Loading...
8.2. SR 03-21-1994 CIVil ENGlNEEPING ENVIPQNMENT AI MUNiCiPAl PlANNiNG STRUCTURAl _URVEYING TRAFFIC TRANSPO,W;TiON AGENDA ITEM 8.2. March 18, 1994 File: 230-195-20 Honorable Mayor and City Council City of Elk River 13065 Orono Parkway Elk River, MN 55330 RE: DEERFIELD 3RD STORM DRAINAGE IMPROVEMENTS BID AWARD AND CHANGE ORDER NO. 1 Dear Council Members: As you are aware, the storm drainage improvements in the Deerfield 3rd area to relieve the drainage problem on the Poppen property were bid last October. The low bid was submitted by W. B. Miller, Inc., in the amount of $122,307. Since that time, we have been negotiating with Mr. Steve Hartman for an easement to cross his property in Royal Oaks Ridge for the outlet to the storm sewer improvement. Those negotiations have been completed and the result is Change Order No.1, a copy of which is attached. Change Order No. 1 extends the storm sewer pipe across Mr. Hartman I s property outletting to the wetland south of his home. The total increase in cost of this change order is $16,637, for a total project cost of $138,944. In order to proceed with this project, it is necessary to accept the bid and order the execution of the contract withW. B. Miller for the completion of the improvements and to approve Change Order No. 1 to meet the intent of the easement agreement with Mr. Hartman. Attached is a draft resolution which accomplishes these two items. We would recommend City Council adopt the resolution if they desire to proceed with this project. If you have any questions, I will be in attendance at Monday evening's meeting. 1326 Energy Pork Drive Sin cerel y , St. Paul, MN 55108 612-644.4389 Fox: 612.644.9446 .800 Shelard Parkway Minneapolis, MN 55441 612'546-0432 Fox: 612.544.6398 MSA, CONSULTING ENGINEERS ~JlIf~ Terry J. Maurer, P. E. TJM: tp Attachment 230/1 95-1802.mar e e e RESOLUTION 94 - A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION ACCEPTING BID AND AUTHORIZING EXECUTION OF CONTRACT IN THE MATTER OF THE DEERFIELD 3RD STORM DRAINAGE IMPROVEMENT OF 1994 WHEREAS pursuant to Resolution 93-60, competitive bids were solicited and received for the Deerfield 3rd Storm Drainage improvement as set forth in the bid tabulation attached hereto and incorporated herein by this reference; and WHEREAS the City Council has considered the amount of the bids and the responsibility of the bidders and determined that W. B. Miller, Inc., is the lowest responsible bidder; and WHEREAS the City Council has considered Change Order No. 1 to extend the storm sewer pipe in accordance with the Hartman easement agreement; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota: 1. The Mayor and City Administrator are authorized and directed to execute, on behalf of the City, such contract and Change Order No.1 with W. B. Miller, Inc., as is approved by the City Attorney for the completion of the Deerfield 3rd Storm Drainage improvement according to the approved plans and specifications designated in Resolution 93-60. 2. The City Administrator is authorized and directed to forthwith return to all bidders the deposits made with their bids upon execution of the contract above specified. Passed and adopted this 21st day of March, 1994. Henry A. Duitsman, Mayor ATTEST: Sandra A. Thackeray, City Clerk 230/000-1801.mar CHANGE ORDER (Instructions on reverse side) No. 1 PROJECT: Deerfield 3rd Addition Stormwater System Improvements DATE OF ISSUANCE: February 23, 1994 OWNER: City of Elk River (Name, 13065 Orono Parkway Address) Elk River, MN 55330 CONTRACTOR: OWNER's Project No. 230-195-20 W.B. Miller, Inc. 16765 Nutria Street Ramsey, MN 55303 ENGINEER: Maier Stewart & Associates, Inc. 1326 Energy Park Drive St. Paul, MN 55108 CONTRACT FOR: Deerfield 3rd Addition Stormwater System Improvements ENGINEER's Project No. 230-195-20 You are directed to make the following changes in the Contract Documents. Description: Extension of 36" RCP beneath driveway to existing pond. Purpose of Change Order: Eliminate ditch as per property owners request in exchange of easement. Attachments: (List documents supporting change) Revised plan sheet, change order bid schedule, and narrative. CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIME: Original Contract Price Original Contract Time $ 122,307.00 45 days days or date Previous Change Orders No. -- to No. -- Net change from previous Change Orders $ None - 0 - days Contract Price prior to this Change Order Contract Time Prior to this Change Order $ 122,307.00 45 days da s or date Net Increase (DoorEJaGo) of this Change Order Net Increase (Decrease) of this Change Order $ 16,637.00 none days Contract Price with all approved Change Orders Contract Time with all approved Change Orders $ 138,944.00 45 days City of Elk River, MN days or date RECOMMENDED: ------= By ~11~U/~ MSA Cons ng Engineers APPROVED: by by EJCDC No. 1910-8-B (1983 Edition) e 230195c:o.#1 e e e CHANGE ORDER NO.1 DEERFIELD 3RD ADDITION STORMW ATER SYSTEM IMPROVEMENTS February 23, 1994 Change Order No.1 extends the outlet pipe from north of the Hartman property driveway in Royal Oaks Ridge (Lot 11), through lot 12 and into an existing wetland. The new design involves additional 36" RCP, an extra manhole, driveway removal and restoration, a conduit through the driveway embankment for a sprinkler system, and rip-rap. The original design terminated the outlet pipe north of the driveway, with a 42" RCP through the driveway embankment. In exchange for the drainage easement through the Hartman property, the Owner requested a buried pipe rather than a swale-type arrangement. All prices are either unit prices from the original bid or new prices for additional items not in the original bid. Two items, the 36" RCP and 2" Bituminous Driveway, were requested by the Contractor to be modified from the original bid unit price. The cost change is shown below. 36" RCP 2" Bituminous Driveway From $53.00 to $54.00 per linear foot From $8.00 to $12.00 per square yard A permit, dated February 15, 1994, was received from the U.S. Army Corps of Engineers for the work required under the Change Order in the fringe wetland area around the existing pond/wetland. It is understood that the homeowner, Mr. Hartman, will contract independently for the restoration of the area disturbed by the construction. The contractor is obligated to salvage any topsoil and respread it after construction. Costs associated with this Change Order are shown on the attached Change Order cost breakdown. . CHANGE ORDER FOR: DEERFIELD 3RD ADDITION STORMWATER SYSTEM IMPROVEMENTS ELK RIVER, MN (230-195-20) ITEMS ADDED SCHEDULE 3.0 - STORM DRAINAGE 1 36" RCP CLASS III 2 72" DIA. MANHOLE (0'-8' DEPTH) 3 72" DIA. MANHOLE (EX. DEPTH) 4 REMOVE BITUMINOUS DRIVEWAY 5 2" BITUMINOUS DRIVEWAY 6 RIP-RAP LF EA LF SY SY TON 317 1 3 250 250 16 54.00 2,800.00 175.00 2.00 12.00 19.00 17,118.00 2,800.00 525.00 500.00 3,000.00 304.00 ADDED ITEMS TOTAL $24,247.00 ITEMS DELETED e SCHEDULE 3.0 - STORM DRAINAGE 1 42" RCP END SECTION 2 42" RCP 3 * JOINT TIES 4 SCOUR BASIN EA LF EA LS 2 44 38 1 1,500.00 85.00 15.00 300.00 3,000.00 3,740.00 570.00 300.00 DELETED ITEMS TOTAL $7,610.00 * - JOINTS REMAIN TIED ON 30" RCP @ 11.3 % FROM ST A. 1 + 20 TO ST MH 1 ONLY TOTAL BASE BID CHANGE ORDER ADJUSTMENT $122,307.00 $16,637.00 REVISED CONSTRUCTION COST $138,944.00 e