Loading...
2.0. SR 01-08-1994 '\ ; \ OONSUL mG &~GlnIRS December 15, 1993 File: 230-080-10 CIVIL ENGINEERING Mr. Pat Klaers City Administrator City of Elk River 13065 Orono Parkway Elk River, MN 55330 ENVIRONMENTAl RE: EAST TH 10 SURVEY RESULTS !vlUNICIPAl Dear Mr. Klaers: ;R~';IC As requested, we have compiled the results of the surveys sent out along the east TH 10 corridor regarding the extension of City utilities to this area. There were a total of 40 questionnaires sent out. This includes 37 within the specified area that the Informational Hearing was held for and 3 individuals who showed up at the Informational Hearing but are outside of that area. These 40 property owners represent 64 individual parcels of property. Of the 40 surveys sent out, 20 were returned, representing 34 individual parcels of property. Attached is a copy of the survey that was sent out, and the following is a summary of the returned surveys: PLANNING 5 TWcrURAL .URVEYING ,.,AN5?ORTA TION Survey Summary . Total surveys sent = 40 (64 individual parcels). Total surveys returned = 20 (34 individual parcels). Eight surveys returned representing 20 parcels favoring utilities in 1996. Eight surveys represent 20% of total surveys and 40% of returned surveys. Twenty parcels of property represent 31.3% of total property and 58.8% of returned property. Twelve surveys returned representing 14 parcels of property favoring utilities in 2003. Twelve surveys represent 30% of the total surveys and 60% of returned surveys. Fourteen parcels represent 21.9 % of the total parcels and 41.2 % of returned parcels. . . . 1326 Energy Parle Drive 51. Paul. MN 55108 612-644-4389 Fax: 612-644-9446 Attached is a map of the area with coloring showing the various parcels that have returned their surveys and an indication of whether they favored sewer in 1996 or 2003. _800 5helord Parkway Minneapolis, MN 55441 612-546-0432 Fax: 612-544-6398 . e e e .. \ Mr. Pat Klaers December 15, 1993 Page Two There are several ways that the City Council may consider proceeding with this project. They are as follows: 1. . Hold another Informational Hearing with a larger group of property owners. 2. Send out another survey to a larger group of property owners. 3. Initiate work on updating the original feasibility study for extending sewer and water to this area, followed by Informational Hearings and/or additional surveys. If this option is chosen, specific direction will need to be given as to what area is to be served by utilities. Please advise me how you would like to proceed with this issue. Sincerely, MSA, CONSULTING ENGINEERS ~~~ Terry J. Maurer, P.E. TJM:tp Attachment 08Q.lSlO.dec: