AGENDA ITEM 8.2.
March 18, 1994
File: 230-195-20
Honorable Mayor and City Council
City of Elk River
13065 Orono Parkway
Elk River, MN 55330
RE: DEERFIELD 3RD STORM DRAINAGE IMPROVEMENTS
BID AWARD AND CHANGE ORDER NO. 1
Dear Council Members:
As you are aware, the storm drainage improvements in the Deerfield 3rd area to relieve the
drainage problem on the Poppen property were bid last October. The low bid was submitted
by W. B. Miller, Inc., in the amount of $122,307. Since that time, we have been
negotiating with Mr. Steve Hartman for an easement to cross his property in Royal Oaks
Ridge for the outlet to the storm sewer improvement. Those negotiations have been
completed and the result is Change Order No.1, a copy of which is attached. Change Order
No. 1 extends the storm sewer pipe across Mr. Hartman I s property outletting to the wetland
south of his home. The total increase in cost of this change order is $16,637, for a total
project cost of $138,944.
In order to proceed with this project, it is necessary to accept the bid and order the execution
of the contract withW. B. Miller for the completion of the improvements and to approve
Change Order No. 1 to meet the intent of the easement agreement with Mr. Hartman.
Attached is a draft resolution which accomplishes these two items. We would recommend
City Council adopt the resolution if they desire to proceed with this project.
If you have any questions, I will be in attendance at Monday evening's meeting.
1326 Energy Pork Drive Sin cerel y ,
St. Paul, MN 55108
612-644.4389
Fox: 612.644.9446
.800 Shelard Parkway
Minneapolis, MN 55441
612'546-0432
Fox: 612.544.6398
MSA, CONSULTING ENGINEERS
~JlIf~
Terry J. Maurer, P. E.
TJM: tp
Attachment
230/1 95-1802.mar
e
e
e
RESOLUTION 94 -
A RESOLUTION FOR THE CITY OF ELK RIVER
A RESOLUTION ACCEPTING BID AND AUTHORIZING
EXECUTION OF CONTRACT IN THE MATTER OF THE
DEERFIELD 3RD STORM DRAINAGE IMPROVEMENT OF 1994
WHEREAS pursuant to Resolution 93-60, competitive bids were solicited and received for the
Deerfield 3rd Storm Drainage improvement as set forth in the bid tabulation
attached hereto and incorporated herein by this reference; and
WHEREAS the City Council has considered the amount of the bids and the responsibility of the
bidders and determined that W. B. Miller, Inc., is the lowest responsible bidder;
and
WHEREAS the City Council has considered Change Order No. 1 to extend the storm sewer
pipe in accordance with the Hartman easement agreement;
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River,
Minnesota:
1. The Mayor and City Administrator are authorized and directed to execute, on behalf of the
City, such contract and Change Order No.1 with W. B. Miller, Inc., as is approved by
the City Attorney for the completion of the Deerfield 3rd Storm Drainage improvement
according to the approved plans and specifications designated in Resolution 93-60.
2. The City Administrator is authorized and directed to forthwith return to all bidders the
deposits made with their bids upon execution of the contract above specified.
Passed and adopted this 21st day of March, 1994.
Henry A. Duitsman, Mayor
ATTEST:
Sandra A. Thackeray, City Clerk
230/000-1801.mar
CHANGE ORDER
(Instructions on reverse side)
No.
1
PROJECT:
Deerfield 3rd Addition
Stormwater System Improvements
DATE OF ISSUANCE: February 23, 1994
OWNER: City of Elk River
(Name, 13065 Orono Parkway
Address) Elk River, MN 55330
CONTRACTOR:
OWNER's Project No.
230-195-20
W.B. Miller, Inc.
16765 Nutria Street
Ramsey, MN 55303
ENGINEER: Maier Stewart & Associates, Inc.
1326 Energy Park Drive
St. Paul, MN 55108
CONTRACT FOR:
Deerfield 3rd Addition
Stormwater System Improvements
ENGINEER's Project No.
230-195-20
You are directed to make the following changes in the Contract Documents.
Description:
Extension of 36" RCP beneath driveway to existing pond.
Purpose of Change Order:
Eliminate ditch as per property owners request in exchange of easement.
Attachments: (List documents supporting change)
Revised plan sheet, change order bid schedule, and narrative.
CHANGE IN CONTRACT PRICE:
CHANGE IN CONTRACT TIME:
Original Contract Price
Original Contract Time
$
122,307.00
45 days
days or date
Previous Change Orders No. -- to No. --
Net change from previous Change Orders
$
None
- 0 -
days
Contract Price prior to this Change Order
Contract Time Prior to this Change Order
$
122,307.00
45 days
da s or date
Net Increase (DoorEJaGo) of this Change Order
Net Increase (Decrease) of this Change Order
$
16,637.00
none
days
Contract Price with all approved Change Orders
Contract Time with all approved Change Orders
$
138,944.00
45 days
City of Elk River, MN
days or date
RECOMMENDED:
------=
By ~11~U/~
MSA Cons ng Engineers
APPROVED:
by
by
EJCDC No. 1910-8-B (1983
Edition)
e
230195c:o.#1
e
e
e
CHANGE ORDER NO.1
DEERFIELD 3RD ADDITION STORMW ATER SYSTEM IMPROVEMENTS
February 23, 1994
Change Order No.1 extends the outlet pipe from north of the Hartman property driveway
in Royal Oaks Ridge (Lot 11), through lot 12 and into an existing wetland. The new design
involves additional 36" RCP, an extra manhole, driveway removal and restoration, a conduit
through the driveway embankment for a sprinkler system, and rip-rap.
The original design terminated the outlet pipe north of the driveway, with a 42" RCP
through the driveway embankment. In exchange for the drainage easement through the Hartman
property, the Owner requested a buried pipe rather than a swale-type arrangement.
All prices are either unit prices from the original bid or new prices for additional items not
in the original bid. Two items, the 36" RCP and 2" Bituminous Driveway, were requested by the
Contractor to be modified from the original bid unit price. The cost change is shown below.
36" RCP
2" Bituminous Driveway
From $53.00 to $54.00 per linear foot
From $8.00 to $12.00 per square yard
A permit, dated February 15, 1994, was received from the U.S. Army Corps of Engineers
for the work required under the Change Order in the fringe wetland area around the existing
pond/wetland.
It is understood that the homeowner, Mr. Hartman, will contract independently for the
restoration of the area disturbed by the construction. The contractor is obligated to salvage any
topsoil and respread it after construction.
Costs associated with this Change Order are shown on the attached Change Order cost
breakdown.
.
CHANGE ORDER FOR:
DEERFIELD 3RD ADDITION STORMWATER SYSTEM IMPROVEMENTS
ELK RIVER, MN (230-195-20)
ITEMS ADDED
SCHEDULE 3.0 - STORM DRAINAGE
1 36" RCP CLASS III
2 72" DIA. MANHOLE (0'-8' DEPTH)
3 72" DIA. MANHOLE (EX. DEPTH)
4 REMOVE BITUMINOUS DRIVEWAY
5 2" BITUMINOUS DRIVEWAY
6 RIP-RAP
LF
EA
LF
SY
SY
TON
317
1
3
250
250
16
54.00
2,800.00
175.00
2.00
12.00
19.00
17,118.00
2,800.00
525.00
500.00
3,000.00
304.00
ADDED ITEMS TOTAL
$24,247.00
ITEMS DELETED
e SCHEDULE 3.0 - STORM DRAINAGE
1 42" RCP END SECTION
2 42" RCP
3 * JOINT TIES
4 SCOUR BASIN
EA
LF
EA
LS
2
44
38
1
1,500.00
85.00
15.00
300.00
3,000.00
3,740.00
570.00
300.00
DELETED ITEMS TOTAL
$7,610.00
* - JOINTS REMAIN TIED ON 30" RCP @ 11.3 % FROM ST A. 1 + 20 TO ST MH 1 ONLY
TOTAL BASE BID
CHANGE ORDER ADJUSTMENT
$122,307.00
$16,637.00
REVISED CONSTRUCTION COST
$138,944.00