to be addressed by the 12/13/93 public hearing on Elk Park Center. Attached for your review is a 11/18/93 memo from the City Engineer to City Planner, Steve Ach, regarding the scope of major issues for this project. The basis of this scope summary is the Planning Commission minutes, the findings of fact resolution, and information supplied by former Mayor Jim Tralle. e As this is a worksession on an important topic, staff has invited representatives from the neighborhood adjacent to the proposal to this meeting. This was done in order to make sure that no one felt that anything on this proposal is being decided "behind closed doors". As the citizens have been invited, it is also appropriate to have developer representatives present. Finally, former Mayor Tralle, representing the mediation group has also been invited. Having these groups present at the worksession should help ensure that no issues which need to be discussed on 12/13 are left out. Terry can complete all the work listed in his memo by the 12/13 public hearing and can have a report, at least in summary form, available by this date. The 11/18/93 City Engineer memo appears to be complete, but the City Engineer needs to hear and receive input from the City Council on what are the most important issues to analyze and which issues could conceivably wait until after the 12/13/93 public hearing. This is important if new issues are added to the list. There are some real time limits on what can be accomplished before this public hearing. e It is anticipated that there will be some feedback available from MnDOT by this 11/22 meeting on MnDOT's position regarding expansion of the right in/right out intersection at Highway 169 to include a crossover for the northbound lanes. This is an important piece of the overall puzzle for this Elk Park Center proposal. This information will not affect the Elk Park Center P.O. Box 490 · 13065 Orono Parkway · Elk River, MN 55330 · (612) 441-7420 · Fax: (612) 441-7425 e e e site plan, but there needs to be an updated site plan submitted and analyzed. This is important for drainage and building pad identifications and also to decide whether or not the Freeport match up at Jackson Avenue is to align with Highland Avenue. A remaining new site plan issue relates to the possible "back door" private driveway that is off of Jackson Avenue at the southern part of the property that could be used as an entrance into the center. At the 12/13/93 public hearing, the City Council will hear all new information on the proposal. If the major issues have been addressed, then the proposal may be able to move forward. However, if not, then the Council should consider the resolution to deny this proposal following the public hearing, or the Council could continue the 12/13 public hearing so that more time is available to work out the remaining issues with this project. .MS ~ CONSULTING ENGINEERS CIVil ENGINEERING: ENVIRONMENTAl MUNICIPAL PLANNING STRUCTURAL _SURVEYING TRAFFIC TRANSPORTATION 1326 Energy Park Drive St. Paul, MN 55108 612-644-4389 Fax: 612-644-9446 _ 9800 Shelard Parkway Minneapolis, MN 55441 612-546-0432 Fax: 612-544-6398 Memo To: From: File: Date: Re: Steve Ach, City Planner Terry Maurer, P .E. ~ 230-152-10 November 18, 1993 Elk Park Center Feasibility Study Scope of Major Items Based on all the available information concerning the Elk Park Center, including staff reports, developer submitted information, and Planning Commission and City Council minutes, I would summarize the major points to be considered within the feasibility study as follows: A. 152-1805.nov TRAFFIC 1. Re-analyze total traffic generated by development based on the most current site plan. 2. Re-analyze distribution of traffic entering and exiting the site considering market-based distribution. 3. Analyze all adjacent intersections as outlined in the Planning Commission public hearing minutes to determine level of service prior to the development of the site, and identify improvements needed to maintain the same level of service after development. 4. Re-analyze the movement of traffic from northbound TH 169 to westbound School Street between TH 169 and Freeport. 5. Analyze the street section necessary on School Street between TH 169 and Freeport, considering the section needed from Freeport to Jackson and ultimately to Proctor Avenue. Once this is established, analyze the available right-of-way and determine land acquisition needs. 6. Re-analyze the traffic flow to the site from both west Highway 10 and the northwest area of the County, specifically looking at the amount of traffic that would utilize either School Street or Highland Avenue to access the site from the west. . Steve Ach, City Planner November 18, 1993 Page Two 7. Analyze the effect an additional access to the site from Jackson Avenue would have on traffic utilizing School Street between Jackson and TH 169. 8. Analyze the effect a median crossover and signalized intersection at the location of the right-in/right-out point would have on overall traffic patterns to the site. 9. Analyze the pedestrian movements both school-related and general public- related, and make recommendations relative to sidewalks, pathways, and school crossing zones. 10. Re-analyze the traffic control needs at the intersection of School Street and Jackson Avenue. 11. Re-analyze the signalization of School Street and Freeport and the coordination of this signal with TH 169 and School Street existing signals. 12. Re-analyze the improvements needed to Jackson Avenue both from the Freeport intersection to TH 169 and between Freeport and School Street. e 13. Re-analyze the proposed access at the most northerly end of the site for safety concerns and environmental concerns, specifically the need to cut down mature trees to provide adequate site lines and determine whether or not it is reasonable to allow an access off of Jackson at this point. B. DRAINAGE 1. Re-analyze the drainage plan, specifically the two-thirds of the site that flow to the east under TH 169. Analyze the need or lack thereof for an outlet from the regional pond, given the phasing of the proposed shopping center. 2. Re-analyze the internal drainage system in accordance with Best Management Practices, specifically the design of the sedimentation pond. 3. Analyze and make recommendations for appropriate fencing around the ponds adjacent to the School District property on the south and adjacent to Jackson Avenue on the west. 4. Analyze the portion of the site that flows to the south down Freeport Avenue. This will require modeling of the entire drainage system that flows all the way to the Mississippi River. Comment on the effect on the intersection of Main and Evans or any other critical point. e 152-1805.nov e Steve Ach, City Planner November 18, 1993 Page Three 5. Analyze the alternative drainage plan which calls for significantly more on- site storage and all drainage flowing to the south with no drainage flowing under TH 169 to the east. The above listing of critical items attempts to identify those items which we would concentrate our efforts on between now and the December 13th public hearing. Obviously, the final feasibility study will cover many, many more items, such as sanitary sewer, water, and street infrastructure to serve the site. Also, a critical part of the feasibility study will be cost estimates on the various improvements needed and a funding scenario for those costs. TJM:tp e e 152-1805.noY