Loading...
1.0. - 5.0. SR 01-08-1994 DEC-30-93 THU 9:20 · M~ CONSUL'IUG RNGINRS CIVil ENGINEERING: ENVIRONMENTAl MUNlC:PAI PlANNING STRUCTURAl _ SURVEYING r,QAFFIC TRANSPORTATION 1 326 Energy Pork Drive 51. Poul. MN 55108 612-64.(.4389 Fox: 612.64.(-9446 _9800 Shelard Parkway Minneapolis, MN 55441 612-546-0432 Fax: 612-544-6398 MSA CONSULTING ENGINEERS FAX NO. 6126449446 P. 02/04 r- December 29, 1993 File: 230-000-00 Ms. Lori Johnson Finance Director City of Elk River 13065 Orono Parkway Elk River, MN 55330 RE: CITY COUNCIL WORKSHOP MEETING SATURDA Y, JANUARY 8, 1994 Dear Ms. Johnson: As we discusseq, this memo will give you a brief outline of the various issues that I will be prepared to discuss at the City Council workshop on Saturday, January 8, 1994. They are as follows: 1. Wastewater Treatment Plant I will be prepared to update the City Council on the status of the interim improvement scheduled for construction in 1994, the major improvements to the treatment plant and also the outcome of the variance proceeding with the Minnesota Pollution Control Agency, along with the ramifications of that outcome. 2. East TH 10 Utilities The City Council has previously received a memo summarizing the outcome of the survey which was taken from the properties along the Highway 10 corridor. We will be prepared to show the City Council a visual representation of the survey results. The issue that then needs to be discussed is how to proceed with this project. The City Council basically has three options. They could a) schedule a second informational meeting with a larger area represented, b) could send out another question~aire to additional property owners along east TH 10, or 3) revise the East TH 10 feasibility study and proceed into informational/public hearings. 3. Storm Drainage There are several issues we will be prepared to discuss regarding the storm drainage comprehensive plan. They are as follows: 000-2904.DEC DEC-30-93 THU 9:20 MSA CONSULTING ENGINEERS FAX NO. 6126449446 P, 03/04 e Ms. Lori Johnson December 29, 1993 Page Two a. Deertield 3rd Improvements We will update the City Council on the status of the easement negotiations with the Hartmans and the impact that will have on the change order to the contract for which W. B. Miller was the low bidder. b. SchultzlDescbene Drainage Area We have met with both property owners, have walked the site, have prepared a map of the area and laid out a preliminary pipe alignment for this improvement. We will be prepared to show that to the City Council and discuss any issues. The next step, should the City Council decide to proceed, would be to describe and acquire easements for the pipe construction, and prepare plans and specifications. c. Main/Evans Improvements e No work has been done on this particular drainage issue since the report which discussed the options for segregating this from the overall system. We will be prepared to discuss the timing of that relative to Elk Park Center improvements or timing without Elk Park Center. d. Impact Fee Several City Council meetings ago, preliminary discussion was initiated relative to an impact fee for storm drainage improvements. We would like to proceed with that discussion and start to think about what level of cost should be associated with this type of impact fee. e. Surface Water Utility We have been working to begin summarizing the properties within the City that would be charged for surface water utility fee. We will be prepared to update the City Council on this process and would like to discuss briefly with them the types of fees and how to address different types of properties such as rural and/or undeveloped properties. 4. Transportation Plan e This study was previously presented to the City Council in draft form and they requested that two specific road alignments discussed in the report be looked at in more det;ail relative to the available land to build such a roadway. We have prepared a large scale exhibit of each of these showing the wetlands in the area, and will be able to discuss these alignments and how they may be built some day in the future. 000-2904.DEC DEC-30-93 THU 9:21 MSA CONSULTING ENGINEERS FAX NO. 6126449446 P. 04/04 e Ms. Lori Johnson December 29, 1993 Page Three s. Assessment Manual A draft copy of a revised assessment manual is available which indicates the areas where changes either by deletion or addition are suggested to the City's assessment manual, based on recent assessment hearings. The one issue that has not been included at this point is the most recent change made with the Fresno Street assessment hearing. That issue dealt with the assessment for street purposes only the front footage that actually had street reconstruction or new construction adjacent to it. This can easily be added before final draft of the assessment manual is prepared for adoption. We will be ready to discuss any or all of the changes in the draft assessment manual. The City Council should be encouraged to bring their copies of the draft Transportation Plan, Storm Drainage Plan, and the Supplemental Storm Drainage Study which dealt with three different drainage areas. We will have some large scale exhibits to show and will be prepared to discuss any of the issues listed above in this memo or other items the City Council may have interest in relative to these issues. Sincerely, e TJM:tp 000-2904.dec . 000-2904.DEC