2.0. SR 01-08-1994
'\
;
\
OONSUL mG &~GlnIRS
December 15, 1993
File: 230-080-10
CIVIL ENGINEERING
Mr. Pat Klaers
City Administrator
City of Elk River
13065 Orono Parkway
Elk River, MN 55330
ENVIRONMENTAl
RE: EAST TH 10 SURVEY RESULTS
!vlUNICIPAl
Dear Mr. Klaers:
;R~';IC
As requested, we have compiled the results of the surveys sent out along the east TH 10
corridor regarding the extension of City utilities to this area. There were a total of 40
questionnaires sent out. This includes 37 within the specified area that the Informational
Hearing was held for and 3 individuals who showed up at the Informational Hearing but are
outside of that area. These 40 property owners represent 64 individual parcels of property.
Of the 40 surveys sent out, 20 were returned, representing 34 individual parcels of
property. Attached is a copy of the survey that was sent out, and the following is a
summary of the returned surveys:
PLANNING
5 TWcrURAL
.URVEYING
,.,AN5?ORTA TION
Survey Summary
.
Total surveys sent = 40 (64 individual parcels).
Total surveys returned = 20 (34 individual parcels).
Eight surveys returned representing 20 parcels favoring utilities in 1996.
Eight surveys represent 20% of total surveys and 40% of returned surveys.
Twenty parcels of property represent 31.3% of total property and 58.8% of
returned property.
Twelve surveys returned representing 14 parcels of property favoring utilities in
2003.
Twelve surveys represent 30% of the total surveys and 60% of returned
surveys.
Fourteen parcels represent 21.9 % of the total parcels and 41.2 % of returned
parcels.
.
.
.
1326 Energy Parle Drive
51. Paul. MN 55108
612-644-4389
Fax: 612-644-9446
Attached is a map of the area with coloring showing the various parcels that have returned
their surveys and an indication of whether they favored sewer in 1996 or 2003.
_800 5helord Parkway
Minneapolis, MN 55441
612-546-0432
Fax: 612-544-6398
.
e
e
e
..
\
Mr. Pat Klaers
December 15, 1993
Page Two
There are several ways that the City Council may consider proceeding with this project.
They are as follows:
1. . Hold another Informational Hearing with a larger group of property owners.
2. Send out another survey to a larger group of property owners.
3. Initiate work on updating the original feasibility study for extending sewer and water
to this area, followed by Informational Hearings and/or additional surveys. If this
option is chosen, specific direction will need to be given as to what area is to be
served by utilities.
Please advise me how you would like to proceed with this issue.
Sincerely,
MSA, CONSULTING ENGINEERS
~~~
Terry J. Maurer, P.E.
TJM:tp
Attachment
08Q.lSlO.dec: