Loading...
3.1.L. SR 02-21-1994 - 1326 Energy 1M Drive Sl Paul. tiS ~108.32llt &1!-6H.4389 e Far &12-644-9-14& WI SbeIanI PartWilY, S1t. 1tl2 lliuneapolis. }IS ~H1.G431 &12.346-8432 Far &12.344-6398 ITEM 3. 1. L . October 20, 1993 File: 230-165-20 The Honorable Mayor and City Council City of Elk River 13065 Orono Parkway Elk River, MN 55330 RE: 221st Avenue Construction Bids Dear Council Members: On Monday, September 20, 1993, bids were opened for the realignment and reconstruction of 221st Avenue in the northern part of the City. There were a total of four bids. The following table provides a list of the bidders and their bids. 1. 2. 3. 4. S.J. Louis Construction, Inc. Veit and Company, Inc. R.L. Larson Excavating, Inc. Boboszenski & Sons $101,661.85 $112,251.28 $131,567.10 $146,695.35 Since the opening of the bids, City staff has been working with the two landowners in question to review the proposed realignment and to secure the necessary easement documents. We have also been working with the landowners in an attempt to secure Class 5 material to help reduce the total cost of the project. At this point in time we have not yet completed these processes and feel that the low bid, which is slightly over $100,000, is too high to proceed with at this time. We believe that given a little more time to work with the property owners, we will be able to get cooperation from them which should help to reduce the total cost of the project. Therefore, at this point in time, City staff is recommending that all bids be rejected and the project be reconsidered in 1994. I have prepared a draft resolution attached for your consideration which rejects the bids. If you have any questions, I will be at attendance at Monday evening's meetings. Sincerely, MSA, CONSULTING ENGINEERS ~pr~ Terry J. Maurer, P.E. TJM:ds 165-2020.0CT 1/18/93 ClP Meeting 7 of 9 Pages 1993-1997 PROJECTS (From 1990 ClP List) Railroad Drive & 3rd Street _Dodge Avenue Dodge Avenue & 5th Street Railroad Trail West Highway 10 S/W & Street Library Expansion 173rd/175th Street Easements 173rd/175th Street Construction (OTR) WWTP Expansion Old Township Road (OTR-SEE MAP) Possible Projects: 221st 225th 213th Cleveland . Edison Jarvis Naples LAWCON Park Grant Water Tower and Wells Storm Sewer Plan Railroad Parking Lots 3rd & Gates 2nd Liquor Store Medium Size Park Projects e 1/18/93 CIP Meeting 8 of 9 Pages NEW 1993-1997 PROJECTS e Main Street/Highway 10 School Street/Jackson Avenue Intersection School Street/Freeport Avenue Intersection School Street Joplin Avenue Orono Parkway and County Land County Parking Lot Second Ice Arena Evans Avenue (South of Main Street) QSItH L . . PENDING PROJECTS 1/18/93 CIP Meeting 9 of 9 Pages Sidewalk Replacement . Waco Bridge East Highway 10 Sewer, Water al"l.fi=O-tDoga Ein.L~ Community Center Liquor Store Road Dredging Lake Orono Athletic Complex Fire Department Satellite Station Equipment: Sweeper . Grader Sludge Truck Jet Truck Pumper . ~~\~~ e SURFACE WATER MANAGEMENT l(O~~ Annual Fee * 1. Developed Property A B · Single Family Lots 3,200 Lots $38,400 $64,000 . Townhome '1 '1 '1 · Apartment Units '1 '1 '1 . Commercial/Industrial 165 AC 16,500 26,400 · School Property 190 AC 7,600 15,200 · City/County 225 AC 9,000 18,000 2. Undeveloped Property A. Urban Service Area 2,200 AC 26,400 52,800 B. 21h Acre Zone 8,900 AC 35,600 71,200 C. Northerly Portion of City 6,400 AC -0- -0- e D. Gravel Mining 2,600 AC -0- -0- ANNUAL FEE TOTAL I $133,500 $247 600 * Potential Fees A B Single Family Lots $3/UnitlQuarter $5/UnitlQuarter Commercial/Industrial $25/ AC/Quarter $40/ AC/Quarter School Property $10/ AC/Quarter $20/ AC/Quarter City/County Property $10/ AC/Quarter $20/ AC/Quarter Undeveloped Property · Urban Service Area $3/ AC/Quarter $6/ AC/Quarter . 21h Acre Zone $11 AC/Quarter $2/ AC/Quarter · Northerly Portion -0- -0- · Gravel Mining -0- -0- e 069-2104.feb 230-069-70 MEMORANDUM e TO: MAYOR & CITY COUNCIL FROM: PHIL HALS, STREET/PARK SUPT. DATE: FEBRUARY 18, 1994 SUBJECT: CIP OVERLAY PROJECT PETERSON ADDN. The streets in this development were paved in 1978 or 1979 and are in poor condition. I would recommend a two inch thick bituminous overlay that would add to the structural strength of the existing pavement. I believe that there would be 29 benefited properties. The estimated cost for the overlay is $40,500, with City overhead of 10% or $4,050 for a total of $44,550; this total divided by 29 properties would come to a total of $1,536 per lot. e e e MEMORANDUM TO: MAYOR & CITY COUNCIL FROM: PHIL HALS, STREETIP ARK SUPT. DATE: FEBRUARY 18, 1994 SUBJECT: CIP OVERLAY PROJECT GREENHEAD ADDITION The streets in this development are approximately fourteen years old and are in poor condition. I would recommend a two inch thick bituminous overlay that would add a much needed structural strength to the existing pavement. I believe there are 26 parcels that are assessed in this area. e The estimated cost for the overlay is $36,000 with City overhead of 10% or $3,600 for a total of $39,600; this total divided by 26 lots would come to a total of $1,525 per lot. e / / / / I / CNJc:I (}.2 CY3-N33!!l NOI1IOOV ON2 OV3HN33(j~ e e . . e e ., RESOLUTION NO. 94 - A RESOLUTION OF THE CITY OF ELK RIVER A RESOLUTION REQUESTING VARIANCES FROM MINNESOTA DEPARTMENT OF TRANSPORTATION RULES FOR STATE AID OPERATIONS TO ALLOW RECONSTRUCTION OF JACKSON AVENUE USING MUNICIPAL STATE AID TURNBACK FUNDS. WHEREAS, the segment of Jackson Avenue from Trunk Highway 10 to Trunk Highway 169 was reverted from TH 201 (old 169) to the City of Elk River's Municipal State Aid System in September 1987, and WHEREAS, the segment of Jackson Avenue from TH 10 to School Street was reconstructed to a 44 foot urban section in 1988, and WHEREAS, the segment of Jackson Avenue from School Street to TH 169 was overlaid as a temporary measure to improve the driving surface at that time in 1988, and WHEREAS, the City understood in 1988 that Municipal State Aid Tumback Funds could be utilized in the tumback, 1987 to 1997, to further reconstruct Jackson Avenue from School Street to TH 169 once development of the adjacent area occured, and WHEREAS, the City of Elk River has plans to reconstruct Jackson Avenue from School Street to Trunk Highway 169 by lowering the rural road section and constructing an urban road section to meet the growing needs of the community, and WHEREAS, this improvement does not meet the Minnesota Department of Transportation rules for State Aid Operations, Chapter 8820.2900; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota: 1. That the City requests a variance from Minnesota Department of Transportation's, State Aid Operations Rules, Chapter 8820.2900, to allow the use of Municipal State Aid Tumback Funds for the reconstruction of Jackson Avenue from School Street to Trunk Highway 169. 216-150l.feb . . e e f 2. That the City agrees to credit back the Municipal State Aid Tumback Funds spent for the overlay of this road segment in 1988. 3. That the City directs MSA Consulting Engineers to prepare and submit the necessary documents to the State for said variance request. Passed and adopted this 21st day of February, 1994. Henry A. Duitsman, Mayor ATTEST: Sandra A. Thackeray, City Clerk 216-1501.feb